Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 34 Bates St Cambridge, Ma Kitchen remodeling; replace the kitchen cabinets and countertops following existing layout, install new appliances, build a bench, painting bath remodeling in the second floor, demolition of a partition wall to expand the bathroom, new plumbing, new electric, new tiles, new sheetrock, new bath fixtures and painting. Remodeling of a half bath in the second floor and make it a full bathroom; build a new wall as part of the extension and remove an existing partition wall. Install new with shower, toilet & sink and fit a washer and drier at the bath corner. Painting painting Permit type: Addition/alteration | Completion date: April 22, 2013 | Current use: Townhouse | Parcel: 20962 | |||||
SCORE 93 7 Vineyard St Cambridge, Ma Patch the walls and ceilings with joint compound & sand it; install sheetrock over existing tv rooms ceiling; replace the laundry cabinets/shelves, patch the walls & sand it; install a 48" french door at the enclosure porch closet/storage; in the master bedroom(where used to be a small storage room), replace the existing slide/pocket door, install wire shelves system and install new laminate floor; in the basement, door replacement, sheetrock patch/sanding, ceiling tiles replacement, install new laminate flooring & painting; painting the house (interior only); clean up and finish it. Permit type: Addition/alteration | Completion date: December 12, 2013 | Current use: Two-family | Parcel: 25781 | |||||
SCORE 93 14 Sacramento St Cambridge, Ma Demolition of kitchen and bathroom repair the framing as required plumbing and eletrical services as required for the project install insulation as required new sheetrock, plastering where is necessary for the project install new kitchen cabinets & countertop and new hardwood floor for the kitchen install ceramic floor for the bath, shower tiles and kitchen backsplash finish carpentry work for interior doors, trim and baseboards install all appliances painting the kitchen, bath living/diner room and hall way (ceilin,walls,trimwork) refinish the existing hardwood floor for the living/diner room and hallway in existing 2 bedrooms none work was required. Permit type: Addition/alteration | Completion date: June 9, 2014 | Current use: Two-family | Parcel: 156722 | |||||
SCORE 93 3 Walden St Cambridge, Ma Excavate the proposed area in the basement folowing the architect drawings, build new concrete reiforcement for the basement walls, new drainage system, beams replacement, sump pum, new concrete slab, new window well, create a recreation room finish, new concrete stairs to the back yard, kitchen remodeling at first floor and new beam installation, window replacement, painting nd finish the hardwood flooring. Kitchen work only - no basement work pending zoning review - mg Permit type: Addition/alteration | Completion date: July 23, 2014 | Current use: One-family | Parcel: 2291 | |||||
SCORE 93 3 Maple Ave Cambridge, Ma Demolition and disposal according to drawings. Install new sheetrock, flooring and partition walls. Plastering, prep and paint. Build the dormer framing per drawings and structural enginner specifications. Bath wall will be fully tiled. Install shower valve, hand shower, glass door and granite vanity top. Install closet system. Install 2 skylights. Install clapboards siding, exterior trim, fascia and soffit as required. Install ice water shield. Install spray foam insulation for the entire 3rd floor walls and rafters. Install new hardwood flooring and oak treads for the stairway. Install new doors at bottom of stairs,bathroom and attic entrance. All trim work inside and baseboards. Plumbing for the bathroom and bring ac/heat unit. Electric work as required, new wiring for the 3rd floor, new exhaust fan in the bath and install recessed lights as specified. Fire alarm will be replaced. Painting interior and exterior of dormer as required. Install new trane ac/heat gas unit for the 3rd fl Permit type: Addition/alteration | Completion date: April 13, 2015 | Current use: Two-family | Parcel: 1121142 | |||||
