Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Date: December 13, 2011 Contractor: Pugetsoundsolar Applicant: Pugetsoundsolar | Permit type: Sign/billboard/awning | Permit status: Permit closed | Completion date: November 15, 2012 | Expiration date: June 13, 2013 | Current use: Commercial | Permit id: 6304737 | |||||
SCORE 99 10 James St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 41(kw) solar photovoltaic system will be installed on roof of property. 12 6 17 mwb: renewal Date: November 23, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 6, 2017 | Expiration date: November 23, 2018 | Current use: Commercial | Permit id: 6568547 | |||||
SCORE 99 4326 S Morgan St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9(kw) solar photovoltaic system will be installed on roof of residence. Date: December 1, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 11, 2017 | Expiration date: December 1, 2018 | Current use: Single family / duplex | Permit id: 6633131 | |||||
SCORE 99 1118 Nw 50th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 6. 72 kw solar system on roof of property. 08 16 17 cep; system size reduced to 2. 88 kw. Date: May 17, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 11, 2017 | Expiration date: May 17, 2018 | Current use: Commercial | Permit id: 6597754 | |||||
SCORE 99 5611 17th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 2(kw) solar photovoltaic system will be installed on roof of residence. Date: April 26, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 21, 2017 | Expiration date: April 26, 2018 | Current use: Commercial | Permit id: 6593803 | |||||
SCORE 99 6516 12th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 8 kw solar photovoltaic system on theroof of the building. 11 28 17 jk waived plan review because the total ac output power of the system is less than or equal to 7,7 watts. Date: November 21, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: November 21, 2018 | Current use: Commercial | Permit id: 6631558 | |||||
SCORE 99 7006 43rd Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 4(kw) solar photovoltaic system will be installed on roof of residence. Date: November 29, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: November 29, 2018 | Current use: Single family / duplex | Permit id: 6632636 | |||||
SCORE 99 1518 W Dravus St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 35(kw) solar photovoltaic system will be installed on roof of property. 11 28 2017 ym renewed Date: November 23, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: November 23, 2018 | Current use: Commercial | Permit id: 6568694 | |||||
SCORE 99 731 N 72nd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 57kw photovoltaic system and interconnection to scl grid. Date: December 12, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: December 12, 2018 | Current use: Single family / duplex | Permit id: 6634777 | |||||
SCORE 99 11021 Durland Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 0kw solar photovoltaic system on roof of residence. System components include (30) itek energy 300w modules & (15) aps yc-500a microinverters. Date: December 6, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 13, 2017 | Expiration date: December 6, 2018 | Current use: Single family / duplex | Permit id: 6633909 | |||||
SCORE 99 52 20th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 28 kw solar photovoltaic system on roof of residence. Date: October 24, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 13, 2017 | Expiration date: October 24, 2018 | Current use: Single family / duplex | Permit id: 6626328 | |||||
SCORE 99 5007 2nd Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 12kw solar photovoltaic system will be installed on roof of property. Date: December 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: December 13, 2018 | Current use: Single family / duplex | Permit id: 6635067 | |||||
SCORE 99 1715 12th Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 1. 45kw photovoltaic system on roof of property. Date: September 11, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2017 | Expiration date: September 11, 2018 | Current use: Commercial | Permit id: 6617978 | |||||
SCORE 99 13332 23rd Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 88(kw) solar photovoltaic system will be installed on roof of property. Date: November 29, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2017 | Expiration date: November 29, 2018 | Current use: Single family / duplex | Permit id: 6632608 | |||||
SCORE 99 4619 Ne 73rd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding two solar photovoltiac modules to existing system. 12 15 17 jk approved one-line diagram. Date: December 14, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: December 14, 2018 | Current use: Single family / duplex | Permit id: 6635381 | |||||
SCORE 99 6536 1st Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6kw solar photovoltaic system on roof of residence. System components include ( itek energy 280w modules & (1) itek pvi-5200tl string inverter. Date: December 1, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 7, 2016 | Expiration date: November 30, 2016 | Current use: Single family / duplex | Permit id: 6507400 | |||||
SCORE 99 6717 Roosevelt Way Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 4. 34kw photovoltaic system on roof of property and interconnected to house panel Date: September 26, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: September 26, 2018 | Current use: Commercial | Permit id: 6620841 | |||||
SCORE 99 3631b Wallingford Ave N Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: November 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 5, 2015 | Expiration date: November 1, 2016 | Current use: Single family / duplex | Permit id: 6503109 | |||||
SCORE 99 2026 E Madison St Seattle Wa 2 25 2016 - cancelled customer log #16-281[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 25(kw) solar photovoltaic system will be installed on roof of residence. Date: February 22, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: February 21, 2017 | Current use: Commercial | Permit id: 6520181 | |||||
SCORE 99 1706 Nw 56th St Seattle Wa 9-21-17 bz pv sytem one-line appproved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 55kw solar system on roof of property. Date: August 24, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: August 24, 2018 | Current use: Commercial | Permit id: 6615194 | |||||
SCORE 99 Date: July 30, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 31, 2015 | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487311 | |||||
SCORE 99 Date: June 8, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 30, 2017 | Expiration date: June 8, 2018 | Current use: Commercial | Permit id: 6601535 | |||||
SCORE 99 38 Woodland Park Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6 watt solar photo-voltaic system will be installed on roof of property. Date: January 12, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 16, 2016 | Expiration date: January 11, 2017 | Current use: Commercial | Permit id: 6513264 | |||||
SCORE 99 1057 Ne 97th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 11. 12kw solar pv system on roof of residence. Date: March 17, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 25, 2016 | Expiration date: March 17, 2017 | Current use: Single family / duplex | Permit id: 6524601 | |||||
SCORE 99 1902 35th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 6(kw) solar photovoltaic system will be installed on roof of residence. 1-17-17 bz approved plans. Date: January 3, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 8, 2017 | Expiration date: January 3, 2018 | Current use: Single family / duplex | Permit id: 6574147 | |||||
SCORE 99 11021 Durland Ave Ne Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: April 13, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 15, 2015 | Expiration date: April 12, 2016 | Current use: Single family / duplex | Permit id: 6468587 | |||||
SCORE 99 3824 Ne 94th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96 kw solar photovoltaic system on roof of residence. Main panel upgrade. Date: June 18, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 3, 2015 | Expiration date: June 17, 2016 | Current use: Single family / duplex | Permit id: 6480002 | |||||
SCORE 99 3618 Meridian Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 0(kw) solar photovoltaic system will be installed on roof of residence. Date: July 20, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 20, 2015 | Expiration date: July 19, 2016 | Current use: Single family / duplex | Permit id: 6485283 | |||||
SCORE 99 1116 Sw Holden St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 41kw solar photovoltaic system on roof of building. System components include (18) itek energy 245w modules & (1) solectria pvi-40 string inverter. Date: March 9, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 28, 2015 | Expiration date: March 8, 2016 | Current use: Commercial | Permit id: 6463112 | |||||
SCORE 99 25 Magnolia Blvd W Seattle Wa An electric vehicle charging station will be installed on roof of property. Date: June 1, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: June 1, 2018 | Current use: Single family / duplex | Permit id: 6600213 | |||||
SCORE 99 3718 37th Ave S Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: January 27, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 29, 2015 | Expiration date: January 27, 2016 | Current use: Single family / duplex | Permit id: 6456396 | |||||
SCORE 99 Date: December 3, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 11, 2016 | Expiration date: December 2, 2016 | Current use: Single family / duplex | Permit id: 6507865 | |||||
SCORE 99 836 Ne 67th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 1. 45kw solar photovoltaic system on roof. Date: February 2, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 24, 2017 | Expiration date: February 2, 2018 | Current use: Commercial | Permit id: 6579321 | |||||
SCORE 99 8426 9th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 57kw solar photovoltaic system on roof of residence. System components include (13) itek 275w modules & (1) eltek theia he-t 38 ul string inverter. Date: February 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 11, 2015 | Expiration date: February 2, 2016 | Current use: Single family / duplex | Permit id: 6457518 | |||||
SCORE 99 3236 S Edmunds St Seattle Wa An electrical rough-in will be performed in electrical room and residence for possible future solar photovoltaic system. Date: December 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2015 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508308 | |||||
SCORE 99 5608 Latona Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 12 kw solar photovoltaic system on roof of residence. Main electrical panel upgrade. Evse circuit installation. Additional amp circuit installation Date: June 1, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2015 | Expiration date: May 31, 2016 | Current use: Single family / duplex | Permit id: 6476814 | |||||
SCORE 99 7503 Fairway Dr Ne Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: February 15, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 17, 2016 | Expiration date: February 14, 2017 | Current use: Single family / duplex | Permit id: 6518982 | |||||
SCORE 99 2648 S Hudson St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 7 kw solar photovoltaic system on roof of residence. 1-17-17 bz approved plans. Date: January 5, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2017 | Expiration date: January 5, 2018 | Current use: Single family / duplex | Permit id: 6574642 | |||||
SCORE 99 317 37th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 64 kw solar photovoltaic system on roof of residence. Date: October 11, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: October 11, 2018 | Current use: Single family / duplex | Permit id: 6623864 | |||||
SCORE 99 9511 31st Ave Nw Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. Date: August 9, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 11, 2017 | Expiration date: August 9, 2018 | Current use: Single family / duplex | Permit id: 6612410 | |||||
SCORE 99 1538 N 128th St Seattle Wa Installation of a electric vehicle charging station will be installed om electrical room and residence. Date: March 10, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 1, 2016 | Expiration date: March 10, 2017 | Current use: Single family / duplex | Permit id: 6523290 | |||||
SCORE 99 1217 39th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw solar photovoltaic system on roof of residence. System components include (16) itek 280w modules & (8) blue frog aps yc-5 microinverters. 4-29-15 ah. Added (1) 30-50a charging station Date: April 28, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 13, 2015 | Expiration date: April 27, 2016 | Current use: Single family / duplex | Permit id: 6471303 | |||||
SCORE 99 1508 24th Ave Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. Date: December 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 24, 2016 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508291 | |||||
SCORE 99 2051 E Madison St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 05 solar photovoltaic system will be installed on roof of residence. Date: September 3, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 4, 2016 | Expiration date: September 2, 2016 | Current use: Commercial | Permit id: 6493149 | |||||
SCORE 99 334 Ne 55th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 64kw solar photovoltaic system on roof of residence. System components include (13) itek energy 280w modules & (1) pvi-3800tl string inverter by itek. Date: January 5, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 10, 2016 | Expiration date: January 4, 2017 | Current use: Single family / duplex | Permit id: 6512080 | |||||
SCORE 99 1107 38th Ave Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: March 28, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2017 | Expiration date: March 28, 2018 | Current use: Single family / duplex | Permit id: 6588670 | |||||
SCORE 99 2648 Nw 96th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 3. 42 kw solar photovoltaic system on of roof of residence. Date: February 25, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 3, 2016 | Expiration date: February 24, 2017 | Current use: Single family / duplex | Permit id: 6520843 | |||||
SCORE 99 3901 S Edmunds St Seattle Wa 3 31 2015 - cancelled customer log #15-537 an electrical rough-in will be performed for possible future solar photovoltaic system in electrical room and residence. Date: March 26, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: March 25, 2016 | Current use: Single family / duplex | Permit id: 6465874 | |||||
SCORE 99 8734 20th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 84(kw) solar photovoltaic system will be installed on roof of residence. Date: August 19, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 22, 2015 | Expiration date: August 18, 2016 | Current use: Single family / duplex | Permit id: 6490714 | |||||
SCORE 99 Date: January 28, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2016 | Expiration date: January 27, 2017 | Current use: Single family / duplex | Permit id: 6516150 | |||||
SCORE 99 42 S Othello St Seattle Wa Cancel per customer log 16-06[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 19. 2(kw) solar photovoltaic system will be installed on roof of building. Date: December 22, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: December 21, 2016 | Current use: Commercial | Permit id: 6510843 | |||||
SCORE 99 3608 Nw 65th Ct Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 5 kw solar photovoltaic system to previously existing 5. 5 kw photovoltaic system. Additional 1 amp sub-panel to be installed. Date: June 1, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 22, 2015 | Expiration date: May 31, 2016 | Current use: Single family / duplex | Permit id: 6476785 | |||||
SCORE 99 11825 Seola Beach Dr Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. (16) lg 315w modules & (16) enphase m2 microinverters. Date: March 22, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2016 | Expiration date: March 22, 2017 | Current use: Single family / duplex | Permit id: 6525263 | |||||
SCORE 99 4242 Ne 89th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 28 solar photovoltaic system on roof of residence. Date: July 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 13, 2015 | Expiration date: July 1, 2016 | Current use: Single family / duplex | Permit id: 6482546 | |||||
SCORE 99 44 Sw Alaska St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 83(kw) solar photovoltaic system will be installed on roof of residence. Date: March 14, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 4, 2016 | Expiration date: March 14, 2017 | Current use: Single family / duplex | Permit id: 6523835 | |||||
SCORE 99 8015 Greenwood Ave N Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and property. Date: August 22, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 25, 2017 | Expiration date: August 22, 2017 | Current use: Single family / duplex | Permit id: 6552760 | |||||
SCORE 99 3847 24th Ave W Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: January 18, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 12, 2017 | Expiration date: January 18, 2018 | Current use: Single family / duplex | Permit id: 6576727 | |||||
SCORE 99 3709 Sw Trenton St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 54 kw solar photovoltaic system on roof of residence. Installation of sub panel. Date: December 9, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 22, 2016 | Expiration date: December 9, 2017 | Current use: Single family / duplex | Permit id: 6570904 | |||||
SCORE 99 5623 36th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 0kw solar photovoltaic system on roof of residence. (25) itek 280w modules & (1) pvi-6600tl. Service and panel upgrade. Electrical plans have been uploaded Date: February 11, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 24, 2015 | Expiration date: February 11, 2016 | Current use: Single family / duplex | Permit id: 6459100 | |||||
SCORE 99 5063 Harold Pl Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 865kw solar photovoltaic system on roof of residence. System components include (17) sunpower 345w modules & (17) abb 300w hv microinverters. Date: December 1, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2016 | Expiration date: November 30, 2016 | Current use: Single family / duplex | Permit id: 6507293 | |||||
SCORE 99 2708 Ne 82nd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 98kw solar photovoltaic system on roof of residence. System components include (21) itek energy 285w modules & (10. 5) blue frog yc-500a miw microinverters. Date: December 22, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 3, 2016 | Expiration date: December 21, 2016 | Current use: Single family / duplex | Permit id: 6510863 | |||||
SCORE 99 4833 55th Ave S Seattle Wa 6-12-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 8 kw solar photovoltaic system on roof of residence. Date: May 30, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 21, 2017 | Expiration date: May 30, 2018 | Current use: Single family / duplex | Permit id: 6599741 | |||||
SCORE 99 2614 S Ferdinand St Seattle Wa Installation of a electric vehicle charging station and additional circuit will be installed in electrical room and residence. Date: December 16, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 19, 2016 | Expiration date: December 16, 2017 | Current use: Single family / duplex | Permit id: 6572050 | |||||
SCORE 99 1212 E Harrison St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 22kw solar system on the roof of property. Date: July 10, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: July 10, 2018 | Current use: Commercial | Permit id: 6606800 | |||||
