Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Permit id: Bp-2012-181 | |||||
SCORE 100 Permit id: Ep-2012-145 | |||||
SCORE 100 Parcel: 42019 0012 | |||||
SCORE 100 Date: July 12, 2006 Contractor: Independent Power Systems Client: Joanna Rosenblum,Mark Rosenblum | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: October 1, 2006 | Current use: Single family d | |||||
SCORE 100 18 Sumac Ave Boulder Co Electrical permit for tilt-mounted solar photovoltaic system on roof. No increase in building height or solar shadow. Date: July 12, 2006 Contractor: Independent Power Systems Client: Peter Rodgers,Cook Rodgers | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: August 8, 2006 | Current use: Single family d | |||||
SCORE 100 Date: October 4, 2006 Contractor: Independent Power Systems Client: Lois Edgar | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: January 28, 2007 | Current use: Single family d | |||||
SCORE 100 Date: October 10, 2006 Contractor: Independent Power Systems Client: Bud Wonsiewicz,Marie Wonsiewicz | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: January 2, 2007 | Current use: Single family a | |||||
SCORE 100 Date: October 31, 2006 Contractor: Independent Power Systems Client: Demos Bell | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: January 7, 2007 | Current use: Single family d | |||||
SCORE 100 14 Zamia Av Boulder Co Installation of a flush mounted 3. 4 kw photovoltaic system on roof of structure. Inspector: details of installation requirements in permit packet. Date: December 6, 2006 Contractor: Independent Power Systems Client: Neighborho Holiday | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 100 436 Utica Av Boulder Co Installation of a flush mounted 9. 675kw photovoltaic system on roof of structure. Inspector: details of installation requirements in permit packet. Date: December 6, 2006 Contractor: Independent Power Systems Client: James Newcomb, Newcomb | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: February 25, 2007 | Current use: Single family d | |||||
SCORE 100 Date: December 13, 2006 Contractor: Independent Power Systems Client: Richard Fetter,Suzanne Fetter | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: March 2, 2007 | Current use: Single family d | |||||
SCORE 100 Date: March 7, 2007 Contractor: Independent Power Systems Client: Condominiu Canyon | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 27, 2007 | Current use: Commercial/reta | |||||
SCORE 100 Date: April 10, 2007 Contractor: Independent Power Systems Client: Neighborho Holiday | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 11, 2007 | Current use: Single family d | |||||
SCORE 100 1446 Zamia Av Boulder Co Installation of a 4. 3 kw flush mounted photovoltaic system w section of buried conductor between garage & main structure. Date: April 26, 2007 Contractor: Independent Power Systems Client: Neighborho Holiday | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 29, 2007 | Current use: Single family d | |||||
SCORE 100 Date: May 30, 2007 Contractor: Independent Power Systems Client: Joyce Mcdaniel,Dennis Mcdaniel | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 3, 2007 | Current use: Single family d | |||||
SCORE 100 1474 Easy Rider Ln Boulder Co Electrical permit for flush mounted solar pv system on existing roof. 4. 3 kw Date: July 11, 2007 Contractor: Independent Power Systems Client: Neighborho Holiday | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 18, 2007 | Current use: Single family d | |||||
SCORE 100 1466 Easy Rider Ln Boulder Co Electrical permit for flush mounted solar pv system on existing roof. 4. 3 kw Date: July 11, 2007 Contractor: Independent Power Systems Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 24, 2007 | Current use: Single family d | |||||
SCORE 100 Client: Josh Wurman,Ling Wurman | Applicant: Independent Power Systems | Permit type: Building, photovolta | Permit status: Cmp | Completion date: October 24, 2007 | Current use: Single family d | |||||
SCORE 100 Date: August 15, 2007 Contractor: Independent Power Systems Client: Darlene Mitchell,Patricia Summers | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 14, 2007 | Current use: Single family d | |||||
SCORE 100 6 Locust Av Boulder Co Installation of 3. 5 kw rooftop photovoltaic system. (includes a battery storage system)(ventilated according to engineers supplementary report & paperwork). Client: Darlene Mitchell,Patricia Summers | Applicant: Independent Power Systems | Permit type: Building, photovolta | Permit status: Cmp | Completion date: July 10, 2008 | Current use: Single family d | |||||
SCORE 100 Client: David Brandt, Brandt | Applicant: Independent Power Systems | Permit type: Building, photovolta | Permit status: Cmp | Completion date: February 19, 2008 | Current use: Single family d | |||||
SCORE 100 Date: September 10, 2007 Contractor: Independent Power Systems Client: Maureen Cassulo | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 21, 2008 | Current use: Multifamily dwe | |||||
SCORE 100 Client: Anthony Boniface | Applicant: Independent Power Systems | Permit type: Building, photovolta | Permit status: Cmp | Completion date: October 8, 2007 | Current use: Townhomes, remo | |||||
SCORE 100 Date: October 4, 2007 Contractor: Independent Power Systems Client: Josh Wurman,Ling Wurman | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: N&v | Current use: Single family d | |||||
SCORE 100 Date: October 10, 2007 Contractor: Independent Power Systems Client: David Sawyer,Liza Weems | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 5, 2007 | Current use: Single family d | |||||
