Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing one dedicated amp breaker in existing breaker panel for solar pv panels to be installed on the roof Date: July 20, 2015 Contractor: West Seattle Natrl Energy Llc Permit type: Electrical | Permit status: Permit closed | Completion date: July 24, 2015 | Expiration date: July 19, 2016 | Current use: Single family / duplex | Permit id: 6485214 | |||||
SCORE 95 Replace gas furnace Date: January 11, 2008 Contractor: Genesee Fuel And Htng Co Inc Applicant: Genesee Fuel&htng Co Inc | Permit type: Mechanical | Permit status: Permit finaled | Completion date: January 18, 2008 | Expiration date: July 11, 2009 | Current use: Single family / duplex | Permit id: 6166665 | |||||
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing one dedicated amp breaker in existing breaker panel for solar pv panels to be installed on the roof Date: July 20, 2015 Contractor: West Seattle Electric And Solar Permit type: Electrical | Permit status: Permit closed | Completion date: July 24, 2015 | Expiration date: July 19, 2016 | Current use: Single family / duplex | Permit id: 6485214 |