Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Replacing 2 amp service Date: March 29, 2007 Contractor: Streamline Electrical Ser Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: April 9, 2007 | Expiration date: March 29, 2008 | Current use: Single family / duplex | Permit id: 6134145 | |||||
SCORE 100 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9kw solar photovoltaic system on roof of residence. System components include (30) solarworld 300w modules & (1) fronius primo 7. 6 string inverter. 9/21/16 jk approved plans. 9/22/16 jk approved revised plans. Date: September 9, 2016 Contractor: Puget Sound Solar Llc Permit type: Electrical | Permit status: Permit closed | Completion date: September 27, 2016 | Expiration date: September 9, 2017 | Current use: Single family / duplex | Permit id: 6555728 | |||||
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9kw solar photovoltaic system on roof of residence. System components include (30) solarworld 300w modules & (1) fronius primo 7. 6 string inverter. 9 21 16 jk approved plans. 9 22 16 jk approved revised plans. Date: September 9, 2016 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: September 27, 2016 | Expiration date: September 9, 2017 | Current use: Single family / duplex | Permit id: 6555728 |