SCORE 95 747 16th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install one dedicated amp breaker for solar pv system to be installed on the roof. Install one 125 amp sub-panel. ![]() ![]() Permit type: Electrical | Permit status: Permit issued | Expiration date: January 9, 2018 | Current use: Single family / duplex | Permit id: 6575195 |
SCORE 95 4608 Sw Juneau St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding one dedicated amp circuit for solar system to be installed on the roof. Upgrading existing breaker panel to a 2 amp ch42-225 solar ready panel and upgrading existing service from 125 amp to 2 amp. 1-12-17 bz approved plans ![]() ![]() Permit type: Electrical | Permit status: Permit issued | Expiration date: December 22, 2017 | Current use: Single family / duplex | Permit id: 6573202 |
SCORE 95 86 35th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing a 15 panel solar array on the new dadu in the backyard. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: January 6, 2017 | Expiration date: November 29, 2017 | Current use: Single family / duplex | Permit id: 6569045 |
SCORE 95 10037 39th Ave Sw Seattle Wa Installing one dedicated amp breaker for 18 panel (5. 4 kw) solar pv system to be installed on the roof. ![]() ![]() Permit type: Electrical | Permit status: Permit issued | Expiration date: November 28, 2017 | Current use: Single family / duplex | Permit id: 6568738 |
SCORE 95 40 46th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing a new 2 amp service entrance with meter base and mast on the north side of the garage. Replacing the existing breaker panel with a new 225 amp rated breaker panel in the garage and re-configuring existing panel in the basement. Installing an 18 module solar pv array on the new carport. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: January 12, 2017 | Expiration date: November 14, 2017 | Current use: Single family / duplex | Permit id: 6566722 |
SCORE 95 9219 13th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing a 21 panel solar pv system on the roof and connecting to the existing system through a new dedicated amp circuit. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: December 9, 2016 | Expiration date: November 9, 2017 | Current use: Single family / duplex | Permit id: 6566195 |
SCORE 95 4 Fairview Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing 48 solar panels on roof and connecting to existing ac disconnect load center installed previously by veca electric. 11 30 16 jk approved plans. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: January 17, 2017 | Expiration date: November 8, 2017 | Current use: Commercial | Permit id: 6566000 |
SCORE 95 5008 Sw Stevens St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] upgrade existing service entrance to 2 amp and install a new 225 amp meter main. Install one dedicated amp breaker in meter main for solar pv system. 10 27 16 jk approved plans. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: November 7, 2016 | Expiration date: October 10, 2017 | Current use: Single family / duplex | Permit id: 6561043 |
SCORE 95 10784 Marine View Dr Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing one dedicated amp breaker in the existing utility meter main for solar pv system to be installed on the roof. Replacing existing main breaker in utility meter main witha 175 amp breaker. 10 18 16 jk 50a circuit breaker changed to 60a. 10 19 16 jk approved plans. ![]() ![]() Permit type: Electrical | Permit status: Permit issued | Completion date: October 21, 2016 | Expiration date: October 6, 2017 | Current use: Single family / duplex | Permit id: 6560536 |
SCORE 95 ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: September 26, 2016 | Expiration date: September 21, 2017 | Current use: Single family / duplex | Permit id: 6557658 |
Contractor Rank | Contractor Details | Number of Projects | Avg. Project Cost | Years in Business | Photos |
---|---|---|---|---|---|
SCORE 99 | Home Improvement Services | 129 Projects | $7,886 Avg. Project Cost | 13 Years in Business | ![]() |
SCORE 99 | Hubers Custom Building Inc | 22 Projects | $209,992 Avg. Project Cost | 8 Years in Business | ![]() |
SCORE 99 | Blanket: Millennium Twr Off Fl | 33 Projects | $192,582 Avg. Project Cost | 10 Years in Business | ![]() |
SCORE 98 | Homeworks | 31 Projects | $23,525 Avg. Project Cost | 13 Years in Business | ![]() |
SCORE 96 | Johnson Brothers Constuction | 13 Projects | $50,808 Avg. Project Cost | 6 Years in Business | ![]() |