Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Kitchen remodeling; replace the kitchen cabinets and countertops following existing layout, install new appliances, build a bench, painting bath remodeling in the second floor, demolition of a partition wall to expand the bathroom, new plumbing, new electric, new tiles, new sheetrock, new bath fixtures and painting. Remodeling of a half bath in the second floor and make it a full bathroom; build a new wall as part of the extension and remove an existing partition wall. Install new with shower, toilet & sink and fit a washer and drier at the bath corner. Painting painting Permit type: Addition/alteration | Completion date: April 22, 2013 | Current use: Townhouse | Parcel: 20962 |