Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 9(kw) solar photovoltaic system will be installed on roof of residence. Date: September 24, 2015 Contractor: Puget Sound Solar Llc Permit type: Electrical | Permit status: Permit closed | Completion date: October 27, 2015 | Expiration date: September 23, 2016 | Current use: Single family / duplex | Permit id: 6496612 | |||||
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 9. 9(kw) solar photovoltaic system will be installed on roof of residence. Date: September 24, 2015 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: October 27, 2015 | Expiration date: September 23, 2016 | Current use: Single family / duplex | Permit id: 6496612 |