SCORE 99 55 Sw Winthrop St Seattle Wa 8-28-17 bz plan review waived 2017 threshold 7. 7kva. Micro inverter limits output to below7. 7kva. Final approival subject to field inspector.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4(kw) solar photovoltiac system will be installed on roof of property. Date: August 22, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2017 | Expiration date: August 22, 2018 | Current use: Single family / duplex | Permit id: 6614728 | |||||
SCORE 99 6488 48th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 05kw solar photovoltaic system on roof of residence. System components include (22) itek energy 275w modules & (1) itek pvi-5200tl string inverter. Date: February 5, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 26, 2015 | Expiration date: February 5, 2016 | Current use: Single family / duplex | Permit id: 6457989 | |||||
SCORE 99 6237 44th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 12kw solar photovoltaic system on roof of residence. System components include (32) itek energy 285w modules & (1) itek pvi-7600tl string inverter. Date: November 5, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 17, 2015 | Expiration date: November 4, 2016 | Current use: Single family / duplex | Permit id: 6503594 | |||||
SCORE 99 10036 59th Ave S Seattle Wa 8-14-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 6(kw) solar photovoltaic system will be installed on roof of property. Date: August 1, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 31, 2017 | Expiration date: August 1, 2018 | Current use: Single family / duplex | Permit id: 6611068 | |||||
SCORE 99 77 California Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16(kw) solar photovoltaic system will be installed on roof of residence. Date: March 5, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2015 | Expiration date: March 4, 2016 | Current use: Single family / duplex | Permit id: 6462643 | |||||
SCORE 99 4815 38th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9(kw) solar photovoltaic system will be installed on roof of property. Also, a panel upgrade will be performed in electrical room. Date: August 9, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 17, 2017 | Expiration date: August 9, 2018 | Current use: Single family / duplex | Permit id: 6612619 | |||||
SCORE 99 75 15th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 31kw photovoltaic system and interconnection to house panel. Date: September 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618753 | |||||
SCORE 99 6729 17th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw solar photovoltaic system on roof of residence. System components include (16) itek energy 280w modules & (1) itek pvi-5200tl string inverter. Date: April 23, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 26, 2015 | Expiration date: April 22, 2016 | Current use: Single family / duplex | Permit id: 6470601 | |||||
SCORE 99 4335 2nd Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 64kw solar photovoltaic system on roof of residence. System components include (13) itek energy 280w modules & (6. 5) blue frog yc-5 miw dual input microinverters. Date: January 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 26, 2015 | Expiration date: January 16, 2016 | Current use: Single family / duplex | Permit id: 6455113 | |||||
SCORE 99 305 25th Ave E Seattle Wa 12 8 2016 - cancelled customer log #16-1779 an electrical rough-in will be done for possible future solar photovoltaic system. Date: September 27, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: September 27, 2017 | Current use: Single family / duplex | Permit id: 6558750 | |||||
SCORE 99 Date: September 1, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 7, 2016 | Expiration date: September 1, 2017 | Current use: Single family / duplex | Permit id: 6554603 | |||||
SCORE 99 Date: April 24, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: April 24, 2018 | Current use: Single family / duplex | Permit id: 6593156 | |||||
SCORE 99 5727 29th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 64kw solar photovoltaic system on roof of residence. System components include (13) itek 280w modules & (1) pvi-3800tl string inverter. Date: April 21, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 5, 2015 | Expiration date: April 20, 2016 | Current use: Single family / duplex | Permit id: 6469911 | |||||
SCORE 99 3242 36th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 11. 2 kw solar photovoltaic system on roof of residence. System components include (40) itek 280w modules, (1) itek pvi-7600tl & (1) itek theia 2. 9 he-t ul string inverters. Date: March 4, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 15, 2015 | Expiration date: March 3, 2016 | Current use: Single family / duplex | Permit id: 6462448 | |||||
SCORE 99 6538 52nd Ave Ne Seattle Wa 3 15 2016 - cancelled customer log #16-370[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 96 kw solar photovoltaic system on roof of residence Date: August 20, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: August 19, 2016 | Current use: Single family / duplex | Permit id: 6490922 | |||||
SCORE 99 7305 34th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 4 kw solar photovoltaic system on roof of residence. Date: January 17, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: January 17, 2018 | Current use: Single family / duplex | Permit id: 6576412 | |||||
SCORE 99 Date: September 27, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 30, 2016 | Expiration date: September 27, 2017 | Current use: Single family / duplex | Permit id: 6558675 | |||||
SCORE 99 727 N 70th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 64(kw) solar photovoltaic system will be installed on roof of residence. Date: June 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 16, 2015 | Expiration date: June 14, 2016 | Current use: Single family / duplex | Permit id: 6479262 | |||||
SCORE 99 1427 11th Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of solarworld 2 watt modules and a centralized sma inverter Date: October 14, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2016 | Expiration date: October 13, 2016 | Current use: Commercial | Permit id: 6499836 | |||||
SCORE 99 2446 Lorentz Pl N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 5kw solar photovoltaic system on roof of sfr. System components include (25) itek energy 300w modules & (13) blue frog yc-500miw dual-input microinverters. 2-13-17 bz approved plans. Date: January 24, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 6, 2017 | Expiration date: January 24, 2018 | Current use: Single family / duplex | Permit id: 6577827 | |||||
SCORE 99 7623 39th Ave S Seattle Wa Installation of a electric vehicle will be installed in electrical room and residence. Date: April 25, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 23, 2017 | Expiration date: April 25, 2018 | Current use: Single family / duplex | Permit id: 6593627 | |||||
SCORE 99 30 Nw 63rd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 245kw solar photovoltaic system on roof of residence. System components include (21) sunpower 345w modules w solaredge dc optimizers & (1) solaredge se6000a-us string inverter. 3 16 16 jk approved pv plans. Date: March 10, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2016 | Expiration date: March 10, 2017 | Current use: Single family / duplex | Permit id: 6523281 | |||||
SCORE 99 2752 44th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 84kw solar photovoltaic system on roof of residence. System components include (24) itek 280w modules & (1) pvi-6600tl string inverter by itek. Date: May 21, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 1, 2015 | Expiration date: May 20, 2016 | Current use: Single family / duplex | Permit id: 6475442 | |||||
SCORE 99 322 21st Ave E Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. Date: April 5, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 7, 2017 | Expiration date: April 5, 2018 | Current use: Single family / duplex | Permit id: 6590038 | |||||
SCORE 99 1926 41st Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 36kw solar photovoltaic system on roof of residence. System components include (12) itek energy 280w modules & (1) eltek theia 2. 9kw string inverter. System has previously been roughed in. Date: January 20, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 28, 2015 | Expiration date: January 20, 2016 | Current use: Single family / duplex | Permit id: 6455355 | |||||
SCORE 99 11354 Durland Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 651kw solar photovoltaic system on roof of residence. Panel upgrade qo 225a buss bar. Date: January 26, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 3, 2015 | Expiration date: January 26, 2016 | Current use: Single family / duplex | Permit id: 6456276 | |||||
SCORE 99 4212 Ne 110th St Seattle Wa 10-2-17 bz pv system review waived under 2017 threshold 7. 7kva final subject to field inspectors approval.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9(kw) solar photovoltaic system will be installed on roof of residence. Date: September 26, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 10, 2017 | Expiration date: September 26, 2018 | Current use: Single family / duplex | Permit id: 6620842 | |||||
SCORE 99 3437 Nw 62nd St Seattle Wa 8-28-17 bz plan review waived 2017 threshold 7. 7kva. Micro inverter limits output to below7. 7kva. Final approval subject to field inspector.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 2 kw solar photovoltaic system on roof of residence. Date: August 25, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 7, 2017 | Expiration date: August 25, 2018 | Current use: Single family / duplex | Permit id: 6615389 | |||||
SCORE 99 1217 39th Ave E Seattle Wa Installation of a receptacle for a electric vehicle charging station will be installed in electrical room and residence. Date: August 9, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 23, 2016 | Expiration date: August 9, 2017 | Current use: Single family / duplex | Permit id: 6550562 | |||||
SCORE 99 4743 45th Ave Ne Seattle Wa 10-2-17 bz pv system review waived under 2017 threshold 7. 7kva final subject to field inspectors approval.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 28(kw) solar photovoltaic system will be installed in roof of residence. Date: September 28, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 5, 2017 | Expiration date: September 28, 2018 | Current use: Single family / duplex | Permit id: 6621434 | |||||
SCORE 99 2816 31st Ave S Seattle Wa Cancel per customer log 15-1656 installation of a electric vehicle charging station will be performed in electrical room and residence. Date: October 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: October 1, 2016 | Current use: Single family / duplex | Permit id: 6497922 | |||||
SCORE 99 4749 35th Ave S Seattle Wa An electrical rough-in will be performed for possible future solar photovotaic system. Date: December 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 15, 2015 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508340 | |||||
SCORE 99 Date: March 15, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 28, 2017 | Expiration date: March 15, 2018 | Current use: Single family / duplex | Permit id: 6586318 | |||||
SCORE 99 6517 38th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48(kw) solar photovoltaic system will be installed on roof of residence. Array will consist of (16) itek energy 280w modules and (1) itek energy pvi3800-tl string inverter. Date: May 6, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 26, 2015 | Expiration date: May 5, 2016 | Current use: Single family / duplex | Permit id: 6472659 | |||||
SCORE 99 1005 Nw 122nd St Seattle Wa Installation of a electric vehicle charging station will be performed a residence. Date: September 27, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 29, 2016 | Expiration date: September 27, 2017 | Current use: Single family / duplex | Permit id: 6558671 | |||||
SCORE 99 4453 47th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 795kw solar photovoltaic system on roof of sfr. System components include (19) itek energy 305w modules & (10) blue frog yc-500a miw dual-input microinverters. Date: April 11, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 27, 2017 | Expiration date: April 11, 2018 | Current use: Single family / duplex | Permit id: 6591029 | |||||
SCORE 99 2335 West Viewmont Way W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 28 kw solar photovoltaic system on roof of residence. 5 25 16 jk approved plans Date: February 17, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 2, 2016 | Expiration date: February 16, 2017 | Current use: Single family / duplex | Permit id: 6519446 | |||||
SCORE 99 92 Cyrus Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 405kw solar photovoltaic system on roof of sfr. Components include (33) itek 285w modules & (1) itek pvi-7600tl string inverter. Date: April 13, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: April 13, 2017 | Current use: Single family / duplex | Permit id: 6529197 | |||||
SCORE 99 2312 29th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 4 kw solar photovoltaic system on roof of residence. 10 10 17 jk approved plans. Date: October 4, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 25, 2017 | Expiration date: October 4, 2018 | Current use: Single family / duplex | Permit id: 6622631 | |||||
SCORE 99 15 Ne 62nd St Seattle Wa An electrical rough-in will done for possible future solar photovoltaic system. Date: January 26, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 14, 2017 | Expiration date: January 26, 2018 | Current use: Single family / duplex | Permit id: 6578240 | |||||
SCORE 99 3028 47th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9kw solar photovoltaic system on roof of residence. System components include (30) solarworld 300w modules & (1) fronius primo 7. 6 string inverter. 9 21 16 jk approved plans. 9 22 16 jk approved revised plans. Date: September 9, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 27, 2016 | Expiration date: September 9, 2017 | Current use: Single family / duplex | Permit id: 6555728 | |||||
SCORE 99 3237a California Ave Sw Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. This will be done in electrical room and residence. Date: March 26, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 1, 2015 | Expiration date: March 25, 2016 | Current use: Single family / duplex | Permit id: 6465953 | |||||
SCORE 99 10021 46th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16 kw solar photovoltaic system on the roof of residence Date: June 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 8, 2015 | Expiration date: June 14, 2016 | Current use: Single family / duplex | Permit id: 6479301 | |||||
SCORE 99 1506 Nw 61st St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of grid tied 1. 18kw solar system on roof Date: January 16, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 29, 2017 | Expiration date: January 16, 2018 | Current use: Multifamily | Permit id: 6576207 | |||||
SCORE 99 4417 Corliss Ave N Seattle Wa Installation of a electric vehicle charging station will be performed in electrical and residence. Date: July 23, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 8, 2015 | Expiration date: July 22, 2016 | Current use: Single family / duplex | Permit id: 6486137 | |||||
SCORE 99 6 32nd Ave Seattle Wa 10-24-17 bz waived plan review under 2017 7. 7kva threshold based on inverter output[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 625 kw solar photovoltaic system on roof of residence. Date: October 18, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 13, 2017 | Expiration date: October 18, 2018 | Current use: Single family / duplex | Permit id: 6624948 | |||||
SCORE 99 6825 52nd Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 41 kw solar photovoltaic system on roof of residence. 6 2 16 jk approved plans. 6 28 16 jk approved revised plans to add (3) 285 watt modules.. Date: May 25, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 29, 2016 | Expiration date: May 25, 2017 | Current use: Single family / duplex | Permit id: 6537094 | |||||
SCORE 99 623 Federal Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 24(kw) solar photovoltaic system will be installed on roof of residence. Array will consist of (33) itek 280w modules (1) itek pvi-7600tl string inverter Date: September 22, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 30, 2015 | Expiration date: September 21, 2016 | Current use: Commercial | Permit id: 6496131 | |||||
SCORE 99 2026 E Madison St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 25(kw) solar photovoltaic system will installed on roof of a multi-family dwelling. 10 27 16 jk added revision for review. 10 27 16 jk approved revised plans. 03 09 2017 ndm renewal. Date: February 1, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 5, 2017 | Expiration date: January 31, 2018 | Current use: Commercial | Permit id: 6516598 | |||||
SCORE 99 8041 32nd Ave Nw Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: August 17, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: August 17, 2018 | Current use: Single family / duplex | Permit id: 6613989 | |||||
SCORE 99 Date: September 23, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 26, 2015 | Expiration date: September 22, 2016 | Current use: Institutional | Permit id: 6496248 | |||||
SCORE 99 1818 E Shelby St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 59(kw) solar photovoltaic system will be installed on roof of residence, Date: April 30, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 28, 2015 | Expiration date: April 29, 2016 | Current use: Single family / duplex | Permit id: 6471735 | |||||
SCORE 99 10818 27th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 28 kw solar photovoltaic system on roof of residence. Date: May 25, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2016 | Expiration date: May 25, 2017 | Current use: Single family / duplex | Permit id: 6537081 | |||||
SCORE 99 325 31st Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 55kw solar photovoltaic system on roof of residence. System components include (30) itek energy 285w he modules & (15) blue frog aps yc-500a miw microinverters. Date: April 4, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: April 4, 2017 | Current use: Single family / duplex | Permit id: 6527525 | |||||
SCORE 99 121 N Argyle Pl Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3(kw) solar photovoltaic system will be installed on roof of residence. Date: June 8, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2017 | Expiration date: June 8, 2018 | Current use: Single family / duplex | Permit id: 6601714 | |||||
SCORE 99 801 Ne 75th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] solar pv system modification Date: May 28, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2015 | Expiration date: May 27, 2016 | Current use: Single family / duplex | Permit id: 6476221 | |||||
SCORE 99 Date: June 4, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 9, 2015 | Expiration date: June 3, 2016 | Current use: Single family / duplex | Permit id: 6477591 | |||||
SCORE 99 4454 S Brandon St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] re-routing conduit for existing solar photovoltaic system. Date: September 29, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 8, 2015 | Expiration date: September 28, 2016 | Current use: Single family / duplex | Permit id: 6497200 | |||||
SCORE 99 25 34th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 7 solar photovoltaic system will be installed on roof of residence. Date: July 10, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 21, 2015 | Expiration date: July 9, 2016 | Current use: Institutional | Permit id: 6483783 | |||||
SCORE 99 1 N 47th St Seattle Wa Installation of two electric vehicle charging stations will be installed in electrical room and residence. - 3 21 17 tas; add (1) one 1 to 2 amp feeder. - 3 22 17 sr removed one electric charging station. Date: March 19, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit finaled | Completion date: March 28, 2017 | Expiration date: March 19, 2018 | Current use: Single family / duplex | Permit id: 6586952 | |||||
SCORE 99 625 Hillside Dr E Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and residence. Date: September 12, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 21, 2016 | Expiration date: September 12, 2017 | Current use: Single family / duplex | Permit id: 6555940 | |||||