SCORE 93 23 Roberts Rd Cambridge, Ma Demolition of existing concrete deck and stairs. Haul away all debris caused by this work. Remove rot wood plate (aprox. 10). Install new pt wood plate. Install new studs sister to connect to the new plate. Install 2 footings and concrete base for the stairs. Build neww wood framing with 2 posts for the decking. Install pressure treated plywood and glue rubber membrane over it and after install azek tongue and grove flooring. Install azek railings and posts and stair railings. Build new wood stringers and install pvc risers and azek planks as treads. Build new wood stairs. Install lattice on sides of the porch. Install 2 railings sections at stairway. Remove all construction debris. All wood will be pressure treated wood. Permit type: Addition/alteration | Completion date: August 12, 2015 | Current use: One-family | Parcel: 1409 | |||||
SCORE 93 397 Walden St Cambridge, Ma - kitchen remodel: pull construction permit. Demolition of existing kitchen cabinets. Replace 4 windows matching existing ones. Remove existing flooring and clean up. New electric system for the kitchen as required. Plumbing services as required. Install new cabinets as per plans. Install new granite countertop with stainless sink and faucet. Build new shelves above countertop near stove. Install all appliances and chimney exhaust fan. Paint the entire kitchen area. Permit type: Addition/alteration | Completion date: December 4, 2015 | Current use: One-family | Parcel: 263102 | |||||
SCORE 93 7 Vineyard St Cambridge, Ma Header work: remove sheetrock both sides of the wall. Build temporary wall on both sides. Remove the studs. Install lvl and (2) posts (4x4) on each end between the dining and living room. Remove temporary walls. Install new sheetrock, apply plaster and paint. Clean up debris caused by this job. Permit type: Addition/alteration | Completion date: February 16, 2016 | Current use: Two-family | Parcel: 25781 | |||||
SCORE 93 7 Vineyard St Cambridge, Ma Patch the walls and ceilings with joint compound & sand it; install sheetrock over existing tv rooms ceiling; replace the laundry cabinets shelves, patch the walls & sand it; install a 48" french door at the enclosure porch closet storage; in the master bedroom(where used to be a small storage room), replace the existing slide pocket door, install wire shelves system and install new laminate floor; in the basement, door replacement, sheetrock patch sanding, ceiling tiles replacement, install new laminate flooring & painting; painting the house (interior only); clean up and finish it. Permit type: Addition/alteration | Completion date: December 12, 2013 | Current use: Two-family | Permit id: 0 | Parcel: 25781 | |||||
SCORE 93 14 Sacramento St Cambridge, Ma Demolition of kitchen and bathroom repair the framing as required plumbing and eletrical services as required for the project install insulation as required new sheetrock, plastering where is necessary for the project install new kitchen cabinets & countertop and new hardwood floor for the kitchen install ceramic floor for the bath, shower tiles and kitchen backsplash finish carpentry work for interior doors, trim and baseboards install all appliances painting the kitchen, bath living diner room and hall way (ceilin,walls,trimwork) refinish the existing hardwood floor for the living diner room and hallway in existing 2 bedrooms none work was required. Permit type: Addition/alteration | Completion date: June 9, 2014 | Current use: Two-family | Permit id: 0 | Parcel: 156722 | |||||
SCORE 93 3 Maple Ave Cambridge, Ma Demolition and disposal according to drawings. Install new sheetrock, flooring and partition walls. Plastering, prep and paint. Build the dormer framing per drawings and structural enginner specifications. Bath wall will be fully tiled. Install shower valve, hand shower, glass door and granite vanity top. Install closet system. Install 2 skylights. Install clapboards siding, exterior trim, fascia and soffit as required. Install ice water shield. Install spray foam insulation for the entire 3rd floor walls and rafters. Install new hardwood flooring and oak treads for the stairway. Install new doors at bottom of stairs,bathroom and attic entrance. All trim work inside and baseboards. Plumbing for the bathroom and bring ac heat unit. Electric work as required, new wiring for the 3rd floor, new exhaust fan in the bath and install recessed lights as specified. Fire alarm will be replaced. Painting interior and exterior of dormer as required. Install new trane ac heat gas unit for the 3rd fl Permit type: Addition/alteration | Completion date: April 13, 2015 | Current use: Two-family | Permit id: 0 | Parcel: 1121142 | |||||
SCORE 93 Permit type: Addition/alteration | Completion date: October 20, 2017 | Current use: One-family | Permit id: 0 | Parcel: 2291 |