SCORE

PUGETSOUNDSOLAR

ABOUT PUGETSOUNDSOLAR

Pugetsoundsolar specializes in:

Pugetsoundsolar offers services:

Based on the information received from , associated with Pugetsoundsolar over the past .

If you are considering hiring Pugetsoundsolar for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Pugetsoundsolar has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
99
805 Rainier Ave S Seattle Wa
Install non-illum wall sign - puget sound solar
Date:  December 13, 2011
Contractor: Pugetsoundsolar

Applicant: Pugetsoundsolar | Permit type: Sign/billboard/awning | Permit status: Permit closed | Completion date: November 15, 2012 | Expiration date: June 13, 2013 | Current use: Commercial | Permit id: 6304737
2011/12/13099805 Rainier Ave S Seattle WaPugetsoundsolar
SCORE
99
10 James St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 41(kw) solar photovoltaic system will be installed on roof of property. 12 6 17 mwb: renewal
Date:  November 23, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 6, 2017 | Expiration date: November 23, 2018 | Current use: Commercial | Permit id: 6568547
2016/11/2309910 James St Seattle WaPugetsoundsolar
SCORE
99
4326 S Morgan St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9(kw) solar photovoltaic system will be installed on roof of residence.
Date:  December 1, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 11, 2017 | Expiration date: December 1, 2018 | Current use: Single family / duplex | Permit id: 6633131
2017/12/010994326 S Morgan St Seattle WaPugetsoundsolar
SCORE
99
1118 Nw 50th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 6. 72 kw solar system on roof of property. 08 16 17 cep; system size reduced to 2. 88 kw.
Date:  May 17, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 11, 2017 | Expiration date: May 17, 2018 | Current use: Commercial | Permit id: 6597754
2017/05/170991118 Nw 50th St Seattle WaPugetsoundsolar
SCORE
99
5611 17th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 2(kw) solar photovoltaic system will be installed on roof of residence.
Date:  April 26, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 21, 2017 | Expiration date: April 26, 2018 | Current use: Commercial | Permit id: 6593803
2017/04/260995611 17th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
6516 12th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 8 kw solar photovoltaic system on theroof of the building. 11 28 17 jk waived plan review because the total ac output power of the system is less than or equal to 7,7 watts.
Date:  November 21, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: November 21, 2018 | Current use: Commercial | Permit id: 6631558
2017/11/210996516 12th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
7006 43rd Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 4(kw) solar photovoltaic system will be installed on roof of residence.
Date:  November 29, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: November 29, 2018 | Current use: Single family / duplex | Permit id: 6632636
2017/11/290997006 43rd Ave Ne Seattle WaPugetsoundsolar
SCORE
99
1518 W Dravus St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 35(kw) solar photovoltaic system will be installed on roof of property. 11 28 2017 ym renewed
Date:  November 23, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: November 23, 2018 | Current use: Commercial | Permit id: 6568694
2016/11/230991518 W Dravus St Seattle WaPugetsoundsolar
SCORE
99
731 N 72nd St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 57kw photovoltaic system and interconnection to scl grid.
Date:  December 12, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: December 12, 2018 | Current use: Single family / duplex | Permit id: 6634777
2017/12/12099731 N 72nd St Seattle WaPugetsoundsolar
SCORE
99
11021 Durland Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 0kw solar photovoltaic system on roof of residence. System components include (30) itek energy 300w modules & (15) aps yc-500a microinverters.
Date:  December 6, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 13, 2017 | Expiration date: December 6, 2018 | Current use: Single family / duplex | Permit id: 6633909
2017/12/0609911021 Durland Ave Ne Seattle WaPugetsoundsolar
SCORE
99
52 20th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 28 kw solar photovoltaic system on roof of residence.
Date:  October 24, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 13, 2017 | Expiration date: October 24, 2018 | Current use: Single family / duplex | Permit id: 6626328
2017/10/2409952 20th Ave S Seattle WaPugetsoundsolar
SCORE
99
5007 2nd Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 12kw solar photovoltaic system will be installed on roof of property.
Date:  December 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: December 13, 2018 | Current use: Single family / duplex | Permit id: 6635067
2017/12/130995007 2nd Ave Nw Seattle WaPugetsoundsolar
SCORE
99
1715 12th Ave Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 1. 45kw photovoltaic system on roof of property.
Date:  September 11, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2017 | Expiration date: September 11, 2018 | Current use: Commercial | Permit id: 6617978
2017/09/110991715 12th Ave Seattle WaPugetsoundsolar
SCORE
99
13332 23rd Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 88(kw) solar photovoltaic system will be installed on roof of property.
Date:  November 29, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2017 | Expiration date: November 29, 2018 | Current use: Single family / duplex | Permit id: 6632608
2017/11/2909913332 23rd Ave Ne Seattle WaPugetsoundsolar
SCORE
99
4619 Ne 73rd St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding two solar photovoltiac modules to existing system. 12 15 17 jk approved one-line diagram.
Date:  December 14, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: December 14, 2018 | Current use: Single family / duplex | Permit id: 6635381
2017/12/140994619 Ne 73rd St Seattle WaPugetsoundsolar
SCORE
99
6536 1st Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6kw solar photovoltaic system on roof of residence. System components include ( itek energy 280w modules & (1) itek pvi-5200tl string inverter.
Date:  December 1, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 7, 2016 | Expiration date: November 30, 2016 | Current use: Single family / duplex | Permit id: 6507400
2015/12/010996536 1st Ave Nw Seattle WaPugetsoundsolar
SCORE
99
6717 Roosevelt Way Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 4. 34kw photovoltaic system on roof of property and interconnected to house panel
Date:  September 26, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 26, 2018 | Current use: Commercial | Permit id: 6620841
2017/09/260996717 Roosevelt Way Ne Seattle WaPugetsoundsolar
SCORE
99
3631b Wallingford Ave N Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  November 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 5, 2015 | Expiration date: November 1, 2016 | Current use: Single family / duplex | Permit id: 6503109
2015/11/020993631b Wallingford Ave N Seattle WaPugetsoundsolar
SCORE
99
2026 E Madison St Seattle Wa
2 25 2016 - cancelled customer log #16-281[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 25(kw) solar photovoltaic system will be installed on roof of residence.
Date:  February 22, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: February 21, 2017 | Current use: Commercial | Permit id: 6520181
2016/02/220992026 E Madison St Seattle WaPugetsoundsolar
SCORE
99
1706 Nw 56th St Seattle Wa
9-21-17 bz pv sytem one-line appproved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 55kw solar system on roof of property.
Date:  August 24, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: August 24, 2018 | Current use: Commercial | Permit id: 6615194
2017/08/240991706 Nw 56th St Seattle WaPugetsoundsolar
SCORE
99
8015 Greenwood Ave N Seattle Wa
Installation of an evse and new feeder
Date:  July 30, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 31, 2015 | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487311
2015/07/300998015 Greenwood Ave N Seattle WaPugetsoundsolar
SCORE
99
4701 11th Ave Ne Seattle Wa
Install sub panel and ev charging stations
Date:  June 8, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 30, 2017 | Expiration date: June 8, 2018 | Current use: Commercial | Permit id: 6601535
2017/06/080994701 11th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
38 Woodland Park Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6 watt solar photo-voltaic system will be installed on roof of property.
Date:  January 12, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 16, 2016 | Expiration date: January 11, 2017 | Current use: Commercial | Permit id: 6513264
2016/01/1209938 Woodland Park Ave N Seattle WaPugetsoundsolar
SCORE
99
1057 Ne 97th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 11. 12kw solar pv system on roof of residence.
Date:  March 17, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 25, 2016 | Expiration date: March 17, 2017 | Current use: Single family / duplex | Permit id: 6524601
2016/03/170991057 Ne 97th St Seattle WaPugetsoundsolar
SCORE
99
1902 35th Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 6(kw) solar photovoltaic system will be installed on roof of residence. 1-17-17 bz approved plans.
Date:  January 3, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 8, 2017 | Expiration date: January 3, 2018 | Current use: Single family / duplex | Permit id: 6574147
2017/01/030991902 35th Ave W Seattle WaPugetsoundsolar
SCORE
99
11021 Durland Ave Ne Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  April 13, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 15, 2015 | Expiration date: April 12, 2016 | Current use: Single family / duplex | Permit id: 6468587
2015/04/1309911021 Durland Ave Ne Seattle WaPugetsoundsolar
SCORE
99
3824 Ne 94th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96 kw solar photovoltaic system on roof of residence. Main panel upgrade.
Date:  June 18, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 3, 2015 | Expiration date: June 17, 2016 | Current use: Single family / duplex | Permit id: 6480002
2015/06/180993824 Ne 94th St Seattle WaPugetsoundsolar
SCORE
99
3618 Meridian Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 0(kw) solar photovoltaic system will be installed on roof of residence.
Date:  July 20, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 20, 2015 | Expiration date: July 19, 2016 | Current use: Single family / duplex | Permit id: 6485283
2015/07/200993618 Meridian Ave N Seattle WaPugetsoundsolar
SCORE
99
1116 Sw Holden St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 41kw solar photovoltaic system on roof of building. System components include (18) itek energy 245w modules & (1) solectria pvi-40 string inverter.
Date:  March 9, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 28, 2015 | Expiration date: March 8, 2016 | Current use: Commercial | Permit id: 6463112
2015/03/090991116 Sw Holden St Seattle WaPugetsoundsolar
SCORE
99
25 Magnolia Blvd W Seattle Wa
An electric vehicle charging station will be installed on roof of property.
Date:  June 1, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: June 1, 2018 | Current use: Single family / duplex | Permit id: 6600213
2017/06/0109925 Magnolia Blvd W Seattle WaPugetsoundsolar
SCORE
99
3718 37th Ave S Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  January 27, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 29, 2015 | Expiration date: January 27, 2016 | Current use: Single family / duplex | Permit id: 6456396
2015/01/270993718 37th Ave S Seattle WaPugetsoundsolar
SCORE
99
59 17th Ave S Seattle Wa
Installation of a 6. 27 kw solar photovoltaic system on roof of residence.
Date:  December 3, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 11, 2016 | Expiration date: December 2, 2016 | Current use: Single family / duplex | Permit id: 6507865
2015/12/0309959 17th Ave S Seattle WaPugetsoundsolar
SCORE
99
836 Ne 67th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 1. 45kw solar photovoltaic system on roof.
Date:  February 2, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 24, 2017 | Expiration date: February 2, 2018 | Current use: Commercial | Permit id: 6579321
2017/02/02099836 Ne 67th St Seattle WaPugetsoundsolar
SCORE
99
8426 9th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 57kw solar photovoltaic system on roof of residence. System components include (13) itek 275w modules & (1) eltek theia he-t 38 ul string inverter.
Date:  February 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 11, 2015 | Expiration date: February 2, 2016 | Current use: Single family / duplex | Permit id: 6457518
2015/02/020998426 9th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
3236 S Edmunds St Seattle Wa
An electrical rough-in will be performed in electrical room and residence for possible future solar photovoltaic system.
Date:  December 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2015 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508308
2015/12/070993236 S Edmunds St Seattle WaPugetsoundsolar
SCORE
99
5608 Latona Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 12 kw solar photovoltaic system on roof of residence. Main electrical panel upgrade. Evse circuit installation. Additional amp circuit installation
Date:  June 1, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2015 | Expiration date: May 31, 2016 | Current use: Single family / duplex | Permit id: 6476814
2015/06/010995608 Latona Ave Ne Seattle WaPugetsoundsolar
SCORE
99
7503 Fairway Dr Ne Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  February 15, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 17, 2016 | Expiration date: February 14, 2017 | Current use: Single family / duplex | Permit id: 6518982
2016/02/150997503 Fairway Dr Ne Seattle WaPugetsoundsolar
SCORE
99
2648 S Hudson St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 7 kw solar photovoltaic system on roof of residence. 1-17-17 bz approved plans.
Date:  January 5, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2017 | Expiration date: January 5, 2018 | Current use: Single family / duplex | Permit id: 6574642
2017/01/050992648 S Hudson St Seattle WaPugetsoundsolar
SCORE
99
317 37th Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 64 kw solar photovoltaic system on roof of residence.
Date:  October 11, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: October 11, 2018 | Current use: Single family / duplex | Permit id: 6623864
2017/10/11099317 37th Ave E Seattle WaPugetsoundsolar
SCORE
99
9511 31st Ave Nw Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  August 9, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 11, 2017 | Expiration date: August 9, 2018 | Current use: Single family / duplex | Permit id: 6612410
2017/08/090999511 31st Ave Nw Seattle WaPugetsoundsolar
SCORE
99
1538 N 128th St Seattle Wa
Installation of a electric vehicle charging station will be installed om electrical room and residence.
Date:  March 10, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 1, 2016 | Expiration date: March 10, 2017 | Current use: Single family / duplex | Permit id: 6523290
2016/03/100991538 N 128th St Seattle WaPugetsoundsolar
SCORE
99
1217 39th Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw solar photovoltaic system on roof of residence. System components include (16) itek 280w modules & (8) blue frog aps yc-5 microinverters. 4-29-15 ah. Added (1) 30-50a charging station
Date:  April 28, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 13, 2015 | Expiration date: April 27, 2016 | Current use: Single family / duplex | Permit id: 6471303
2015/04/280991217 39th Ave E Seattle WaPugetsoundsolar
SCORE
99
1508 24th Ave Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  December 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 24, 2016 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508291
2015/12/070991508 24th Ave Seattle WaPugetsoundsolar
SCORE
99
2051 E Madison St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 05 solar photovoltaic system will be installed on roof of residence.
Date:  September 3, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 4, 2016 | Expiration date: September 2, 2016 | Current use: Commercial | Permit id: 6493149
2015/09/030992051 E Madison St Seattle WaPugetsoundsolar
SCORE
99
334 Ne 55th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 64kw solar photovoltaic system on roof of residence. System components include (13) itek energy 280w modules & (1) pvi-3800tl string inverter by itek.
Date:  January 5, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 10, 2016 | Expiration date: January 4, 2017 | Current use: Single family / duplex | Permit id: 6512080
2016/01/05099334 Ne 55th St Seattle WaPugetsoundsolar
SCORE
99
1107 38th Ave Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  March 28, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2017 | Expiration date: March 28, 2018 | Current use: Single family / duplex | Permit id: 6588670
2017/03/280991107 38th Ave Seattle WaPugetsoundsolar
SCORE
99
2648 Nw 96th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 3. 42 kw solar photovoltaic system on of roof of residence.
Date:  February 25, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 3, 2016 | Expiration date: February 24, 2017 | Current use: Single family / duplex | Permit id: 6520843
2016/02/250992648 Nw 96th St Seattle WaPugetsoundsolar
SCORE
99
3901 S Edmunds St Seattle Wa
3 31 2015 - cancelled customer log #15-537 an electrical rough-in will be performed for possible future solar photovoltaic system in electrical room and residence.
Date:  March 26, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: March 25, 2016 | Current use: Single family / duplex | Permit id: 6465874
2015/03/260993901 S Edmunds St Seattle WaPugetsoundsolar
SCORE
99
8734 20th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 84(kw) solar photovoltaic system will be installed on roof of residence.
Date:  August 19, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 22, 2015 | Expiration date: August 18, 2016 | Current use: Single family / duplex | Permit id: 6490714
2015/08/190998734 20th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
Date:  January 28, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2016 | Expiration date: January 27, 2017 | Current use: Single family / duplex | Permit id: 6516150
2016/01/280993621 59th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
42 S Othello St Seattle Wa
Cancel per customer log 16-06[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 19. 2(kw) solar photovoltaic system will be installed on roof of building.
Date:  December 22, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: December 21, 2016 | Current use: Commercial | Permit id: 6510843
2015/12/2209942 S Othello St Seattle WaPugetsoundsolar
SCORE
99
3608 Nw 65th Ct Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 5 kw solar photovoltaic system to previously existing 5. 5 kw photovoltaic system. Additional 1 amp sub-panel to be installed.
Date:  June 1, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 22, 2015 | Expiration date: May 31, 2016 | Current use: Single family / duplex | Permit id: 6476785
2015/06/010993608 Nw 65th Ct Seattle WaPugetsoundsolar
SCORE
99
11825 Seola Beach Dr Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. (16) lg 315w modules & (16) enphase m2 microinverters.
Date:  March 22, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2016 | Expiration date: March 22, 2017 | Current use: Single family / duplex | Permit id: 6525263
2016/03/2209911825 Seola Beach Dr Sw Seattle WaPugetsoundsolar
SCORE
99
4242 Ne 89th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 28 solar photovoltaic system on roof of residence.
Date:  July 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 13, 2015 | Expiration date: July 1, 2016 | Current use: Single family / duplex | Permit id: 6482546
2015/07/020994242 Ne 89th St Seattle WaPugetsoundsolar
SCORE
99
44 Sw Alaska St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 83(kw) solar photovoltaic system will be installed on roof of residence.
Date:  March 14, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 4, 2016 | Expiration date: March 14, 2017 | Current use: Single family / duplex | Permit id: 6523835
2016/03/1409944 Sw Alaska St Seattle WaPugetsoundsolar
SCORE
99
8015 Greenwood Ave N Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and property.
Date:  August 22, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 25, 2017 | Expiration date: August 22, 2017 | Current use: Single family / duplex | Permit id: 6552760
2016/08/220998015 Greenwood Ave N Seattle WaPugetsoundsolar
SCORE
99
3847 24th Ave W Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  January 18, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 12, 2017 | Expiration date: January 18, 2018 | Current use: Single family / duplex | Permit id: 6576727
2017/01/180993847 24th Ave W Seattle WaPugetsoundsolar
SCORE
99
3709 Sw Trenton St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 54 kw solar photovoltaic system on roof of residence. Installation of sub panel.
Date:  December 9, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 22, 2016 | Expiration date: December 9, 2017 | Current use: Single family / duplex | Permit id: 6570904
2016/12/090993709 Sw Trenton St Seattle WaPugetsoundsolar
SCORE
99
5623 36th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 0kw solar photovoltaic system on roof of residence. (25) itek 280w modules & (1) pvi-6600tl. Service and panel upgrade. Electrical plans have been uploaded
Date:  February 11, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 24, 2015 | Expiration date: February 11, 2016 | Current use: Single family / duplex | Permit id: 6459100
2015/02/110995623 36th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
5063 Harold Pl Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 865kw solar photovoltaic system on roof of residence. System components include (17) sunpower 345w modules & (17) abb 300w hv microinverters.
Date:  December 1, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2016 | Expiration date: November 30, 2016 | Current use: Single family / duplex | Permit id: 6507293
2015/12/010995063 Harold Pl Ne Seattle WaPugetsoundsolar
SCORE
99
2708 Ne 82nd St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 98kw solar photovoltaic system on roof of residence. System components include (21) itek energy 285w modules & (10. 5) blue frog yc-500a miw microinverters.
Date:  December 22, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 3, 2016 | Expiration date: December 21, 2016 | Current use: Single family / duplex | Permit id: 6510863
2015/12/220992708 Ne 82nd St Seattle WaPugetsoundsolar
SCORE
99
4833 55th Ave S Seattle Wa
6-12-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 8 kw solar photovoltaic system on roof of residence.
Date:  May 30, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 21, 2017 | Expiration date: May 30, 2018 | Current use: Single family / duplex | Permit id: 6599741
2017/05/300994833 55th Ave S Seattle WaPugetsoundsolar
SCORE
99
2614 S Ferdinand St Seattle Wa
Installation of a electric vehicle charging station and additional circuit will be installed in electrical room and residence.