SCORE 99 4515 36th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 12(kw) solar photovoltaic system will be installed on roof of property. Date: September 8, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 27, 2016 | Expiration date: September 8, 2017 | Current use: Commercial | Permit id: 6555444 | |||||
SCORE 99 5209 1st Ave Nw Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: March 17, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 4, 2016 | Expiration date: March 17, 2017 | Current use: Single family / duplex | Permit id: 6524633 | |||||
SCORE 99 6058 35th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 1kw photovoltaic system on roof and interconnection to house panel. 09 21 17 jk approved plans. Date: September 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618749 | |||||
SCORE 99 4921 24th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16kw solar photovoltaic system on roof of residence. System components include (22) itek 280w modules & (1) pvi-5200tl string inverter. Date: May 4, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 20, 2015 | Expiration date: May 3, 2016 | Current use: Single family / duplex | Permit id: 6472273 | |||||
SCORE 99 7912 Fremont Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 76 kw solar photovoltaic system on roof of residence. Date: January 17, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2017 | Expiration date: January 17, 2018 | Current use: Single family / duplex | Permit id: 6576530 | |||||
SCORE 99 3618 Sw Orchard St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 28 kw solar photovoltaic system on roof of residence. 5 24 16 plans approved. Date: May 5, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2016 | Expiration date: May 5, 2017 | Current use: Single family / duplex | Permit id: 6533199 | |||||
SCORE 99 7755 Highland Park Way Sw Seattle Wa Installation of a electrical vehicle charging station will be performed in electrical room and residence. Date: January 22, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 2, 2015 | Expiration date: January 22, 2016 | Current use: Single family / duplex | Permit id: 6455746 | |||||
SCORE 99 7347 14th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 83kw solar photovoltaic system on roof of sfr. System components include (22) canadian solar 265w modules with (22) solaredge p3 dc optimizers & (1) solaredge se5000a-us string inverter. Date: June 6, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 1, 2016 | Expiration date: June 6, 2017 | Current use: Single family / duplex | Permit id: 6538861 | |||||
SCORE 99 5007 40th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 6(kw) solar photovoltaic system will be installed on roof of residence. Date: September 29, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 10, 2017 | Expiration date: September 29, 2018 | Current use: Single family / duplex | Permit id: 6621741 | |||||
SCORE 99 4914 55th Ave S Seattle Wa An electrical service change from 125a to 200a will be done in electrical room and residence. Date: April 13, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 25, 2016 | Expiration date: April 13, 2017 | Current use: Single family / duplex | Permit id: 6529137 | |||||
SCORE 99 2614 S Ferdinand St Seattle Wa 12 21 2016 - cancelled customer log #16-1841 installation of a electric vehicle charging station will be installed in electrical room and residence. Date: December 7, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: December 7, 2017 | Current use: Single family / duplex | Permit id: 6570390 | |||||
SCORE 99 26 E Denny Way Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and reisidence. Date: May 26, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 29, 2015 | Expiration date: May 25, 2016 | Current use: Single family / duplex | Permit id: 6475868 | |||||
SCORE 99 7701 Lakemont Dr Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 66 kw solar photovoltaic system on roof of residence. Date: June 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 10, 2015 | Expiration date: June 15, 2016 | Current use: Single family / duplex | Permit id: 6479706 | |||||
SCORE 99 1531 Ne 88th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 94(kw) solar photo voltaic system will be installed on roof of residence. Date: September 19, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 25, 2017 | Expiration date: September 19, 2018 | Current use: Single family / duplex | Permit id: 6619602 | |||||
SCORE 99 1922 15th Ave E Seattle Wa Installation of a electric vehicle charging station will be installed on property and residence. Date: October 31, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 4, 2016 | Expiration date: October 31, 2017 | Current use: Single family / duplex | Permit id: 6564695 | |||||
SCORE 99 1942 S Waite St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04 kw solar photovoltaic system on roof of residence. Date: October 28, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 12, 2015 | Expiration date: October 27, 2016 | Current use: Single family / duplex | Permit id: 6502298 | |||||
SCORE 99 1749 Nw 61st St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] (5) module addition to existing solar photovoltaic system. Date: September 23, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 21, 2015 | Expiration date: September 22, 2016 | Current use: Single family / duplex | Permit id: 6496423 | |||||
SCORE 99 589 Occidental Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 1kw solar system on roof of property. 08 15 17 jk approved plans Date: July 10, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: July 10, 2018 | Current use: Commercial | Permit id: 6606808 | |||||
SCORE 99 309 S Cloverdale St Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. This work will done in unit d-38 Date: April 13, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 18, 2015 | Expiration date: April 12, 2016 | Current use: Single family / duplex | Permit id: 6468593 | |||||
SCORE 99 40 Sw Hanford St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 64kw solar photovoltaic system on roof of residence. System components include (13) itek energy 280w modules & (7) aps blue frog yc-500a miw dual input microinverters. Date: February 9, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 11, 2015 | Expiration date: February 9, 2016 | Current use: Single family / duplex | Permit id: 6458572 | |||||
SCORE 99 Date: December 18, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 23, 2015 | Expiration date: December 17, 2016 | Current use: Single family / duplex | Permit id: 6510355 | |||||
SCORE 99 6293 20th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6 solar photovoltaic system will be installed on roof of residence. Date: June 10, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 18, 2015 | Expiration date: June 9, 2016 | Current use: Single family / duplex | Permit id: 6478667 | |||||
SCORE 99 5103 Woodlawn Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 9 kw solar photovoltaic system on roof of residence. Installation of 100a feeder panel. Date: November 16, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 28, 2016 | Expiration date: November 16, 2017 | Current use: Single family / duplex | Permit id: 6567417 | |||||
SCORE 99 7022 12th Ave Nw Seattle Wa 7-27-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 25(kw) solar photovoltaic system will be installed on roof of property. Date: July 25, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 14, 2017 | Expiration date: July 25, 2018 | Current use: Single family / duplex | Permit id: 6609682 | |||||
SCORE 99 6522 42nd Ave S Seattle Wa 3-28-17 bz pv sytem approved 4-18-17 bz rvision deleated [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4kw solar photovoltaic system on roof of residence. Date: March 21, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 19, 2017 | Expiration date: March 21, 2018 | Current use: Single family / duplex | Permit id: 6587408 | |||||
SCORE 99 1418 Nw 65th St Seattle Wa Installation of a 115 kw dc (1 kw ac) solar pv array on the roof of ballard high school, connected to existing electrical switchboard. Value: $182,596 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627803 | |||||
SCORE 99 5124 S Graham St Seattle Wa Installation of a 3. 66 kw solar photovoltaic system on roof of residence. Date: June 2, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 14, 2017 | Expiration date: June 2, 2018 | Current use: Single family / duplex | Permit id: 6600625 | |||||
SCORE 99 3024 Nw 95th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 41 kw solar photovoltaic system on roof of residence. Installation of sub panel Date: November 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 24, 2015 | Expiration date: November 1, 2016 | Current use: Single family / duplex | Permit id: 6503131 | |||||
SCORE 99 5601 22nd Ave Nw Seattle Wa Installation of a 31. 68(kw) solar photovoltaic system will be installed on roof of property Permit type: Electrical | Permit status: Permit closed | Completion date: September 30, 2016 | Expiration date: April 28, 2017 | Current use: Commercial | Permit id: 6528408 | |||||
SCORE 99 Date: July 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 27, 2015 | Expiration date: July 23, 2016 | Current use: Single family / duplex | Permit id: 6486368 | |||||
SCORE 99 5727 30th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 7(kw) solar photovoltaic system will be installed on roof of residence. Date: August 20, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 25, 2017 | Expiration date: August 20, 2018 | Current use: Single family / duplex | Permit id: 6614378 | |||||
SCORE 99 31 S Oregon St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 88 kw solar photovoltaic system on roof of residence. Date: June 17, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 14, 2015 | Expiration date: June 16, 2016 | Current use: Single family / duplex | Permit id: 6479870 | |||||
SCORE 99 4 S Jackson St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 84(kw) solar photovoltaic system will be installed on roof of property. Date: February 22, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 28, 2016 | Expiration date: February 21, 2017 | Current use: Commercial | Permit id: 6520199 | |||||
SCORE 99 4445 33rd Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a solar photovoltaic system on roof of residence. Date: February 11, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 30, 2015 | Expiration date: February 11, 2016 | Current use: Single family / duplex | Permit id: 6459097 | |||||
SCORE 99 Date: February 8, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 12, 2016 | Expiration date: February 7, 2017 | Current use: Single family / duplex | Permit id: 6517966 | |||||
SCORE 99 Date: February 16, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 23, 2017 | Expiration date: February 16, 2018 | Current use: Single family / duplex | Permit id: 6581820 | |||||
SCORE 99 37 E Blaine St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 97kw solar photovoltaic system on roof of sfr. Service upgrade to 200a. 5 20 16 jk approved plans. Date: May 9, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 7, 2016 | Expiration date: May 9, 2017 | Current use: Single family / duplex | Permit id: 6533697 | |||||
SCORE 99 94 California Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96 kw solar photovoltaic system on roof of residence Date: September 10, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 15, 2015 | Expiration date: September 9, 2016 | Current use: Single family / duplex | Permit id: 6494051 | |||||
SCORE 99 1121 30th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96kw solar photovoltaic system on roof of residence. System components include (32) itek 280w modules & (1) pvi-7600tl string inverter. Also new circuit for possible future evse. Date: June 25, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 17, 2015 | Expiration date: June 24, 2016 | Current use: Single family / duplex | Permit id: 6481175 | |||||
SCORE 99 4205 50th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site] an electrical rough-in will be performed for possible future solar photovoltaic system, work will be performed in electrical room and residence. 5 19 15 jle add [1] 7-26kw solar photovoltaic system. Date: April 8, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 4, 2015 | Expiration date: April 7, 2016 | Current use: Single family / duplex | Permit id: 6468135 | |||||
SCORE 99 2109 31st Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 7kw solar photovoltaic system on roof of residence. System components include (28) itek energy 275w modules & (1) pvi-6600tl itek string inverter. Date: December 29, 2014 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 20, 2015 | Expiration date: December 29, 2015 | Current use: Single family / duplex | Permit id: 6452525 | |||||
SCORE 99 8 Dexter Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 25. 51 solar photovoltaic system will be installed on roof of residence. Date: July 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: July 6, 2016 | Current use: Commercial | Permit id: 6482875 | |||||
SCORE 99 3212 37th Ave S Seattle Wa Alteration to main electrical panel (permit was not pulled when panel was originally installed). Date: September 25, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 26, 2017 | Expiration date: September 25, 2018 | Current use: Single family / duplex | Permit id: 6620721 | |||||
SCORE 99 4531b Rainier Ave S Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system Date: July 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 18, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6483032 | |||||
SCORE 99 126 Blakely Pl Nw Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: April 8, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 9, 2015 | Expiration date: April 7, 2016 | Current use: Single family / duplex | Permit id: 6467911 | |||||
SCORE 99 8816 26th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 7kw solar photovoltaic system on roof of sfr. System components include (20) itek energy 285w modules & (10) blue frog yc-500a miw microinverters. Date: June 6, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 29, 2016 | Expiration date: June 6, 2017 | Current use: Single family / duplex | Permit id: 6538776 | |||||
SCORE 99 Date: July 30, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 10, 2015 | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487127 | |||||
SCORE 99 6607 58th Ave Ne Seattle Wa 10-24-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 4(kw) solar photovoltaic system will be installed on roof of residence. Date: September 26, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: September 26, 2018 | Current use: Single family / duplex | Permit id: 6621084 | |||||
SCORE 99 3278 38th Ave Sw Seattle Wa 8-28-17 bz plan review waived 2017 threshold 7. 7kva. Micro inverter limits output to below7. 7kva. Final approval subject to field inspector.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9 kw solar photovoltaic system on roof of residence. Date: August 29, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 18, 2017 | Expiration date: August 29, 2018 | Current use: Single family / duplex | Permit id: 6616167 | |||||
SCORE 99 4765 35th Ave S Seattle Wa (unit b) an electrical rough-in will be done for possible future solar photovoltaic system. Date: January 18, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 4, 2016 | Expiration date: January 17, 2017 | Current use: Single family / duplex | Permit id: 6514200 | |||||
SCORE 99 103 N 73rd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 45kw solar photovoltaic system on roof of sfr + adu on same lot. (30) lg 315w modules & (30) enphase s2 microinverters. Plans approved on 5 3 16.. Date: April 26, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 16, 2016 | Expiration date: April 26, 2017 | Current use: Single family / duplex | Permit id: 6531540 | |||||
SCORE 99 8211 34th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 10. 92kw solar photovoltaic system on roof of residence. System components include (39) itek energy 280w modules & (2) pvi-5200tl string inverters. Date: August 5, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 26, 2015 | Expiration date: August 4, 2016 | Current use: Single family / duplex | Permit id: 6488215 | |||||
SCORE 99 6212 29th Ave Ne Seattle Wa 4 14 2015 - cancelled customer log #15-623[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 72 (kw) solar photovoltaic system will be installed on roof of residence. Also, a service upgrade will be done in electrical room and residence. Array will consists of (28) itek energy modules and (1)itek pvi-66 inverter. Date: April 13, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: April 12, 2016 | Current use: Single family / duplex | Permit id: 6468614 | |||||
SCORE 99 3831 Corliss Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48(kw) solar photovoltaic system will be installed on roof of residence. Also, a panel change will be performed. Date: August 13, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 29, 2015 | Expiration date: August 12, 2016 | Current use: Single family / duplex | Permit id: 6489630 | |||||
SCORE 99 10019 20th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 8kw solar photovoltaic system on roof of sfr. System components include (20) itek energy 290w modules & (10) blue frog yc-500a miw microinverters. Date: May 10, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 20, 2016 | Expiration date: May 10, 2017 | Current use: Single family / duplex | Permit id: 6534021 | |||||
SCORE 99 8 Ne 67th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 13. 44(kw)solar photovoltaic system will be installed on roof of residence. Array will consist of (48) solarworld 280w modules and (3) sma tl string inverters. Date: June 23, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 29, 2016 | Expiration date: June 22, 2016 | Current use: Commercial | Permit id: 6480803 | |||||
SCORE 99 408 17th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 64 kw solar photovoltaic system on roof of residence. 10 13 17 jk waived plan review because the total ac power output of the system is less than or equal to 7,7 watts. Date: October 4, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 16, 2017 | Expiration date: October 4, 2018 | Current use: Single family / duplex | Permit id: 6622603 | |||||
SCORE 99 1823 Eastlake Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 875(kw) solar photovoltaic system will be installed on roof of property. 4 21 16 jk approved plans. Date: February 23, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 8, 2016 | Expiration date: February 22, 2017 | Current use: Commercial | Permit id: 6520436 | |||||
SCORE 99 3239b California Ave Sw Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. Date: May 12, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 18, 2015 | Expiration date: May 11, 2016 | Current use: Single family / duplex | Permit id: 6473550 | |||||
SCORE 99 6542 Woodlawn Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 13kw solar photovoltaic system on roof of residence. System components include (18) itek energy 285w modules & (9) aps blue frog yc-500a miw microinverters. Date: September 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 21, 2015 | Expiration date: September 15, 2016 | Current use: Single family / duplex | Permit id: 6495133 | |||||
SCORE 99 3537 Ne 87th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw solar photovoltaic system on roof of residence. System components include (13) sunpower 345w modules w solaredge p4 dc optimizers & (1) solaredge 3800w string inverter. Date: March 1, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 21, 2016 | Expiration date: March 1, 2017 | Current use: Single family / duplex | Permit id: 6521528 | |||||
SCORE 99 25 Sw Chicago Ct Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 76kw solar photovoltaic system on roof of residence. System includes (17) itek 280w modules & (9) aps blue frog yc-500a miw dual input microinverters. Date: February 11, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 6, 2015 | Expiration date: February 11, 2016 | Current use: Single family / duplex | Permit id: 6459063 | |||||