SCORE 100 Date: October 19, 2007 Contractor: Independent Power Systems Client: Ryan Lewis,Brooke Lewis | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 30, 2007 | Current use: Single family d | |||||
SCORE 100 Date: November 20, 2007 Contractor: Independent Power Systems Client: Josh Wurman,Ling Wurman | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: February 6, 2008 | Current use: Single family d | |||||
SCORE 100 1505 Pearl St Boulder Co Installation of a 48. 3 kw grid-tie photovoltaic system. Roof mounted tilt-up system at a 12 degree angle. Date: December 12, 2007 Contractor: Independent Power Systems Client: Pearl 15.0 | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cls | Completion date: April 30, 2008 | Current use: Commercial/reta | |||||
SCORE 100 Date: December 11, 2007 Contractor: Independent Power Systems Client: Josh Wurman,Ling Wurman | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 6, 2008 | Current use: Single family d | |||||
SCORE 100 805 Union Av Boulder Co Installation of a 2. 8 kw flush-mounted grid-tie, battery back-up photovoltaic system. Battery enclosure to remian outside of structure; plumbing & mechanical vents, intakes & exhaust not allowed to be covered by solar array or associated equipment. Date: February 13, 2008 Contractor: Independent Power Systems Client: Ellen Mitchell,Carol Coffey | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 9, 2008 | Current use: Single family d | |||||
SCORE 100 906 Union Av Boulder Co Installation of a flush-mount grid-tie photovoltaic system, 6. 3 kw, no battery tie-in. Date: April 18, 2008 Contractor: Independent Power Systems Client: James Pettit,Jane Greenfield | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 30, 2008 | Current use: Single family d | |||||
SCORE 100 Date: May 19, 2008 Contractor: Independent Power Systems Client: James Hartman,Susan Ely | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Single family d | |||||
SCORE 100 Date: June 4, 2008 Contractor: Independent Power Systems Client: Charles Keller,Lynn Keller | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Current use: Single family d | |||||
SCORE 100 2825 6th St Boulder Co Installation of a flush-mount grid-tie photovoltaic system, 6 kw (no battery tie-in) Date: June 6, 2008 Contractor: Independent Power Systems Client: Jon Brandon,Karen Brandon | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Single family d | |||||
SCORE 100 Date: June 27, 2008 Contractor: Independent Power Systems Client: Neighborho Holiday | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 12, 2008 | Current use: Single family d | |||||
SCORE 100 Date: June 27, 2008 Contractor: Independent Power Systems Client: Neighborho Holiday | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 4, 2008 | Current use: Single family d | |||||
SCORE 100 Date: July 10, 2008 Contractor: Independent Power Systems Client: Angela Giustina | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 4, 2008 | Current use: Single family d | |||||
SCORE 100 Date: July 11, 2008 Contractor: Independent Power Systems Client: Ball Charlotte | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 30, 2008 | Current use: Commercial/reta | |||||
SCORE 100 Date: July 23, 2008 Contractor: Independent Power Systems Client: Ranch Ponderrosa | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 12, 2008 | Current use: Office - profes | |||||
SCORE 100 Date: July 31, 2008 Contractor: Independent Power Systems Client: Brad Segal | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 13, 2008 | Current use: Single family d | |||||
SCORE 100 4234 26th St Boulder Co Installation of 3. 68 kw photovoltaic solar energy system on single-family residence. System to be flush-mounted on rooftop, grid-tied. Date: August 7, 2008 Contractor: Independent Power Systems Client: Douglas Ginley,Gwen Ginley | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 13, 2008 | Current use: Single family d | |||||
SCORE 100 1321 Cedar Av Boulder Co Installation of grid-tied, flushmounted solar photovoltaic system, 1. 84 kw. Date: August 8, 2008 Contractor: Independent Power Systems Client: Paul Heller | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 2, 2012 | Current use: Single family d | |||||
SCORE 100 31 Lane Ct Boulder Co Installation of a flush-mount photo-voltaic system. 2. 2 kw grid-tie, no battery tie-in. Date: August 20, 2008 Contractor: Independent Power Systems Client: Michael Walker,Arzelia Walker | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 17, 2008 | Current use: Single family d | |||||
SCORE 100 2292 Vineyard Pl Boulder Co Installation of a grid-tie 3. 6 kw photo-voltaic system, no battery tie-in. Date: August 20, 2008 Contractor: Independent Power Systems Client: Joanne Tilley | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 6, 2008 | Current use: Single family d | |||||
SCORE 100 Date: September 4, 2008 Contractor: Independent Power Systems Client: Diane Rosenthal,Daniel Friedlander | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 23, 2008 | Current use: Single family d | |||||
SCORE 100 31 Lane Ct Boulder Co Installation of a 4. 14 kw flush-mount grid-tie photovoltaic system. Must be installed in accordance with conditions specified in administrative solar exception adr2008-00168 Date: October 2, 2008 Contractor: Independent Power Systems Client: Marilyn Ramsey,Kenneth Ramsey | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 15, 2008 | Current use: Single family d | |||||
SCORE 100 Date: October 7, 2008 Contractor: Independent Power Systems Client: Adam Sak,Jane Snyder Sak | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 13, 2008 | Current use: Single family d | |||||
SCORE 100 Date: October 13, 2008 Contractor: Independent Power Systems Client: Michael Walker,Arzelia Walker | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: N&v | Current use: Single family d | |||||