Date:  December 16, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 19, 2016 | Expiration date: December 16, 2017 | Current use: Single family / duplex | Permit id: 6572050
2016/12/160992614 S Ferdinand St Seattle WaPugetsoundsolar
SCORE
99
1212 E Harrison St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 22kw solar system on the roof of property.
Date:  July 10, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: July 10, 2018 | Current use: Commercial | Permit id: 6606800
2017/07/100991212 E Harrison St Seattle WaPugetsoundsolar
SCORE
99
55 Sw Winthrop St Seattle Wa
8-28-17 bz plan review waived 2017 threshold 7. 7kva. Micro inverter limits output to below7. 7kva. Final approival subject to field inspector.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4(kw) solar photovoltiac system will be installed on roof of property.
Date:  August 22, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2017 | Expiration date: August 22, 2018 | Current use: Single family / duplex | Permit id: 6614728
2017/08/2209955 Sw Winthrop St Seattle WaPugetsoundsolar
SCORE
99
6488 48th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 05kw solar photovoltaic system on roof of residence. System components include (22) itek energy 275w modules & (1) itek pvi-5200tl string inverter.
Date:  February 5, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 26, 2015 | Expiration date: February 5, 2016 | Current use: Single family / duplex | Permit id: 6457989
2015/02/050996488 48th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
6237 44th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 12kw solar photovoltaic system on roof of residence. System components include (32) itek energy 285w modules & (1) itek pvi-7600tl string inverter.
Date:  November 5, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 17, 2015 | Expiration date: November 4, 2016 | Current use: Single family / duplex | Permit id: 6503594
2015/11/050996237 44th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
10036 59th Ave S Seattle Wa
8-14-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 6(kw) solar photovoltaic system will be installed on roof of property.
Date:  August 1, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 31, 2017 | Expiration date: August 1, 2018 | Current use: Single family / duplex | Permit id: 6611068
2017/08/0109910036 59th Ave S Seattle WaPugetsoundsolar
SCORE
99
77 California Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16(kw) solar photovoltaic system will be installed on roof of residence.
Date:  March 5, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2015 | Expiration date: March 4, 2016 | Current use: Single family / duplex | Permit id: 6462643
2015/03/0509977 California Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4815 38th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9(kw) solar photovoltaic system will be installed on roof of property. Also, a panel upgrade will be performed in electrical room.
Date:  August 9, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 17, 2017 | Expiration date: August 9, 2018 | Current use: Single family / duplex | Permit id: 6612619
2017/08/090994815 38th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
75 15th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 31kw photovoltaic system and interconnection to house panel.
Date:  September 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618753
2017/09/1309975 15th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
6729 17th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw solar photovoltaic system on roof of residence. System components include (16) itek energy 280w modules & (1) itek pvi-5200tl string inverter.
Date:  April 23, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 26, 2015 | Expiration date: April 22, 2016 | Current use: Single family / duplex | Permit id: 6470601
2015/04/230996729 17th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4335 2nd Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 64kw solar photovoltaic system on roof of residence. System components include (13) itek energy 280w modules & (6. 5) blue frog yc-5 miw dual input microinverters.
Date:  January 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 26, 2015 | Expiration date: January 16, 2016 | Current use: Single family / duplex | Permit id: 6455113
2015/01/160994335 2nd Ave Nw Seattle WaPugetsoundsolar
SCORE
99
305 25th Ave E Seattle Wa
12 8 2016 - cancelled customer log #16-1779 an electrical rough-in will be done for possible future solar photovoltaic system.
Date:  September 27, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 27, 2017 | Current use: Single family / duplex | Permit id: 6558750
2016/09/27099305 25th Ave E Seattle WaPugetsoundsolar
SCORE
99
5202 S Morgan St Seattle Wa
Replacing main electrical panel
Date:  September 1, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 7, 2016 | Expiration date: September 1, 2017 | Current use: Single family / duplex | Permit id: 6554603
2016/09/010995202 S Morgan St Seattle WaPugetsoundsolar
SCORE
99
2348 28th Ave S Seattle Wa
Installation of an eletric vehicle charging station.
Date:  April 24, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: April 24, 2018 | Current use: Single family / duplex | Permit id: 6593156
2017/04/240992348 28th Ave S Seattle WaPugetsoundsolar
SCORE
99
5727 29th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 64kw solar photovoltaic system on roof of residence. System components include (13) itek 280w modules & (1) pvi-3800tl string inverter.
Date:  April 21, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 5, 2015 | Expiration date: April 20, 2016 | Current use: Single family / duplex | Permit id: 6469911
2015/04/210995727 29th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
3242 36th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 11. 2 kw solar photovoltaic system on roof of residence. System components include (40) itek 280w modules, (1) itek pvi-7600tl & (1) itek theia 2. 9 he-t ul string inverters.
Date:  March 4, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 15, 2015 | Expiration date: March 3, 2016 | Current use: Single family / duplex | Permit id: 6462448
2015/03/040993242 36th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
6538 52nd Ave Ne Seattle Wa
3 15 2016 - cancelled customer log #16-370[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 96 kw solar photovoltaic system on roof of residence
Date:  August 20, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: August 19, 2016 | Current use: Single family / duplex | Permit id: 6490922
2015/08/200996538 52nd Ave Ne Seattle WaPugetsoundsolar
SCORE
99
7305 34th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 4 kw solar photovoltaic system on roof of residence.
Date:  January 17, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: January 17, 2018 | Current use: Single family / duplex | Permit id: 6576412
2017/01/170997305 34th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
334 Ne 55th St Seattle Wa
Installation of a electric vehicle charging station,
Date:  September 27, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 30, 2016 | Expiration date: September 27, 2017 | Current use: Single family / duplex | Permit id: 6558675
2016/09/27099334 Ne 55th St Seattle WaPugetsoundsolar
SCORE
99
727 N 70th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 64(kw) solar photovoltaic system will be installed on roof of residence.
Date:  June 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 16, 2015 | Expiration date: June 14, 2016 | Current use: Single family / duplex | Permit id: 6479262
2015/06/15099727 N 70th St Seattle WaPugetsoundsolar
SCORE
99
1427 11th Ave Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of solarworld 2 watt modules and a centralized sma inverter
Date:  October 14, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2016 | Expiration date: October 13, 2016 | Current use: Commercial | Permit id: 6499836
2015/10/140991427 11th Ave Seattle WaPugetsoundsolar
SCORE
99
2446 Lorentz Pl N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 5kw solar photovoltaic system on roof of sfr. System components include (25) itek energy 300w modules & (13) blue frog yc-500miw dual-input microinverters. 2-13-17 bz approved plans.
Date:  January 24, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 6, 2017 | Expiration date: January 24, 2018 | Current use: Single family / duplex | Permit id: 6577827
2017/01/240992446 Lorentz Pl N Seattle WaPugetsoundsolar
SCORE
99
7623 39th Ave S Seattle Wa
Installation of a electric vehicle will be installed in electrical room and residence.
Date:  April 25, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 23, 2017 | Expiration date: April 25, 2018 | Current use: Single family / duplex | Permit id: 6593627
2017/04/250997623 39th Ave S Seattle WaPugetsoundsolar
SCORE
99
30 Nw 63rd St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 245kw solar photovoltaic system on roof of residence. System components include (21) sunpower 345w modules w solaredge dc optimizers & (1) solaredge se6000a-us string inverter. 3 16 16 jk approved pv plans.
Date:  March 10, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2016 | Expiration date: March 10, 2017 | Current use: Single family / duplex | Permit id: 6523281
2016/03/1009930 Nw 63rd St Seattle WaPugetsoundsolar
SCORE
99
2752 44th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 84kw solar photovoltaic system on roof of residence. System components include (24) itek 280w modules & (1) pvi-6600tl string inverter by itek.
Date:  May 21, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 1, 2015 | Expiration date: May 20, 2016 | Current use: Single family / duplex | Permit id: 6475442
2015/05/210992752 44th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
322 21st Ave E Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  April 5, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 7, 2017 | Expiration date: April 5, 2018 | Current use: Single family / duplex | Permit id: 6590038
2017/04/05099322 21st Ave E Seattle WaPugetsoundsolar
SCORE
99
1926 41st Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 36kw solar photovoltaic system on roof of residence. System components include (12) itek energy 280w modules & (1) eltek theia 2. 9kw string inverter. System has previously been roughed in.
Date:  January 20, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 28, 2015 | Expiration date: January 20, 2016 | Current use: Single family / duplex | Permit id: 6455355
2015/01/200991926 41st Ave Sw Seattle WaPugetsoundsolar
SCORE
99
11354 Durland Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 651kw solar photovoltaic system on roof of residence. Panel upgrade qo 225a buss bar.
Date:  January 26, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 3, 2015 | Expiration date: January 26, 2016 | Current use: Single family / duplex | Permit id: 6456276
2015/01/2609911354 Durland Ave Ne Seattle WaPugetsoundsolar
SCORE
99
4212 Ne 110th St Seattle Wa
10-2-17 bz pv system review waived under 2017 threshold 7. 7kva final subject to field inspectors approval.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9(kw) solar photovoltaic system will be installed on roof of residence.
Date:  September 26, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 10, 2017 | Expiration date: September 26, 2018 | Current use: Single family / duplex | Permit id: 6620842
2017/09/260994212 Ne 110th St Seattle WaPugetsoundsolar
SCORE
99
3437 Nw 62nd St Seattle Wa
8-28-17 bz plan review waived 2017 threshold 7. 7kva. Micro inverter limits output to below7. 7kva. Final approval subject to field inspector.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 2 kw solar photovoltaic system on roof of residence.
Date:  August 25, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 7, 2017 | Expiration date: August 25, 2018 | Current use: Single family / duplex | Permit id: 6615389
2017/08/250993437 Nw 62nd St Seattle WaPugetsoundsolar
SCORE
99
1217 39th Ave E Seattle Wa
Installation of a receptacle for a electric vehicle charging station will be installed in electrical room and residence.
Date:  August 9, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 23, 2016 | Expiration date: August 9, 2017 | Current use: Single family / duplex | Permit id: 6550562
2016/08/090991217 39th Ave E Seattle WaPugetsoundsolar
SCORE
99
4743 45th Ave Ne Seattle Wa
10-2-17 bz pv system review waived under 2017 threshold 7. 7kva final subject to field inspectors approval.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 28(kw) solar photovoltaic system will be installed in roof of residence.
Date:  September 28, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 5, 2017 | Expiration date: September 28, 2018 | Current use: Single family / duplex | Permit id: 6621434
2017/09/280994743 45th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
2816 31st Ave S Seattle Wa
Cancel per customer log 15-1656 installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  October 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: October 1, 2016 | Current use: Single family / duplex | Permit id: 6497922
2015/10/020992816 31st Ave S Seattle WaPugetsoundsolar
SCORE
99
4749 35th Ave S Seattle Wa
An electrical rough-in will be performed for possible future solar photovotaic system.
Date:  December 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 15, 2015 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508340
2015/12/070994749 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
4765 35th Ave S Seattle Wa
Installation of an ev charger.
Date:  March 15, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 28, 2017 | Expiration date: March 15, 2018 | Current use: Single family / duplex | Permit id: 6586318
2017/03/150994765 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
6517 38th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48(kw) solar photovoltaic system will be installed on roof of residence. Array will consist of (16) itek energy 280w modules and (1) itek energy pvi3800-tl string inverter.
Date:  May 6, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 26, 2015 | Expiration date: May 5, 2016 | Current use: Single family / duplex | Permit id: 6472659
2015/05/060996517 38th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
1005 Nw 122nd St Seattle Wa
Installation of a electric vehicle charging station will be performed a residence.
Date:  September 27, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 29, 2016 | Expiration date: September 27, 2017 | Current use: Single family / duplex | Permit id: 6558671
2016/09/270991005 Nw 122nd St Seattle WaPugetsoundsolar
SCORE
99
4453 47th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 795kw solar photovoltaic system on roof of sfr. System components include (19) itek energy 305w modules & (10) blue frog yc-500a miw dual-input microinverters.
Date:  April 11, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 27, 2017 | Expiration date: April 11, 2018 | Current use: Single family / duplex | Permit id: 6591029
2017/04/110994453 47th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
2335 West Viewmont Way W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 28 kw solar photovoltaic system on roof of residence. 5 25 16 jk approved plans
Date:  February 17, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 2, 2016 | Expiration date: February 16, 2017 | Current use: Single family / duplex | Permit id: 6519446
2016/02/170992335 West Viewmont Way W Seattle WaPugetsoundsolar
SCORE
99
92 Cyrus Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 405kw solar photovoltaic system on roof of sfr. Components include (33) itek 285w modules & (1) itek pvi-7600tl string inverter.
Date:  April 13, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: April 13, 2017 | Current use: Single family / duplex | Permit id: 6529197
2016/04/1309992 Cyrus Ave Nw Seattle WaPugetsoundsolar
SCORE
99
2312 29th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 4 kw solar photovoltaic system on roof of residence. 10 10 17 jk approved plans.
Date:  October 4, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 25, 2017 | Expiration date: October 4, 2018 | Current use: Single family / duplex | Permit id: 6622631
2017/10/040992312 29th Ave S Seattle WaPugetsoundsolar
SCORE
99
15 Ne 62nd St Seattle Wa
An electrical rough-in will done for possible future solar photovoltaic system.
Date:  January 26, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 14, 2017 | Expiration date: January 26, 2018 | Current use: Single family / duplex | Permit id: 6578240
2017/01/2609915 Ne 62nd St Seattle WaPugetsoundsolar
SCORE
99
3028 47th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9kw solar photovoltaic system on roof of residence. System components include (30) solarworld 300w modules & (1) fronius primo 7. 6 string inverter. 9 21 16 jk approved plans. 9 22 16 jk approved revised plans.
Date:  September 9, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 27, 2016 | Expiration date: September 9, 2017 | Current use: Single family / duplex | Permit id: 6555728
2016/09/090993028 47th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
3237a California Ave Sw Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system. This will be done in electrical room and residence.
Date:  March 26, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 1, 2015 | Expiration date: March 25, 2016 | Current use: Single family / duplex | Permit id: 6465953
2015/03/260993237a California Ave Sw Seattle WaPugetsoundsolar
SCORE
99
10021 46th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16 kw solar photovoltaic system on the roof of residence
Date:  June 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 8, 2015 | Expiration date: June 14, 2016 | Current use: Single family / duplex | Permit id: 6479301
2015/06/1509910021 46th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
1506 Nw 61st St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of grid tied 1. 18kw solar system on roof
Date:  January 16, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 29, 2017 | Expiration date: January 16, 2018 | Current use: Multifamily | Permit id: 6576207
2017/01/160991506 Nw 61st St Seattle WaPugetsoundsolar
SCORE
99
4417 Corliss Ave N Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical and residence.
Date:  July 23, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 8, 2015 | Expiration date: July 22, 2016 | Current use: Single family / duplex | Permit id: 6486137
2015/07/230994417 Corliss Ave N Seattle WaPugetsoundsolar
SCORE
99
6 32nd Ave Seattle Wa
10-24-17 bz waived plan review under 2017 7. 7kva threshold based on inverter output[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 625 kw solar photovoltaic system on roof of residence.
Date:  October 18, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 13, 2017 | Expiration date: October 18, 2018 | Current use: Single family / duplex | Permit id: 6624948
2017/10/180996 32nd Ave Seattle WaPugetsoundsolar
SCORE
99
6825 52nd Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 41 kw solar photovoltaic system on roof of residence. 6 2 16 jk approved plans. 6 28 16 jk approved revised plans to add (3) 285 watt modules..
Date:  May 25, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 29, 2016 | Expiration date: May 25, 2017 | Current use: Single family / duplex | Permit id: 6537094
2016/05/250996825 52nd Ave Ne Seattle WaPugetsoundsolar
SCORE
99
623 Federal Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 24(kw) solar photovoltaic system will be installed on roof of residence. Array will consist of (33) itek 280w modules (1) itek pvi-7600tl string inverter
Date:  September 22, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 30, 2015 | Expiration date: September 21, 2016 | Current use: Commercial | Permit id: 6496131
2015/09/22099623 Federal Ave E Seattle WaPugetsoundsolar
SCORE
99
2026 E Madison St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 25(kw) solar photovoltaic system will installed on roof of a multi-family dwelling. 10 27 16 jk added revision for review. 10 27 16 jk approved revised plans. 03 09 2017 ndm renewal.
Date:  February 1, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 5, 2017 | Expiration date: January 31, 2018 | Current use: Commercial | Permit id: 6516598
2016/02/010992026 E Madison St Seattle WaPugetsoundsolar
SCORE
99
8041 32nd Ave Nw Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  August 17, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: August 17, 2018 | Current use: Single family / duplex | Permit id: 6613989
2017/08/170998041 32nd Ave Nw Seattle WaPugetsoundsolar
SCORE
99
1415 Ne 43rd St Seattle Wa
Install four receptacle circuits from existing panel
Date:  September 23, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 26, 2015 | Expiration date: September 22, 2016 | Current use: Institutional | Permit id: 6496248
2015/09/230991415 Ne 43rd St Seattle WaPugetsoundsolar
SCORE
99
1818 E Shelby St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 59(kw) solar photovoltaic system will be installed on roof of residence,
Date:  April 30, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 28, 2015 | Expiration date: April 29, 2016 | Current use: Single family / duplex | Permit id: 6471735
2015/04/300991818 E Shelby St Seattle WaPugetsoundsolar
SCORE
99
10818 27th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 28 kw solar photovoltaic system on roof of residence.
Date:  May 25, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2016 | Expiration date: May 25, 2017 | Current use: Single family / duplex | Permit id: 6537081
2016/05/2509910818 27th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
325 31st Ave Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 55kw solar photovoltaic system on roof of residence. System components include (30) itek energy 285w he modules & (15) blue frog aps yc-500a miw microinverters.
Date:  April 4, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: April 4, 2017 | Current use: Single family / duplex | Permit id: 6527525
2016/04/04099325 31st Ave Seattle WaPugetsoundsolar
SCORE
99
121 N Argyle Pl Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3(kw) solar photovoltaic system will be installed on roof of residence.
Date:  June 8, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2017 | Expiration date: June 8, 2018 | Current use: Single family / duplex | Permit id: 6601714
2017/06/08099121 N Argyle Pl Seattle WaPugetsoundsolar
SCORE
99
801 Ne 75th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] solar pv system modification
Date:  May 28, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2015 | Expiration date: May 27, 2016 | Current use: Single family / duplex | Permit id: 6476221
2015/05/28099801 Ne 75th St Seattle WaPugetsoundsolar
SCORE
99
803 24th Ave S Seattle Wa
Installation of a sub-panel will be done in electrical room and residence.
Date:  June 4, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 9, 2015 | Expiration date: June 3, 2016 | Current use: Single family / duplex | Permit id: 6477591
2015/06/04099803 24th Ave S Seattle WaPugetsoundsolar
SCORE
99
4454 S Brandon St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] re-routing conduit for existing solar photovoltaic system.
Date:  September 29, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 8, 2015 | Expiration date: September 28, 2016 | Current use: Single family / duplex | Permit id: 6497200
2015/09/290994454 S Brandon St Seattle WaPugetsoundsolar
SCORE
99
25 34th Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 7 solar photovoltaic system will be installed on roof of residence.
Date:  July 10, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 21, 2015 | Expiration date: July 9, 2016 | Current use: Institutional | Permit id: 6483783
2015/07/1009925 34th Ave W Seattle WaPugetsoundsolar
SCORE
99
1 N 47th St Seattle Wa
Installation of two electric vehicle charging stations will be installed in electrical room and residence. - 3 21 17 tas; add (1) one 1 to 2 amp feeder. - 3 22 17 sr removed one electric charging station.
Date:  March 19, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit finaled | Completion date: March 28, 2017 | Expiration date: March 19, 2018 | Current use: Single family / duplex | Permit id: 6586952
2017/03/190991 N 47th St Seattle WaPugetsoundsolar
SCORE
99
625 Hillside Dr E Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  September 12, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 21, 2016 | Expiration date: September 12, 2017 | Current use: Single family / duplex | Permit id: 6555940
2016/09/12099625 Hillside Dr E Seattle WaPugetsoundsolar
SCORE
99
4515 36th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 12(kw) solar photovoltaic system will be installed on roof of property.