SCORE 99 4045 32nd Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 4kw solar photovoltaic system on roof of residence. Panel upgrade. New subpanel in garage. Date: December 30, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 22, 2016 | Expiration date: December 29, 2016 | Current use: Single family / duplex | Permit id: 6511525 | |||||
SCORE 99 1 10th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 11. 36kw photovoltaic system on roof of property and interconnection to scl grid. Date: October 3, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: October 3, 2018 | Current use: Multifamily | Permit id: 6622189 | |||||
SCORE 99 4751 35th Ave S Seattle Wa 6 28 2016 - cancelled customer log #16-9 (cont. Off job) (unit a) an electrical rough-in will be done for possible future solar photovoltaic system Date: January 21, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: January 20, 2017 | Current use: Single family / duplex | Permit id: 6514951 | |||||
SCORE 99 628 Nw 88th St Seattle Wa Installation of a electric vehicle charging station will be installed on roof of reisidence. Date: March 1, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 17, 2017 | Expiration date: March 1, 2018 | Current use: Single family / duplex | Permit id: 6583896 | |||||
SCORE 99 747 N 82nd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 28(kw) solar photovoltaic system will be installed on roof of residence. Date: May 25, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 9, 2015 | Expiration date: May 24, 2016 | Current use: Single family / duplex | Permit id: 6475688 | |||||
SCORE 99 7914 9th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 3. 36kw solar photovoltaic system on roof of residence. (12) itek 280w modules & (1) pvi-38 itek inverter. Separate system from existing pv system. Interconnection method uses line side tap. Date: April 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 27, 2015 | Expiration date: April 15, 2016 | Current use: Single family / duplex | Permit id: 6469339 | |||||
SCORE 99 4769 35th Ave S Seattle Wa This is for (unit b) an electrical rough-in will be performed for possible future solar photovoltaic system. Date: December 30, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 7, 2016 | Expiration date: December 29, 2016 | Current use: Single family / duplex | Permit id: 6511601 | |||||
SCORE 99 1749 Nw 61st St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 7(kw) photovoltaic solar system will be installed on roof of residence. 5 13 15 jle address was changed from 1749 nw 63rd st. Date: May 5, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 18, 2015 | Expiration date: May 4, 2016 | Current use: Single family / duplex | Permit id: 6472519 | |||||
SCORE 99 26 24th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 88 solar photovolatiac system on roof of residence. Main service panel replacement Date: June 4, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 1, 2015 | Expiration date: June 3, 2016 | Current use: Single family / duplex | Permit id: 6477678 | |||||
SCORE 99 52 University Way Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 83(kw) solar photovoltaic system will be installed on roof of property. Date: November 28, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2017 | Expiration date: November 28, 2017 | Current use: Commercial | Permit id: 6568973 | |||||
SCORE 99 4529a Rainier Ave S Seattle Wa An electrical rough-in will be performed in electrical room and residence Date: July 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6483001 | |||||
SCORE 99 Date: October 22, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: October 21, 2016 | Current use: Single family / duplex | Permit id: 6501177 | |||||
SCORE 99 Date: April 14, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 14, 2015 | Expiration date: April 13, 2016 | Current use: Single family / duplex | Permit id: 6468818 | |||||
SCORE 99 10046 Mary Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 6 solar photovoltaic system will be installed on roof of residence. Date: August 14, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 23, 2017 | Expiration date: August 14, 2018 | Current use: Single family / duplex | Permit id: 6613332 | |||||
SCORE 99 305 25th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 7 kw solar photovoltaic system on roof of residence. Date: November 15, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 5, 2017 | Expiration date: November 15, 2017 | Current use: Single family / duplex | Permit id: 6566998 | |||||
SCORE 99 Date: October 21, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 6, 2015 | Expiration date: October 20, 2016 | Current use: Single family / duplex | Permit id: 6501058 | |||||
SCORE 99 1136 35th Ave Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: January 6, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 9, 2015 | Expiration date: January 6, 2016 | Current use: Single family / duplex | Permit id: 6453385 | |||||
SCORE 99 5418 S Angeline St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 92kw solar photovoltaic system on roof or residence. System components include (14) itek 280w modules & (7) aps blue frog yc-500a miw dual-input microinverters. Date: March 5, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 26, 2015 | Expiration date: March 4, 2016 | Current use: Single family / duplex | Permit id: 6462624 | |||||
SCORE 99 6045 18th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 5kw solar photovoltaic system on roof of residence. (20) itek energy 275w modules & (1) itek pvi-5200tl string inverter. Service upgrade to 200a. Date: February 12, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 24, 2015 | Expiration date: February 12, 2016 | Current use: Single family / duplex | Permit id: 6459279 | |||||
SCORE 99 1851 S Weller St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16kw solar photovoltaic system on roof of residence. System components include (22) itek 280w he modules & (12) blue frog yc-500a miw microinverters. Date: October 5, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 18, 2016 | Expiration date: October 5, 2017 | Current use: Single family / duplex | Permit id: 6560246 | |||||
SCORE 99 68 Greenwood Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 47(kw) solar photovoltaic system will be installed on roof of property. Date: August 30, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 24, 2017 | Expiration date: August 30, 2017 | Current use: Single family / duplex | Permit id: 6554156 | |||||
SCORE 99 3528 Burke Ave N Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. Work will be done in electrical room and residence. Date: October 12, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 15, 2015 | Expiration date: October 11, 2016 | Current use: Single family / duplex | Permit id: 6499242 | |||||
SCORE 99 7601 39th Ave S Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: September 17, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 19, 2017 | Expiration date: September 17, 2018 | Current use: Single family / duplex | Permit id: 6619274 | |||||
SCORE 99 1717 N 37th St Seattle Wa An electrical rough-in for possible future solar photovoltaic system will be performed in electrical room and residence. Date: October 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 20, 2015 | Expiration date: October 14, 2016 | Current use: Single family / duplex | Permit id: 6500156 | |||||
SCORE 99 48 S Henderson St Seattle Wa Installation of a 137. 7 kw dc (1 kw ac) solar pv array on the roof of south shore school, connected to existing electrical switchboard. Value: $114,508 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627829 | |||||
SCORE 99 4114 Burke Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 9(kw) solar photovoltaic system will be installed on roof of residence. Date: September 27, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 3, 2017 | Expiration date: September 27, 2018 | Current use: Single family / duplex | Permit id: 6621301 | |||||
SCORE 99 3522 S Leschi Pl Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 83 kw solar photovoltaic solar system on roof of residence. Date: August 12, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 17, 2015 | Expiration date: August 11, 2016 | Current use: Single family / duplex | Permit id: 6489563 | |||||
SCORE 99 Date: March 8, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 1, 2016 | Expiration date: March 8, 2017 | Current use: Single family / duplex | Permit id: 6522756 | |||||
SCORE 99 1747 Nw 61st St Seattle Wa An electrical rough-in will be performed in (unit b) for possible future solar photovoltaic system. Date: March 26, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2015 | Expiration date: March 25, 2016 | Current use: Single family / duplex | Permit id: 6466008 | |||||
SCORE 99 322 21st Ave E Seattle Wa 7-26-17 bz pv system one-line approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 0kw solar system on roof of property. Date: July 25, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 17, 2017 | Expiration date: July 25, 2018 | Current use: Single family / duplex | Permit id: 6609609 | |||||
SCORE 99 219 1st Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 83(kw) solar photovoltaic system will be installed on roof of property. Date: September 2, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 11, 2017 | Expiration date: September 2, 2017 | Current use: Commercial | Permit id: 6554757 | |||||
SCORE 99 107 5th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw photovoltaic system on roof of property and interconnection to scl grid. This permit for the east building at this address. Date: October 12, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: October 12, 2018 | Current use: Commercial | Permit id: 6624035 | |||||
SCORE 99 516 N 77th St Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and residence. Date: July 6, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 5, 2016 | Expiration date: July 6, 2017 | Current use: Single family / duplex | Permit id: 6544399 | |||||
SCORE 99 1718a 27th Ave Seattle Wa Cancel per customer log 15-1317 rough in for possible future solar pv system. Date: July 30, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487131 | |||||
SCORE 99 42 S Othello St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 19. 2(kw) solar photovoltaic system will be installed on roof of residence. 8 4 16 jk approved plans. 12 15 2016 sr renew. 03 02 17 jk approved revised plans. Date: January 4, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: January 3, 2018 | Current use: Commercial | Permit id: 6511837 | |||||
SCORE 99 39 47th Ave S Seattle Wa 8-28-17 bz plan review waived 2017 threshold 7. 7kva. Micro inverter limits output to below7. 7kva. Final approval subject to field inspector.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 0(kw) solar photovoltaic system will be installed on roof of property. Date: September 1, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 14, 2017 | Expiration date: September 1, 2018 | Current use: Single family / duplex | Permit id: 6616773 | |||||
SCORE 99 1001 James St Seattle Wa 5-5-17 bz revision approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 15. 08(kw) solar photovoltaic system will be installed on roof of property. 12 01 16 jk approved plans. Date: November 22, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: November 22, 2017 | Current use: Commercial | Permit id: 6568449 | |||||
SCORE 99 5603 Phinney Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7 kw solar photovoltaic system on roof of residence. Date: June 3, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 7, 2015 | Expiration date: June 2, 2016 | Current use: Single family / duplex | Permit id: 6477328 | |||||
SCORE 99 6212 29th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 84(kw) solar photovoltaic system will be installed on roof of residence. Also, a service upgrade will be done in electrical room and residence. 3 14 2016 paf add (1) 2 amp feeder. Date: April 14, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 23, 2015 | Expiration date: April 13, 2016 | Current use: Single family / duplex | Permit id: 6468831 | |||||
SCORE 99 61 Ravenna Ave Ne Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. Date: January 6, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 15, 2017 | Expiration date: January 6, 2018 | Current use: Single family / duplex | Permit id: 6574854 | |||||
SCORE 99 3937 Sw Holden St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 9(kw) solar photovoltaic system will be installed on roof of residence. Date: September 29, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 13, 2015 | Expiration date: September 28, 2016 | Current use: Single family / duplex | Permit id: 6497362 | |||||
SCORE 99 327 Randolph Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 4. 2 kw solar photovoltaic system on roof of residence. Date: September 1, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 29, 2015 | Expiration date: August 31, 2016 | Current use: Single family / duplex | Permit id: 6492751 | |||||
SCORE 99 2211 41st Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 71(kw) solar photovoltaic system will be installed on roof of property. 07 19 17 jk approved plans. Date: July 11, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 24, 2017 | Expiration date: July 11, 2018 | Current use: Single family / duplex | Permit id: 6607185 | |||||
SCORE 99 3451 Nw 64th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 24 kw solar photovoltaic system on roof of residence. Date: June 11, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 25, 2015 | Expiration date: June 10, 2016 | Current use: Single family / duplex | Permit id: 6478828 | |||||
SCORE 99 Date: January 25, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: January 24, 2017 | Current use: Single family / duplex | Permit id: 6515364 | |||||
SCORE 99 3914 42nd Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 85(kw) solar photovoltaic system will be installed on roof of residence. 10 21 16 jk approved plans. 11 01 16 cep; add (1) 1-125 amp service. Date: October 20, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 15, 2016 | Expiration date: October 20, 2017 | Current use: Single family / duplex | Permit id: 6562984 | |||||
SCORE 99 4531a Rainier Ave S Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. Date: July 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6483028 | |||||
SCORE 99 3 1st Ave W Seattle Wa 2-15-17 bz approved plans. Pv. 4-12-17 bz approved revision [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 6(kw) solar photovoltaic system will be installed on roof of property. 2 10 17 sk change address from 301 queen anne ave n Date: February 9, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2017 | Expiration date: February 9, 2018 | Current use: Commercial | Permit id: 6580488 | |||||
SCORE 99 4619 Ne 73rd St Seattle Wa 10-24-17 bz approved pv system one-line[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 71 kw solar photovoltaic system on roof of residence. Also swapping out main electrical panel and adding an electric vehicle charging station. Date: October 11, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 7, 2017 | Expiration date: October 11, 2018 | Current use: Single family / duplex | Permit id: 6623788 | |||||
SCORE 99 1207 Westlake Ave N Seattle Wa 4-24-17 bz pv system revision approved.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] (this is for lot #2) installation of a 15. 2(kw) solar photovoltaic system will be performed in electrical room and roof of property. Date: February 23, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2017 | Expiration date: February 22, 2017 | Current use: Commercial | Permit id: 6520459 | |||||
SCORE 99 2601 Sw Kenyon St Seattle Wa Installation of a 140. 6 kw dc (100kw ac) solar pv array on the roof of denny international middle school, connected to existing electrical switchboard. Value: $112,204 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627813 | |||||
SCORE 99 7357 12th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 2kw solar photovoltaic system on roof of residence. System components include (19) itek 275w modules & (9. 5) aps blue frog yc-5 microinverters. Date: January 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 21, 2015 | Expiration date: January 15, 2016 | Current use: Single family / duplex | Permit id: 6454760 | |||||
SCORE 99 4122 Sunnyside Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 76kw solar photovoltaic system on roof of residence. System components include (17) itek energy 280w & (9) blue frog yc-500a microinverters. Date: November 3, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 18, 2015 | Expiration date: November 2, 2016 | Current use: Single family / duplex | Permit id: 6503295 | |||||
SCORE 99 11 Nw 134th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 8 kw photovoltaic solar system will be installed on roof of residence. Date: June 1, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 11, 2015 | Expiration date: May 31, 2016 | Current use: Single family / duplex | Permit id: 6476777 | |||||
SCORE 99 2672 Bishop Pl W Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: May 15, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 17, 2017 | Expiration date: May 15, 2018 | Current use: Single family / duplex | Permit id: 6597026 | |||||
SCORE 99 3019 47th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 575kw solar photovoltaic system on roof of residence. System components include (13) itek 275w modules & (1) theia 3. 8kw string inverter. Date: February 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 2, 2015 | Expiration date: February 2, 2016 | Current use: Single family / duplex | Permit id: 6457427 | |||||
SCORE 99 4314 12th Ave S Seattle Wa Installation of a 6. 96 kw solar photovoltaic system on roof of residence. Date: November 22, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 27, 2016 | Expiration date: November 22, 2017 | Current use: Single family / duplex | Permit id: 6568326 | |||||
SCORE 99 5607 15th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 88kw solar photovoltaic system on roof of multi-familiy residence. Interconnection with the house meter, which covers the small apartment in the basement and the public area lighting and laundry. Date: April 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 29, 2015 | Expiration date: April 6, 2016 | Current use: Multifamily | Permit id: 6467790 | |||||
SCORE 99 1107 E Madison St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 4 kw solar electric system on the roof. Date: September 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618565 | |||||
SCORE 99 22 E Union St Seattle Wa 4-19-17 bz pv system approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 98kw solar photovoltaic system Date: April 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: April 13, 2018 | Current use: Commercial | Permit id: 6591644 | |||||
SCORE 99 3652 Dayton Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 85(kw) solar photovoltaic system will be installed on roof of residence. Date: December 29, 2014 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 8, 2015 | Expiration date: December 29, 2015 | Current use: Single family / duplex | Permit id: 6452580 | |||||
SCORE 99 9012 31st Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 8kw solar photovoltaic system addition ((10) itek 280w modules) to existing 4. 8kw system. Pvi-7600tl itek inverter will replace existing theia 4. 4 string inverter. Total system size to be 7. 6kw. Date: April 21, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 15, 2015 | Expiration date: April 20, 2016 | Current use: Single family / duplex | Permit id: 6469961 | |||||
SCORE 99 32 16th Ave W Seattle Wa 6-2-17 bz pv system revision one-line approved2-27-17 bz pv sys. Approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 8 kw grid tied solar system on roof of property. Date: January 31, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: January 31, 2018 | Current use: Commercial | Permit id: 6578936 | |||||