SCORE 100 Date: October 22, 2008 Contractor: Independent Power Systems Client: Neighborho Holiday | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 7, 2008 | Current use: Multifamily dwe | |||||
SCORE 100 Date: October 29, 2008 Contractor: Independent Power Systems Client: Lynn Guissinger,Leslie Guissinger | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 8, 2008 | Current use: Single family d | |||||
SCORE 100 Date: December 3, 2008 Contractor: Independent Power Systems Client: Erik Johnson | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 7, 2009 | Current use: Single family d | |||||
SCORE 100 Date: December 12, 2008 Contractor: Independent Power Systems Client: James Leftwich,Katherine Leftwich | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 18, 2009 | Current use: Single family d | |||||
SCORE 100 Date: January 15, 2009 Contractor: Independent Power Systems Client: James Patrick | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 6, 2009 | Current use: Single family d | |||||
SCORE 100 1655 Walnut St Boulder Co Pv installation on mixed-use building (see adr2009-00 for minor mod approval). Ballast system, grid-tied with residential (1)7. 2 kw. Associated with system installed though pmt2009-01452. Unit 404 Date: February 4, 2009 Contractor: Independent Power Systems Client: Walnut Mcv | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 23, 2009 | Current use: Commercial/reta | |||||
SCORE 100 29 Juilliard St Boulder Co Installation of 6. 44 flush mounted, rooftop photovoltaic grid-tied solar energy system Date: April 20, 2009 Contractor: Independent Power Systems Client: Patrick Owinter,Carole Owinter | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 29, 2009 | Current use: Single family d | |||||
SCORE 100 1626 North St Boulder Co Installation of 1. 575 kw flush-mounted, grid-tied photovoltaic solar energy system. Date: April 30, 2009 Contractor: Independent Power Systems Client: Regina Gray | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 29, 2009 | Current use: Single family d | |||||
SCORE 100 1655 Walnut St Boulder Co Pv installation on mixed-use building (see adr2009-00 for minor mod approval). Ballast system, grid-tied with residential 4. 05 kw. Associated with system installed through pmt2009-00354. Unit 302 Date: April 30, 2009 Contractor: Independent Power Systems Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 8, 2009 | Current use: Commercial/reta | |||||
SCORE 100 2265 Vassar Dr Boulder Co Installation of 5. 04 kw rooftop, flush-mounted photovoltaic solar energy system. Date: July 6, 2009 Contractor: Independent Power Systems Client: Bruce Morley,Laurie Morley | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 24, 2009 | Current use: Single family d | |||||
SCORE 100 Date: July 21, 2009 Contractor: Independent Power Systems Client: Brett Piane | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 17, 2009 | Current use: Single family d | |||||
SCORE 100 Date: July 29, 2009 Contractor: Independent Power Systems Client: William Toor,Maria Toor | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 2, 2009 | Current use: Single family d | |||||
SCORE 100 Date: July 30, 2009 Contractor: Independent Power Systems Client: Ryan Artale,Evans A | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 10, 2009 | Current use: Single family d | |||||
SCORE 100 Date: August 12, 2009 Contractor: Independent Power Systems Client: Robert Tangen | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 9, 2009 | Current use: Single family d | |||||
SCORE 100 Date: August 13, 2009 Contractor: Independent Power Systems Client: Lucia De | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 8, 2009 | Current use: Single family d | |||||
SCORE 100 Date: August 13, 2009 Contractor: Independent Power Systems Client: James Hartman,Nancy Hartman | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 8, 2009 | Current use: Single family d | |||||
SCORE 100 Date: September 22, 2009 Contractor: Independent Power Systems Client: Barbara Engel | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 24, 2009 | Current use: Single family d | |||||
SCORE 100 39 Britting Av Boulder Co Installation of 3. 6 kw, rooftop, flushmounted, grid tied, photovoltaic solar system. Date: September 22, 2009 Contractor: Independent Power Systems Client: Joseph Maclennan, Brummer | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Single family d | |||||
SCORE 100 4255 Eaton Ct Boulder Co Installation of 4. 7 kw, flush-mounted, rooftop photovoltaic solar system on a single-family residence. Date: October 2, 2009 Contractor: Independent Power Systems Client: Elizabeth White-Oconnor,Thomas White-Oconnor | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 21, 2009 | Current use: Single family d | |||||
SCORE 100 865 7th St Boulder Co Installation of 5. 4 kw, flush-mounted, rooftop photovoltaic solar system on a single-family residence. Date: October 2, 2009 Contractor: Independent Power Systems Client: Annette Ashley,Peter Ashley | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Single family d | |||||
SCORE 100 Date: October 28, 2009 Contractor: Independent Power Systems Client: David Turner,Nancy Turner | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 29, 2011 | Current use: Single family d | |||||
SCORE 100 Date: October 28, 2009 Contractor: Independent Power Systems Client: Lorant Muth | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 19, 2009 | Current use: Single family d | |||||
SCORE 100 Date: November 13, 2009 Contractor: Independent Power Systems Client: Mathias Thurmer, Thurmer | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 4, 2009 | Current use: Single family d | |||||
