Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding one dedicated 30amp breaker for 4. 2 kw solar system on the roof ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: June 16, 2015 | Expiration date: June 10, 2016 | Current use: Single family / duplex | Permit id: 6478941 | |||||
SCORE 95 Upgrade existing service entrance to 200amp with a meter main; replace existing breaker panel with new ch 30/40 ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: June 16, 2015 | Expiration date: June 11, 2016 | Current use: Single family / duplex | Permit id: 6479097 | |||||
SCORE 95 Upgrade existing service entrance to 200amp with a meter main; replace existing breaker panel with new ch 30 40 ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: June 16, 2015 | Expiration date: June 11, 2016 | Current use: Single family / duplex | Permit id: 6479097 | |||||
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding one dedicated 30amp breaker for 4. 2 kw solar system on the roof ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: June 16, 2015 | Expiration date: June 10, 2016 | Current use: Single family / duplex | Permit id: 6478941 |