Date:  September 8, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 27, 2016 | Expiration date: September 8, 2017 | Current use: Commercial | Permit id: 6555444
2016/09/080994515 36th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
5209 1st Ave Nw Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  March 17, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 4, 2016 | Expiration date: March 17, 2017 | Current use: Single family / duplex | Permit id: 6524633
2016/03/170995209 1st Ave Nw Seattle WaPugetsoundsolar
SCORE
99
6058 35th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 1kw photovoltaic system on roof and interconnection to house panel. 09 21 17 jk approved plans.
Date:  September 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618749
2017/09/130996058 35th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4921 24th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16kw solar photovoltaic system on roof of residence. System components include (22) itek 280w modules & (1) pvi-5200tl string inverter.
Date:  May 4, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 20, 2015 | Expiration date: May 3, 2016 | Current use: Single family / duplex | Permit id: 6472273
2015/05/040994921 24th Ave S Seattle WaPugetsoundsolar
SCORE
99
7912 Fremont Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 76 kw solar photovoltaic system on roof of residence.
Date:  January 17, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2017 | Expiration date: January 17, 2018 | Current use: Single family / duplex | Permit id: 6576530
2017/01/170997912 Fremont Ave N Seattle WaPugetsoundsolar
SCORE
99
3618 Sw Orchard St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 28 kw solar photovoltaic system on roof of residence. 5 24 16 plans approved.
Date:  May 5, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2016 | Expiration date: May 5, 2017 | Current use: Single family / duplex | Permit id: 6533199
2016/05/050993618 Sw Orchard St Seattle WaPugetsoundsolar
SCORE
99
7755 Highland Park Way Sw Seattle Wa
Installation of a electrical vehicle charging station will be performed in electrical room and residence.
Date:  January 22, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 2, 2015 | Expiration date: January 22, 2016 | Current use: Single family / duplex | Permit id: 6455746
2015/01/220997755 Highland Park Way Sw Seattle WaPugetsoundsolar
SCORE
99
7347 14th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 83kw solar photovoltaic system on roof of sfr. System components include (22) canadian solar 265w modules with (22) solaredge p3 dc optimizers & (1) solaredge se5000a-us string inverter.
Date:  June 6, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 1, 2016 | Expiration date: June 6, 2017 | Current use: Single family / duplex | Permit id: 6538861
2016/06/060997347 14th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
5007 40th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 6(kw) solar photovoltaic system will be installed on roof of residence.
Date:  September 29, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 10, 2017 | Expiration date: September 29, 2018 | Current use: Single family / duplex | Permit id: 6621741
2017/09/290995007 40th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4914 55th Ave S Seattle Wa
An electrical service change from 125a to 200a will be done in electrical room and residence.
Date:  April 13, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 25, 2016 | Expiration date: April 13, 2017 | Current use: Single family / duplex | Permit id: 6529137
2016/04/130994914 55th Ave S Seattle WaPugetsoundsolar
SCORE
99
2614 S Ferdinand St Seattle Wa
12 21 2016 - cancelled customer log #16-1841 installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  December 7, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: December 7, 2017 | Current use: Single family / duplex | Permit id: 6570390
2016/12/070992614 S Ferdinand St Seattle WaPugetsoundsolar
SCORE
99
26 E Denny Way Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and reisidence.
Date:  May 26, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 29, 2015 | Expiration date: May 25, 2016 | Current use: Single family / duplex | Permit id: 6475868
2015/05/2609926 E Denny Way Seattle WaPugetsoundsolar
SCORE
99
7701 Lakemont Dr Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 66 kw solar photovoltaic system on roof of residence.
Date:  June 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 10, 2015 | Expiration date: June 15, 2016 | Current use: Single family / duplex | Permit id: 6479706
2015/06/160997701 Lakemont Dr Ne Seattle WaPugetsoundsolar
SCORE
99
1531 Ne 88th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 94(kw) solar photo voltaic system will be installed on roof of residence.
Date:  September 19, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 25, 2017 | Expiration date: September 19, 2018 | Current use: Single family / duplex | Permit id: 6619602
2017/09/190991531 Ne 88th St Seattle WaPugetsoundsolar
SCORE
99
1922 15th Ave E Seattle Wa
Installation of a electric vehicle charging station will be installed on property and residence.
Date:  October 31, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 4, 2016 | Expiration date: October 31, 2017 | Current use: Single family / duplex | Permit id: 6564695
2016/10/310991922 15th Ave E Seattle WaPugetsoundsolar
SCORE
99
1942 S Waite St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04 kw solar photovoltaic system on roof of residence.
Date:  October 28, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 12, 2015 | Expiration date: October 27, 2016 | Current use: Single family / duplex | Permit id: 6502298
2015/10/280991942 S Waite St Seattle WaPugetsoundsolar
SCORE
99
1749 Nw 61st St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] (5) module addition to existing solar photovoltaic system.
Date:  September 23, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 21, 2015 | Expiration date: September 22, 2016 | Current use: Single family / duplex | Permit id: 6496423
2015/09/230991749 Nw 61st St Seattle WaPugetsoundsolar
SCORE
99
589 Occidental Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 1kw solar system on roof of property. 08 15 17 jk approved plans
Date:  July 10, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: July 10, 2018 | Current use: Commercial | Permit id: 6606808
2017/07/10099589 Occidental Ave S Seattle WaPugetsoundsolar
SCORE
99
309 S Cloverdale St Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence. This work will done in unit d-38
Date:  April 13, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 18, 2015 | Expiration date: April 12, 2016 | Current use: Single family / duplex | Permit id: 6468593
2015/04/13099309 S Cloverdale St Seattle WaPugetsoundsolar
SCORE
99
40 Sw Hanford St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 64kw solar photovoltaic system on roof of residence. System components include (13) itek energy 280w modules & (7) aps blue frog yc-500a miw dual input microinverters.
Date:  February 9, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 11, 2015 | Expiration date: February 9, 2016 | Current use: Single family / duplex | Permit id: 6458572
2015/02/0909940 Sw Hanford St Seattle WaPugetsoundsolar
SCORE
99
1007 20th Ave S Seattle Wa
Install (1) new 40a 240v circuit and evse in garage
Date:  December 18, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 23, 2015 | Expiration date: December 17, 2016 | Current use: Single family / duplex | Permit id: 6510355
2015/12/180991007 20th Ave S Seattle WaPugetsoundsolar
SCORE
99
6293 20th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6 solar photovoltaic system will be installed on roof of residence.
Date:  June 10, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 18, 2015 | Expiration date: June 9, 2016 | Current use: Single family / duplex | Permit id: 6478667
2015/06/100996293 20th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
5103 Woodlawn Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 9 kw solar photovoltaic system on roof of residence. Installation of 100a feeder panel.
Date:  November 16, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 28, 2016 | Expiration date: November 16, 2017 | Current use: Single family / duplex | Permit id: 6567417
2016/11/160995103 Woodlawn Ave N Seattle WaPugetsoundsolar
SCORE
99
7022 12th Ave Nw Seattle Wa
7-27-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 25(kw) solar photovoltaic system will be installed on roof of property.
Date:  July 25, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 14, 2017 | Expiration date: July 25, 2018 | Current use: Single family / duplex | Permit id: 6609682
2017/07/250997022 12th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
6522 42nd Ave S Seattle Wa
3-28-17 bz pv sytem approved 4-18-17 bz rvision deleated [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4kw solar photovoltaic system on roof of residence.
Date:  March 21, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 19, 2017 | Expiration date: March 21, 2018 | Current use: Single family / duplex | Permit id: 6587408
2017/03/210996522 42nd Ave S Seattle WaPugetsoundsolar
SCORE
99
1418 Nw 65th St Seattle Wa
Installation of a 115 kw dc (1 kw ac) solar pv array on the roof of ballard high school, connected to existing electrical switchboard.
Value:   $182,596
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627803
182596991418 Nw 65th St Seattle WaPugetsoundsolar
SCORE
99
5124 S Graham St Seattle Wa
Installation of a 3. 66 kw solar photovoltaic system on roof of residence.
Date:  June 2, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 14, 2017 | Expiration date: June 2, 2018 | Current use: Single family / duplex | Permit id: 6600625
2017/06/020995124 S Graham St Seattle WaPugetsoundsolar
SCORE
99
3024 Nw 95th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 41 kw solar photovoltaic system on roof of residence. Installation of sub panel
Date:  November 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 24, 2015 | Expiration date: November 1, 2016 | Current use: Single family / duplex | Permit id: 6503131
2015/11/020993024 Nw 95th St Seattle WaPugetsoundsolar
SCORE
99
5601 22nd Ave Nw Seattle Wa
Installation of a 31. 68(kw) solar photovoltaic system will be installed on roof of property
Date:  April 28, 2016
Value:   $31,355
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 30, 2016 | Expiration date: April 28, 2017 | Current use: Commercial | Permit id: 6528408
2016/04/2831355995601 22nd Ave Nw Seattle WaPugetsoundsolar
SCORE
99
6244 50th Ave Ne Seattle Wa
Repair work in meter enclosure. Inspection needed for scl re-connection
Date:  July 24, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 27, 2015 | Expiration date: July 23, 2016 | Current use: Single family / duplex | Permit id: 6486368
2015/07/240996244 50th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
5727 30th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 7(kw) solar photovoltaic system will be installed on roof of residence.
Date:  August 20, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 25, 2017 | Expiration date: August 20, 2018 | Current use: Single family / duplex | Permit id: 6614378
2017/08/200995727 30th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
31 S Oregon St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 88 kw solar photovoltaic system on roof of residence.
Date:  June 17, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 14, 2015 | Expiration date: June 16, 2016 | Current use: Single family / duplex | Permit id: 6479870
2015/06/1709931 S Oregon St Seattle WaPugetsoundsolar
SCORE
99
4 S Jackson St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 84(kw) solar photovoltaic system will be installed on roof of property.
Date:  February 22, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 28, 2016 | Expiration date: February 21, 2017 | Current use: Commercial | Permit id: 6520199
2016/02/220994 S Jackson St Seattle WaPugetsoundsolar
SCORE
99
4445 33rd Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a solar photovoltaic system on roof of residence.
Date:  February 11, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 30, 2015 | Expiration date: February 11, 2016 | Current use: Single family / duplex | Permit id: 6459097
2015/02/110994445 33rd Ave S Seattle WaPugetsoundsolar
SCORE
99
4737 35th Ave S Seattle Wa
Rough in for possible future solar pv system.
Date:  February 8, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 12, 2016 | Expiration date: February 7, 2017 | Current use: Single family / duplex | Permit id: 6517966
2016/02/080994737 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
5137 Ne 41st St Seattle Wa
Rough in for possible future solar photovoltaic system.
Date:  February 16, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 23, 2017 | Expiration date: February 16, 2018 | Current use: Single family / duplex | Permit id: 6581820
2017/02/160995137 Ne 41st St Seattle WaPugetsoundsolar
SCORE
99
37 E Blaine St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 97kw solar photovoltaic system on roof of sfr. Service upgrade to 200a. 5 20 16 jk approved plans.
Date:  May 9, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 7, 2016 | Expiration date: May 9, 2017 | Current use: Single family / duplex | Permit id: 6533697
2016/05/0909937 E Blaine St Seattle WaPugetsoundsolar
SCORE
99
94 California Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96 kw solar photovoltaic system on roof of residence
Date:  September 10, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 15, 2015 | Expiration date: September 9, 2016 | Current use: Single family / duplex | Permit id: 6494051
2015/09/1009994 California Ave Sw Seattle WaPugetsoundsolar
SCORE
99
1121 30th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96kw solar photovoltaic system on roof of residence. System components include (32) itek 280w modules & (1) pvi-7600tl string inverter. Also new circuit for possible future evse.
Date:  June 25, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 17, 2015 | Expiration date: June 24, 2016 | Current use: Single family / duplex | Permit id: 6481175
2015/06/250991121 30th Ave S Seattle WaPugetsoundsolar
SCORE
99
4205 50th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site] an electrical rough-in will be performed for possible future solar photovoltaic system, work will be performed in electrical room and residence. 5 19 15 jle add [1] 7-26kw solar photovoltaic system.
Date:  April 8, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 4, 2015 | Expiration date: April 7, 2016 | Current use: Single family / duplex | Permit id: 6468135
2015/04/080994205 50th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
2109 31st Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 7kw solar photovoltaic system on roof of residence. System components include (28) itek energy 275w modules & (1) pvi-6600tl itek string inverter.
Date:  December 29, 2014
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 20, 2015 | Expiration date: December 29, 2015 | Current use: Single family / duplex | Permit id: 6452525
2014/12/290992109 31st Ave S Seattle WaPugetsoundsolar
SCORE
99
8 Dexter Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 25. 51 solar photovoltaic system will be installed on roof of residence.
Date:  July 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: July 6, 2016 | Current use: Commercial | Permit id: 6482875
2015/07/070998 Dexter Ave N Seattle WaPugetsoundsolar
SCORE
99
3212 37th Ave S Seattle Wa
Alteration to main electrical panel (permit was not pulled when panel was originally installed).
Date:  September 25, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 26, 2017 | Expiration date: September 25, 2018 | Current use: Single family / duplex | Permit id: 6620721
2017/09/250993212 37th Ave S Seattle WaPugetsoundsolar
SCORE
99
4531b Rainier Ave S Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system
Date:  July 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 18, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6483032
2015/07/070994531b Rainier Ave S Seattle WaPugetsoundsolar
SCORE
99
126 Blakely Pl Nw Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  April 8, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 9, 2015 | Expiration date: April 7, 2016 | Current use: Single family / duplex | Permit id: 6467911
2015/04/08099126 Blakely Pl Nw Seattle WaPugetsoundsolar
SCORE
99
8816 26th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 7kw solar photovoltaic system on roof of sfr. System components include (20) itek energy 285w modules & (10) blue frog yc-500a miw microinverters.
Date:  June 6, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 29, 2016 | Expiration date: June 6, 2017 | Current use: Single family / duplex | Permit id: 6538776
2016/06/060998816 26th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
1716a 27th Ave Seattle Wa
Rough in for possible future solar pv system.
Date:  July 30, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 10, 2015 | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487127
2015/07/300991716a 27th Ave Seattle WaPugetsoundsolar
SCORE
99
6607 58th Ave Ne Seattle Wa
10-24-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 4(kw) solar photovoltaic system will be installed on roof of residence.
Date:  September 26, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 26, 2018 | Current use: Single family / duplex | Permit id: 6621084
2017/09/260996607 58th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
3278 38th Ave Sw Seattle Wa
8-28-17 bz plan review waived 2017 threshold 7. 7kva. Micro inverter limits output to below7. 7kva. Final approval subject to field inspector.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9 kw solar photovoltaic system on roof of residence.
Date:  August 29, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 18, 2017 | Expiration date: August 29, 2018 | Current use: Single family / duplex | Permit id: 6616167
2017/08/290993278 38th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4765 35th Ave S Seattle Wa
(unit b) an electrical rough-in will be done for possible future solar photovoltaic system.
Date:  January 18, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 4, 2016 | Expiration date: January 17, 2017 | Current use: Single family / duplex | Permit id: 6514200
2016/01/180994765 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
103 N 73rd St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 45kw solar photovoltaic system on roof of sfr + adu on same lot. (30) lg 315w modules & (30) enphase s2 microinverters. Plans approved on 5 3 16..
Date:  April 26, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 16, 2016 | Expiration date: April 26, 2017 | Current use: Single family / duplex | Permit id: 6531540
2016/04/26099103 N 73rd St Seattle WaPugetsoundsolar
SCORE
99
8211 34th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 10. 92kw solar photovoltaic system on roof of residence. System components include (39) itek energy 280w modules & (2) pvi-5200tl string inverters.
Date:  August 5, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 26, 2015 | Expiration date: August 4, 2016 | Current use: Single family / duplex | Permit id: 6488215
2015/08/050998211 34th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
6212 29th Ave Ne Seattle Wa
4 14 2015 - cancelled customer log #15-623[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 72 (kw) solar photovoltaic system will be installed on roof of residence. Also, a service upgrade will be done in electrical room and residence. Array will consists of (28) itek energy modules and (1)itek pvi-66 inverter.
Date:  April 13, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: April 12, 2016 | Current use: Single family / duplex | Permit id: 6468614
2015/04/130996212 29th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
3831 Corliss Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48(kw) solar photovoltaic system will be installed on roof of residence. Also, a panel change will be performed.
Date:  August 13, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 29, 2015 | Expiration date: August 12, 2016 | Current use: Single family / duplex | Permit id: 6489630
2015/08/130993831 Corliss Ave N Seattle WaPugetsoundsolar
SCORE
99
10019 20th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 8kw solar photovoltaic system on roof of sfr. System components include (20) itek energy 290w modules & (10) blue frog yc-500a miw microinverters.
Date:  May 10, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 20, 2016 | Expiration date: May 10, 2017 | Current use: Single family / duplex | Permit id: 6534021
2016/05/1009910019 20th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
8 Ne 67th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 13. 44(kw)solar photovoltaic system will be installed on roof of residence. Array will consist of (48) solarworld 280w modules and (3) sma tl string inverters.
Date:  June 23, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 29, 2016 | Expiration date: June 22, 2016 | Current use: Commercial | Permit id: 6480803
2015/06/230998 Ne 67th St Seattle WaPugetsoundsolar
SCORE
99
408 17th Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 64 kw solar photovoltaic system on roof of residence. 10 13 17 jk waived plan review because the total ac power output of the system is less than or equal to 7,7 watts.
Date:  October 4, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 16, 2017 | Expiration date: October 4, 2018 | Current use: Single family / duplex | Permit id: 6622603
2017/10/04099408 17th Ave E Seattle WaPugetsoundsolar
SCORE
99
1823 Eastlake Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 875(kw) solar photovoltaic system will be installed on roof of property. 4 21 16 jk approved plans.
Date:  February 23, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 8, 2016 | Expiration date: February 22, 2017 | Current use: Commercial | Permit id: 6520436
2016/02/230991823 Eastlake Ave E Seattle WaPugetsoundsolar
SCORE
99
3239b California Ave Sw Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  May 12, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 18, 2015 | Expiration date: May 11, 2016 | Current use: Single family / duplex | Permit id: 6473550
2015/05/120993239b California Ave Sw Seattle WaPugetsoundsolar
SCORE
99
6542 Woodlawn Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 13kw solar photovoltaic system on roof of residence. System components include (18) itek energy 285w modules & (9) aps blue frog yc-500a miw microinverters.
Date:  September 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 21, 2015 | Expiration date: September 15, 2016 | Current use: Single family / duplex | Permit id: 6495133
2015/09/160996542 Woodlawn Ave N Seattle WaPugetsoundsolar
SCORE
99
3537 Ne 87th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw solar photovoltaic system on roof of residence. System components include (13) sunpower 345w modules w solaredge p4 dc optimizers & (1) solaredge 3800w string inverter.
Date:  March 1, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 21, 2016 | Expiration date: March 1, 2017 | Current use: Single family / duplex | Permit id: 6521528
2016/03/010993537 Ne 87th St Seattle WaPugetsoundsolar
SCORE
99
25 Sw Chicago Ct Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 76kw solar photovoltaic system on roof of residence. System includes (17) itek 280w modules & (9) aps blue frog yc-500a miw dual input microinverters.
Date:  February 11, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 6, 2015 | Expiration date: February 11, 2016 | Current use: Single family / duplex | Permit id: 6459063
2015/02/1109925 Sw Chicago Ct Seattle WaPugetsoundsolar
SCORE
99
4045 32nd Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 4kw solar photovoltaic system on roof of residence. Panel upgrade. New subpanel in garage.