SCORE 100 Date: November 13, 2009 Contractor: Independent Power Systems Client: Lorant Muth | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: November 19, 2009 | Current use: Single family d | |||||
SCORE 100 Date: November 17, 2009 Contractor: Independent Power Systems Client: Peter Olesen,Anne Olesen | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 3, 2010 | Current use: Single family d | |||||
SCORE 100 Date: November 17, 2009 Contractor: Independent Power Systems Client: Jeffrey Frykholm,Kelli Frykholm | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 11, 2009 | Current use: Single family d | |||||
SCORE 100 7 Utica Av Boulder Co Pv installation on existing sfd. Tilt-up system ( degrees) on flat roof, grid-tied and 6. 75 kw. Date: December 2, 2009 Contractor: Independent Power Systems Client: William Ury,Lizanne Ury | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 22, 2010 | Current use: Single family d | |||||
SCORE 100 30 Valmont Rd Boulder Co Pv installation (meter #16) on commercial building. Tilt-up system, grid-tied and 9. 84 kw. Date: December 16, 2009 Contractor: Independent Power Systems Client: Llc Thirty80 | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Commercial/reta | |||||
SCORE 100 30 Valmont Rd Boulder Co Pv installation (meter #17) on commercial building. Tilt-up system, grid-tied and 9. 84 kw. Date: December 16, 2009 Contractor: Independent Power Systems Client: Llc Thirty80 | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 30, 2009 | Current use: Commercial/reta | |||||
SCORE 100 30 Valmont Rd Boulder Co Pv installation (meter #18) on commercial building. Tilt-up system, grid-tied and 9. 84 kw. Date: December 16, 2009 Contractor: Independent Power Systems Client: Llc Thirty80 | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 30, 2009 | Current use: Commercial/reta | |||||
SCORE 100 Date: January 27, 2010 Contractor: Independent Power Systems Client: Elise Sachs | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 8, 2010 | Current use: Single family d | |||||
SCORE 100 Date: February 5, 2010 Contractor: Independent Power Systems Client: Deborah Kershner,Rudolph Andrade | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 18, 2010 | Current use: Single family d | |||||
SCORE 100 4894 Brandon Creek Dr Boulder Co Installation of 3. 22 kw solar array, flush mounted and grid tied. Approved through adr2010-00009. Date: February 5, 2010 Contractor: Independent Power Systems Client: William Torrie, Torrie | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 18, 2010 | Current use: Single family d | |||||
SCORE 100 1885 Del Rosa Ct Boulder Co Installation of flushmounted, 2. 52 kw rooftop photovoltaic solar system. Date: March 5, 2010 Contractor: Independent Power Systems Client: Richard Quick,Sheila Quick | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 12, 2010 | Current use: Single family d | |||||
SCORE 100 Date: March 5, 2010 Contractor: Independent Power Systems Client: Douglas Yager,Alison Yager | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: April 6, 2010 | Current use: Single family d | |||||
SCORE 100 Date: March 5, 2010 Contractor: Independent Power Systems Client: Douglas Yager,Alison Yager | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family d | |||||
SCORE 100 1526 Spruce St Boulder Co Installation of 9. 2 kw solar array. Tilted at a degree angle, not to exceed existing roof parapet. The panels do not add to building height. Second system through pmt2010-01663 on seperate meter. Date: April 13, 2010 Contractor: Independent Power Systems Client: Spruce 1526.0 | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2010 | Current use: Office - profes | |||||
SCORE 100 Date: April 15, 2010 Contractor: Independent Power Systems Client: Stories Three | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 1, 2010 | Current use: Existing | |||||
SCORE 100 2944 Tincup Cr Boulder Co Pv installation on sfd. Flush mounted, grid-tied, and 4. 41 kw. Also includes service change to 2 amps. Date: April 23, 2010 Contractor: Independent Power Systems Client: Karl Kellogg,Nancy Kellogg | Applicant: Independent Power Systems | Permit type: Electrical, photovol | Permit status: Cmp | Completion date: May 4, 2010 | Current use: Single family d | |||||
SCORE 100 Date: April 23, 2010 Contractor: Independent Power Systems Client: Pamela Hill,James Hill | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 14, 2010 | Current use: Single family d | |||||
SCORE 100 1526 Spruce St Boulder Co Installation of 7. 36 kw solar array. Tilted at a degree angle, not to exceed existing roof parapet. Panels do not add to height of the building. See pmt2010-01336 for second system with seperate meter. Date: May 5, 2010 Contractor: Independent Power Systems Client: Spruce 1526.0 | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2010 | Current use: Office - profes | |||||
SCORE 100 Date: May 11, 2010 Contractor: Independent Power Systems Client: David Simon,Andrea Jason | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 25, 2010 | Current use: Single family d | |||||
SCORE 100 Date: May 14, 2010 Contractor: Independent Power Systems Client: Nathaniel Burger | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 27, 2010 | Current use: Single family d | |||||
SCORE 100 Date: May 17, 2010 Contractor: Independent Power Systems Client: Lisa Bennett,Jeffrey Bennett | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family d | |||||
SCORE 100 6 Benthaven Pl Boulder Co Installation of 7. 2 kw flushmounted, grid-tied photovoltaic solar system on detached garage. Date: May 19, 2010 Contractor: Independent Power Systems Client: Cheryl Cox | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 1, 2010 | Current use: Townhomes, exis | |||||