SCORE 99 4769 35th Ave S Seattle Wa This is for (unit a). An electrical rough-in will be performed for possible future solar photovoltaic system. Date: December 30, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 7, 2016 | Expiration date: December 29, 2016 | Current use: Single family / duplex | Permit id: 6511598 | |||||
SCORE 99 6105 Roosevelt Way Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 8(kw) solar photovoltaic system will be installed on roof of property. Date: September 8, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2017 | Expiration date: September 8, 2017 | Current use: Commercial | Permit id: 6555462 | |||||
SCORE 99 8021 41st Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4 kw solar photovoltaic solar system. Main panel upgrade. Date: June 9, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 19, 2015 | Expiration date: June 8, 2016 | Current use: Single family / duplex | Permit id: 6478396 | |||||
SCORE 99 4338 32nd Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 9(kw) solar photovoltaic system will be installed on roof of residence. Date: September 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 27, 2015 | Expiration date: September 23, 2016 | Current use: Single family / duplex | Permit id: 6496612 | |||||
SCORE 99 13529 25th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96(kw) solar photovoltaic system will be installed on roof of residence. Date: July 21, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 1, 2015 | Expiration date: July 20, 2016 | Current use: Single family / duplex | Permit id: 6485629 | |||||
SCORE 99 9417 25th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16(kw) solar photovoltaic system will be installed on roof of residence and installation of a electric vehicle charging station will be performed in electrical room and residence. Date: March 25, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 7, 2015 | Expiration date: March 24, 2016 | Current use: Single family / duplex | Permit id: 6465814 | |||||
SCORE 99 Date: September 28, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 2, 2015 | Expiration date: September 27, 2016 | Current use: Single family / duplex | Permit id: 6497038 | |||||
SCORE 99 6244 50th Ave Ne Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Also, a panel upgrade will be performed in electrical room. Date: April 28, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 8, 2015 | Expiration date: April 27, 2016 | Current use: Single family / duplex | Permit id: 6471165 | |||||
SCORE 99 1019 S Southern St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 8kw solar photovoltaic system on roof of sfr Date: July 26, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 2, 2017 | Expiration date: July 26, 2018 | Current use: Single family / duplex | Permit id: 6609926 | |||||
SCORE 99 6049 45th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek energy 280w modules & (1) itek solectria pvi-5200tl string inverter. Date: February 17, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 26, 2015 | Expiration date: February 17, 2016 | Current use: Single family / duplex | Permit id: 6459860 | |||||
SCORE 99 4803 55th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 5 kw solar photovoltaic system on roof of residence. 1-17-17 bz approved plans Date: January 4, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 30, 2017 | Expiration date: January 4, 2018 | Current use: Single family / duplex | Permit id: 6574572 | |||||
SCORE 99 Date: September 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 23, 2015 | Expiration date: September 15, 2016 | Current use: Single family / duplex | Permit id: 6495122 | |||||
SCORE 99 2348 28th Ave S Seattle Wa Installation of a electric vehicle will be installed in electrical room and residence. Date: April 25, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 14, 2017 | Expiration date: April 25, 2018 | Current use: Single family / duplex | Permit id: 6593628 | |||||
SCORE 99 8505 21st Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 9kw solar photovoltaic system on roof of residence. System components include (36) itek energy 275w modules & (2) itek pvi-5200tl string inverters. Also downsizing main breaker size to 175a. Date: November 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 2, 2015 | Expiration date: November 15, 2016 | Current use: Single family / duplex | Permit id: 6505365 | |||||
SCORE 99 5603 Phinney Ave N Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and residence Date: July 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 4, 2015 | Expiration date: July 15, 2016 | Current use: Single family / duplex | Permit id: 6484760 | |||||
SCORE 99 339c 16th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 68(kw) solar photovoltaic system will be installed on roof of residence. Date: March 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 2, 2015 | Expiration date: March 23, 2016 | Current use: Single family / duplex | Permit id: 6465554 | |||||
SCORE 99 3903 S Edmunds St Seattle Wa An electrical rough-in will be performed for possible future solar-photovoltaic system. Date: January 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 28, 2015 | Expiration date: January 15, 2016 | Current use: Single family / duplex | Permit id: 6454789 | |||||
SCORE 99 433 16th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 32 solar pv system, service upgrade, and main panel change out. Date: August 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 2, 2015 | Expiration date: August 6, 2016 | Current use: Single family / duplex | Permit id: 6488623 | |||||
SCORE 99 103 Nw 105th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 24kw solar photovoltaic system on roof of residence and on roof of home and on new deck addition. (33) itek energy 280w modules & (2) itek pvi 5200tl string inverters. Interconnection method using a line side tap. Date: March 11, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 21, 2015 | Expiration date: March 10, 2016 | Current use: Single family / duplex | Permit id: 6463423 | |||||
SCORE 99 128 Ne 125th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek 280w modules & (10) aps blue frog yc-500a miw microinverters Date: May 14, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 20, 2015 | Expiration date: May 13, 2016 | Current use: Single family / duplex | Permit id: 6474125 | |||||
SCORE 99 5733 29th Ave Ne Seattle Wa Installation of a 14- nema receptacle for a electric vehicle charging station. Date: August 22, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 31, 2016 | Expiration date: August 22, 2017 | Current use: Single family / duplex | Permit id: 6552766 | |||||
SCORE 99 Date: October 16, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 17, 2017 | Expiration date: October 16, 2018 | Current use: Single family / duplex | Permit id: 6624441 | |||||
SCORE 99 218 Dorffel Dr E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] an additional 4. 69(kw) solar photovoltaic system will be installed on roof of residence. Date: December 1, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 19, 2016 | Expiration date: November 30, 2016 | Current use: Single family / duplex | Permit id: 6507412 | |||||
SCORE 99 527 N 67th St Seattle Wa 2-27-17 bz revision #2 approved and fee added [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 83kw solar photovoltaic system on roof of sfr. System components include (27) solarworld 290w modules & (1) itek energy pvi-7600tl string inverter. 8 22 16 jk approved plans. 12 08 16 jk added revision. 12 08 16 jk approved revised plans. Date: June 15, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 12, 2017 | Expiration date: June 15, 2017 | Current use: Single family / duplex | Permit id: 6540798 | |||||
SCORE 99 11 Nw 134th St Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and residence. Date: April 27, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 7, 2015 | Expiration date: April 26, 2016 | Current use: Single family / duplex | Permit id: 6470898 | |||||
SCORE 99 6308 17th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 05kw solar photovoltaic system on roof of residence. System components include (22) itek energy 275w modules & (1) itek pvi-5200tl string inverter. Date: February 10, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 17, 2015 | Expiration date: February 10, 2016 | Current use: Single family / duplex | Permit id: 6458738 | |||||
SCORE 99 3526 Sw 112th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 12kw solar photovoltaic system on roof of residence. System components include (32) itek energy 285w modules & (1) itek pvi-7600tl string inverter. Date: December 14, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2016 | Expiration date: December 13, 2016 | Current use: Single family / duplex | Permit id: 6509540 | |||||
SCORE 99 138 4th Ave Ne Seattle Wa Installation of a electric vehicle charging station will be permed in electrical room and residence. Date: June 8, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 14, 2017 | Expiration date: June 8, 2018 | Current use: Single family / duplex | Permit id: 6601670 | |||||
SCORE 99 3414 Nw 62nd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek energy 280w modules & (1) pvi-5200tl itek string inverter. Date: July 13, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 6, 2015 | Expiration date: July 12, 2016 | Current use: Single family / duplex | Permit id: 6484100 | |||||
SCORE 99 Date: May 26, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 31, 2016 | Expiration date: May 26, 2017 | Current use: Single family / duplex | Permit id: 6537134 | |||||
SCORE 99 1711 Nw 61st St Seattle Wa (this is for unit a) an electrical rough-in will be done for possible future solar photovoltaic system. 2 5 16 jle changed address from 1709 nw 61st st Date: December 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2016 | Expiration date: December 15, 2016 | Current use: Single family / duplex | Permit id: 6509818 | |||||
SCORE 99 2622 27th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw solar photovoltaic system on roof of residence. (13) itek energy 280w modules & (1) itek pvi-3800tl string inverter. Date: March 12, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 9, 2015 | Expiration date: March 11, 2016 | Current use: Single family / duplex | Permit id: 6463793 | |||||
SCORE 99 315c 14th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 52kw solar photovoltaic system on roof of residence. System components include (8) solarworld 315w modules & (8) abb 300w microinverters. Date: September 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: September 1, 2016 | Current use: Single family / duplex | Permit id: 6492901 | |||||
SCORE 99 3621 59th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 98kw solar photovoltaic system on roof of residence. System components include (28) itek 285w modules & (14) blue frog yc-500a miw microinverters. Date: November 12, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: November 11, 2016 | Current use: Single family / duplex | Permit id: 6504747 | |||||
SCORE 99 63 21st Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 28kw solar photovoltaic system on roof of residence. System components include (26) itek energy 280w modules & (1) itek pvi-6600tl string inverter. Electrical plans have been uploaded Date: February 19, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 12, 2015 | Expiration date: February 19, 2016 | Current use: Single family / duplex | Permit id: 6460274 | |||||
SCORE 99 1701 Nw 56th St Seattle Wa 2-27-17 bz pv sys. Approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 55kw solar photovoltaic system on roof. Date: February 2, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: February 2, 2018 | Current use: Commercial | Permit id: 6579346 | |||||
SCORE 99 1624 E Mercer St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 35kw pv system addition. (15) itek 290w modules & (8) blue frog yc-500a miw microinverters. Date: April 27, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 17, 2016 | Expiration date: April 27, 2017 | Current use: Single family / duplex | Permit id: 6531901 | |||||
SCORE 99 8001 Crest Dr Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 12kw solar photovoltaic system on roof of detached garage. System components include (32) itek energy 285w modules (1) pvi-7600tl itek string inverter. Date: November 17, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 24, 2015 | Expiration date: November 16, 2016 | Current use: Single family / duplex | Permit id: 6505483 | |||||
SCORE 99 3249 Nw 62nd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9(kw) solar photovoltaic system will be installed on roof of residence. 04 26 17 jk approved plans. Date: April 21, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 23, 2017 | Expiration date: April 21, 2018 | Current use: Single family / duplex | Permit id: 6593048 | |||||
SCORE 99 4535 Sw Director St Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: May 18, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 23, 2017 | Expiration date: May 18, 2018 | Current use: Single family / duplex | Permit id: 6597965 | |||||
SCORE 99 606 Nw 83rd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6 kw solar photovoltaic system on roof of residence. Date: August 4, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 8, 2015 | Expiration date: August 3, 2016 | Current use: Single family / duplex | Permit id: 6487829 | |||||
SCORE 99 2207 18th Ave S Seattle Wa 12 15 2016 - cancelled customer log #16-1824 installation of a electric vehicle charging station will be performed in electrical room and residence. Date: January 11, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: January 10, 2017 | Current use: Single family / duplex | Permit id: 6513122 | |||||
SCORE 99 4218 Ne 115th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 32(kw) solar photovoltaic system will be installed on roof of residence. Date: August 17, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 16, 2015 | Expiration date: August 16, 2016 | Current use: Single family / duplex | Permit id: 6490196 | |||||
SCORE 99 Permit type: Electrical | Permit status: Application accepted | Current use: Commercial | Permit id: 6625093 | |||||
SCORE 99 2626 27th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 32 solar photovoltaic system on roof of residence. Date: June 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 11, 2015 | Expiration date: June 23, 2016 | Current use: Single family / duplex | Permit id: 6480981 | |||||
SCORE 99 8831 Midvale Ave N Seattle Wa Installation of a electric vehicle charging station will be installed on roof of property. Date: March 27, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 29, 2017 | Expiration date: March 27, 2018 | Current use: Single family / duplex | Permit id: 6588311 | |||||
SCORE 99 6311 18th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16kw solar photovoltaic system on roof of residence. System components include (22) itek energy 280w modules & (1) itek pvi-5200tl string inverter. Date: February 10, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 12, 2015 | Expiration date: February 10, 2016 | Current use: Single family / duplex | Permit id: 6458829 | |||||
SCORE 99 Date: February 8, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 12, 2016 | Expiration date: February 7, 2017 | Current use: Single family / duplex | Permit id: 6517976 | |||||
SCORE 99 4319 Ne 45th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 4kw solar photovoltaic system on roof of residence. System components include (30) itek 280w modules & (1) itek pvi-7600tl string inverter. 3 17 2016 paf add (1) amp circuit. Date: January 14, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 24, 2016 | Expiration date: January 13, 2017 | Current use: Single family / duplex | Permit id: 6513879 | |||||
SCORE 99 5372 Sw Admiral Way Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 92kw solar photovoltaic system on roof of residence. System components include (14) itek energy 280w modules & (7) aps blue frog yc-500a miw dual-input microinverters. Date: January 20, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 3, 2015 | Expiration date: January 20, 2016 | Current use: Single family / duplex | Permit id: 6455257 | |||||
SCORE 99 328 Nw 76th St Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. Date: December 28, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2016 | Expiration date: December 27, 2016 | Current use: Single family / duplex | Permit id: 6511299 | |||||
SCORE 99 3237b California Ave Sw Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. This will be done in electrical room and residence. Date: March 26, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 2, 2015 | Expiration date: March 25, 2016 | Current use: Single family / duplex | Permit id: 6465963 | |||||
SCORE 99 3304 Beacon Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7 kw solar photovoltaic system on roof of building. Date: January 4, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2016 | Expiration date: January 3, 2017 | Current use: Commercial | Permit id: 6511945 | |||||
SCORE 99 20 14th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 76kw solar photovoltaic system on roof of residence. System components include (17) itek energy 280w modules & (9) blue frog aps yc-500a miw microinverters Date: May 13, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 1, 2015 | Expiration date: May 12, 2016 | Current use: Single family / duplex | Permit id: 6473795 | |||||
SCORE 99 4914 55th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 68(kw) solar photovoltaic system will be installed on roof of residence. Date: April 11, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 25, 2016 | Expiration date: April 11, 2017 | Current use: Single family / duplex | Permit id: 6528676 | |||||
SCORE 99 2211 41st Ave Sw Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. Date: February 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: February 13, 2018 | Current use: Single family / duplex | Permit id: 6580971 | |||||
SCORE 99 86 35th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 4 kw solar photovoltaic system on roof of residence. Date: September 16, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 26, 2017 | Expiration date: September 16, 2018 | Current use: Single family / duplex | Permit id: 6619255 | |||||
SCORE 99 3948 Sw Arroyo Dr Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 5kw solar photovoltaic system on roof of residence. System components include (20) itek energy 275w modules & (1) pvi-5200tl itek string inverter. Date: December 16, 2014 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 26, 2015 | Expiration date: December 16, 2015 | Current use: Single family / duplex | Permit id: 6450964 | |||||
SCORE 99 9444 34th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 25(kw) solar photovoltaic system will be installed on roof of residence. Date: January 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 16, 2015 | Expiration date: January 2, 2016 | Current use: Single family / duplex | Permit id: 6453092 | |||||
SCORE 99 224 32nd Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 44 kw solar photovoltaic system on roof of residence Date: July 9, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2015 | Expiration date: July 8, 2016 | Current use: Single family / duplex | Permit id: 6483521 | |||||
SCORE 99 222 Etruria St Seattle Wa 2 3 2017 - cancelled customer log #17-115 install ev charging station on new 40a circuit Date: January 31, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: January 31, 2018 | Current use: Commercial | Permit id: 6579016 | |||||
SCORE 99 Date: June 15, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 27, 2016 | Expiration date: June 15, 2017 | Current use: Single family / duplex | Permit id: 6540824 | |||||
SCORE 99 2205 41st Ave Sw Seattle Wa 3 3 2017 = cancelled customer log #17-189[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a solar photovoltaic system will be installed on roof of residence. Date: January 16, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: January 16, 2018 | Current use: Single family / duplex | Permit id: 6576245 | |||||