Date:  December 30, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 22, 2016 | Expiration date: December 29, 2016 | Current use: Single family / duplex | Permit id: 6511525
2015/12/300994045 32nd Ave W Seattle WaPugetsoundsolar
SCORE
99
1 10th Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 11. 36kw photovoltaic system on roof of property and interconnection to scl grid.
Date:  October 3, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: October 3, 2018 | Current use: Multifamily | Permit id: 6622189
2017/10/030991 10th Ave E Seattle WaPugetsoundsolar
SCORE
99
4751 35th Ave S Seattle Wa
6 28 2016 - cancelled customer log #16-9 (cont. Off job) (unit a) an electrical rough-in will be done for possible future solar photovoltaic system
Date:  January 21, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: January 20, 2017 | Current use: Single family / duplex | Permit id: 6514951
2016/01/210994751 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
628 Nw 88th St Seattle Wa
Installation of a electric vehicle charging station will be installed on roof of reisidence.
Date:  March 1, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 17, 2017 | Expiration date: March 1, 2018 | Current use: Single family / duplex | Permit id: 6583896
2017/03/01099628 Nw 88th St Seattle WaPugetsoundsolar
SCORE
99
747 N 82nd St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 28(kw) solar photovoltaic system will be installed on roof of residence.
Date:  May 25, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 9, 2015 | Expiration date: May 24, 2016 | Current use: Single family / duplex | Permit id: 6475688
2015/05/25099747 N 82nd St Seattle WaPugetsoundsolar
SCORE
99
7914 9th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 3. 36kw solar photovoltaic system on roof of residence. (12) itek 280w modules & (1) pvi-38 itek inverter. Separate system from existing pv system. Interconnection method uses line side tap.
Date:  April 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 27, 2015 | Expiration date: April 15, 2016 | Current use: Single family / duplex | Permit id: 6469339
2015/04/160997914 9th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4769 35th Ave S Seattle Wa
This is for (unit b) an electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  December 30, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 7, 2016 | Expiration date: December 29, 2016 | Current use: Single family / duplex | Permit id: 6511601
2015/12/300994769 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
1749 Nw 61st St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 7(kw) photovoltaic solar system will be installed on roof of residence. 5 13 15 jle address was changed from 1749 nw 63rd st.
Date:  May 5, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 18, 2015 | Expiration date: May 4, 2016 | Current use: Single family / duplex | Permit id: 6472519
2015/05/050991749 Nw 61st St Seattle WaPugetsoundsolar
SCORE
99
26 24th Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 88 solar photovolatiac system on roof of residence. Main service panel replacement
Date:  June 4, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 1, 2015 | Expiration date: June 3, 2016 | Current use: Single family / duplex | Permit id: 6477678
2015/06/0409926 24th Ave E Seattle WaPugetsoundsolar
SCORE
99
52 University Way Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 83(kw) solar photovoltaic system will be installed on roof of property.
Date:  November 28, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2017 | Expiration date: November 28, 2017 | Current use: Commercial | Permit id: 6568973
2016/11/2809952 University Way Ne Seattle WaPugetsoundsolar
SCORE
99
4529a Rainier Ave S Seattle Wa
An electrical rough-in will be performed in electrical room and residence
Date:  July 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6483001
2015/07/070994529a Rainier Ave S Seattle WaPugetsoundsolar
SCORE
99
3525 S Oregon St Seattle Wa
Rough in for possible future solar photovoltaic system.
Date:  October 22, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: October 21, 2016 | Current use: Single family / duplex | Permit id: 6501177
2015/10/220993525 S Oregon St Seattle WaPugetsoundsolar
SCORE
99
5603 40th Ave Ne Seattle Wa
Installation of a new 125a subpanel
Date:  April 14, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 14, 2015 | Expiration date: April 13, 2016 | Current use: Single family / duplex | Permit id: 6468818
2015/04/140995603 40th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
10046 Mary Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 6 solar photovoltaic system will be installed on roof of residence.
Date:  August 14, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 23, 2017 | Expiration date: August 14, 2018 | Current use: Single family / duplex | Permit id: 6613332
2017/08/1409910046 Mary Ave Nw Seattle WaPugetsoundsolar
SCORE
99
305 25th Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 7 kw solar photovoltaic system on roof of residence.
Date:  November 15, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 5, 2017 | Expiration date: November 15, 2017 | Current use: Single family / duplex | Permit id: 6566998
2016/11/15099305 25th Ave E Seattle WaPugetsoundsolar
SCORE
99
755 32nd Ave Seattle Wa
Additional feeder
Date:  October 21, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 6, 2015 | Expiration date: October 20, 2016 | Current use: Single family / duplex | Permit id: 6501058
2015/10/21099755 32nd Ave Seattle WaPugetsoundsolar
SCORE
99
1136 35th Ave Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  January 6, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 9, 2015 | Expiration date: January 6, 2016 | Current use: Single family / duplex | Permit id: 6453385
2015/01/060991136 35th Ave Seattle WaPugetsoundsolar
SCORE
99
5418 S Angeline St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 92kw solar photovoltaic system on roof or residence. System components include (14) itek 280w modules & (7) aps blue frog yc-500a miw dual-input microinverters.
Date:  March 5, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 26, 2015 | Expiration date: March 4, 2016 | Current use: Single family / duplex | Permit id: 6462624
2015/03/050995418 S Angeline St Seattle WaPugetsoundsolar
SCORE
99
6045 18th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 5kw solar photovoltaic system on roof of residence. (20) itek energy 275w modules & (1) itek pvi-5200tl string inverter. Service upgrade to 200a.
Date:  February 12, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 24, 2015 | Expiration date: February 12, 2016 | Current use: Single family / duplex | Permit id: 6459279
2015/02/120996045 18th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
1851 S Weller St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16kw solar photovoltaic system on roof of residence. System components include (22) itek 280w he modules & (12) blue frog yc-500a miw microinverters.
Date:  October 5, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 18, 2016 | Expiration date: October 5, 2017 | Current use: Single family / duplex | Permit id: 6560246
2016/10/050991851 S Weller St Seattle WaPugetsoundsolar
SCORE
99
68 Greenwood Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 47(kw) solar photovoltaic system will be installed on roof of property.
Date:  August 30, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 24, 2017 | Expiration date: August 30, 2017 | Current use: Single family / duplex | Permit id: 6554156
2016/08/3009968 Greenwood Ave N Seattle WaPugetsoundsolar
SCORE
99
3528 Burke Ave N Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system. Work will be done in electrical room and residence.
Date:  October 12, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 15, 2015 | Expiration date: October 11, 2016 | Current use: Single family / duplex | Permit id: 6499242
2015/10/120993528 Burke Ave N Seattle WaPugetsoundsolar
SCORE
99
7601 39th Ave S Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  September 17, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 19, 2017 | Expiration date: September 17, 2018 | Current use: Single family / duplex | Permit id: 6619274
2017/09/170997601 39th Ave S Seattle WaPugetsoundsolar
SCORE
99
1717 N 37th St Seattle Wa
An electrical rough-in for possible future solar photovoltaic system will be performed in electrical room and residence.
Date:  October 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 20, 2015 | Expiration date: October 14, 2016 | Current use: Single family / duplex | Permit id: 6500156
2015/10/150991717 N 37th St Seattle WaPugetsoundsolar
SCORE
99
48 S Henderson St Seattle Wa
Installation of a 137. 7 kw dc (1 kw ac) solar pv array on the roof of south shore school, connected to existing electrical switchboard.
Value:   $114,508
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627829
1145089948 S Henderson St Seattle WaPugetsoundsolar
SCORE
99
4114 Burke Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 9(kw) solar photovoltaic system will be installed on roof of residence.
Date:  September 27, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 3, 2017 | Expiration date: September 27, 2018 | Current use: Single family / duplex | Permit id: 6621301
2017/09/270994114 Burke Ave N Seattle WaPugetsoundsolar
SCORE
99
3522 S Leschi Pl Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 83 kw solar photovoltaic solar system on roof of residence.
Date:  August 12, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 17, 2015 | Expiration date: August 11, 2016 | Current use: Single family / duplex | Permit id: 6489563
2015/08/120993522 S Leschi Pl Seattle WaPugetsoundsolar
SCORE
99
1538 N 128th St Seattle Wa
3 18 2016 paf change description, install of heat pump in residence.
Date:  March 8, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 1, 2016 | Expiration date: March 8, 2017 | Current use: Single family / duplex | Permit id: 6522756
2016/03/080991538 N 128th St Seattle WaPugetsoundsolar
SCORE
99
1747 Nw 61st St Seattle Wa
An electrical rough-in will be performed in (unit b) for possible future solar photovoltaic system.
Date:  March 26, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2015 | Expiration date: March 25, 2016 | Current use: Single family / duplex | Permit id: 6466008
2015/03/260991747 Nw 61st St Seattle WaPugetsoundsolar
SCORE
99
322 21st Ave E Seattle Wa
7-26-17 bz pv system one-line approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 0kw solar system on roof of property.
Date:  July 25, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 17, 2017 | Expiration date: July 25, 2018 | Current use: Single family / duplex | Permit id: 6609609
2017/07/25099322 21st Ave E Seattle WaPugetsoundsolar
SCORE
99
219 1st Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 83(kw) solar photovoltaic system will be installed on roof of property.
Date:  September 2, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 11, 2017 | Expiration date: September 2, 2017 | Current use: Commercial | Permit id: 6554757
2016/09/02099219 1st Ave N Seattle WaPugetsoundsolar
SCORE
99
107 5th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw photovoltaic system on roof of property and interconnection to scl grid. This permit for the east building at this address.
Date:  October 12, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: October 12, 2018 | Current use: Commercial | Permit id: 6624035
2017/10/12099107 5th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
516 N 77th St Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  July 6, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 5, 2016 | Expiration date: July 6, 2017 | Current use: Single family / duplex | Permit id: 6544399
2016/07/06099516 N 77th St Seattle WaPugetsoundsolar
SCORE
99
1718a 27th Ave Seattle Wa
Cancel per customer log 15-1317 rough in for possible future solar pv system.
Date:  July 30, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487131
2015/07/300991718a 27th Ave Seattle WaPugetsoundsolar
SCORE
99
42 S Othello St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 19. 2(kw) solar photovoltaic system will be installed on roof of residence. 8 4 16 jk approved plans. 12 15 2016 sr renew. 03 02 17 jk approved revised plans.
Date:  January 4, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: January 3, 2018 | Current use: Commercial | Permit id: 6511837
2016/01/0409942 S Othello St Seattle WaPugetsoundsolar
SCORE
99
39 47th Ave S Seattle Wa
8-28-17 bz plan review waived 2017 threshold 7. 7kva. Micro inverter limits output to below7. 7kva. Final approval subject to field inspector.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 0(kw) solar photovoltaic system will be installed on roof of property.
Date:  September 1, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 14, 2017 | Expiration date: September 1, 2018 | Current use: Single family / duplex | Permit id: 6616773
2017/09/0109939 47th Ave S Seattle WaPugetsoundsolar
SCORE
99
1001 James St Seattle Wa
5-5-17 bz revision approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 15. 08(kw) solar photovoltaic system will be installed on roof of property. 12 01 16 jk approved plans.
Date:  November 22, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: November 22, 2017 | Current use: Commercial | Permit id: 6568449
2016/11/220991001 James St Seattle WaPugetsoundsolar
SCORE
99
5603 Phinney Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7 kw solar photovoltaic system on roof of residence.
Date:  June 3, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 7, 2015 | Expiration date: June 2, 2016 | Current use: Single family / duplex | Permit id: 6477328
2015/06/030995603 Phinney Ave N Seattle WaPugetsoundsolar
SCORE
99
6212 29th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 84(kw) solar photovoltaic system will be installed on roof of residence. Also, a service upgrade will be done in electrical room and residence. 3 14 2016 paf add (1) 2 amp feeder.
Date:  April 14, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 23, 2015 | Expiration date: April 13, 2016 | Current use: Single family / duplex | Permit id: 6468831
2015/04/140996212 29th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
61 Ravenna Ave Ne Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  January 6, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 15, 2017 | Expiration date: January 6, 2018 | Current use: Single family / duplex | Permit id: 6574854
2017/01/0609961 Ravenna Ave Ne Seattle WaPugetsoundsolar
SCORE
99
3937 Sw Holden St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 9(kw) solar photovoltaic system will be installed on roof of residence.
Date:  September 29, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 13, 2015 | Expiration date: September 28, 2016 | Current use: Single family / duplex | Permit id: 6497362
2015/09/290993937 Sw Holden St Seattle WaPugetsoundsolar
SCORE
99
327 Randolph Ave Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 4. 2 kw solar photovoltaic system on roof of residence.
Date:  September 1, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 29, 2015 | Expiration date: August 31, 2016 | Current use: Single family / duplex | Permit id: 6492751
2015/09/01099327 Randolph Ave Seattle WaPugetsoundsolar
SCORE
99
2211 41st Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 71(kw) solar photovoltaic system will be installed on roof of property. 07 19 17 jk approved plans.
Date:  July 11, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 24, 2017 | Expiration date: July 11, 2018 | Current use: Single family / duplex | Permit id: 6607185
2017/07/110992211 41st Ave Sw Seattle WaPugetsoundsolar
SCORE
99
3451 Nw 64th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 24 kw solar photovoltaic system on roof of residence.
Date:  June 11, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 25, 2015 | Expiration date: June 10, 2016 | Current use: Single family / duplex | Permit id: 6478828
2015/06/110993451 Nw 64th St Seattle WaPugetsoundsolar
SCORE
99
5202 S Morgan St Seattle Wa
3 1 2016 - cancelled customer log #16-311panel upgrade
Date:  January 25, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: January 24, 2017 | Current use: Single family / duplex | Permit id: 6515364
2016/01/250995202 S Morgan St Seattle WaPugetsoundsolar
SCORE
99
3914 42nd Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 85(kw) solar photovoltaic system will be installed on roof of residence. 10 21 16 jk approved plans. 11 01 16 cep; add (1) 1-125 amp service.
Date:  October 20, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 15, 2016 | Expiration date: October 20, 2017 | Current use: Single family / duplex | Permit id: 6562984
2016/10/200993914 42nd Ave S Seattle WaPugetsoundsolar
SCORE
99
4531a Rainier Ave S Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  July 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6483028
2015/07/070994531a Rainier Ave S Seattle WaPugetsoundsolar
SCORE
99
3 1st Ave W Seattle Wa
2-15-17 bz approved plans. Pv. 4-12-17 bz approved revision [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 6(kw) solar photovoltaic system will be installed on roof of property. 2 10 17 sk change address from 301 queen anne ave n
Date:  February 9, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2017 | Expiration date: February 9, 2018 | Current use: Commercial | Permit id: 6580488
2017/02/090993 1st Ave W Seattle WaPugetsoundsolar
SCORE
99
4619 Ne 73rd St Seattle Wa
10-24-17 bz approved pv system one-line[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 71 kw solar photovoltaic system on roof of residence. Also swapping out main electrical panel and adding an electric vehicle charging station.
Date:  October 11, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 7, 2017 | Expiration date: October 11, 2018 | Current use: Single family / duplex | Permit id: 6623788
2017/10/110994619 Ne 73rd St Seattle WaPugetsoundsolar
SCORE
99
1207 Westlake Ave N Seattle Wa
4-24-17 bz pv system revision approved.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] (this is for lot #2) installation of a 15. 2(kw) solar photovoltaic system will be performed in electrical room and roof of property.
Date:  February 23, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2017 | Expiration date: February 22, 2017 | Current use: Commercial | Permit id: 6520459
2016/02/230991207 Westlake Ave N Seattle WaPugetsoundsolar
SCORE
99
2601 Sw Kenyon St Seattle Wa
Installation of a 140. 6 kw dc (100kw ac) solar pv array on the roof of denny international middle school, connected to existing electrical switchboard.
Value:   $112,204
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627813
112204992601 Sw Kenyon St Seattle WaPugetsoundsolar
SCORE
99
7357 12th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 2kw solar photovoltaic system on roof of residence. System components include (19) itek 275w modules & (9. 5) aps blue frog yc-5 microinverters.
Date:  January 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 21, 2015 | Expiration date: January 15, 2016 | Current use: Single family / duplex | Permit id: 6454760
2015/01/150997357 12th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4122 Sunnyside Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 76kw solar photovoltaic system on roof of residence. System components include (17) itek energy 280w & (9) blue frog yc-500a microinverters.
Date:  November 3, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 18, 2015 | Expiration date: November 2, 2016 | Current use: Single family / duplex | Permit id: 6503295
2015/11/030994122 Sunnyside Ave N Seattle WaPugetsoundsolar
SCORE
99
11 Nw 134th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 8 kw photovoltaic solar system will be installed on roof of residence.
Date:  June 1, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 11, 2015 | Expiration date: May 31, 2016 | Current use: Single family / duplex | Permit id: 6476777
2015/06/0109911 Nw 134th St Seattle WaPugetsoundsolar
SCORE
99
2672 Bishop Pl W Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  May 15, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 17, 2017 | Expiration date: May 15, 2018 | Current use: Single family / duplex | Permit id: 6597026
2017/05/150992672 Bishop Pl W Seattle WaPugetsoundsolar
SCORE
99
3019 47th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 575kw solar photovoltaic system on roof of residence. System components include (13) itek 275w modules & (1) theia 3. 8kw string inverter.
Date:  February 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 2, 2015 | Expiration date: February 2, 2016 | Current use: Single family / duplex | Permit id: 6457427
2015/02/020993019 47th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4314 12th Ave S Seattle Wa
Installation of a 6. 96 kw solar photovoltaic system on roof of residence.
Date:  November 22, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 27, 2016 | Expiration date: November 22, 2017 | Current use: Single family / duplex | Permit id: 6568326
2016/11/220994314 12th Ave S Seattle WaPugetsoundsolar
SCORE
99
5607 15th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 88kw solar photovoltaic system on roof of multi-familiy residence. Interconnection with the house meter, which covers the small apartment in the basement and the public area lighting and laundry.
Date:  April 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 29, 2015 | Expiration date: April 6, 2016 | Current use: Multifamily | Permit id: 6467790
2015/04/070995607 15th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
1107 E Madison St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 4 kw solar electric system on the roof.
Date:  September 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618565
2017/09/130991107 E Madison St Seattle WaPugetsoundsolar
SCORE
99
22 E Union St Seattle Wa
4-19-17 bz pv system approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 98kw solar photovoltaic system
Date:  April 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: April 13, 2018 | Current use: Commercial | Permit id: 6591644
2017/04/1309922 E Union St Seattle WaPugetsoundsolar
SCORE
99
3652 Dayton Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 85(kw) solar photovoltaic system will be installed on roof of residence.
Date:  December 29, 2014
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 8, 2015 | Expiration date: December 29, 2015 | Current use: Single family / duplex | Permit id: 6452580
2014/12/290993652 Dayton Ave N Seattle WaPugetsoundsolar
SCORE
99
9012 31st Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 8kw solar photovoltaic system addition ((10) itek 280w modules) to existing 4. 8kw system. Pvi-7600tl itek inverter will replace existing theia 4. 4 string inverter. Total system size to be 7. 6kw.
Date:  April 21, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 15, 2015 | Expiration date: April 20, 2016 | Current use: Single family / duplex | Permit id: 6469961
2015/04/210999012 31st Ave Nw Seattle WaPugetsoundsolar
SCORE
99
32 16th Ave W Seattle Wa
6-2-17 bz pv system revision one-line approved2-27-17 bz pv sys. Approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 8 kw grid tied solar system on roof of property.
Date:  January 31, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: January 31, 2018 | Current use: Commercial | Permit id: 6578936
2017/01/3109932 16th Ave W Seattle WaPugetsoundsolar
SCORE
99
4769 35th Ave S Seattle Wa
This is for (unit a). An electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  December 30, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 7, 2016 | Expiration date: December 29, 2016 | Current use: Single family / duplex | Permit id: 6511598
2015/12/300994769 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
6105 Roosevelt Way Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 8(kw) solar photovoltaic system will be installed on roof of property.