SCORE 100 7 Juniper Av Boulder Co Installation of rooftop, flush-mounted, 5. 16 kw photovoltaic solar system on single-family residence. Date: June 7, 2010 Contractor: Independent Power Systems Client: Thomas Daly,Margaret Fitzgibbons | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 10, 2010 | Current use: Single family d | |||||
SCORE 100 Date: June 23, 2010 Contractor: Independent Power Systems Client: Molly Brodin | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 29, 2010 | Current use: Single family d | |||||
SCORE 100 2155 Poplar Av Boulder Co Installation of 2. 3 kw, rooftop, flushmounted photovoltaic solar energy system on single-family residence. Date: July 6, 2010 Contractor: Independent Power Systems Client: Lisa Morzel | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 19, 2010 | Current use: Single family d | |||||
SCORE 100 Date: July 7, 2010 Contractor: Independent Power Systems Client: Jane Greenfield,James Pettit | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 8, 2010 | Current use: Single family d | |||||
SCORE 100 Date: August 20, 2010 Contractor: Independent Power Systems Client: Leo Nelsen,Mary Nelsen | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 14, 2010 | Current use: Single family d | |||||
SCORE 100 48 Qualla Dr Boulder Co Electrical permit - for service change only to 2 amps for sfd. See pv under separate. Date: August 24, 2010 Contractor: Independent Power Systems Client: Leo Nelsen,Mary Nelsen | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: September 14, 2010 | Current use: Single family d | |||||
SCORE 100 Date: August 24, 2010 Contractor: Independent Power Systems Client: Elizabeth Blumenthal, Blumenthal | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 8, 2010 | Current use: Single family d | |||||
SCORE 100 Date: August 31, 2010 Contractor: Independent Power Systems Client: Cynthia Stevenson,Peter Stevenson | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family d | |||||
SCORE 100 5985 Brandywine Ct Boulder Co Installation of 8. 5 kw flushmounted, rooftop photovoltaic solar system on single-family residence. Date: September 13, 2010 Contractor: Independent Power Systems Client: Anthony Kos | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family d | |||||
SCORE 100 1332 Scrub Oak Cr Boulder Co Installation of a 3. 78 kw flush-mount grid-tie photovoltaic system -- system to remain below the ridge, inside the rakes and above the eave. Date: September 15, 2010 Contractor: Independent Power Systems Client: Boulos Ayad,Suzanne Ayad | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 1, 2010 | Current use: Single family d | |||||
SCORE 100 28 Stanford Av Boulder Co Installation of 9. 6 kw, flush-mounted, rooftop photovoltaic solar energy system. Date: September 23, 2010 Contractor: Independent Power Systems Client: Jeffrey Mckinny | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 10, 2010 | Current use: Single family d | |||||
SCORE 100 1535 Pearl St Boulder Co Pv installation on restaurant inchmountain suninch. Tilt-up ( degrees), grid-tied, and 9. 856 kw. Date: October 1, 2010 Contractor: Independent Power Systems Client: Storage Sunspot | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 28, 2010 | Current use: Restaurant, exi | |||||
SCORE 100 5 Juniper Av Boulder Co Installation of rooftop, flushmounted photovoltaic 7. 392 kw solar energy system on a single-family residence. Date: November 1, 2010 Contractor: Independent Power Systems Client: Mary Beitner | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 18, 2014 | Current use: Single family d | |||||
SCORE 100 28 Stanford Av Boulder Co Electrical service change to install 2 amp service on single-family residence. Date: November 1, 2010 Contractor: Independent Power Systems Client: Jeffrey Mckinny | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: November 10, 2010 | Current use: Single family d | |||||
SCORE 100 Date: November 3, 2010 Contractor: Independent Power Systems Client: Patricia Nielsen | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 9, 2010 | Current use: Single family d | |||||
SCORE 100 Date: November 4, 2010 Contractor: Independent Power Systems Client: Don Reed,Shirley Reed | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 9, 2010 | Current use: Single family d | |||||
SCORE 100 4845 Lee Cr Boulder Co Installation of flushmounted, 5. 85 kw, rooftop photovoltaic solar energy system on single-family residence. Date: November 4, 2010 Contractor: Independent Power Systems Client: Susan Wu | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 15, 2010 | Current use: Single family d | |||||
SCORE 100 53 Holmes Pl Boulder Co Installation of a 4. 83 kw flush-mount grid tie photovoltaic array. Array to remain insdied of the rakes, below the ridge and above the eave. Date: November 24, 2010 Contractor: Independent Power Systems Client: Baptist Second | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 2, 2011 | Current use: Single family d | |||||
SCORE 100 2102 Kalmia Av Boulder Co Installation of flush-mounted, rooftop, grid tied, rooftop photovoltaic solar energy system on single-family residence. Date: December 6, 2010 Contractor: Independent Power Systems Client: John Ruger,Rita Mahoney | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 2, 2011 | Current use: Single family d | |||||
SCORE 100 Date: December 8, 2010 Contractor: Independent Power Systems Client: Jean Briant,Glenna Briant | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 18, 2014 | Current use: Single family d | |||||
