Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] add one dedicated amp breaker for solar pv system to be installed on the roof ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: April 7, 2015 | Expiration date: April 2, 2016 | Current use: Single family / duplex | Permit id: 6467269 | |||||
Tightline downspouts to ex weep hole on nw market st ![]() Applicant: Kobus Construction, | Permit type: Side sewer | Permit status: Permit issued | Expiration date: September 3, 2018 | Current use: Multifamily | Permit id: 6584279 | |||||
SCORE 98 Basement remodel, bathroom washroom, and bedroom about to expire letter sent 7 03 ![]() ![]() Permit type: Electrical | Permit status: Permit finaled | Completion date: August 12, 2003 | Expiration date: August 19, 2003 | Current use: Single family / duplex | Permit id: 6002599 | |||||
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] add one dedicated amp breaker for solar pv system to be installed on the roof ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: April 7, 2015 | Expiration date: April 2, 2016 | Current use: Single family / duplex | Permit id: 6467269 |