Date:  September 8, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2017 | Expiration date: September 8, 2017 | Current use: Commercial | Permit id: 6555462
2016/09/080996105 Roosevelt Way Ne Seattle WaPugetsoundsolar
SCORE
99
8021 41st Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4 kw solar photovoltaic solar system. Main panel upgrade.
Date:  June 9, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 19, 2015 | Expiration date: June 8, 2016 | Current use: Single family / duplex | Permit id: 6478396
2015/06/090998021 41st Ave Ne Seattle WaPugetsoundsolar
SCORE
99
4338 32nd Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 9(kw) solar photovoltaic system will be installed on roof of residence.
Date:  September 24, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 27, 2015 | Expiration date: September 23, 2016 | Current use: Single family / duplex | Permit id: 6496612
2015/09/240994338 32nd Ave W Seattle WaPugetsoundsolar
SCORE
99
13529 25th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96(kw) solar photovoltaic system will be installed on roof of residence.
Date:  July 21, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 1, 2015 | Expiration date: July 20, 2016 | Current use: Single family / duplex | Permit id: 6485629
2015/07/2109913529 25th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
9417 25th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16(kw) solar photovoltaic system will be installed on roof of residence and installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  March 25, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 7, 2015 | Expiration date: March 24, 2016 | Current use: Single family / duplex | Permit id: 6465814
2015/03/250999417 25th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
3831 Corliss Ave N Seattle Wa
Installation of an ev charging station.
Date:  September 28, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 2, 2015 | Expiration date: September 27, 2016 | Current use: Single family / duplex | Permit id: 6497038
2015/09/280993831 Corliss Ave N Seattle WaPugetsoundsolar
SCORE
99
6244 50th Ave Ne Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence. Also, a panel upgrade will be performed in electrical room.
Date:  April 28, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 8, 2015 | Expiration date: April 27, 2016 | Current use: Single family / duplex | Permit id: 6471165
2015/04/280996244 50th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
1019 S Southern St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 8kw solar photovoltaic system on roof of sfr
Date:  July 26, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 2, 2017 | Expiration date: July 26, 2018 | Current use: Single family / duplex | Permit id: 6609926
2017/07/260991019 S Southern St Seattle WaPugetsoundsolar
SCORE
99
6049 45th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek energy 280w modules & (1) itek solectria pvi-5200tl string inverter.
Date:  February 17, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 26, 2015 | Expiration date: February 17, 2016 | Current use: Single family / duplex | Permit id: 6459860
2015/02/170996049 45th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4803 55th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 5 kw solar photovoltaic system on roof of residence. 1-17-17 bz approved plans
Date:  January 4, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 30, 2017 | Expiration date: January 4, 2018 | Current use: Single family / duplex | Permit id: 6574572
2017/01/040994803 55th Ave S Seattle WaPugetsoundsolar
SCORE
99
8315 Fremont Ave N Seattle Wa
Installation of an hcs- ev charging station.
Date:  September 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 23, 2015 | Expiration date: September 15, 2016 | Current use: Single family / duplex | Permit id: 6495122
2015/09/160998315 Fremont Ave N Seattle WaPugetsoundsolar
SCORE
99
2348 28th Ave S Seattle Wa
Installation of a electric vehicle will be installed in electrical room and residence.
Date:  April 25, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 14, 2017 | Expiration date: April 25, 2018 | Current use: Single family / duplex | Permit id: 6593628
2017/04/250992348 28th Ave S Seattle WaPugetsoundsolar
SCORE
99
8505 21st Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 9kw solar photovoltaic system on roof of residence. System components include (36) itek energy 275w modules & (2) itek pvi-5200tl string inverters. Also downsizing main breaker size to 175a.
Date:  November 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 2, 2015 | Expiration date: November 15, 2016 | Current use: Single family / duplex | Permit id: 6505365
2015/11/160998505 21st Ave Nw Seattle WaPugetsoundsolar
SCORE
99
5603 Phinney Ave N Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and residence
Date:  July 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 4, 2015 | Expiration date: July 15, 2016 | Current use: Single family / duplex | Permit id: 6484760
2015/07/160995603 Phinney Ave N Seattle WaPugetsoundsolar
SCORE
99
339c 16th Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 68(kw) solar photovoltaic system will be installed on roof of residence.
Date:  March 24, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 2, 2015 | Expiration date: March 23, 2016 | Current use: Single family / duplex | Permit id: 6465554
2015/03/24099339c 16th Ave E Seattle WaPugetsoundsolar
SCORE
99
3903 S Edmunds St Seattle Wa
An electrical rough-in will be performed for possible future solar-photovoltaic system.
Date:  January 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 28, 2015 | Expiration date: January 15, 2016 | Current use: Single family / duplex | Permit id: 6454789
2015/01/150993903 S Edmunds St Seattle WaPugetsoundsolar
SCORE
99
433 16th Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 32 solar pv system, service upgrade, and main panel change out.
Date:  August 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 2, 2015 | Expiration date: August 6, 2016 | Current use: Single family / duplex | Permit id: 6488623
2015/08/07099433 16th Ave E Seattle WaPugetsoundsolar
SCORE
99
103 Nw 105th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 24kw solar photovoltaic system on roof of residence and on roof of home and on new deck addition. (33) itek energy 280w modules & (2) itek pvi 5200tl string inverters. Interconnection method using a line side tap.
Date:  March 11, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 21, 2015 | Expiration date: March 10, 2016 | Current use: Single family / duplex | Permit id: 6463423
2015/03/11099103 Nw 105th St Seattle WaPugetsoundsolar
SCORE
99
128 Ne 125th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek 280w modules & (10) aps blue frog yc-500a miw microinverters
Date:  May 14, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 20, 2015 | Expiration date: May 13, 2016 | Current use: Single family / duplex | Permit id: 6474125
2015/05/14099128 Ne 125th St Seattle WaPugetsoundsolar
SCORE
99
5733 29th Ave Ne Seattle Wa
Installation of a 14- nema receptacle for a electric vehicle charging station.
Date:  August 22, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 31, 2016 | Expiration date: August 22, 2017 | Current use: Single family / duplex | Permit id: 6552766
2016/08/220995733 29th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
39 47th Ave S Seattle Wa
Moving the net meter
Date:  October 16, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 17, 2017 | Expiration date: October 16, 2018 | Current use: Single family / duplex | Permit id: 6624441
2017/10/1609939 47th Ave S Seattle WaPugetsoundsolar
SCORE
99
218 Dorffel Dr E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] an additional 4. 69(kw) solar photovoltaic system will be installed on roof of residence.
Date:  December 1, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 19, 2016 | Expiration date: November 30, 2016 | Current use: Single family / duplex | Permit id: 6507412
2015/12/01099218 Dorffel Dr E Seattle WaPugetsoundsolar
SCORE
99
527 N 67th St Seattle Wa
2-27-17 bz revision #2 approved and fee added [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 83kw solar photovoltaic system on roof of sfr. System components include (27) solarworld 290w modules & (1) itek energy pvi-7600tl string inverter. 8 22 16 jk approved plans. 12 08 16 jk added revision. 12 08 16 jk approved revised plans.
Date:  June 15, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 12, 2017 | Expiration date: June 15, 2017 | Current use: Single family / duplex | Permit id: 6540798
2016/06/15099527 N 67th St Seattle WaPugetsoundsolar
SCORE
99
11 Nw 134th St Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  April 27, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 7, 2015 | Expiration date: April 26, 2016 | Current use: Single family / duplex | Permit id: 6470898
2015/04/2709911 Nw 134th St Seattle WaPugetsoundsolar
SCORE
99
6308 17th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 05kw solar photovoltaic system on roof of residence. System components include (22) itek energy 275w modules & (1) itek pvi-5200tl string inverter.
Date:  February 10, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 17, 2015 | Expiration date: February 10, 2016 | Current use: Single family / duplex | Permit id: 6458738
2015/02/100996308 17th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
3526 Sw 112th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 12kw solar photovoltaic system on roof of residence. System components include (32) itek energy 285w modules & (1) itek pvi-7600tl string inverter.
Date:  December 14, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2016 | Expiration date: December 13, 2016 | Current use: Single family / duplex | Permit id: 6509540
2015/12/140993526 Sw 112th St Seattle WaPugetsoundsolar
SCORE
99
138 4th Ave Ne Seattle Wa
Installation of a electric vehicle charging station will be permed in electrical room and residence.
Date:  June 8, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 14, 2017 | Expiration date: June 8, 2018 | Current use: Single family / duplex | Permit id: 6601670
2017/06/08099138 4th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
3414 Nw 62nd St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek energy 280w modules & (1) pvi-5200tl itek string inverter.
Date:  July 13, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 6, 2015 | Expiration date: July 12, 2016 | Current use: Single family / duplex | Permit id: 6484100
2015/07/130993414 Nw 62nd St Seattle WaPugetsoundsolar
SCORE
99
8029 Ashworth Ave N Seattle Wa
Rough in for possible future solar photovoltaic system.
Date:  May 26, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 31, 2016 | Expiration date: May 26, 2017 | Current use: Single family / duplex | Permit id: 6537134
2016/05/260998029 Ashworth Ave N Seattle WaPugetsoundsolar
SCORE
99
1711 Nw 61st St Seattle Wa
(this is for unit a) an electrical rough-in will be done for possible future solar photovoltaic system. 2 5 16 jle changed address from 1709 nw 61st st
Date:  December 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2016 | Expiration date: December 15, 2016 | Current use: Single family / duplex | Permit id: 6509818
2015/12/160991711 Nw 61st St Seattle WaPugetsoundsolar
SCORE
99
2622 27th Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw solar photovoltaic system on roof of residence. (13) itek energy 280w modules & (1) itek pvi-3800tl string inverter.
Date:  March 12, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 9, 2015 | Expiration date: March 11, 2016 | Current use: Single family / duplex | Permit id: 6463793
2015/03/120992622 27th Ave W Seattle WaPugetsoundsolar
SCORE
99
315c 14th Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 52kw solar photovoltaic system on roof of residence. System components include (8) solarworld 315w modules & (8) abb 300w microinverters.
Date:  September 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: September 1, 2016 | Current use: Single family / duplex | Permit id: 6492901
2015/09/02099315c 14th Ave E Seattle WaPugetsoundsolar
SCORE
99
3621 59th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 98kw solar photovoltaic system on roof of residence. System components include (28) itek 285w modules & (14) blue frog yc-500a miw microinverters.
Date:  November 12, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: November 11, 2016 | Current use: Single family / duplex | Permit id: 6504747
2015/11/120993621 59th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
63 21st Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 28kw solar photovoltaic system on roof of residence. System components include (26) itek energy 280w modules & (1) itek pvi-6600tl string inverter. Electrical plans have been uploaded
Date:  February 19, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 12, 2015 | Expiration date: February 19, 2016 | Current use: Single family / duplex | Permit id: 6460274
2015/02/1909963 21st Ave Sw Seattle WaPugetsoundsolar
SCORE
99
1701 Nw 56th St Seattle Wa
2-27-17 bz pv sys. Approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 55kw solar photovoltaic system on roof.
Date:  February 2, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: February 2, 2018 | Current use: Commercial | Permit id: 6579346
2017/02/020991701 Nw 56th St Seattle WaPugetsoundsolar
SCORE
99
1624 E Mercer St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 35kw pv system addition. (15) itek 290w modules & (8) blue frog yc-500a miw microinverters.
Date:  April 27, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 17, 2016 | Expiration date: April 27, 2017 | Current use: Single family / duplex | Permit id: 6531901
2016/04/270991624 E Mercer St Seattle WaPugetsoundsolar
SCORE
99
8001 Crest Dr Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 12kw solar photovoltaic system on roof of detached garage. System components include (32) itek energy 285w modules (1) pvi-7600tl itek string inverter.
Date:  November 17, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 24, 2015 | Expiration date: November 16, 2016 | Current use: Single family / duplex | Permit id: 6505483
2015/11/170998001 Crest Dr Ne Seattle WaPugetsoundsolar
SCORE
99
3249 Nw 62nd St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9(kw) solar photovoltaic system will be installed on roof of residence. 04 26 17 jk approved plans.
Date:  April 21, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 23, 2017 | Expiration date: April 21, 2018 | Current use: Single family / duplex | Permit id: 6593048
2017/04/210993249 Nw 62nd St Seattle WaPugetsoundsolar
SCORE
99
4535 Sw Director St Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  May 18, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 23, 2017 | Expiration date: May 18, 2018 | Current use: Single family / duplex | Permit id: 6597965
2017/05/180994535 Sw Director St Seattle WaPugetsoundsolar
SCORE
99
606 Nw 83rd St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6 kw solar photovoltaic system on roof of residence.
Date:  August 4, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 8, 2015 | Expiration date: August 3, 2016 | Current use: Single family / duplex | Permit id: 6487829
2015/08/04099606 Nw 83rd St Seattle WaPugetsoundsolar
SCORE
99
2207 18th Ave S Seattle Wa
12 15 2016 - cancelled customer log #16-1824 installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  January 11, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: January 10, 2017 | Current use: Single family / duplex | Permit id: 6513122
2016/01/110992207 18th Ave S Seattle WaPugetsoundsolar
SCORE
99
4218 Ne 115th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 32(kw) solar photovoltaic system will be installed on roof of residence.
Date:  August 17, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 16, 2015 | Expiration date: August 16, 2016 | Current use: Single family / duplex | Permit id: 6490196
2015/08/170994218 Ne 115th St Seattle WaPugetsoundsolar
SCORE
99
132 Linden Ave N Seattle Wa
Installation of a 34 kw solar pv system on the roof
Date:  October 19, 2017
Value:   $71,785
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Application accepted | Current use: Commercial | Permit id: 6625093
2017/10/197178599132 Linden Ave N Seattle WaPugetsoundsolar
SCORE
99
2626 27th Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 32 solar photovoltaic system on roof of residence.
Date:  June 24, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 11, 2015 | Expiration date: June 23, 2016 | Current use: Single family / duplex | Permit id: 6480981
2015/06/240992626 27th Ave W Seattle WaPugetsoundsolar
SCORE
99
8831 Midvale Ave N Seattle Wa
Installation of a electric vehicle charging station will be installed on roof of property.
Date:  March 27, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 29, 2017 | Expiration date: March 27, 2018 | Current use: Single family / duplex | Permit id: 6588311
2017/03/270998831 Midvale Ave N Seattle WaPugetsoundsolar
SCORE
99
6311 18th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16kw solar photovoltaic system on roof of residence. System components include (22) itek energy 280w modules & (1) itek pvi-5200tl string inverter.
Date:  February 10, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 12, 2015 | Expiration date: February 10, 2016 | Current use: Single family / duplex | Permit id: 6458829
2015/02/100996311 18th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4755 35th Ave S Seattle Wa
Rough in for possible future solar pv system
Date:  February 8, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 12, 2016 | Expiration date: February 7, 2017 | Current use: Single family / duplex | Permit id: 6517976
2016/02/080994755 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
4319 Ne 45th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 4kw solar photovoltaic system on roof of residence. System components include (30) itek 280w modules & (1) itek pvi-7600tl string inverter. 3 17 2016 paf add (1) amp circuit.
Date:  January 14, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 24, 2016 | Expiration date: January 13, 2017 | Current use: Single family / duplex | Permit id: 6513879
2016/01/140994319 Ne 45th St Seattle WaPugetsoundsolar
SCORE
99
5372 Sw Admiral Way Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 92kw solar photovoltaic system on roof of residence. System components include (14) itek energy 280w modules & (7) aps blue frog yc-500a miw dual-input microinverters.
Date:  January 20, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 3, 2015 | Expiration date: January 20, 2016 | Current use: Single family / duplex | Permit id: 6455257
2015/01/200995372 Sw Admiral Way Seattle WaPugetsoundsolar
SCORE
99
328 Nw 76th St Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  December 28, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 14, 2016 | Expiration date: December 27, 2016 | Current use: Single family / duplex | Permit id: 6511299
2015/12/28099328 Nw 76th St Seattle WaPugetsoundsolar
SCORE
99
3237b California Ave Sw Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system. This will be done in electrical room and residence.
Date:  March 26, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 2, 2015 | Expiration date: March 25, 2016 | Current use: Single family / duplex | Permit id: 6465963
2015/03/260993237b California Ave Sw Seattle WaPugetsoundsolar
SCORE
99
3304 Beacon Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7 kw solar photovoltaic system on roof of building.
Date:  January 4, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2016 | Expiration date: January 3, 2017 | Current use: Commercial | Permit id: 6511945
2016/01/040993304 Beacon Ave S Seattle WaPugetsoundsolar
SCORE
99
20 14th Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 76kw solar photovoltaic system on roof of residence. System components include (17) itek energy 280w modules & (9) blue frog aps yc-500a miw microinverters
Date:  May 13, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 1, 2015 | Expiration date: May 12, 2016 | Current use: Single family / duplex | Permit id: 6473795
2015/05/1309920 14th Ave W Seattle WaPugetsoundsolar
SCORE
99
4914 55th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 68(kw) solar photovoltaic system will be installed on roof of residence.
Date:  April 11, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 25, 2016 | Expiration date: April 11, 2017 | Current use: Single family / duplex | Permit id: 6528676
2016/04/110994914 55th Ave S Seattle WaPugetsoundsolar
SCORE
99
2211 41st Ave Sw Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  February 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: February 13, 2018 | Current use: Single family / duplex | Permit id: 6580971
2017/02/130992211 41st Ave Sw Seattle WaPugetsoundsolar
SCORE
99
86 35th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 4 kw solar photovoltaic system on roof of residence.
Date:  September 16, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 26, 2017 | Expiration date: September 16, 2018 | Current use: Single family / duplex | Permit id: 6619255
2017/09/1609986 35th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
3948 Sw Arroyo Dr Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 5kw solar photovoltaic system on roof of residence. System components include (20) itek energy 275w modules & (1) pvi-5200tl itek string inverter.
Date:  December 16, 2014
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 26, 2015 | Expiration date: December 16, 2015 | Current use: Single family / duplex | Permit id: 6450964
2014/12/160993948 Sw Arroyo Dr Seattle WaPugetsoundsolar
SCORE
99
9444 34th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 25(kw) solar photovoltaic system will be installed on roof of residence.
Date:  January 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 16, 2015 | Expiration date: January 2, 2016 | Current use: Single family / duplex | Permit id: 6453092
2015/01/020999444 34th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
224 32nd Ave Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 44 kw solar photovoltaic system on roof of residence
Date:  July 9, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2015 | Expiration date: July 8, 2016 | Current use: Single family / duplex | Permit id: 6483521
2015/07/09099224 32nd Ave Seattle WaPugetsoundsolar
SCORE
99
222 Etruria St Seattle Wa
2 3 2017 - cancelled customer log #17-115 install ev charging station on new 40a circuit
Date:  January 31, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: January 31, 2018 | Current use: Commercial | Permit id: 6579016
2017/01/31099222 Etruria St Seattle WaPugetsoundsolar
SCORE
99
2206 Ne 63rd St Seattle Wa
Service work - new mast, strike, conduit, feeders, meter.
Date:  June 15, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 27, 2016 | Expiration date: June 15, 2017 | Current use: Single family / duplex | Permit id: 6540824
2016/06/150992206 Ne 63rd St Seattle WaPugetsoundsolar
SCORE
99
2205 41st Ave Sw Seattle Wa
3 3 2017 = cancelled customer log #17-189[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a solar photovoltaic system will be installed on roof of residence.
Date:  January 16, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: January 16, 2018 | Current use: Single family / duplex | Permit id: 6576245
2017/01/160992205 41st Ave Sw Seattle WaPugetsoundsolar
SCORE
99
2808 43rd Ave W Seattle Wa
Installation of a electric vehicle charging station will be performed on electrical room and residence.