SCORE 100 1647 Pearl St Boulder Co Installation of 3. 72 kw solar awning. See rev2010-000 for revocable permit. Date: December 14, 2010 Contractor: Independent Power Systems Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 3, 2011 | Current use: Commercial/reta | |||||
SCORE 100 1647 Pearl St Boulder Co Pv array mounted on awning for 1647 pearl (pharmaca), partial sidewalk closure for scafolding Date: December 17, 2010 Contractor: Independent Power Systems Applicant: Independent Power Systems | Permit type: Right-of-way | Permit status: Iss | Current use: Commercial/reta | |||||
SCORE 100 Date: December 29, 2010 Contractor: Independent Power Systems Client: James Booth,Susie Booth | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 14, 2011 | Current use: Single family d | |||||
SCORE 100 Date: December 29, 2010 Contractor: Independent Power Systems Client: Edward Schwalenberg,Lori Bogart | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 28, 2011 | Current use: Single family d | |||||
SCORE 100 Date: January 6, 2011 Contractor: Independent Power Systems Client: Robert Webb,Amy Webb | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 22, 2011 | Current use: Single family d | |||||
SCORE 100 Date: February 8, 2011 Contractor: Independent Power Systems Client: Liwen Pan,Shen Ting | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 24, 2011 | Current use: Single family d | |||||
SCORE 100 3015 10th St Boulder Co Installation of 2. 142 kw solar array, flush mounted and grid tied. Not to exceed roof pitch. Date: February 9, 2011 Contractor: Independent Power Systems Client: Wei Hintsa,Eric Hintsa | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 24, 2011 | Current use: Single family d | |||||
SCORE 100 Date: February 15, 2011 Contractor: Independent Power Systems Client: Albin Gasiewski | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 2, 2011 | Current use: Single family d | |||||
SCORE 100 Date: February 15, 2011 Contractor: Independent Power Systems Client: Richard Stone | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 28, 2011 | Current use: Single family d | |||||
SCORE 100 5101 E Euclid Av Boulder Co Installation of 4. 83 kw solar array, flush mounted and grid tied. Not to exceed existing roof height. Date: February 16, 2011 Contractor: Independent Power Systems Client: Donald Durso, Durso | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 24, 2011 | Current use: Single family d | |||||
SCORE 100 Date: February 18, 2011 Contractor: Independent Power Systems Client: Wendy Rochman,Kenneth Nova | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 28, 2011 | Current use: Single family d | |||||
SCORE 100 Date: February 22, 2011 Contractor: Independent Power Systems Client: Aron Ralston | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 29, 2011 | Current use: Single family d | |||||
SCORE 100 Date: February 23, 2011 Contractor: Independent Power Systems Client: Catherine Swanson,Jon Swanson | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 4, 2011 | Current use: Single family d | |||||
SCORE 100 Date: March 7, 2011 Contractor: Independent Power Systems Client: Ken Kreidl,Ming-Yi Kreidl | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 18, 2011 | Current use: Single family d | |||||
SCORE 100 15 Findlay Wy Boulder Co Installation of 7. 14 kw, flush-mounted, rooftop, photovoltaic solar system on single-family residence. Date: March 15, 2011 Contractor: Independent Power Systems Client: Cynthia Covell,Bradford Covell | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 8, 2014 | Current use: Single family d | |||||
SCORE 100 Date: March 16, 2011 Contractor: Independent Power Systems Client: Cynthia Covell,Bradford Covell | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: July 8, 2014 | Current use: Single family d | |||||
SCORE 100 Date: March 21, 2011 Contractor: Independent Power Systems Client: Brent Cullimore | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 6, 2011 | Current use: Single family d | |||||
SCORE 100 437 Pine St Boulder Co Installation of a 5. 98 kw solar array, flush mounted and grid tied. In accordance with landmarks approval his2010-00256. Date: March 22, 2011 Contractor: Independent Power Systems Client: Christina Cheatham | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 19, 2011 | Current use: Single family d | |||||
SCORE 100 4645 Broadway A1 Boulder Co Installation of 2. 76 kw, tilt-mounted, rooftop, photovoltaic solar energy system on mixed use building. Date: March 24, 2011 Contractor: Independent Power Systems Client: Duzer Van | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 12, 2011 | Current use: Multifamily dwe | |||||
SCORE 100 14 Yaupon Av Boulder Co Installation of a flush-mount, grid tie 3. 22 phototvoltaic system. Array to remain below ridge, inside of rake edges and above eave. Date: March 31, 2011 Contractor: Independent Power Systems Client: Developmen Flathead | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 20, 2011 | Current use: Single family d | |||||
SCORE 100 2212 Juniper Ct Boulder Co Installation of a flush-mount, grid tie 7. 52 phototvoltaic system. Array to remain below ridge, inside of rake edges and above eave. Date: March 31, 2011 Contractor: Independent Power Systems Client: John Ellwood,Wendy Ellwood | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 14, 2011 | Current use: Single family d | |||||
SCORE 100 1445 Riverside Av Boulder Co Installation of a 5. 52 kw flush-mount grid tie photovoltaic system -- array to remain below ridge, inside of rakes edges of roof and above eave. See enginnerfoots letter for specific attachment details. Date: April 14, 2011 Contractor: Independent Power Systems Client: Mary Gorman,Paul Fuller | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2011 | Current use: Single family d | |||||
