Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Burg system Date: September 9, 2005 Contractor: Guardian Security Systems Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: April 27, 2006 | Expiration date: September 9, 2006 | Current use: Single family / duplex | Permit id: 6071822 | |||||
SCORE 100 Solar system for residential house Date: August 30, 2005 Contractor: E And F Electric Incorporated Permit type: Electrical | Permit status: Permit finaled | Completion date: June 16, 2006 | Expiration date: August 30, 2006 | Current use: Single family / duplex | Permit id: 6070964 | |||||
SCORE 100 Install temp power pole - bldg permit #748130 Date: March 25, 2005 Contractor: Streamline Electrical Ser Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: April 4, 2005 | Expiration date: March 25, 2006 | Current use: Single family / duplex | Permit id: 6054461 | |||||
SCORE 95 Install new boiler Date: January 25, 2006 Contractor: Nelson Heating Llc Applicant: Nelson Heating Llc | Permit type: Boiler / pressure vessel | Permit status: Permit finaled | Completion date: January 30, 2006 | Expiration date: July 25, 2007 | Current use: Single family / duplex | Permit id: 6086223 | |||||
SCORE 78 Tie into existing side sewer, run downspouts to alley. Mdc required prior to final Date: April 27, 2005 Contractor: Stonewood Construction Applicant: Stonewood Construction | Permit type: Side sewer | Permit status: Permit finaled | Completion date: April 24, 2007 | Expiration date: July 27, 2005 | Current use: Single family / duplex | Permit id: 6056566 | |||||
SCORE 100 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a solar photovoltaic system will be installed on roof of residence. Date: January 16, 2017 Contractor: Puget Sound Solar Llc Permit type: Electrical | Permit status: Permit issued | Expiration date: January 16, 2018 | Current use: Single family / duplex | Permit id: 6576245 | |||||
SCORE 99 3 3 2017 = cancelled customer log #17-189[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a solar photovoltaic system will be installed on roof of residence. Date: January 16, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: January 16, 2018 | Current use: Single family / duplex | Permit id: 6576245 | |||||
SCORE 100 Wire new sfr 9 12 05 bew upgraded to 325 service & added electric heat Date: August 17, 2005 Contractor: Streamline Electrical Ser Inc Permit type: Electrical | Permit status: Permit finaled | Completion date: January 31, 2006 | Expiration date: August 17, 2006 | Current use: Single family / duplex | Permit id: 6069594 |