Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 6-12-17 bz pv system one-line approveda one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9 kw solar photovoltaic system on roof of residence. Also installing a sub panel off the main electrical panel. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: June 29, 2017 | Expiration date: June 7, 2018 | Current use: Single family / duplex | Permit id: 6601266 | |||||
SCORE 95 Installation of ductless heat pump ![]() ![]() Applicant: Ballard Natural Gas Svcs Inc | Permit type: Refrigeration | Permit status: Permit issued | Expiration date: April 6, 2019 | Current use: Single family / duplex | Permit id: 6622304 |