SCORE 100 14 Yaupon Av Boulder Co Addition of two panels to an existing flush-mount, grid tie 3. 22 phototvoltaic system. New panels (. 46 kw) to remain below ridge, inside of rake edges and above eave. Total yield existing & proposed 3. 68 kw. Date: April 20, 2011 Contractor: Independent Power Systems Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 22, 2011 | Current use: Single family d | |||||
SCORE 100 Date: May 13, 2011 Contractor: Independent Power Systems Client: Toan Nguyen,Jennifer Brandon | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 10, 2011 | Current use: Single family d | |||||
SCORE 100 2895 Lagrange Cr Boulder Co Installation of a flush-mount grid-tie 6. 44 kw photovoltaic system -- array to remain below ridge, inside of rakes & hips, and above eave. See engineerfoots letter for specific details. Date: May 26, 2011 Contractor: Independent Power Systems Client: Robert Cifelli,Nancy Cifelli | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 11, 2011 | Current use: Single family d | |||||
SCORE 100 715 Willowbrook Rd Boulder Co Pv installation over garage on sfd. Flush mounted, grid-tied, and 2. 25 kw. Date: May 31, 2011 Contractor: Independent Power Systems Client: Albin Gasiewski | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 23, 2011 | Current use: Single family d | |||||
SCORE 100 Date: June 8, 2011 Contractor: Independent Power Systems Client: Brian Volkman,Sarah Volkman | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: July 11, 2011 | Current use: Single family d | |||||
SCORE 100 1051 Tantra Park Cr Boulder Co Installation of a flush mount grid-tie 9. 2 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawings for specific information. Date: June 2, 2011 Contractor: Independent Power Systems Client: Brian Vickers,Nancy Vickers | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 24, 2011 | Current use: Single family d | |||||
SCORE 100 1315 5th St Boulder Co Installation of a flush mount grid-tie 4. 32 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: June 3, 2011 Contractor: Independent Power Systems Client: Dennis Mcgilvray,Carol Trustees | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 24, 2011 | Current use: Single family d | |||||
SCORE 100 Date: June 13, 2011 Contractor: Independent Power Systems Client: James Parra | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 19, 2011 | Current use: Single family d | |||||
SCORE 100 Date: June 13, 2011 Contractor: Independent Power Systems Client: William Paradise | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 1, 2011 | Current use: Single family d | |||||
SCORE 100 Date: June 14, 2011 Contractor: Independent Power Systems Client: Stephen Gombosi | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 26, 2011 | Current use: Single family d | |||||
SCORE 100 Date: June 16, 2011 Contractor: Independent Power Systems Client: Thomas Volckhausen | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: August 12, 2011 | Current use: Single family d | |||||
SCORE 100 2636 5th St Boulder Co Installation of 4. 56 kw flushmounted, rooftop, photovoltaic solar energy system on single-family residence. Date: June 16, 2011 Contractor: Independent Power Systems Client: Thomas Volckhausen | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 10, 2011 | Current use: Single family d | |||||
SCORE 100 3005 18th St Boulder Co Installation of 1. 38 kw, (actually 1. 84 kw -- revised 10 19 2011) rooftop, low-slope tilt mounted solar photovoltaic system on single-family residence. Date: July 1, 2011 Contractor: Independent Power Systems Client: Larry Macarthur,Jayne Macarthur | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 1, 2011 | Current use: Single family d | |||||
SCORE 100 Date: July 20, 2011 Contractor: Independent Power Systems Client: Stephen Gombosi | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: July 26, 2011 | Current use: Single family d | |||||
SCORE 100 47 Shoup Pl Boulder Co Electrical service change to upgrade to 2 amp service on a single-family residence. Date: July 26, 2011 Contractor: Independent Power Systems Client: Sam Richman | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: August 12, 2011 | Current use: Single family d | |||||
SCORE 100 47 Shoup Pl Boulder Co Installation of 6. 44 kw, rooftop, flushmounted photovoltaic solar system on single-family residence. Date: July 26, 2011 Contractor: Independent Power Systems Client: Sam Richman | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 12, 2011 | Current use: Single family d | |||||
SCORE 100 47 Holiday Dr 302 Boulder Co Installation of a 5. 47 kw solar array, tilted at degrees as approved through adr2011-00117. Date: August 2, 2011 Contractor: Independent Power Systems Client: Maureen Cassulo | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 16, 2011 | Current use: Multifamily dwe | |||||
SCORE 100 Date: August 2, 2011 Contractor: Independent Power Systems Client: Paul Waskiewwicz,Janet Montgomery | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 12, 2011 | Current use: Single family a | |||||
SCORE 100 28 Iliff St Boulder Co Installation of rooftop, flushmounted photovoltaic solar energy system, 4. 6 kw, on single-family residence. Date: August 26, 2011 Contractor: Independent Power Systems Client: Thomas Windham,Paula Windham | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 9, 2011 | Current use: Single family d | |||||
SCORE 100 Date: September 7, 2011 Contractor: Independent Power Systems Client: Andrew Pfouts,Kara Pfouts | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 20, 2011 | Current use: Single family d | |||||
SCORE 100 Date: September 7, 2011 Contractor: Independent Power Systems Client: Darwin Pruisner,Coleen Pruisner | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 10, 2013 | Current use: Single family d | |||||
