Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96(kw) solar photovoltaic system will be installed on roof of residence. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2015 | Expiration date: May 19, 2016 | Current use: Single family / duplex | Permit id: 6475214 | |||||
SCORE 62 Upgrade existing single phase 1 amp electrical panel with new single phase 2 amp electrical panel. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: October 11, 2010 | Expiration date: August 5, 2011 | Current use: Single family / duplex | Permit id: 6256979 | |||||
SCORE 62 Upgrade existing single phase 1 amp electrical panel with new single phase 2 amp electrical panel. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: October 11, 2010 | Expiration date: August 5, 2011 | Current use: Single family / duplex | Permit id: 6256979 | |||||
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 8. 96(kw) solar photovoltaic system will be installed on roof of residence. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2015 | Expiration date: May 19, 2016 | Current use: Single family / duplex | Permit id: 6475214 |