Date:  March 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: March 13, 2018 | Current use: Single family / duplex | Permit id: 6585930
2017/03/130992808 43rd Ave W Seattle WaPugetsoundsolar
SCORE
99
5421 30th Ave S Seattle Wa
3-28-17 bz pv system approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 0kw solar photovoltaic system on roof of residence.
Date:  March 15, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 21, 2017 | Expiration date: March 15, 2018 | Current use: Single family / duplex | Permit id: 6586399
2017/03/150995421 30th Ave S Seattle WaPugetsoundsolar
SCORE
99
3403 Nw 71st St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 84(kw) solar photovoltaic system will be installed on roof of residence.
Date:  June 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 6, 2015 | Expiration date: June 15, 2016 | Current use: Single family / duplex | Permit id: 6479678
2015/06/160993403 Nw 71st St Seattle WaPugetsoundsolar
SCORE
99
5603 40th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48kw solar photovoltaic system on roof of residence. System components include (16) itek energy 280w modules & (8) aps blue frog yc-500a miw dual-input microinverters.
Date:  March 18, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 14, 2015 | Expiration date: March 17, 2016 | Current use: Single family / duplex | Permit id: 6464596
2015/03/180995603 40th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
1818 E Shelby St Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  April 1, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 13, 2015 | Expiration date: March 31, 2016 | Current use: Single family / duplex | Permit id: 6466746
2015/04/010991818 E Shelby St Seattle WaPugetsoundsolar
SCORE
99
7022 12th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 32 kw solar photovoltaic system will be installed on roof of residence
Date:  November 30, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 19, 2016 | Expiration date: November 30, 2017 | Current use: Single family / duplex | Permit id: 6569434
2016/11/300997022 12th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
2249 Ne 46th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a . 885(kw) solar photovoltaic system will be installed on roof of residence.
Date:  December 10, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 17, 2016 | Expiration date: December 9, 2016 | Current use: Commercial | Permit id: 6508979
2015/12/100992249 Ne 46th St Seattle WaPugetsoundsolar
SCORE
99
427 11th Ave E Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  April 7, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: April 7, 2018 | Current use: Single family / duplex | Permit id: 6590704
2017/04/07099427 11th Ave E Seattle WaPugetsoundsolar
SCORE
99
37 Sw Cloverdale St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04(kw) solar photovoltaic system will be installed on roof of residence.
Date:  January 12, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 4, 2015 | Expiration date: January 12, 2016 | Current use: Single family / duplex | Permit id: 6454242
2015/01/1209937 Sw Cloverdale St Seattle WaPugetsoundsolar
SCORE
99
6538 52nd Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 85 kw solar photovolatic system on roof of residence. Also changing out the main electrical panel. 09 12 17 jk waived plan review because total output power is 7. 488 kw which does not exceed the 7. 7 kw threshold for plan review and the new panel is not rated 400a minimum nor does it operate at greater than 600v. This project is, therefore, subject to field inspection.
Date:  September 7, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 21, 2017 | Expiration date: September 7, 2018 | Current use: Single family / duplex | Permit id: 6617471
2017/09/070996538 52nd Ave Ne Seattle WaPugetsoundsolar
SCORE
99
1809 26th Ave Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 72kw solar photovoltaic system on roof of sfr. System components include (16) itek energy 295w modules & (8) blue frog yc-500a miw dual-input microinverters.
Date:  April 12, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 18, 2017 | Expiration date: April 12, 2018 | Current use: Single family / duplex | Permit id: 6591350
2017/04/120991809 26th Ave Seattle WaPugetsoundsolar
SCORE
99
2902 Beacon Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 79 kw solar electric system on the roof.
Date:  September 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618570
2017/09/130992902 Beacon Ave S Seattle WaPugetsoundsolar
SCORE
99
3015 44th Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 7. 84 kw solar photovoltaic system on roof of residence.
Date:  June 18, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 20, 2015 | Expiration date: June 17, 2016 | Current use: Single family / duplex | Permit id: 6480156
2015/06/180993015 44th Ave W Seattle WaPugetsoundsolar
SCORE
99
3901 S Edmunds St Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  January 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 28, 2015 | Expiration date: January 15, 2016 | Current use: Single family / duplex | Permit id: 6454786
2015/01/150993901 S Edmunds St Seattle WaPugetsoundsolar
SCORE
99
8207 Linden Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 32(kw) solar photovoltaic system will be installed on roof of residence.
Date:  September 20, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 28, 2017 | Expiration date: September 20, 2018 | Current use: Single family / duplex | Permit id: 6619950
2017/09/200998207 Linden Ave N Seattle WaPugetsoundsolar
SCORE
99
9508 4th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48(kw) solar photovoltaic system will be installed on roof of residence. Array will consist of (16) itek 280w modules and (1) pvo-3800tl itek.
Date:  April 13, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 15, 2015 | Expiration date: April 12, 2016 | Current use: Single family / duplex | Permit id: 6468795
2015/04/130999508 4th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
47 32nd Ave S Seattle Wa
4-24-17 bz pv system approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 735kw solar photovoltaic system on the roof of property
Date:  April 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: April 13, 2018 | Current use: Commercial | Permit id: 6591638
2017/04/1309947 32nd Ave S Seattle WaPugetsoundsolar
SCORE
99
1711 Nw 61st St Seattle Wa
Rough in for possible future solar photovoltaic system.
Date:  November 25, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: November 24, 2016 | Current use: Single family / duplex | Permit id: 6506864
2015/11/250991711 Nw 61st St Seattle WaPugetsoundsolar
SCORE
99
5231 16th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 6. 7kw solar photovoltaic system on roof of residence.
Date:  August 11, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 16, 2016 | Expiration date: August 11, 2017 | Current use: Single family / duplex | Permit id: 6550975
2016/08/110995231 16th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
7305 34th Ave Nw Seattle Wa
Installation of a sub-panel will be done in electrical room and residence.
Date:  March 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: March 13, 2018 | Current use: Single family / duplex | Permit id: 6585722
2017/03/130997305 34th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
2207 16th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site] installation of a 5. 6(kw) solar photovoltaic system will be installed on roof of residence. 4 23 15 jcb; add 2 amp service.
Date:  March 10, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 30, 2015 | Expiration date: March 9, 2016 | Current use: Single family / duplex | Permit id: 6463255
2015/03/100992207 16th Ave S Seattle WaPugetsoundsolar
SCORE
99
4749 35th Ave S Seattle Wa
(unit c) an electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  December 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 15, 2015 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508347
2015/12/070994749 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
2605 19th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16kw solar photovoltaic system on roof of residence. Installation of a new circuit and evse in garage.
Date:  April 14, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 14, 2015 | Expiration date: April 13, 2016 | Current use: Single family / duplex | Permit id: 6469015
2015/04/140992605 19th Ave S Seattle WaPugetsoundsolar
SCORE
99
3609 55th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 12kw solar photovoltaic system on roof of sfr. System components include (32) itek 285w modules & (1) pvi-7600tl itek string inverter.
Date:  June 3, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 19, 2016 | Expiration date: June 3, 2017 | Current use: Single family / duplex | Permit id: 6538642
2016/06/030993609 55th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
1147 N 81st St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a . 93(kw) solar photovoltaic system will be installed on roof of residence.
Date:  May 24, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 26, 2016 | Expiration date: May 24, 2017 | Current use: Commercial | Permit id: 6536713
2016/05/240991147 N 81st St Seattle WaPugetsoundsolar
SCORE
99
1725 Ne 137th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96(kw) solar photovoltaic system will be installed on roof of residence.
Date:  May 20, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2015 | Expiration date: May 19, 2016 | Current use: Single family / duplex | Permit id: 6475214
2015/05/200991725 Ne 137th St Seattle WaPugetsoundsolar
SCORE
99
4529b Rainier Ave S Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system
Date:  July 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6483021
2015/07/070994529b Rainier Ave S Seattle WaPugetsoundsolar
SCORE
99
2519 34th Ave S Seattle Wa
4 13 2015 - cancelled customer log #15-616[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 24kw solar photovoltaic system on roof of residence. System components include (33) itek 280w modules & (1) pvi-7600tl string inverter.
Date:  April 9, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: April 8, 2016 | Current use: Single family / duplex | Permit id: 6468142
2015/04/090992519 34th Ave S Seattle WaPugetsoundsolar
SCORE
99
1625 N 52nd St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 84 kw solar photovoltaic system on roof of residence.
Date:  November 3, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 17, 2015 | Expiration date: November 2, 2016 | Current use: Single family / duplex | Permit id: 6503261
2015/11/030991625 N 52nd St Seattle WaPugetsoundsolar
SCORE
99
19 47th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 96kw solar photovoltaic system on roof of residence. System components include (32) itek energy 280w modules & (1) pvi-7600tl itek string inverter.
Date:  September 9, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2015 | Expiration date: September 8, 2016 | Current use: Single family / duplex | Permit id: 6493977
2015/09/0909919 47th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
1023 E Alder St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 8(kw) solar photovoltaic system will be installed on roof of residence.
Date:  February 17, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 23, 2016 | Expiration date: February 16, 2017 | Current use: Commercial | Permit id: 6519492
2016/02/170991023 E Alder St Seattle WaPugetsoundsolar
SCORE
99
14 Magnolia Blvd W Seattle Wa
An electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  January 27, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: January 27, 2018 | Current use: Single family / duplex | Permit id: 6578335
2017/01/2709914 Magnolia Blvd W Seattle WaPugetsoundsolar
SCORE
99
5044b Fauntleroy Way Sw Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  November 15, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 28, 2016 | Expiration date: November 15, 2017 | Current use: Single family / duplex | Permit id: 6567032
2016/11/150995044b Fauntleroy Way Sw Seattle WaPugetsoundsolar
SCORE
99
102 37th Ave Sw Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  June 19, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2017 | Expiration date: June 19, 2018 | Current use: Single family / duplex | Permit id: 6603496
2017/06/19099102 37th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
51 S Raymond St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4(kw) solar photovoltaic solar system will be installed on roof of residence.
Date:  July 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2015 | Expiration date: July 14, 2016 | Current use: Single family / duplex | Permit id: 6484611
2015/07/1509951 S Raymond St Seattle WaPugetsoundsolar
SCORE
99
9655 California Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 12(kw) solar photovoltaic system will be installed on roof of residence. Installation includes (32) itek energy 285 watt modules and (1) itek energy pvi7600-tl.
Date:  November 24, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 15, 2015 | Expiration date: November 23, 2016 | Current use: Single family / duplex | Permit id: 6506728
2015/11/240999655 California Ave Sw Seattle WaPugetsoundsolar
SCORE
99
3504 West Laurelhurst Dr Ne Seattle Wa
5-24-17 bz approved pv system one-line[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4kw solar photovoltaic system on roof of residence.
Date:  May 16, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 27, 2017 | Expiration date: May 16, 2018 | Current use: Single family / duplex | Permit id: 6597526
2017/05/160993504 West Laurelhurst Dr Ne Seattle WaPugetsoundsolar
SCORE
99
1229 Madison St Seattle Wa
Installation of circuit for uninterrupted power supply.
Date:  June 30, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 17, 2016 | Expiration date: June 30, 2017 | Current use: Commercial | Permit id: 6543720
2016/06/300991229 Madison St Seattle WaPugetsoundsolar
SCORE
99
4516 Union Bay Pl Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 84 kw solar electric system on the roof.
Date:  September 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618568
2017/09/130994516 Union Bay Pl Ne Seattle WaPugetsoundsolar
SCORE
99
5737 37th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 96 kw solar photovoltaic system on roof of residence
Date:  July 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 10, 2015 | Expiration date: July 15, 2016 | Current use: Single family / duplex | Permit id: 6484796
2015/07/160995737 37th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
4701 11th Ave Ne Seattle Wa
6 8 2017 - cancelled customer log #17-794 install ev charging station
Date:  May 29, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: May 29, 2018 | Current use: Commercial | Permit id: 6599580
2017/05/290994701 11th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
3826 Ne 96th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 0kw solar photovoltaic system on roof of sfr. System components include (20) itek energy 300w modules & (10) blue frog yc-500a miw dual input microinverters.
Date:  March 15, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2017 | Expiration date: March 15, 2018 | Current use: Single family / duplex | Permit id: 6586302
2017/03/150993826 Ne 96th St Seattle WaPugetsoundsolar
SCORE
99
8245 41st Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 84kw solar photovoltaic system on roof of residence. System components include (24) solarworld 285w modules & (24) enphase m2 microinverters.
Date:  June 3, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 29, 2015 | Expiration date: June 2, 2016 | Current use: Single family / duplex | Permit id: 6477512
2015/06/030998245 41st Ave Ne Seattle WaPugetsoundsolar
SCORE
99
9334 32nd Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 3. 77 kw solar photovoltaic system on roof of residence.
Date:  October 6, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 13, 2016 | Expiration date: October 6, 2017 | Current use: Single family / duplex | Permit id: 6560509
2016/10/060999334 32nd Ave Sw Seattle WaPugetsoundsolar
SCORE
99
101 Broadway E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 61 kw solar photovoltaic system on roof
Date:  April 19, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 6, 2017 | Expiration date: April 19, 2018 | Current use: Commercial | Permit id: 6592421
2017/04/19099101 Broadway E Seattle WaPugetsoundsolar
SCORE
99
3635 Phinney Ave N Seattle Wa
Closed as incomplete[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 24. 96(kw) solar photovoltaic system will be installed on roof of property. 6 28 16 jk approved plans. 3 2 17 cpg installation of 24. 96(kw) solar photovoltaic system will be installed on roof of residence. (t. Rasmussen poc assoc. Field elec. #6541123) 03 02 17 change from 24. 96 kw system to 25. 92 kw system. 03 10 17 jk approved revised plans.
Date:  June 16, 2016
Value:   $30,000
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 7, 2017 | Expiration date: June 16, 2017 | Current use: Commercial | Permit id: 6541123
2016/06/1630000993635 Phinney Ave N Seattle WaPugetsoundsolar
SCORE
99
4008 Ne 60th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 97 solar photovoltaic system will be installed on roof of residence. 8 9 16 jk approved plans.
Date:  June 30, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2016 | Expiration date: June 30, 2017 | Current use: Single family / duplex | Permit id: 6543790
2016/06/300994008 Ne 60th St Seattle WaPugetsoundsolar
SCORE
99
3236 S Edmunds St Seattle Wa
This is for unit a. An electrical rough-in will be performed in electrical room and residence.
Date:  November 3, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 4, 2015 | Expiration date: November 2, 2016 | Current use: Single family / duplex | Permit id: 6503293
2015/11/030993236 S Edmunds St Seattle WaPugetsoundsolar
SCORE
99
217 N 51st St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 66(kw) solar photovoltaic system will be installed on roof of residence.
Date:  December 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: December 14, 2016 | Current use: Single family / duplex | Permit id: 6509624
2015/12/15099217 N 51st St Seattle WaPugetsoundsolar
SCORE
99
9009 45th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 56kw solar photovoltaic system on roof of residence. System components include (27) itek 280w modules & (1) itek pvi-6600tl string inverter.
Date:  March 24, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 16, 2015 | Expiration date: March 23, 2016 | Current use: Single family / duplex | Permit id: 6465453
2015/03/240999009 45th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
4733 54th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4 kw solar photovoltaic system on roof of residence
Date:  June 22, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 23, 2015 | Expiration date: June 21, 2016 | Current use: Single family / duplex | Permit id: 6480588
2015/06/220994733 54th Ave S Seattle WaPugetsoundsolar
SCORE
99
2168 38th Ave E Seattle Wa
[ one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a (8. 4(kw) solar photovoltaic system will be installed on roof of residence.
Date:  December 17, 2014
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 30, 2015 | Expiration date: December 17, 2015 | Current use: Single family / duplex | Permit id: 6451172
2014/12/170992168 38th Ave E Seattle WaPugetsoundsolar
SCORE
99
2344 30th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 08 kw solar photovoltaic system on roof of residence.
Date:  August 12, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 10, 2015 | Expiration date: August 11, 2016 | Current use: Single family / duplex | Permit id: 6489419
2015/08/120992344 30th Ave S Seattle WaPugetsoundsolar
SCORE
99
727 N 70th St Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  March 27, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 26, 2017 | Expiration date: March 27, 2018 | Current use: Single family / duplex | Permit id: 6588336
2017/03/27099727 N 70th St Seattle WaPugetsoundsolar
SCORE
99
6319 16th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 13kw solar photovoltaic system on roof of residence. System components include (18) itek energy 285w modules & (1) itek pvi-5200tl string inverter.
Date:  March 30, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 14, 2016 | Expiration date: March 30, 2017 | Current use: Single family / duplex | Permit id: 6526808
2016/03/300996319 16th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
1616 Sw Elmgrove St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 56kw solar photovoltaic system on roof of residence. System components include (27) itek energy 280w modules & (14) aps blue frog yc-500a miw microinverters.
Date:  September 14, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 30, 2015 | Expiration date: September 13, 2016 | Current use: Single family / duplex | Permit id: 6494629
2015/09/140991616 Sw Elmgrove St Seattle WaPugetsoundsolar
SCORE
99
3801 Ne 62nd St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16kw solar photovoltaic system on roof of residence. Electrical service upgrade to 200a.
Date:  October 29, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 17, 2015 | Expiration date: October 28, 2016 | Current use: Single family / duplex | Permit id: 6502499
2015/10/290993801 Ne 62nd St Seattle WaPugetsoundsolar
SCORE
99
3809d M L King Jr Way S Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence,
Date:  September 12, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 13, 2017 | Expiration date: September 12, 2018 | Current use: Single family / duplex | Permit id: 6618269
2017/09/120993809d M L King Jr Way S Seattle WaPugetsoundsolar
SCORE
99
107 5th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 28kw photovoltaic system on roof of property and interconnection to scl grid. This permit is for the west building.
Date:  October 12, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: October 12, 2018 | Current use: Commercial | Permit id: 6624037
2017/10/12099107 5th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
414 Ne Ravenna Blvd Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 2. 52(kw) solar photovoltaic system will be installed on roof of building.
Date:  December 21, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: December 20, 2016 | Current use: Commercial | Permit id: 6510556
2015/12/21099414 Ne Ravenna Blvd Seattle WaPugetsoundsolar
SCORE
99
5209 1st Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6kw solar photovoltaic system on roof of residence. Interconnection method using a line side tap.
Date:  April 1, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 27, 2015 | Expiration date: March 31, 2016 | Current use: Single family / duplex | Permit id: 6466831
2015/04/010995209 1st Ave Nw Seattle WaPugetsoundsolar
SCORE
99
8103 6th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04 solar photovoltaic system will be installed on roof of residence.
Date:  May 19, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 7, 2017 | Expiration date: May 18, 2016 | Current use: Single family / duplex | Permit id: 6474745
2015/05/190998103 6th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
3208 Rainier Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 1. 36 kw solar electric system on the roof.
Date:  September 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 13, 2018 | Current use: Commercial | Permit id: 6618572
2017/09/130993208 Rainier Ave S Seattle WaPugetsoundsolar
SCORE
99
4818 48th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 45 solar photovoltaic system will be installed on roof of residence.
Date:  January 27, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 30, 2016 | Expiration date: January 26, 2017 | Current use: Single family / duplex | Permit id: 6515940
2016/01/270994818 48th Ave S Seattle WaPugetsoundsolar
SCORE
99
5226 Sw Stevens St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 11. 115kw solar photovoltaic system on roof of residence. System components include (39) 285w itek energy modules & (2) itek pvi-5200tl string inverters.