SCORE 99 2808 43rd Ave W Seattle Wa Installation of a electric vehicle charging station will be performed on electrical room and residence. Date: March 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: March 13, 2018 | Current use: Single family / duplex | Permit id: 6585930 | |||||
SCORE 99 5421 30th Ave S Seattle Wa 3-28-17 bz pv system approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 0kw solar photovoltaic system on roof of residence. Date: March 15, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 21, 2017 | Expiration date: March 15, 2018 | Current use: Single family / duplex | Permit id: 6586399 | |||||
SCORE 99 3403 Nw 71st St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 84(kw) solar photovoltaic system will be installed on roof of residence. Date: June 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 6, 2015 | Expiration date: June 15, 2016 | Current use: Single family / duplex | Permit id: 6479678 | |||||
SCORE 99 5603 40th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw solar photovoltaic system on roof of residence. System components include (16) itek energy 280w modules & (8) aps blue frog yc-500a miw dual-input microinverters. Date: March 18, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 14, 2015 | Expiration date: March 17, 2016 | Current use: Single family / duplex | Permit id: 6464596 | |||||
SCORE 99 1818 E Shelby St Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: April 1, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 13, 2015 | Expiration date: March 31, 2016 | Current use: Single family / duplex | Permit id: 6466746 | |||||
SCORE 99 7022 12th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 32 kw solar photovoltaic system will be installed on roof of residence Date: November 30, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 19, 2016 | Expiration date: November 30, 2017 | Current use: Single family / duplex | Permit id: 6569434 | |||||
SCORE 99 2249 Ne 46th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a . 885(kw) solar photovoltaic system will be installed on roof of residence. Date: December 10, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 17, 2016 | Expiration date: December 9, 2016 | Current use: Commercial | Permit id: 6508979 | |||||
SCORE 99 427 11th Ave E Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and residence. Date: April 7, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: April 7, 2018 | Current use: Single family / duplex | Permit id: 6590704 | |||||
SCORE 99 37 Sw Cloverdale St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04(kw) solar photovoltaic system will be installed on roof of residence. Date: January 12, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 4, 2015 | Expiration date: January 12, 2016 | Current use: Single family / duplex | Permit id: 6454242 | |||||
SCORE 99 6538 52nd Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 85 kw solar photovolatic system on roof of residence. Also changing out the main electrical panel. 09 12 17 jk waived plan review because total output power is 7. 488 kw which does not exceed the 7. 7 kw threshold for plan review and the new panel is not rated 400a minimum nor does it operate at greater than 600v. This project is, therefore, subject to field inspection. Date: September 7, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 21, 2017 | Expiration date: September 7, 2018 | Current use: Single family / duplex | Permit id: 6617471 | |||||
SCORE 99 1809 26th Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 72kw solar photovoltaic system on roof of sfr. System components include (16) itek energy 295w modules & (8) blue frog yc-500a miw dual-input microinverters. Date: April 12, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 18, 2017 | Expiration date: April 12, 2018 | Current use: Single family / duplex | Permit id: 6591350 | |||||
SCORE 99 2902 Beacon Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 79 kw solar electric system on the roof. Date: September 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618570 | |||||
SCORE 99 3015 44th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 84 kw solar photovoltaic system on roof of residence. Date: June 18, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 20, 2015 | Expiration date: June 17, 2016 | Current use: Single family / duplex | Permit id: 6480156 | |||||
SCORE 99 3901 S Edmunds St Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. Date: January 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 28, 2015 | Expiration date: January 15, 2016 | Current use: Single family / duplex | Permit id: 6454786 | |||||
SCORE 99 8207 Linden Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 32(kw) solar photovoltaic system will be installed on roof of residence. Date: September 20, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 28, 2017 | Expiration date: September 20, 2018 | Current use: Single family / duplex | Permit id: 6619950 | |||||
SCORE 99 9508 4th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48(kw) solar photovoltaic system will be installed on roof of residence. Array will consist of (16) itek 280w modules and (1) pvo-3800tl itek. Date: April 13, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 15, 2015 | Expiration date: April 12, 2016 | Current use: Single family / duplex | Permit id: 6468795 | |||||
SCORE 99 47 32nd Ave S Seattle Wa 4-24-17 bz pv system approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 735kw solar photovoltaic system on the roof of property Date: April 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: April 13, 2018 | Current use: Commercial | Permit id: 6591638 | |||||
SCORE 99 Date: November 25, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: November 24, 2016 | Current use: Single family / duplex | Permit id: 6506864 | |||||
SCORE 99 5231 16th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 6. 7kw solar photovoltaic system on roof of residence. Date: August 11, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 16, 2016 | Expiration date: August 11, 2017 | Current use: Single family / duplex | Permit id: 6550975 | |||||
SCORE 99 7305 34th Ave Nw Seattle Wa Installation of a sub-panel will be done in electrical room and residence. Date: March 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: March 13, 2018 | Current use: Single family / duplex | Permit id: 6585722 | |||||
SCORE 99 2207 16th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site] installation of a 5. 6(kw) solar photovoltaic system will be installed on roof of residence. 4 23 15 jcb; add 2 amp service. Date: March 10, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 30, 2015 | Expiration date: March 9, 2016 | Current use: Single family / duplex | Permit id: 6463255 | |||||
SCORE 99 4749 35th Ave S Seattle Wa (unit c) an electrical rough-in will be performed for possible future solar photovoltaic system. Date: December 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 15, 2015 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508347 | |||||
SCORE 99 2605 19th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16kw solar photovoltaic system on roof of residence. Installation of a new circuit and evse in garage. Date: April 14, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 14, 2015 | Expiration date: April 13, 2016 | Current use: Single family / duplex | Permit id: 6469015 | |||||
SCORE 99 3609 55th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 12kw solar photovoltaic system on roof of sfr. System components include (32) itek 285w modules & (1) pvi-7600tl itek string inverter. Date: June 3, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 19, 2016 | Expiration date: June 3, 2017 | Current use: Single family / duplex | Permit id: 6538642 | |||||
SCORE 99 1147 N 81st St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a . 93(kw) solar photovoltaic system will be installed on roof of residence. Date: May 24, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 26, 2016 | Expiration date: May 24, 2017 | Current use: Commercial | Permit id: 6536713 | |||||
SCORE 99 1725 Ne 137th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96(kw) solar photovoltaic system will be installed on roof of residence. Date: May 20, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2015 | Expiration date: May 19, 2016 | Current use: Single family / duplex | Permit id: 6475214 | |||||
SCORE 99 4529b Rainier Ave S Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system Date: July 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6483021 | |||||
SCORE 99 2519 34th Ave S Seattle Wa 4 13 2015 - cancelled customer log #15-616[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 24kw solar photovoltaic system on roof of residence. System components include (33) itek 280w modules & (1) pvi-7600tl string inverter. Date: April 9, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: April 8, 2016 | Current use: Single family / duplex | Permit id: 6468142 | |||||
SCORE 99 1625 N 52nd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 84 kw solar photovoltaic system on roof of residence. Date: November 3, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 17, 2015 | Expiration date: November 2, 2016 | Current use: Single family / duplex | Permit id: 6503261 | |||||
SCORE 99 19 47th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 96kw solar photovoltaic system on roof of residence. System components include (32) itek energy 280w modules & (1) pvi-7600tl itek string inverter. Date: September 9, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2015 | Expiration date: September 8, 2016 | Current use: Single family / duplex | Permit id: 6493977 | |||||
SCORE 99 1023 E Alder St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 8(kw) solar photovoltaic system will be installed on roof of residence. Date: February 17, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 23, 2016 | Expiration date: February 16, 2017 | Current use: Commercial | Permit id: 6519492 | |||||
SCORE 99 14 Magnolia Blvd W Seattle Wa An electrical rough-in will be performed for possible future solar photovoltaic system. Date: January 27, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: January 27, 2018 | Current use: Single family / duplex | Permit id: 6578335 | |||||
SCORE 99 5044b Fauntleroy Way Sw Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and residence. Date: November 15, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 28, 2016 | Expiration date: November 15, 2017 | Current use: Single family / duplex | Permit id: 6567032 | |||||
SCORE 99 102 37th Ave Sw Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and residence. Date: June 19, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2017 | Expiration date: June 19, 2018 | Current use: Single family / duplex | Permit id: 6603496 | |||||
SCORE 99 51 S Raymond St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4(kw) solar photovoltaic solar system will be installed on roof of residence. Date: July 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2015 | Expiration date: July 14, 2016 | Current use: Single family / duplex | Permit id: 6484611 | |||||
SCORE 99 9655 California Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 12(kw) solar photovoltaic system will be installed on roof of residence. Installation includes (32) itek energy 285 watt modules and (1) itek energy pvi7600-tl. Date: November 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 15, 2015 | Expiration date: November 23, 2016 | Current use: Single family / duplex | Permit id: 6506728 | |||||
SCORE 99 3504 West Laurelhurst Dr Ne Seattle Wa 5-24-17 bz approved pv system one-line[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4kw solar photovoltaic system on roof of residence. Date: May 16, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 27, 2017 | Expiration date: May 16, 2018 | Current use: Single family / duplex | Permit id: 6597526 | |||||
SCORE 99 Date: June 30, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 17, 2016 | Expiration date: June 30, 2017 | Current use: Commercial | Permit id: 6543720 | |||||
SCORE 99 4516 Union Bay Pl Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 84 kw solar electric system on the roof. Date: September 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618568 | |||||
SCORE 99 5737 37th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 96 kw solar photovoltaic system on roof of residence Date: July 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 10, 2015 | Expiration date: July 15, 2016 | Current use: Single family / duplex | Permit id: 6484796 | |||||
SCORE 99 Date: May 29, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: May 29, 2018 | Current use: Commercial | Permit id: 6599580 | |||||
SCORE 99 3826 Ne 96th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 0kw solar photovoltaic system on roof of sfr. System components include (20) itek energy 300w modules & (10) blue frog yc-500a miw dual input microinverters. Date: March 15, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2017 | Expiration date: March 15, 2018 | Current use: Single family / duplex | Permit id: 6586302 | |||||
SCORE 99 8245 41st Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 84kw solar photovoltaic system on roof of residence. System components include (24) solarworld 285w modules & (24) enphase m2 microinverters. Date: June 3, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 29, 2015 | Expiration date: June 2, 2016 | Current use: Single family / duplex | Permit id: 6477512 | |||||
SCORE 99 9334 32nd Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 3. 77 kw solar photovoltaic system on roof of residence. Date: October 6, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 13, 2016 | Expiration date: October 6, 2017 | Current use: Single family / duplex | Permit id: 6560509 | |||||
SCORE 99 101 Broadway E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 61 kw solar photovoltaic system on roof Date: April 19, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 6, 2017 | Expiration date: April 19, 2018 | Current use: Commercial | Permit id: 6592421 | |||||
SCORE 99 3635 Phinney Ave N Seattle Wa Closed as incomplete[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 24. 96(kw) solar photovoltaic system will be installed on roof of property. 6 28 16 jk approved plans. 3 2 17 cpg installation of 24. 96(kw) solar photovoltaic system will be installed on roof of residence. (t. Rasmussen poc assoc. Field elec. #6541123) 03 02 17 change from 24. 96 kw system to 25. 92 kw system. 03 10 17 jk approved revised plans. Permit type: Electrical | Permit status: Permit closed | Completion date: June 7, 2017 | Expiration date: June 16, 2017 | Current use: Commercial | Permit id: 6541123 | |||||
SCORE 99 4008 Ne 60th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 97 solar photovoltaic system will be installed on roof of residence. 8 9 16 jk approved plans. Date: June 30, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2016 | Expiration date: June 30, 2017 | Current use: Single family / duplex | Permit id: 6543790 | |||||
SCORE 99 3236 S Edmunds St Seattle Wa This is for unit a. An electrical rough-in will be performed in electrical room and residence. Date: November 3, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 4, 2015 | Expiration date: November 2, 2016 | Current use: Single family / duplex | Permit id: 6503293 | |||||
SCORE 99 217 N 51st St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 66(kw) solar photovoltaic system will be installed on roof of residence. Date: December 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: December 14, 2016 | Current use: Single family / duplex | Permit id: 6509624 | |||||
SCORE 99 9009 45th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 56kw solar photovoltaic system on roof of residence. System components include (27) itek 280w modules & (1) itek pvi-6600tl string inverter. Date: March 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 16, 2015 | Expiration date: March 23, 2016 | Current use: Single family / duplex | Permit id: 6465453 | |||||
SCORE 99 4733 54th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4 kw solar photovoltaic system on roof of residence Date: June 22, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 23, 2015 | Expiration date: June 21, 2016 | Current use: Single family / duplex | Permit id: 6480588 | |||||
SCORE 99 2168 38th Ave E Seattle Wa [ one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a (8. 4(kw) solar photovoltaic system will be installed on roof of residence. Date: December 17, 2014 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 30, 2015 | Expiration date: December 17, 2015 | Current use: Single family / duplex | Permit id: 6451172 | |||||
SCORE 99 2344 30th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 08 kw solar photovoltaic system on roof of residence. Date: August 12, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 10, 2015 | Expiration date: August 11, 2016 | Current use: Single family / duplex | Permit id: 6489419 | |||||
SCORE 99 727 N 70th St Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and residence. Date: March 27, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 26, 2017 | Expiration date: March 27, 2018 | Current use: Single family / duplex | Permit id: 6588336 | |||||
SCORE 99 6319 16th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 13kw solar photovoltaic system on roof of residence. System components include (18) itek energy 285w modules & (1) itek pvi-5200tl string inverter. Date: March 30, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 14, 2016 | Expiration date: March 30, 2017 | Current use: Single family / duplex | Permit id: 6526808 | |||||
SCORE 99 1616 Sw Elmgrove St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 56kw solar photovoltaic system on roof of residence. System components include (27) itek energy 280w modules & (14) aps blue frog yc-500a miw microinverters. Date: September 14, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 30, 2015 | Expiration date: September 13, 2016 | Current use: Single family / duplex | Permit id: 6494629 | |||||
SCORE 99 3801 Ne 62nd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16kw solar photovoltaic system on roof of residence. Electrical service upgrade to 200a. Date: October 29, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 17, 2015 | Expiration date: October 28, 2016 | Current use: Single family / duplex | Permit id: 6502499 | |||||
SCORE 99 3809d M L King Jr Way S Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence, Date: September 12, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 13, 2017 | Expiration date: September 12, 2018 | Current use: Single family / duplex | Permit id: 6618269 | |||||
SCORE 99 107 5th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 28kw photovoltaic system on roof of property and interconnection to scl grid. This permit is for the west building. Date: October 12, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: October 12, 2018 | Current use: Commercial | Permit id: 6624037 | |||||
SCORE 99 414 Ne Ravenna Blvd Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 52(kw) solar photovoltaic system will be installed on roof of building. Date: December 21, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: December 20, 2016 | Current use: Commercial | Permit id: 6510556 | |||||
SCORE 99 5209 1st Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6kw solar photovoltaic system on roof of residence. Interconnection method using a line side tap. Date: April 1, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 27, 2015 | Expiration date: March 31, 2016 | Current use: Single family / duplex | Permit id: 6466831 | |||||
SCORE 99 8103 6th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04 solar photovoltaic system will be installed on roof of residence. Date: May 19, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 7, 2017 | Expiration date: May 18, 2016 | Current use: Single family / duplex | Permit id: 6474745 | |||||
SCORE 99 3208 Rainier Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 36 kw solar electric system on the roof. Date: September 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618572 | |||||
