Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 88kw solar photovoltaic system on roof of multi-familiy residence. Interconnection with the house meter, which covers the small apartment in the basement and the public area lighting and laundry. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: April 29, 2015 | Expiration date: April 6, 2016 | Current use: Multifamily | Permit id: 6467790 | |||||
SCORE 95 Replace existing gas fired hot water space heating boiler with new. ![]() ![]() Applicant: Loyal Mechanical Inc | Permit type: Boiler / pressure vessel | Permit status: Permit finaled | Completion date: November 5, 2002 | Expiration date: April 23, 2004 | Current use: Multifamily | Permit id: 6005775 | |||||
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 88kw solar photovoltaic system on roof of multi-familiy residence. Interconnection with the house meter, which covers the small apartment in the basement and the public area lighting and laundry. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: April 29, 2015 | Expiration date: April 6, 2016 | Current use: Multifamily | Permit id: 6467790 |