Date:  November 24, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 2, 2015 | Expiration date: November 23, 2016 | Current use: Single family / duplex | Permit id: 6506723
2015/11/240995226 Sw Stevens St Seattle WaPugetsoundsolar
SCORE
99
1009 37th Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 82kw solar photovoltaic system on roof of residence. System components include (28) lg 315w modules & (1) abb uno 7600tl string inverter.
Date:  October 6, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 13, 2016 | Expiration date: October 5, 2016 | Current use: Single family / duplex | Permit id: 6498444
2015/10/060991009 37th Ave E Seattle WaPugetsoundsolar
SCORE
99
5629 18th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 8kw solar photovoltaic system on roof of residence. System components include (32) itek energy 275w modules & (1) itek solectria pvi-7600tl string inverter. Electrical plans have been uploaded
Date:  February 17, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 3, 2015 | Expiration date: February 17, 2016 | Current use: Single family / duplex | Permit id: 6459674
2015/02/170995629 18th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
32 California Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 24(kw) solar photovoltaic system will be installed on roof of residence. System will consist of (33) solar world 2 watt modules and (33) enphase energy m2 micro-inverters.
Date:  November 18, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 26, 2016 | Expiration date: November 17, 2016 | Current use: Commercial | Permit id: 6505772
2015/11/1809932 California Ave Sw Seattle WaPugetsoundsolar
SCORE
99
3528 Burke Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 48 kw solar photovoltaic system on roof of residence.
Date:  January 20, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 12, 2016 | Expiration date: January 19, 2017 | Current use: Single family / duplex | Permit id: 6514701
2016/01/200993528 Burke Ave N Seattle WaPugetsoundsolar
SCORE
99
6551 17th Ave Ne Seattle Wa
8-11-17bz approved pv system one-line[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 32(kw) solar photovoltaic system will be installed on roof of residence.
Date:  July 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 14, 2017 | Expiration date: July 13, 2018 | Current use: Single family / duplex | Permit id: 6607653
2017/07/130996551 17th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
5833 Princeton Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 10. 83 kw solar photovoltaic system on roof of residence.
Date:  August 24, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 9, 2015 | Expiration date: August 23, 2016 | Current use: Single family / duplex | Permit id: 6491345
2015/08/240995833 Princeton Ave Ne Seattle WaPugetsoundsolar
SCORE
99
3455 Thorndyke Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a solar photovoltaic system will be installed on roof of property.
Date:  February 13, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 15, 2017 | Expiration date: February 13, 2018 | Current use: Commercial | Permit id: 6580926
2017/02/130993455 Thorndyke Ave W Seattle WaPugetsoundsolar
SCORE
99
6347 37th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 08kw solar photovoltaic system on roof of residence. Service upgrade too. 11 04 16 jk approved pv plans.
Date:  November 2, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 22, 2016 | Expiration date: November 2, 2017 | Current use: Single family / duplex | Permit id: 6565072
2016/11/020996347 37th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
1028 S Snoqualmie St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6kw solar photovoltaic system on roof of residence. System components include (20) itek energy 280w modules & (1) pvi-52 tl string inverter.
Date:  September 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 1, 2015 | Expiration date: September 1, 2016 | Current use: Single family / duplex | Permit id: 6493046
2015/09/020991028 S Snoqualmie St Seattle WaPugetsoundsolar
SCORE
99
755 32nd Ave Seattle Wa
A service upgrade will be performed on residence along with the installation of a electric vehicle charging station.
Date:  August 12, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 4, 2015 | Expiration date: August 11, 2016 | Current use: Single family / duplex | Permit id: 6489579
2015/08/12099755 32nd Ave Seattle WaPugetsoundsolar
SCORE
99
4417 33rd Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 16(kw) solar photovoltaic system will be installed on roof of residence.
Date:  February 6, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 26, 2015 | Expiration date: February 6, 2016 | Current use: Single family / duplex | Permit id: 6458351
2015/02/060994417 33rd Ave S Seattle WaPugetsoundsolar
SCORE
99
4765 35th Ave S Seattle Wa
(unit a) an electrical rough-in will be done for possible future solar photovoltaic system.
Date:  January 18, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 4, 2016 | Expiration date: January 17, 2017 | Current use: Single family / duplex | Permit id: 6514198
2016/01/180994765 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
216 32nd Ave Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 9 kw solar photovoltaic system on roof of residence
Date:  May 24, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2017 | Expiration date: May 24, 2018 | Current use: Single family / duplex | Permit id: 6599020
2017/05/24099216 32nd Ave Seattle WaPugetsoundsolar
SCORE
99
2341 Eastlake Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] an additional . 60(kw) will be added to existing solar photovoltaic system. Work will be performed in electrical room and roof of residence.
Date:  March 31, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2015 | Expiration date: March 30, 2016 | Current use: Commercial | Permit id: 6466527
2015/03/310992341 Eastlake Ave E Seattle WaPugetsoundsolar
SCORE
99
4223 Williams Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 26 kw solar pv system on roof of residence. 10 18 16 jk approved plans.
Date:  September 29, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2017 | Expiration date: September 29, 2017 | Current use: Single family / duplex | Permit id: 6559378
2016/09/290994223 Williams Ave W Seattle WaPugetsoundsolar
SCORE
99
5231 S Pearl St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek energy 280w modules (1) pvi-5200tl itek string inverter.
Date:  November 19, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 8, 2015 | Expiration date: November 18, 2016 | Current use: Single family / duplex | Permit id: 6505840
2015/11/190995231 S Pearl St Seattle WaPugetsoundsolar
SCORE
99
4408 Renton Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 8kw solar photovoltaic solar system on roof of residence
Date:  June 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 3, 2015 | Expiration date: June 14, 2016 | Current use: Single family / duplex | Permit id: 6479414
2015/06/150994408 Renton Ave S Seattle WaPugetsoundsolar
SCORE
99
5111 Sw Orleans St Seattle Wa
6-12-17 bz pv system one-line approveda one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9 kw solar photovoltaic system on roof of residence. Also installing a sub panel off the main electrical panel.
Date:  June 7, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 29, 2017 | Expiration date: June 7, 2018 | Current use: Single family / duplex | Permit id: 6601266
2017/06/070995111 Sw Orleans St Seattle WaPugetsoundsolar
SCORE
99
131 31st Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 56kw solar photovoltaic system on roof of sfr. System components include (23) itek energy 285w modules & (11. 5) blue frog yc-500a miw microinverters.
Date:  May 5, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 10, 2016 | Expiration date: May 5, 2017 | Current use: Single family / duplex | Permit id: 6533290
2016/05/05099131 31st Ave E Seattle WaPugetsoundsolar
SCORE
99
5807 Sw Horton St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 72kw solar photovoltaic system on roof of residence. System components include (24) itek energy 280w modules & (1) itek pvi-6600tl string inverter.
Date:  October 19, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 18, 2016 | Expiration date: October 18, 2016 | Current use: Single family / duplex | Permit id: 6500622
2015/10/190995807 Sw Horton St Seattle WaPugetsoundsolar
SCORE
99
1716b 27th Ave Seattle Wa
Rough in for possible future solar pv installation
Date:  July 30, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 28, 2016 | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487129
2015/07/300991716b 27th Ave Seattle WaPugetsoundsolar
SCORE
99
1801 S Jackson St Seattle Wa
4-25-17 bz pv system revision approved2-27-17 bz pv sys. Approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 86kw solar system on roof of property.
Date:  February 22, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: February 22, 2018 | Current use: Commercial | Permit id: 6582628
2017/02/220991801 S Jackson St Seattle WaPugetsoundsolar
SCORE
99
1116 Sw Holden St Seattle Wa
5 28 2015 - cancelled customer log #15-845 installation of an 125a ac subpanel
Date:  May 27, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: May 26, 2016 | Current use: Commercial | Permit id: 6475959
2015/05/270991116 Sw Holden St Seattle WaPugetsoundsolar
SCORE
99
114 Nw 49th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 6kw solar photovoltaic system on roof of residence. Panel upgade.
Date:  April 18, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 16, 2017 | Expiration date: April 18, 2018 | Current use: Single family / duplex | Permit id: 6592224
2017/04/18099114 Nw 49th St Seattle WaPugetsoundsolar
SCORE
99
4749 35th Ave S Seattle Wa
(unit b) an electrical rough-in will be performed for possible future solar photovoltaic system.
Date:  December 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 15, 2015 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508341
2015/12/070994749 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
2621 32nd Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 85 kw solar photovoltaic system on roof of residence. 8 22 16 jk approved plans.
Date:  August 17, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 6, 2016 | Expiration date: August 17, 2017 | Current use: Single family / duplex | Permit id: 6551943
2016/08/170992621 32nd Ave W Seattle WaPugetsoundsolar
SCORE
99
9176 Holman Rd Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4(kw) solar photovoltaic system will be installed on roof of property. 5 24 16 jk approved plans. 6 2 16 jk approved revised plans.
Date:  May 24, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: May 24, 2017 | Current use: Commercial | Permit id: 6536731
2016/05/240999176 Holman Rd Nw Seattle WaPugetsoundsolar
SCORE
99
4224 51st Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 9. 12kw solar photovoltaic system on roof of residence. 7 5 16 jk approved plans.
Date:  June 22, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 13, 2016 | Expiration date: June 22, 2017 | Current use: Single family / duplex | Permit id: 6542212
2016/06/220994224 51st Ave S Seattle WaPugetsoundsolar
SCORE
99
7308 44th Ave Ne Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  September 12, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 14, 2017 | Expiration date: September 12, 2018 | Current use: Single family / duplex | Permit id: 6618293
2017/09/120997308 44th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
54 16th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 13kw solar photovoltaic system on roof of residence. System components include (15) itek energy 275w modules & (8) aps blue frog yc0500a miw dual input microinverters.
Date:  January 20, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 11, 2015 | Expiration date: January 20, 2016 | Current use: Single family / duplex | Permit id: 6455267
2015/01/2009954 16th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
45 Purdue Ave Ne Seattle Wa
10-24-17 bz waived plan review under 2017 7. 7kva threshold based on inverter output[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9 kw solar photovoltaic system on the roof of residence. Also installing feeder panel.
Date:  October 9, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 9, 2017 | Expiration date: October 9, 2018 | Current use: Single family / duplex | Permit id: 6623339
2017/10/0909945 Purdue Ave Ne Seattle WaPugetsoundsolar
SCORE
99
933 Nw 56th St Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  December 15, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: December 15, 2017 | Current use: Single family / duplex | Permit id: 6571798
2016/12/15099933 Nw 56th St Seattle WaPugetsoundsolar
SCORE
99
1516 Nw 51st St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 15 itek 2 watt modules and aps blue frog micro inverters
Date:  October 14, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: October 13, 2016 | Current use: Commercial | Permit id: 6499839
2015/10/140991516 Nw 51st St Seattle WaPugetsoundsolar
SCORE
99
9003 31st Ave Sw Seattle Wa
A service conduit replacement will be performed in electrical room and residence.
Date:  January 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 23, 2015 | Expiration date: January 15, 2016 | Current use: Single family / duplex | Permit id: 6454762
2015/01/150999003 31st Ave Sw Seattle WaPugetsoundsolar
SCORE
99
435 Dexter Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 48 solarworld 2 watt modules with a solectria 14tl inverter
Date:  October 14, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 24, 2016 | Expiration date: October 13, 2016 | Current use: Commercial | Permit id: 6499842
2015/10/14099435 Dexter Ave N Seattle WaPugetsoundsolar
SCORE
99
3847 24th Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 21kw solar photovoltaic system on roof of sfr. (18) sunpower 345w ac modules w solarbridge microinverters.
Date:  July 19, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 8, 2016 | Expiration date: July 19, 2017 | Current use: Single family / duplex | Permit id: 6546929
2016/07/190993847 24th Ave W Seattle WaPugetsoundsolar
SCORE
99
Date:  April 19, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 21, 2016 | Expiration date: April 19, 2017 | Current use: Single family / duplex | Permit id: 6530229
2016/04/190993537 Ne 87th St Seattle WaPugetsoundsolar
SCORE
99
5209 1st Ave Nw Seattle Wa
Installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  March 22, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 24, 2016 | Expiration date: March 22, 2017 | Current use: Single family / duplex | Permit id: 6525217
2016/03/220995209 1st Ave Nw Seattle WaPugetsoundsolar
SCORE
99
4132 Brooklyn Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 2. 88kw grid tied solar photovoltaic system.
Date:  January 31, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2017 | Expiration date: January 31, 2018 | Current use: Commercial | Permit id: 6578978
2017/01/310994132 Brooklyn Ave Ne Seattle WaPugetsoundsolar
SCORE
99
115 12th Ave Ne Seattle Wa
Installation of a 96. 9 kw dc (73 kw ac) solar pv array on the roof of hazel wolf k-8 e-stem school, connected to existing electrical switchboard
Value:   $98,951
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627826
9895199115 12th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
1003 36th Ave E Seattle Wa
Rough in for future solar pv system
Date:  September 20, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: September 20, 2018 | Current use: Single family / duplex | Permit id: 6620067
2017/09/200991003 36th Ave E Seattle WaPugetsoundsolar
SCORE
99
6113 32nd Ave Nw Seattle Wa
8-14-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 4(kw) solar photovoltaic system will be installed on roof of residence.
Date:  August 2, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 28, 2017 | Expiration date: August 2, 2018 | Current use: Single family / duplex | Permit id: 6611309
2017/08/020996113 32nd Ave Nw Seattle WaPugetsoundsolar
SCORE
99
6321 Seaview Ave Nw Seattle Wa
Installation of 4 electric vehicle charging stations will be performed in electrical room and residence. Also,installation of a 3-phase 225a sub panel will be installed on residence.
Date:  October 5, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: October 4, 2016 | Current use: Commercial | Permit id: 6498163
2015/10/050996321 Seaview Ave Nw Seattle WaPugetsoundsolar
SCORE
99
8315 Fremont Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 84kw solar photovoltaic system on roof of residence. System components include (24) itek 285w modules & (12) blue frog yc-500a miw microinverters.
Date:  October 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 6, 2015 | Expiration date: October 14, 2016 | Current use: Single family / duplex | Permit id: 6500122
2015/10/150998315 Fremont Ave N Seattle WaPugetsoundsolar
SCORE
99
3212 37th Ave S Seattle Wa
8-28-17 bz plan review waived 2017 threshold 7. 7kva. Micro inverter limits output to below7. 7kva. Final approval subject to field inspector.[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 1 kw solar photovoltaic system on roof of residence.
Date:  August 30, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 5, 2017 | Expiration date: August 30, 2018 | Current use: Single family / duplex | Permit id: 6616189
2017/08/300993212 37th Ave S Seattle WaPugetsoundsolar
SCORE
99
7723 Seward Park Ave S Seattle Wa
6 22 2015- cancelled customer log #15-10 installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  June 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: June 15, 2016 | Current use: Single family / duplex | Permit id: 6479490
2015/06/160997723 Seward Park Ave S Seattle WaPugetsoundsolar
SCORE
99
2003 Nw 57th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 55 solar photovoltaic system will be installed on roof of property. 2 13 17 paf renew
Date:  February 23, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 3, 2017 | Expiration date: February 22, 2018 | Current use: Commercial | Permit id: 6520419
2016/02/230992003 Nw 57th St Seattle WaPugetsoundsolar
SCORE
99
3701 Sw 104th St Seattle Wa
Installation of a 142 kw dc (1 kw ac) solar pv array on the roof of arbor heights elementary school, to connect to existing electrical switchboard.
Value:   $106,213
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627383
106213993701 Sw 104th St Seattle WaPugetsoundsolar
SCORE
99
1812 25th Ave Seattle Wa
(unit d) installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  August 29, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 31, 2017 | Expiration date: August 29, 2018 | Current use: Single family / duplex | Permit id: 6615899
2017/08/290991812 25th Ave Seattle WaPugetsoundsolar
SCORE
99
11 Alki Ave Sw Seattle Wa
Installation of a electric vehicle chargng station will be performed in electrical room and residence.
Date:  January 8, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 9, 2015 | Expiration date: January 8, 2016 | Current use: Single family / duplex | Permit id: 6453798
2015/01/0809911 Alki Ave Sw Seattle WaPugetsoundsolar
SCORE
99
3526 Sw 112th St Seattle Wa
Alteration of existing net meter as per seattle city light requirements
Date:  April 25, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 26, 2016 | Expiration date: April 25, 2017 | Current use: Single family / duplex | Permit id: 6531156
2016/04/250993526 Sw 112th St Seattle WaPugetsoundsolar
SCORE
99
5202 S Morgan St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 695kw solar photovoltaic system on roof of residence. System components include (27) itek energy 285w modules & (1) itek pvi-6600tl string inverter. Service panel upgrade.
Date:  September 24, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 4, 2015 | Expiration date: September 23, 2016 | Current use: Single family / duplex | Permit id: 6496586
2015/09/240995202 S Morgan St Seattle WaPugetsoundsolar
SCORE
99
8546 Midvale Ave N Seattle Wa
(unit b) installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  December 11, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 31, 2015 | Expiration date: December 10, 2016 | Current use: Single family / duplex | Permit id: 6509258
2015/12/110998546 Midvale Ave N Seattle WaPugetsoundsolar
SCORE
99
7286 29th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4 kw solar photovoltaic solar system on roof of residence. Service upgrade to 200a. 6 25 15 hkh; add (1) 200a feeder and (1) 100a feeder
Date:  June 8, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 30, 2015 | Expiration date: June 7, 2016 | Current use: Single family / duplex | Permit id: 6478115
2015/06/080997286 29th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
5201 Beach Dr Sw Seattle Wa
2-27-17 bz pv review approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 8kw solar photovoltaic system on roof of residence.
Date:  February 21, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 16, 2017 | Expiration date: February 21, 2018 | Current use: Single family / duplex | Permit id: 6582258
2017/02/210995201 Beach Dr Sw Seattle WaPugetsoundsolar
SCORE
99
911 W Howe St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 98kw solar photovoltaic system on roof of residence. System components include (28) itek energy 285w modules & (1) itek pvi-7600tl string inverter.
Date:  December 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 29, 2015 | Expiration date: December 1, 2016 | Current use: Single family / duplex | Permit id: 6507628
2015/12/02099911 W Howe St Seattle WaPugetsoundsolar
SCORE
99
1718b 27th Ave Seattle Wa
Cancel per customer log 15-1316 rough in for possible future solar pv system.
Date:  July 30, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487134
2015/07/300991718b 27th Ave Seattle WaPugetsoundsolar
SCORE
99
4765 35th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 76kw solar photovoltaic system on roof of sfr. System components include (16) sunpower ac modules.
Date:  March 14, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 11, 2017 | Expiration date: March 14, 2018 | Current use: Single family / duplex | Permit id: 6586081
2017/03/140994765 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
4434 Renton Ave S Seattle Wa
An electrical rough-in will be performed in electrical room and residence for possible future solar photovoltaic system.
Date:  December 16, 2014
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 22, 2014 | Expiration date: December 16, 2015 | Current use: Single family / duplex | Permit id: 6451088
2014/12/160994434 Renton Ave S Seattle WaPugetsoundsolar
SCORE
99
1019 S Southern St Seattle Wa
New circuit for heat pump
Date:  August 2, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: August 2, 2018 | Current use: Single family / duplex | Permit id: 6611194
2017/08/020991019 S Southern St Seattle WaPugetsoundsolar
SCORE
99
4055 41st Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 13 kw solar pv system on roof of residence. Also a service upgrade. 3 14 2016 paf add 2 amp feeder. 3 15 2016 paf add (1) amp circuit.
Date:  February 29, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 23, 2016 | Expiration date: February 28, 2017 | Current use: Single family / duplex | Permit id: 6521344
2016/02/290994055 41st Ave Sw Seattle WaPugetsoundsolar
SCORE
99
22 Etruria St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 6 solar photovoltaic system will be installed on roof of property.