SCORE 99 4818 48th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 45 solar photovoltaic system will be installed on roof of residence. Date: January 27, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 30, 2016 | Expiration date: January 26, 2017 | Current use: Single family / duplex | Permit id: 6515940 | |||||
SCORE 99 5226 Sw Stevens St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 11. 115kw solar photovoltaic system on roof of residence. System components include (39) 285w itek energy modules & (2) itek pvi-5200tl string inverters. Date: November 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 2, 2015 | Expiration date: November 23, 2016 | Current use: Single family / duplex | Permit id: 6506723 | |||||
SCORE 99 1009 37th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 82kw solar photovoltaic system on roof of residence. System components include (28) lg 315w modules & (1) abb uno 7600tl string inverter. Date: October 6, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 13, 2016 | Expiration date: October 5, 2016 | Current use: Single family / duplex | Permit id: 6498444 | |||||
SCORE 99 5629 18th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 8kw solar photovoltaic system on roof of residence. System components include (32) itek energy 275w modules & (1) itek solectria pvi-7600tl string inverter. Electrical plans have been uploaded Date: February 17, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 3, 2015 | Expiration date: February 17, 2016 | Current use: Single family / duplex | Permit id: 6459674 | |||||
SCORE 99 32 California Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 24(kw) solar photovoltaic system will be installed on roof of residence. System will consist of (33) solar world 2 watt modules and (33) enphase energy m2 micro-inverters. Date: November 18, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 26, 2016 | Expiration date: November 17, 2016 | Current use: Commercial | Permit id: 6505772 | |||||
SCORE 99 3528 Burke Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48 kw solar photovoltaic system on roof of residence. Date: January 20, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 12, 2016 | Expiration date: January 19, 2017 | Current use: Single family / duplex | Permit id: 6514701 | |||||
SCORE 99 6551 17th Ave Ne Seattle Wa 8-11-17bz approved pv system one-line[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 32(kw) solar photovoltaic system will be installed on roof of residence. Date: July 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 14, 2017 | Expiration date: July 13, 2018 | Current use: Single family / duplex | Permit id: 6607653 | |||||
SCORE 99 5833 Princeton Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 10. 83 kw solar photovoltaic system on roof of residence. Date: August 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 9, 2015 | Expiration date: August 23, 2016 | Current use: Single family / duplex | Permit id: 6491345 | |||||
SCORE 99 3455 Thorndyke Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a solar photovoltaic system will be installed on roof of property. Date: February 13, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 15, 2017 | Expiration date: February 13, 2018 | Current use: Commercial | Permit id: 6580926 | |||||
SCORE 99 6347 37th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 08kw solar photovoltaic system on roof of residence. Service upgrade too. 11 04 16 jk approved pv plans. Date: November 2, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 22, 2016 | Expiration date: November 2, 2017 | Current use: Single family / duplex | Permit id: 6565072 | |||||
SCORE 99 1028 S Snoqualmie St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6kw solar photovoltaic system on roof of residence. System components include (20) itek energy 280w modules & (1) pvi-52 tl string inverter. Date: September 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 1, 2015 | Expiration date: September 1, 2016 | Current use: Single family / duplex | Permit id: 6493046 | |||||
SCORE 99 755 32nd Ave Seattle Wa A service upgrade will be performed on residence along with the installation of a electric vehicle charging station. Date: August 12, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 4, 2015 | Expiration date: August 11, 2016 | Current use: Single family / duplex | Permit id: 6489579 | |||||
SCORE 99 4417 33rd Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16(kw) solar photovoltaic system will be installed on roof of residence. Date: February 6, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 26, 2015 | Expiration date: February 6, 2016 | Current use: Single family / duplex | Permit id: 6458351 | |||||
SCORE 99 4765 35th Ave S Seattle Wa (unit a) an electrical rough-in will be done for possible future solar photovoltaic system. Date: January 18, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 4, 2016 | Expiration date: January 17, 2017 | Current use: Single family / duplex | Permit id: 6514198 | |||||
SCORE 99 216 32nd Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 9 kw solar photovoltaic system on roof of residence Date: May 24, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2017 | Expiration date: May 24, 2018 | Current use: Single family / duplex | Permit id: 6599020 | |||||
SCORE 99 2341 Eastlake Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] an additional . 60(kw) will be added to existing solar photovoltaic system. Work will be performed in electrical room and roof of residence. Date: March 31, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2015 | Expiration date: March 30, 2016 | Current use: Commercial | Permit id: 6466527 | |||||
SCORE 99 4223 Williams Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 26 kw solar pv system on roof of residence. 10 18 16 jk approved plans. Date: September 29, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2017 | Expiration date: September 29, 2017 | Current use: Single family / duplex | Permit id: 6559378 | |||||
SCORE 99 5231 S Pearl St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek energy 280w modules (1) pvi-5200tl itek string inverter. Date: November 19, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 8, 2015 | Expiration date: November 18, 2016 | Current use: Single family / duplex | Permit id: 6505840 | |||||
SCORE 99 4408 Renton Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 8kw solar photovoltaic solar system on roof of residence Date: June 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 3, 2015 | Expiration date: June 14, 2016 | Current use: Single family / duplex | Permit id: 6479414 | |||||
SCORE 99 5111 Sw Orleans St Seattle Wa 6-12-17 bz pv system one-line approveda one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9 kw solar photovoltaic system on roof of residence. Also installing a sub panel off the main electrical panel. Date: June 7, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 29, 2017 | Expiration date: June 7, 2018 | Current use: Single family / duplex | Permit id: 6601266 | |||||
SCORE 99 131 31st Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 56kw solar photovoltaic system on roof of sfr. System components include (23) itek energy 285w modules & (11. 5) blue frog yc-500a miw microinverters. Date: May 5, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 10, 2016 | Expiration date: May 5, 2017 | Current use: Single family / duplex | Permit id: 6533290 | |||||
SCORE 99 5807 Sw Horton St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 72kw solar photovoltaic system on roof of residence. System components include (24) itek energy 280w modules & (1) itek pvi-6600tl string inverter. Date: October 19, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 18, 2016 | Expiration date: October 18, 2016 | Current use: Single family / duplex | Permit id: 6500622 | |||||
SCORE 99 Date: July 30, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 28, 2016 | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487129 | |||||
SCORE 99 1801 S Jackson St Seattle Wa 4-25-17 bz pv system revision approved2-27-17 bz pv sys. Approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 86kw solar system on roof of property. Date: February 22, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: February 22, 2018 | Current use: Commercial | Permit id: 6582628 | |||||
SCORE 99 1116 Sw Holden St Seattle Wa 5 28 2015 - cancelled customer log #15-845 installation of an 125a ac subpanel Date: May 27, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: May 26, 2016 | Current use: Commercial | Permit id: 6475959 | |||||
SCORE 99 114 Nw 49th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 6kw solar photovoltaic system on roof of residence. Panel upgade. Date: April 18, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 16, 2017 | Expiration date: April 18, 2018 | Current use: Single family / duplex | Permit id: 6592224 | |||||
SCORE 99 4749 35th Ave S Seattle Wa (unit b) an electrical rough-in will be performed for possible future solar photovoltaic system. Date: December 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 15, 2015 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508341 | |||||
SCORE 99 2621 32nd Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 85 kw solar photovoltaic system on roof of residence. 8 22 16 jk approved plans. Date: August 17, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 6, 2016 | Expiration date: August 17, 2017 | Current use: Single family / duplex | Permit id: 6551943 | |||||
SCORE 99 9176 Holman Rd Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4(kw) solar photovoltaic system will be installed on roof of property. 5 24 16 jk approved plans. 6 2 16 jk approved revised plans. Date: May 24, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: May 24, 2017 | Current use: Commercial | Permit id: 6536731 | |||||
SCORE 99 4224 51st Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 12kw solar photovoltaic system on roof of residence. 7 5 16 jk approved plans. Date: June 22, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 13, 2016 | Expiration date: June 22, 2017 | Current use: Single family / duplex | Permit id: 6542212 | |||||
SCORE 99 7308 44th Ave Ne Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and residence. Date: September 12, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 14, 2017 | Expiration date: September 12, 2018 | Current use: Single family / duplex | Permit id: 6618293 | |||||
SCORE 99 54 16th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 13kw solar photovoltaic system on roof of residence. System components include (15) itek energy 275w modules & (8) aps blue frog yc0500a miw dual input microinverters. Date: January 20, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 11, 2015 | Expiration date: January 20, 2016 | Current use: Single family / duplex | Permit id: 6455267 | |||||
SCORE 99 45 Purdue Ave Ne Seattle Wa 10-24-17 bz waived plan review under 2017 7. 7kva threshold based on inverter output[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9 kw solar photovoltaic system on the roof of residence. Also installing feeder panel. Date: October 9, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 9, 2017 | Expiration date: October 9, 2018 | Current use: Single family / duplex | Permit id: 6623339 | |||||
SCORE 99 933 Nw 56th St Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and residence. Date: December 15, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: December 15, 2017 | Current use: Single family / duplex | Permit id: 6571798 | |||||
SCORE 99 1516 Nw 51st St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 15 itek 2 watt modules and aps blue frog micro inverters Date: October 14, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: October 13, 2016 | Current use: Commercial | Permit id: 6499839 | |||||
SCORE 99 9003 31st Ave Sw Seattle Wa A service conduit replacement will be performed in electrical room and residence. Date: January 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 23, 2015 | Expiration date: January 15, 2016 | Current use: Single family / duplex | Permit id: 6454762 | |||||
SCORE 99 435 Dexter Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 48 solarworld 2 watt modules with a solectria 14tl inverter Date: October 14, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 24, 2016 | Expiration date: October 13, 2016 | Current use: Commercial | Permit id: 6499842 | |||||
SCORE 99 3847 24th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 21kw solar photovoltaic system on roof of sfr. (18) sunpower 345w ac modules w solarbridge microinverters. Date: July 19, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 8, 2016 | Expiration date: July 19, 2017 | Current use: Single family / duplex | Permit id: 6546929 | |||||
SCORE 99 Date: April 19, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 21, 2016 | Expiration date: April 19, 2017 | Current use: Single family / duplex | Permit id: 6530229 | |||||
SCORE 99 5209 1st Ave Nw Seattle Wa Installation of a electric vehicle charging station will be installed in electrical room and residence. Date: March 22, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 24, 2016 | Expiration date: March 22, 2017 | Current use: Single family / duplex | Permit id: 6525217 | |||||
SCORE 99 4132 Brooklyn Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 88kw grid tied solar photovoltaic system. Date: January 31, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2017 | Expiration date: January 31, 2018 | Current use: Commercial | Permit id: 6578978 | |||||
SCORE 99 115 12th Ave Ne Seattle Wa Installation of a 96. 9 kw dc (73 kw ac) solar pv array on the roof of hazel wolf k-8 e-stem school, connected to existing electrical switchboard Value: $98,951 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627826 | |||||
SCORE 99 Date: September 20, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: September 20, 2018 | Current use: Single family / duplex | Permit id: 6620067 | |||||
SCORE 99 6113 32nd Ave Nw Seattle Wa 8-14-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4(kw) solar photovoltaic system will be installed on roof of residence. Date: August 2, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 28, 2017 | Expiration date: August 2, 2018 | Current use: Single family / duplex | Permit id: 6611309 | |||||
SCORE 99 6321 Seaview Ave Nw Seattle Wa Installation of 4 electric vehicle charging stations will be performed in electrical room and residence. Also,installation of a 3-phase 225a sub panel will be installed on residence. Date: October 5, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: October 4, 2016 | Current use: Commercial | Permit id: 6498163 | |||||
SCORE 99 8315 Fremont Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 84kw solar photovoltaic system on roof of residence. System components include (24) itek 285w modules & (12) blue frog yc-500a miw microinverters. Date: October 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 6, 2015 | Expiration date: October 14, 2016 | Current use: Single family / duplex | Permit id: 6500122 | |||||
SCORE 99 3212 37th Ave S Seattle Wa 8-28-17 bz plan review waived 2017 threshold 7. 7kva. Micro inverter limits output to below7. 7kva. Final approval subject to field inspector.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 1 kw solar photovoltaic system on roof of residence. Date: August 30, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 5, 2017 | Expiration date: August 30, 2018 | Current use: Single family / duplex | Permit id: 6616189 | |||||
SCORE 99 7723 Seward Park Ave S Seattle Wa 6 22 2015- cancelled customer log #15-10 installation of a electric vehicle charging station will be installed in electrical room and residence. Date: June 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: June 15, 2016 | Current use: Single family / duplex | Permit id: 6479490 | |||||
SCORE 99 2003 Nw 57th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 55 solar photovoltaic system will be installed on roof of property. 2 13 17 paf renew Date: February 23, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 3, 2017 | Expiration date: February 22, 2018 | Current use: Commercial | Permit id: 6520419 | |||||
SCORE 99 3701 Sw 104th St Seattle Wa Installation of a 142 kw dc (1 kw ac) solar pv array on the roof of arbor heights elementary school, to connect to existing electrical switchboard. Value: $106,213 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627383 | |||||
SCORE 99 1812 25th Ave Seattle Wa (unit d) installation of a electric vehicle charging station will be performed in electrical room and residence. Date: August 29, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 31, 2017 | Expiration date: August 29, 2018 | Current use: Single family / duplex | Permit id: 6615899 | |||||
SCORE 99 11 Alki Ave Sw Seattle Wa Installation of a electric vehicle chargng station will be performed in electrical room and residence. Date: January 8, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 9, 2015 | Expiration date: January 8, 2016 | Current use: Single family / duplex | Permit id: 6453798 | |||||
SCORE 99 Date: April 25, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 26, 2016 | Expiration date: April 25, 2017 | Current use: Single family / duplex | Permit id: 6531156 | |||||
SCORE 99 5202 S Morgan St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 695kw solar photovoltaic system on roof of residence. System components include (27) itek energy 285w modules & (1) itek pvi-6600tl string inverter. Service panel upgrade. Date: September 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 4, 2015 | Expiration date: September 23, 2016 | Current use: Single family / duplex | Permit id: 6496586 | |||||
SCORE 99 8546 Midvale Ave N Seattle Wa (unit b) installation of a electric vehicle charging station will be performed in electrical room and residence. Date: December 11, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 31, 2015 | Expiration date: December 10, 2016 | Current use: Single family / duplex | Permit id: 6509258 | |||||
SCORE 99 7286 29th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4 kw solar photovoltaic solar system on roof of residence. Service upgrade to 200a. 6 25 15 hkh; add (1) 200a feeder and (1) 100a feeder Date: June 8, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 30, 2015 | Expiration date: June 7, 2016 | Current use: Single family / duplex | Permit id: 6478115 | |||||
SCORE 99 5201 Beach Dr Sw Seattle Wa 2-27-17 bz pv review approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 8kw solar photovoltaic system on roof of residence. Date: February 21, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: February 21, 2018 | Current use: Single family / duplex | Permit id: 6582258 | |||||
SCORE 99 911 W Howe St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 98kw solar photovoltaic system on roof of residence. System components include (28) itek energy 285w modules & (1) itek pvi-7600tl string inverter. Date: December 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 29, 2015 | Expiration date: December 1, 2016 | Current use: Single family / duplex | Permit id: 6507628 | |||||
SCORE 99 1718b 27th Ave Seattle Wa Cancel per customer log 15-1316 rough in for possible future solar pv system. Date: July 30, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487134 | |||||
SCORE 99 4765 35th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 76kw solar photovoltaic system on roof of sfr. System components include (16) sunpower ac modules. Date: March 14, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 11, 2017 | Expiration date: March 14, 2018 | Current use: Single family / duplex | Permit id: 6586081 | |||||
SCORE 99 4434 Renton Ave S Seattle Wa An electrical rough-in will be performed in electrical room and residence for possible future solar photovoltaic system. Date: December 16, 2014 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 22, 2014 | Expiration date: December 16, 2015 | Current use: Single family / duplex | Permit id: 6451088 | |||||
SCORE 99 Date: August 2, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: August 2, 2018 | Current use: Single family / duplex | Permit id: 6611194 | |||||
