Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Reconfiguration of existing kitchen layout including installing one new window and enlarging one existing window both to standard kitchen window size Permit type: Addition/alteration | Completion date: June 10, 2013 | Current use: Two-family | Parcel: 1121141 | |||||
SCORE 93 Demolition and disposal according to drawings. Install new sheetrock, flooring and partition walls. Plastering, prep and paint. Build the dormer framing per drawings and structural enginner specifications. Bath wall will be fully tiled. Install shower valve, hand shower, glass door and granite vanity top. Install closet system. Install 2 skylights. Install clapboards siding, exterior trim, fascia and soffit as required. Install ice water shield. Install spray foam insulation for the entire 3rd floor walls and rafters. Install new hardwood flooring and oak treads for the stairway. Install new doors at bottom of stairs,bathroom and attic entrance. All trim work inside and baseboards. Plumbing for the bathroom and bring ac/heat unit. Electric work as required, new wiring for the 3rd floor, new exhaust fan in the bath and install recessed lights as specified. Fire alarm will be replaced. Painting interior and exterior of dormer as required. Install new trane ac/heat gas unit for the 3rd fl Permit type: Addition/alteration | Completion date: April 13, 2015 | Current use: Two-family | Parcel: 1121142 | |||||
SCORE 79 Remove existing roof shingles down to wood deck. Renail deck. Install new drip edge. Install ice & watershield. Install 15 lb. Tar paper. Install new pipe flanges. Install iko harvard slate shingles. Permit type: Roof | Completion date: June 9, 2015 | Parcel: 112114 | |||||
SCORE 93 Demolition and disposal according to drawings. Install new sheetrock, flooring and partition walls. Plastering, prep and paint. Build the dormer framing per drawings and structural enginner specifications. Bath wall will be fully tiled. Install shower valve, hand shower, glass door and granite vanity top. Install closet system. Install 2 skylights. Install clapboards siding, exterior trim, fascia and soffit as required. Install ice water shield. Install spray foam insulation for the entire 3rd floor walls and rafters. Install new hardwood flooring and oak treads for the stairway. Install new doors at bottom of stairs,bathroom and attic entrance. All trim work inside and baseboards. Plumbing for the bathroom and bring ac heat unit. Electric work as required, new wiring for the 3rd floor, new exhaust fan in the bath and install recessed lights as specified. Fire alarm will be replaced. Painting interior and exterior of dormer as required. Install new trane ac heat gas unit for the 3rd fl Permit type: Addition/alteration | Completion date: April 13, 2015 | Current use: Two-family | Permit id: 0 | Parcel: 1121142 |