Date:  February 15, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 3, 2016 | Expiration date: February 14, 2017 | Current use: Commercial | Permit id: 6519010
2016/02/1509922 Etruria St Seattle WaPugetsoundsolar
SCORE
99
3333 Wallingford Ave N Seattle Wa
(unit 315) panel in parking garage. Installation of a electric vehicle charging will be installed at parking garage.
Date:  September 12, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 13, 2017 | Expiration date: September 12, 2018 | Current use: Single family / duplex | Permit id: 6618267
2017/09/120993333 Wallingford Ave N Seattle WaPugetsoundsolar
SCORE
99
607 21st Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 0kw solar photovoltaic system on roof of sfr. System components include (20) itek energy 300w modules & (10) blue frog yc-500a miw microinverters.
Date:  April 11, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 27, 2017 | Expiration date: April 11, 2018 | Current use: Single family / duplex | Permit id: 6591013
2017/04/11099607 21st Ave E Seattle WaPugetsoundsolar
SCORE
99
3207 13th Ave W Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 06kw solar photovoltaic system on roof of detached garage. System components include (14) solarwold 290w modules & (14) chilicon power microinverters.
Date:  December 21, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: January 19, 2017 | Expiration date: December 21, 2017 | Current use: Single family / duplex | Permit id: 6572852
2016/12/210993207 13th Ave W Seattle WaPugetsoundsolar
SCORE
99
4738 15th Ave Ne Seattle Wa
3-8-17 bz pv sys approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 20. 7kw solar system on roof of property.
Date:  March 2, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: March 2, 2018 | Current use: Commercial | Permit id: 6584088
2017/03/020994738 15th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
7027 Sycamore Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 8. 4kw solar photovoltaic system on roof of residence. 11 04 16 jk approved plans. 11 17 16 jk approved revised plans.
Date:  October 26, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 22, 2016 | Expiration date: October 26, 2017 | Current use: Single family / duplex | Permit id: 6563901
2016/10/260997027 Sycamore Ave Nw Seattle WaPugetsoundsolar
SCORE
99
124 Denny Way Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4(kw) solar photovoltaic system will be installed on roof of residence.
Date:  August 17, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 1, 2017 | Expiration date: August 17, 2017 | Current use: Commercial | Permit id: 6551914
2016/08/17099124 Denny Way Seattle WaPugetsoundsolar
SCORE
99
1411 Alki Ave Sw Seattle Wa
1 8 2015 - cancelled customer log #15-27 installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  January 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: January 2, 2016 | Current use: Single family / duplex | Permit id: 6453087
2015/01/020991411 Alki Ave Sw Seattle WaPugetsoundsolar
SCORE
99
7018 50th Ave Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 55kw solar photovoltaic system on roof of residence. System components include (30) itek 285w modules & (1) pvi-7600tl string inverter.
Date:  September 17, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 27, 2015 | Expiration date: September 16, 2016 | Current use: Single family / duplex | Permit id: 6495415
2015/09/170997018 50th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
6353 50th Ave Sw Seattle Wa
6-12-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 8 kw solar photovoltaic system on roof of residence.
Date:  May 30, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 14, 2017 | Expiration date: May 30, 2018 | Current use: Single family / duplex | Permit id: 6599756
2017/05/300996353 50th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4122 36th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 13kw solar system on roof of property.
Date:  June 26, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 4, 2017 | Expiration date: June 26, 2018 | Current use: Commercial | Permit id: 6604787
2017/06/260994122 36th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
Date:  February 9, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 10, 2016 | Expiration date: February 8, 2017 | Current use: Single family / duplex | Permit id: 6518056
2016/02/09099334 Ne 55th St Seattle WaPugetsoundsolar
SCORE
99
1747 Nw 61st St Seattle Wa
An electrical rough-in will be performed in (unit a) for possible future solar photovoltaic system.
Date:  March 26, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 31, 2015 | Expiration date: March 25, 2016 | Current use: Single family / duplex | Permit id: 6465996
2015/03/260991747 Nw 61st St Seattle WaPugetsoundsolar
SCORE
99
5637 30th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek energy 280w modules & (9) aps blue frog yc-500a miw dual input microinverters.
Date:  February 10, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 25, 2015 | Expiration date: February 10, 2016 | Current use: Single family / duplex | Permit id: 6458692
2015/02/100995637 30th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
3236 S Edmunds St Seattle Wa
This is for unit b. An electrical rough-in will be performed in electrical room and residence.
Date:  November 3, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 4, 2015 | Expiration date: November 2, 2016 | Current use: Single family / duplex | Permit id: 6503296
2015/11/030993236 S Edmunds St Seattle WaPugetsoundsolar
SCORE
99
3711 47th Pl Ne Seattle Wa
3 25 2015 - cancelled customer log #15-511 installation of a electric vehicle charging station will performed in electrical room and residence.
Date:  February 23, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: February 23, 2016 | Current use: Single family / duplex | Permit id: 6460649
2015/02/230993711 47th Pl Ne Seattle WaPugetsoundsolar
SCORE
99
222 Etruria St Seattle Wa
(this is for suite 1 ssa acoustics) installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  January 18, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 15, 2017 | Expiration date: January 18, 2018 | Current use: Commercial | Permit id: 6576764
2017/01/18099222 Etruria St Seattle WaPugetsoundsolar
SCORE
99
1315 E Jefferson St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 1. 96kw photovoltaic system with enphase micro inverters on roof of building.
Date:  October 14, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2016 | Expiration date: October 13, 2016 | Current use: Commercial | Permit id: 6499835
2015/10/140991315 E Jefferson St Seattle WaPugetsoundsolar
SCORE
99
44 Renton Ave S Seattle Wa
Rough in for future solar photovoltaic system.
Date:  February 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 23, 2015 | Expiration date: February 16, 2016 | Current use: Single family / duplex | Permit id: 6459622
2015/02/1609944 Renton Ave S Seattle WaPugetsoundsolar
SCORE
99
2519 34th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 24(kw) solar photovoltaic system will be installed on roof of residence. Array will consist of (33) itek energy module and (1)itek pvi-7600tl inverter.
Date:  April 13, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2015 | Expiration date: April 12, 2016 | Current use: Single family / duplex | Permit id: 6468606
2015/04/130992519 34th Ave S Seattle WaPugetsoundsolar
SCORE
99
963 22nd Ave Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 9kw solar photovoltaic system on roof of sfr. System components include (23) itek energy 300w modules & (12) blue frog yc-500a miw dual-input microinverters.
Date:  April 11, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 13, 2017 | Expiration date: April 11, 2018 | Current use: Single family / duplex | Permit id: 6591023
2017/04/11099963 22nd Ave Seattle WaPugetsoundsolar
SCORE
99
4765 35th Ave S Seattle Wa
(unit c) an electrical rough-in will be done for possible future solar photovoltaic system.
Date:  January 18, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 4, 2016 | Expiration date: January 17, 2017 | Current use: Single family / duplex | Permit id: 6514201
2016/01/180994765 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
5124 S Graham St Seattle Wa
Installation of a sub panel and an electric vehicle charging station.
Date:  February 8, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 20, 2017 | Expiration date: February 8, 2018 | Current use: Single family / duplex | Permit id: 6580353
2017/02/080995124 S Graham St Seattle WaPugetsoundsolar
SCORE
99
1528 37th Ave E Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 415 kw solar photovoltaic system on roof of residence.
Date:  September 15, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: October 21, 2015 | Expiration date: September 14, 2016 | Current use: Single family / duplex | Permit id: 6494845
2015/09/150991528 37th Ave E Seattle WaPugetsoundsolar
SCORE
99
317 37th Ave E Seattle Wa
An electrical rough-in will be done for possible future solar photovoltaic system.
Date:  March 10, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: March 10, 2018 | Current use: Single family / duplex | Permit id: 6585603
2017/03/10099317 37th Ave E Seattle WaPugetsoundsolar
SCORE
99
82 Fairway Dr Ne Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a photovoltaic system will be installed on roof of residence. 1-17-17 bz approved plans
Date:  December 15, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 6, 2017 | Expiration date: December 15, 2017 | Current use: Single family / duplex | Permit id: 6571860
2016/12/1509982 Fairway Dr Ne Seattle WaPugetsoundsolar
SCORE
99
1325 30th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] an additional 1. 12(kw) solar photovoltaic saystem will be installed on existing pv array.
Date:  March 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 6, 2015 | Expiration date: March 15, 2016 | Current use: Single family / duplex | Permit id: 6464145
2015/03/160991325 30th Ave S Seattle WaPugetsoundsolar
SCORE
99
525 Rainier Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 13kw solar photovoltaic awning. System components include (18) itek energy 285w modules & (1) itek pvi-5200tl string inverter. 9 28 16 jle renewal
Date:  September 29, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 5, 2016 | Expiration date: September 28, 2017 | Current use: Single family / duplex | Permit id: 6497373
2015/09/29099525 Rainier Ave S Seattle WaPugetsoundsolar
SCORE
99
201 Galer St Seattle Wa
1 25 2017 - cancelled customer log #17-84 installation of a electric vehicle charging station will be installed in electrical room and residence.
Date:  January 18, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: January 18, 2018 | Current use: Single family / duplex | Permit id: 6576717
2017/01/18099201 Galer St Seattle WaPugetsoundsolar
SCORE
99
5825 3rd Ave Nw Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence. 1 29 15 jcb; add 2 amp service.
Date:  January 2, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2015 | Expiration date: January 2, 2016 | Current use: Single family / duplex | Permit id: 6453089
2015/01/020995825 3rd Ave Nw Seattle WaPugetsoundsolar
SCORE
99
11423 Marine View Dr Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 8kw solar photovoltaic system on roof of residence. System components include (21) itek 275w modules & (11) aps blue frog yc-500a miw dual-input microinverters.
Date:  March 5, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 8, 2015 | Expiration date: March 4, 2016 | Current use: Single family / duplex | Permit id: 6462497
2015/03/0509911423 Marine View Dr Sw Seattle WaPugetsoundsolar
SCORE
99
6208 57th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 9 solar photovoltaic system will be onstalled on roof of residence. Arrays will consist of (36) itek energy 275w modules and (18) blue frog solar yc500a-miw micro inverters.
Date:  April 23, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 11, 2015 | Expiration date: April 22, 2016 | Current use: Single family / duplex | Permit id: 6470405
2015/04/230996208 57th Ave S Seattle WaPugetsoundsolar
SCORE
99
Date:  March 31, 2014
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Application accepted | Expiration date: March 31, 2015 | Current use: Single family / duplex | Permit id: 6411002
2014/03/310992419 E Helen St Seattle WaPugetsoundsolar
SCORE
99
1515 35th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 4. 8kw photovoltaic system on roof of dadu and connected to existing system on house.
Date:  October 4, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: October 4, 2018 | Current use: Single family / duplex | Permit id: 6622451
2017/10/040991515 35th Ave S Seattle WaPugetsoundsolar
SCORE
99
301 12th Ave Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 15(kw) solar photovoltaic system will be installed on roof of property.
Date:  November 3, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 20, 2016 | Expiration date: November 2, 2016 | Current use: Commercial | Permit id: 6503221
2015/11/03099301 12th Ave Seattle WaPugetsoundsolar
SCORE
99
557 N 80th St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 64 kw solar photovoltaic system on roof of residence. 1-17-17 bz approved plans.
Date:  January 5, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 2, 2017 | Expiration date: January 5, 2018 | Current use: Single family / duplex | Permit id: 6574637
2017/01/05099557 N 80th St Seattle WaPugetsoundsolar
SCORE
99
7316 27th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 4(kw) solar photovoltaic system will be installed on roof of residence.
Date:  July 21, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 3, 2017 | Expiration date: July 21, 2018 | Current use: Single family / duplex | Permit id: 6609248
2017/07/210997316 27th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
3239a California Ave Sw Seattle Wa
An electrical rough-in will be performed on electrical room and residence.
Date:  May 12, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 18, 2015 | Expiration date: May 11, 2016 | Current use: Single family / duplex | Permit id: 6473548
2015/05/120993239a California Ave Sw Seattle WaPugetsoundsolar
SCORE
99
2322 50th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 93kw solar photovoltaic system on roof of residence. System components include (17) itek energy 290w & (1) itek solectria pvi-5200tl string inverter.
Date:  May 10, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 6, 2016 | Expiration date: May 10, 2017 | Current use: Single family / duplex | Permit id: 6534184
2016/05/100992322 50th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
3632 W Commodore Way Seattle Wa
6-12-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 11. 4 kw solar photovoltaic system on roof of residence.
Date:  June 2, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 7, 2017 | Expiration date: June 2, 2018 | Current use: Single family / duplex | Permit id: 6600640
2017/06/020993632 W Commodore Way Seattle WaPugetsoundsolar
SCORE
99
1711 Nw 61st St Seattle Wa
(this is for unit b) an electrcial rough-in will be performed for possible future solar photovoltaic system. 2 5 16 jle changed address from 1709 nw 61st st
Date:  December 16, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2016 | Expiration date: December 15, 2016 | Current use: Single family / duplex | Permit id: 6509820
2015/12/160991711 Nw 61st St Seattle WaPugetsoundsolar
SCORE
99
6406 60th Pl S Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  June 24, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: July 17, 2015 | Expiration date: June 23, 2016 | Current use: Single family / duplex | Permit id: 6481001
2015/06/240996406 60th Pl S Seattle WaPugetsoundsolar
SCORE
99
3719 Burke Ave N Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site] installation of a 5. 04kw solar photovoltaic system on roof of residence. System components include (18) itek 280w modules & (9) blue frog yc-500a miw dual-input microinverters. 3 12 15 jcb; add vehicle charging station.
Date:  March 3, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: August 19, 2015 | Expiration date: March 2, 2016 | Current use: Single family / duplex | Permit id: 6462154
2015/03/030993719 Burke Ave N Seattle WaPugetsoundsolar
SCORE
99
4118 39th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of an 8. 85kw solar photovoltaic system on roof of residence. 11 16 16 jk approved plans.
Date:  October 26, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 16, 2016 | Expiration date: October 26, 2017 | Current use: Single family / duplex | Permit id: 6563937
2016/10/260994118 39th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
4701 11th Ave Ne Seattle Wa
Installation of four ev charging stations circuits
Date:  December 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 6, 2016 | Expiration date: December 6, 2016 | Current use: Commercial | Permit id: 6508194
2015/12/070994701 11th Ave Ne Seattle WaPugetsoundsolar
SCORE
99
3514 E Columbia St Seattle Wa
Installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  August 20, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: September 18, 2015 | Expiration date: August 19, 2016 | Current use: Single family / duplex | Permit id: 6490866
2015/08/200993514 E Columbia St Seattle WaPugetsoundsolar
SCORE
99
5621 6th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 04(kw) solar photovoltaic system will be installed on roof of residence.
Date:  January 13, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: May 5, 2015 | Expiration date: January 13, 2016 | Current use: Single family / duplex | Permit id: 6454536
2015/01/130995621 6th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
1301 E Yesler Way Seattle Wa
Installation of a 153. 4 kw dc (1 kw ac) solar pv array on the roof of bailey gatzert elementary school, connected to the existing electrical switchboard.
Value:   $100,398
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Ready for intake | Current use: Institutional | Permit id: 6627388
100398991301 E Yesler Way Seattle WaPugetsoundsolar
SCORE
99
1625 E Mcgraw St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 9(kw) solar photovoltaic system will be installed on roof of residence.
Date:  May 28, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 4, 2015 | Expiration date: May 27, 2016 | Current use: Single family / duplex | Permit id: 6476227
2015/05/280991625 E Mcgraw St Seattle WaPugetsoundsolar
SCORE
99
1007 20th Ave S Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 6. 27 kw solar pv system on roof of residence.
Date:  December 7, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 23, 2015 | Expiration date: December 6, 2016 | Current use: Single family / duplex | Permit id: 6508335
2015/12/070991007 20th Ave S Seattle WaPugetsoundsolar
SCORE
99
1232 Harrison St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 3. 77kw solar system on roof of property.
Date:  July 10, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: July 10, 2018 | Current use: Commercial | Permit id: 6606805
2017/07/100991232 Harrison St Seattle WaPugetsoundsolar
SCORE
99
126 Blakely Pl Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site] installation of a 6. 16kw solar photovoltaic system on roof of residence; system components include (22) itek 280w modules & (1) itek pvi-5200tl string inverter. 2 26 15 jcb; add 2 amp service.
Date:  February 24, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: March 17, 2015 | Expiration date: February 24, 2016 | Current use: Single family / duplex | Permit id: 6460994
2015/02/24099126 Blakely Pl Nw Seattle WaPugetsoundsolar
SCORE
99
6535 Seaview Ave Nw Seattle Wa
8 30 2017 - cancelled customer log #17-10 installation of a electric vehicle charging station will be performed in electrical room and residence.
Date:  August 23, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit issued | Expiration date: August 23, 2018 | Current use: Single family / duplex | Permit id: 6615064
2017/08/230996535 Seaview Ave Nw Seattle WaPugetsoundsolar
SCORE
99
1815 Bellevue Ave Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a solar photovoltaic system will be installed on roof of property.
Date:  March 14, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: June 28, 2016 | Expiration date: March 14, 2017 | Current use: Single family / duplex | Permit id: 6523846
2016/03/140991815 Bellevue Ave Seattle WaPugetsoundsolar
SCORE
99
1401 Sunset Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 970kw solar photovoltaic system on roof of sfr. System components include (26) sunpower 345w modules & (1) sma sunnyboy 7000tl-ss string inverter.
Date:  April 6, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2016 | Expiration date: April 6, 2017 | Current use: Single family / duplex | Permit id: 6527986
2016/04/060991401 Sunset Ave Sw Seattle WaPugetsoundsolar
SCORE
99
611 E Howell St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] an installation of a . 64(kw) solar photovoltaic system will be installed on roof of property.
Date:  May 19, 2016
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 3, 2016 | Expiration date: May 19, 2017 | Current use: Commercial | Permit id: 6536014
2016/05/19099611 E Howell St Seattle WaPugetsoundsolar
SCORE
99
3525 S Oregon St Seattle Wa
This is for unit b. An electrical rough-in for possible future solar photovoltaic system will be performed in electrical room and residence.
Date:  October 22, 2015
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2015 | Expiration date: October 21, 2016 | Current use: Single family / duplex | Permit id: 6501175
2015/10/220993525 S Oregon St Seattle WaPugetsoundsolar
SCORE
99
4456 47th Ave Sw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 2(kw) solar photovoltaic system will be installed on roof of residence.
Date:  October 30, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 20, 2017 | Expiration date: October 30, 2018 | Current use: Single family / duplex | Permit id: 6627318
2017/10/300994456 47th Ave Sw Seattle WaPugetsoundsolar
SCORE
99
3414 E Ward St Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 32(kw) solar photovoltaic system will be installed on roof of residence.
Date:  October 23, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 29, 2017 | Expiration date: October 23, 2018 | Current use: Single family / duplex | Permit id: 6625944
2017/10/230993414 E Ward St Seattle WaPugetsoundsolar
SCORE
99
8031 11th Ave Nw Seattle Wa
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 4(kw) solar photovoltaic system will be installed on roof of residence.
Date:  October 31, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: December 5, 2017 | Expiration date: October 31, 2018 | Current use: Single family / duplex | Permit id: 6627595
2017/10/310998031 11th Ave Nw Seattle WaPugetsoundsolar
SCORE
99
8527 Burke Ave N Seattle Wa
10-24-17 bz waived plan review under 2017 7. 7kva threshold based on inverter output[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9 kw solar photovoltaic system on roof of residence.
Date:  October 18, 2017
Contractor: Pugetsoundsolar

Permit type: Electrical | Permit status: Permit closed | Completion date: November 22, 2017 | Expiration date: October 18, 2018 | Current use: Single family / duplex | Permit id: 6625148
2017/10/180998527 Burke Ave N Seattle WaPugetsoundsolar
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.