SCORE 99 4055 41st Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 13 kw solar pv system on roof of residence. Also a service upgrade. 3 14 2016 paf add 2 amp feeder. 3 15 2016 paf add (1) amp circuit. Date: February 29, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 23, 2016 | Expiration date: February 28, 2017 | Current use: Single family / duplex | Permit id: 6521344 | |||||
SCORE 99 22 Etruria St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6 solar photovoltaic system will be installed on roof of property. Date: February 15, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 3, 2016 | Expiration date: February 14, 2017 | Current use: Commercial | Permit id: 6519010 | |||||
SCORE 99 3333 Wallingford Ave N Seattle Wa (unit 315) panel in parking garage. Installation of a electric vehicle charging will be installed at parking garage. Date: September 12, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 13, 2017 | Expiration date: September 12, 2018 | Current use: Single family / duplex | Permit id: 6618267 | |||||
SCORE 99 607 21st Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 0kw solar photovoltaic system on roof of sfr. System components include (20) itek energy 300w modules & (10) blue frog yc-500a miw microinverters. Date: April 11, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 27, 2017 | Expiration date: April 11, 2018 | Current use: Single family / duplex | Permit id: 6591013 | |||||
SCORE 99 3207 13th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 06kw solar photovoltaic system on roof of detached garage. System components include (14) solarwold 290w modules & (14) chilicon power microinverters. Date: December 21, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: January 19, 2017 | Expiration date: December 21, 2017 | Current use: Single family / duplex | Permit id: 6572852 | |||||
SCORE 99 4738 15th Ave Ne Seattle Wa 3-8-17 bz pv sys approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 20. 7kw solar system on roof of property. Date: March 2, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: March 2, 2018 | Current use: Commercial | Permit id: 6584088 | |||||
SCORE 99 7027 Sycamore Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4kw solar photovoltaic system on roof of residence. 11 04 16 jk approved plans. 11 17 16 jk approved revised plans. Date: October 26, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 22, 2016 | Expiration date: October 26, 2017 | Current use: Single family / duplex | Permit id: 6563901 | |||||
SCORE 99 124 Denny Way Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4(kw) solar photovoltaic system will be installed on roof of residence. Date: August 17, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 1, 2017 | Expiration date: August 17, 2017 | Current use: Commercial | Permit id: 6551914 | |||||
SCORE 99 1411 Alki Ave Sw Seattle Wa 1 8 2015 - cancelled customer log #15-27 installation of a electric vehicle charging station will be performed in electrical room and residence. Date: January 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: January 2, 2016 | Current use: Single family / duplex | Permit id: 6453087 | |||||
SCORE 99 7018 50th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 55kw solar photovoltaic system on roof of residence. System components include (30) itek 285w modules & (1) pvi-7600tl string inverter. Date: September 17, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 27, 2015 | Expiration date: September 16, 2016 | Current use: Single family / duplex | Permit id: 6495415 | |||||
SCORE 99 6353 50th Ave Sw Seattle Wa 6-12-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 8 kw solar photovoltaic system on roof of residence. Date: May 30, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 14, 2017 | Expiration date: May 30, 2018 | Current use: Single family / duplex | Permit id: 6599756 | |||||
SCORE 99 4122 36th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 13kw solar system on roof of property. Date: June 26, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 4, 2017 | Expiration date: June 26, 2018 | Current use: Commercial | Permit id: 6604787 | |||||
SCORE 99 Date: February 9, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 10, 2016 | Expiration date: February 8, 2017 | Current use: Single family / duplex | Permit id: 6518056 | |||||
SCORE 99 1747 Nw 61st St Seattle Wa An electrical rough-in will be performed in (unit a) for possible future solar photovoltaic system. Date: March 26, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2015 | Expiration date: March 25, 2016 | Current use: Single family / duplex | Permit id: 6465996 | |||||
SCORE 99 5637 30th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek energy 280w modules & (9) aps blue frog yc-500a miw dual input microinverters. Date: February 10, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 25, 2015 | Expiration date: February 10, 2016 | Current use: Single family / duplex | Permit id: 6458692 | |||||
SCORE 99 3236 S Edmunds St Seattle Wa This is for unit b. An electrical rough-in will be performed in electrical room and residence. Date: November 3, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 4, 2015 | Expiration date: November 2, 2016 | Current use: Single family / duplex | Permit id: 6503296 | |||||
SCORE 99 3711 47th Pl Ne Seattle Wa 3 25 2015 - cancelled customer log #15-511 installation of a electric vehicle charging station will performed in electrical room and residence. Date: February 23, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: February 23, 2016 | Current use: Single family / duplex | Permit id: 6460649 | |||||
SCORE 99 222 Etruria St Seattle Wa (this is for suite 1 ssa acoustics) installation of a electric vehicle charging station will be installed in electrical room and residence. Date: January 18, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 15, 2017 | Expiration date: January 18, 2018 | Current use: Commercial | Permit id: 6576764 | |||||
SCORE 99 1315 E Jefferson St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 1. 96kw photovoltaic system with enphase micro inverters on roof of building. Date: October 14, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2016 | Expiration date: October 13, 2016 | Current use: Commercial | Permit id: 6499835 | |||||
SCORE 99 Date: February 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 23, 2015 | Expiration date: February 16, 2016 | Current use: Single family / duplex | Permit id: 6459622 | |||||
SCORE 99 2519 34th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 24(kw) solar photovoltaic system will be installed on roof of residence. Array will consist of (33) itek energy module and (1)itek pvi-7600tl inverter. Date: April 13, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2015 | Expiration date: April 12, 2016 | Current use: Single family / duplex | Permit id: 6468606 | |||||
SCORE 99 963 22nd Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 9kw solar photovoltaic system on roof of sfr. System components include (23) itek energy 300w modules & (12) blue frog yc-500a miw dual-input microinverters. Date: April 11, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 13, 2017 | Expiration date: April 11, 2018 | Current use: Single family / duplex | Permit id: 6591023 | |||||
SCORE 99 4765 35th Ave S Seattle Wa (unit c) an electrical rough-in will be done for possible future solar photovoltaic system. Date: January 18, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 4, 2016 | Expiration date: January 17, 2017 | Current use: Single family / duplex | Permit id: 6514201 | |||||
SCORE 99 Date: February 8, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 20, 2017 | Expiration date: February 8, 2018 | Current use: Single family / duplex | Permit id: 6580353 | |||||
SCORE 99 1528 37th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 415 kw solar photovoltaic system on roof of residence. Date: September 15, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 21, 2015 | Expiration date: September 14, 2016 | Current use: Single family / duplex | Permit id: 6494845 | |||||
SCORE 99 317 37th Ave E Seattle Wa An electrical rough-in will be done for possible future solar photovoltaic system. Date: March 10, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: March 10, 2018 | Current use: Single family / duplex | Permit id: 6585603 | |||||
SCORE 99 82 Fairway Dr Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a photovoltaic system will be installed on roof of residence. 1-17-17 bz approved plans Date: December 15, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 6, 2017 | Expiration date: December 15, 2017 | Current use: Single family / duplex | Permit id: 6571860 | |||||
SCORE 99 1325 30th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] an additional 1. 12(kw) solar photovoltaic saystem will be installed on existing pv array. Date: March 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 6, 2015 | Expiration date: March 15, 2016 | Current use: Single family / duplex | Permit id: 6464145 | |||||
SCORE 99 525 Rainier Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 13kw solar photovoltaic awning. System components include (18) itek energy 285w modules & (1) itek pvi-5200tl string inverter. 9 28 16 jle renewal Date: September 29, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 5, 2016 | Expiration date: September 28, 2017 | Current use: Single family / duplex | Permit id: 6497373 | |||||
SCORE 99 201 Galer St Seattle Wa 1 25 2017 - cancelled customer log #17-84 installation of a electric vehicle charging station will be installed in electrical room and residence. Date: January 18, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: January 18, 2018 | Current use: Single family / duplex | Permit id: 6576717 | |||||
SCORE 99 5825 3rd Ave Nw Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. 1 29 15 jcb; add 2 amp service. Date: January 2, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2015 | Expiration date: January 2, 2016 | Current use: Single family / duplex | Permit id: 6453089 | |||||
SCORE 99 11423 Marine View Dr Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 8kw solar photovoltaic system on roof of residence. System components include (21) itek 275w modules & (11) aps blue frog yc-500a miw dual-input microinverters. Date: March 5, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 8, 2015 | Expiration date: March 4, 2016 | Current use: Single family / duplex | Permit id: 6462497 | |||||
SCORE 99 6208 57th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 9 solar photovoltaic system will be onstalled on roof of residence. Arrays will consist of (36) itek energy 275w modules and (18) blue frog solar yc500a-miw micro inverters. Date: April 23, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 11, 2015 | Expiration date: April 22, 2016 | Current use: Single family / duplex | Permit id: 6470405 | |||||
SCORE 99 Date: March 31, 2014 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Application accepted | Expiration date: March 31, 2015 | Current use: Single family / duplex | Permit id: 6411002 | |||||
SCORE 99 1515 35th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 4. 8kw photovoltaic system on roof of dadu and connected to existing system on house. Date: October 4, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: October 4, 2018 | Current use: Single family / duplex | Permit id: 6622451 | |||||
SCORE 99 301 12th Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 15(kw) solar photovoltaic system will be installed on roof of property. Date: November 3, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 20, 2016 | Expiration date: November 2, 2016 | Current use: Commercial | Permit id: 6503221 | |||||
SCORE 99 557 N 80th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 64 kw solar photovoltaic system on roof of residence. 1-17-17 bz approved plans. Date: January 5, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 2, 2017 | Expiration date: January 5, 2018 | Current use: Single family / duplex | Permit id: 6574637 | |||||
SCORE 99 7316 27th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 4(kw) solar photovoltaic system will be installed on roof of residence. Date: July 21, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 3, 2017 | Expiration date: July 21, 2018 | Current use: Single family / duplex | Permit id: 6609248 | |||||
SCORE 99 3239a California Ave Sw Seattle Wa An electrical rough-in will be performed on electrical room and residence. Date: May 12, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 18, 2015 | Expiration date: May 11, 2016 | Current use: Single family / duplex | Permit id: 6473548 | |||||
SCORE 99 2322 50th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 93kw solar photovoltaic system on roof of residence. System components include (17) itek energy 290w & (1) itek solectria pvi-5200tl string inverter. Date: May 10, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2016 | Expiration date: May 10, 2017 | Current use: Single family / duplex | Permit id: 6534184 | |||||
SCORE 99 3632 W Commodore Way Seattle Wa 6-12-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 11. 4 kw solar photovoltaic system on roof of residence. Date: June 2, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 7, 2017 | Expiration date: June 2, 2018 | Current use: Single family / duplex | Permit id: 6600640 | |||||
SCORE 99 1711 Nw 61st St Seattle Wa (this is for unit b) an electrcial rough-in will be performed for possible future solar photovoltaic system. 2 5 16 jle changed address from 1709 nw 61st st Date: December 16, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2016 | Expiration date: December 15, 2016 | Current use: Single family / duplex | Permit id: 6509820 | |||||
SCORE 99 6406 60th Pl S Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: June 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: July 17, 2015 | Expiration date: June 23, 2016 | Current use: Single family / duplex | Permit id: 6481001 | |||||
SCORE 99 3719 Burke Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek 280w modules & (9) blue frog yc-500a miw dual-input microinverters. 3 12 15 jcb; add vehicle charging station. Date: March 3, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: August 19, 2015 | Expiration date: March 2, 2016 | Current use: Single family / duplex | Permit id: 6462154 | |||||
SCORE 99 4118 39th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 85kw solar photovoltaic system on roof of residence. 11 16 16 jk approved plans. Date: October 26, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 16, 2016 | Expiration date: October 26, 2017 | Current use: Single family / duplex | Permit id: 6563937 | |||||
SCORE 99 Date: December 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2016 | Expiration date: December 6, 2016 | Current use: Commercial | Permit id: 6508194 | |||||
SCORE 99 3514 E Columbia St Seattle Wa Installation of a electric vehicle charging station will be performed in electrical room and residence. Date: August 20, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 18, 2015 | Expiration date: August 19, 2016 | Current use: Single family / duplex | Permit id: 6490866 | |||||
SCORE 99 5621 6th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04(kw) solar photovoltaic system will be installed on roof of residence. Date: January 13, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: May 5, 2015 | Expiration date: January 13, 2016 | Current use: Single family / duplex | Permit id: 6454536 | |||||
SCORE 99 1301 E Yesler Way Seattle Wa Installation of a 153. 4 kw dc (1 kw ac) solar pv array on the roof of bailey gatzert elementary school, connected to the existing electrical switchboard. Value: $100,398 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627388 | |||||
SCORE 99 1625 E Mcgraw St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 9(kw) solar photovoltaic system will be installed on roof of residence. Date: May 28, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 4, 2015 | Expiration date: May 27, 2016 | Current use: Single family / duplex | Permit id: 6476227 | |||||
SCORE 99 1007 20th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 27 kw solar pv system on roof of residence. Date: December 7, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 23, 2015 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508335 | |||||
SCORE 99 1232 Harrison St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 77kw solar system on roof of property. Date: July 10, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: July 10, 2018 | Current use: Commercial | Permit id: 6606805 | |||||
SCORE 99 126 Blakely Pl Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site] installation of a 6. 16kw solar photovoltaic system on roof of residence; system components include (22) itek 280w modules & (1) itek pvi-5200tl string inverter. 2 26 15 jcb; add 2 amp service. Date: February 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: March 17, 2015 | Expiration date: February 24, 2016 | Current use: Single family / duplex | Permit id: 6460994 | |||||
SCORE 99 6535 Seaview Ave Nw Seattle Wa 8 30 2017 - cancelled customer log #17-10 installation of a electric vehicle charging station will be performed in electrical room and residence. Date: August 23, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: August 23, 2018 | Current use: Single family / duplex | Permit id: 6615064 | |||||
SCORE 99 1815 Bellevue Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a solar photovoltaic system will be installed on roof of property. Date: March 14, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 28, 2016 | Expiration date: March 14, 2017 | Current use: Single family / duplex | Permit id: 6523846 | |||||
SCORE 99 1401 Sunset Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 970kw solar photovoltaic system on roof of sfr. System components include (26) sunpower 345w modules & (1) sma sunnyboy 7000tl-ss string inverter. Date: April 6, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: April 6, 2017 | Current use: Single family / duplex | Permit id: 6527986 | |||||
SCORE 99 611 E Howell St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] an installation of a . 64(kw) solar photovoltaic system will be installed on roof of property. Date: May 19, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 3, 2016 | Expiration date: May 19, 2017 | Current use: Commercial | Permit id: 6536014 | |||||
SCORE 99 3525 S Oregon St Seattle Wa This is for unit b. An electrical rough-in for possible future solar photovoltaic system will be performed in electrical room and residence. Date: October 22, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: October 21, 2016 | Current use: Single family / duplex | Permit id: 6501175 | |||||
SCORE 99 4456 47th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 2(kw) solar photovoltaic system will be installed on roof of residence. Date: October 30, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 20, 2017 | Expiration date: October 30, 2018 | Current use: Single family / duplex | Permit id: 6627318 | |||||
SCORE 99 3414 E Ward St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 32(kw) solar photovoltaic system will be installed on roof of residence. Date: October 23, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 29, 2017 | Expiration date: October 23, 2018 | Current use: Single family / duplex | Permit id: 6625944 | |||||
SCORE 99 8031 11th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 4(kw) solar photovoltaic system will be installed on roof of residence. Date: October 31, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: December 5, 2017 | Expiration date: October 31, 2018 | Current use: Single family / duplex | Permit id: 6627595 | |||||
SCORE 99 8527 Burke Ave N Seattle Wa 10-24-17 bz waived plan review under 2017 7. 7kva threshold based on inverter output[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9 kw solar photovoltaic system on roof of residence. Date: October 18, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: November 22, 2017 | Expiration date: October 18, 2018 | Current use: Single family / duplex | Permit id: 6625148 |