Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding one dedicated 40amp breaker for solar pv system to be installed on the roof. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: December 30, 2015 | Expiration date: November 29, 2016 | Current use: Single family / duplex | Permit id: 6507096 | |||||
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding one dedicated 40amp breaker for solar pv system to be installed on the roof. ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: December 30, 2015 | Expiration date: November 29, 2016 | Current use: Single family / duplex | Permit id: 6507096 |