SCORE 100 Date: October 3, 2011 Contractor: Independent Power Systems Client: Francis Bergen | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 10, 2011 | Current use: Single family d | |||||
SCORE 100 2 Abbey Pl Boulder Co Installation of a flush mount grid-tie 9. 66 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: October 17, 2011 Contractor: Independent Power Systems Client: Bernard Bloom,Joan Bloom | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 31, 2011 | Current use: Single family d | |||||
SCORE 100 Date: November 10, 2011 Contractor: Independent Power Systems Client: John Zola, Zola | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2012 | Current use: Single family d | |||||
SCORE 100 Date: November 10, 2011 Contractor: Independent Power Systems Client: Kirk Johnson,Heather Walters | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 21, 2011 | Current use: Single family d | |||||
SCORE 100 40 Darley Av Boulder Co Installation of flush mounted, grid tied, 3. 36 kw, photovoltaic solar system. Date: November 15, 2011 Contractor: Independent Power Systems Client: Alston Williamson,James Iii | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 4, 2012 | Current use: Single family d | |||||
SCORE 100 1245 Berea Dr Boulder Co Installation of a flush mount grid-tie 4. 6 kw photovoltaic system array to remain below ridge, mostly below hips (slight protrusion beyond hip) and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: November 29, 2011 Contractor: Independent Power Systems Client: Jason Vogel,Andria Bilich | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 21, 2011 | Current use: Single family d | |||||
SCORE 100 Date: December 2, 2011 Contractor: Independent Power Systems Client: Elroy Quenroe | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 8, 2012 | Current use: Single family d | |||||
SCORE 100 Date: December 7, 2011 Contractor: Independent Power Systems Client: Roger Barry | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Iss | Current use: Single family d | |||||
SCORE 100 Client: Family Thompson | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 27, 2012 | Current use: Single family d | |||||
SCORE 100 4845 Qualla Dr Boulder Co Installation of 8. 32 kw, rooftop, flushmounted, grid-tied photovoltaic solar energy system on a single-family residence. Date: January 17, 2012 Contractor: Independent Power Systems Client: Levi Brown, Brown | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 8, 2012 | Current use: Single family d | |||||
SCORE 100 1294 Bear Mountain Ct Boulder Co Installation of a flush mount grid-tie 9. 2 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: March 2, 2012 Contractor: Independent Power Systems Client: Niels Brunsgaard,Kathleen Brunsgaard | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 21, 2012 | Current use: Single family d | |||||
SCORE 100 49 Franklin Dr Boulder Co Installation of rooftop, flushmounted, grid-tied, 8. 625 kw photovoltaic solar energy system on residence. Date: March 13, 2012 Contractor: Independent Power Systems Client: Tamara Barnes, Barnes | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 9, 2012 | Current use: Single family d | |||||
SCORE 100 Date: March 29, 2012 Contractor: Independent Power Systems Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 11, 2012 | Current use: Single family d | |||||
SCORE 100 2151 Kincaid Pl Boulder Co Installation of 4. 578 kw, rooftop, flushmounted, photovoltaic solar energy system on residence. Date: April 5, 2012 Contractor: Independent Power Systems Client: Leann Richards | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 14, 2014 | Current use: Single family d | |||||
SCORE 100 Date: May 3, 2012 Contractor: Independent Power Systems Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: June 1, 2012 | Current use: Single family d | |||||
SCORE 100 Date: May 22, 2012 Contractor: Independent Power Systems Client: Michael Early,Lisa Early | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 10, 2012 | Current use: Single family d | |||||
SCORE 100 7383 Augusta Dr Boulder Co Installation of 4. 578 kw flush mount, grid tied, pv array on an existing single family structure. Date: July 19, 2012 Contractor: Independent Power Systems Client: James Mao,Kathryn Mao | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 20, 2012 | Current use: Single family d | |||||
SCORE 100 4487 Applewood Ct Boulder Co Installation of a 5. 886 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Date: August 6, 2012 Contractor: Independent Power Systems Client: Stephen Crider | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 7, 2012 | Current use: Single family d | |||||
SCORE 100 45 Maple Ct Boulder Co Installation of a 7. 848 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Date: August 6, 2012 Contractor: Independent Power Systems Client: Steven Pagnotta,Monica Pagnotta | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 14, 2012 | Current use: Single family d | |||||
SCORE 100 5851 S Orchard Creek Cr Boulder Co Installation of a 9. 81 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Date: August 6, 2012 Contractor: Independent Power Systems Client: Sky Canyon | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 8, 2012 | Current use: Single family d | |||||
SCORE 100 5709 Orchard Creek Cr Boulder Co Installation of a 5. 559 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Date: August 7, 2012 Contractor: Independent Power Systems Client: Jeffrey Franke,Amy Franke | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 20, 2012 | Current use: Single family d | |||||
SCORE 100 5822 S Orchard Creek Cr Boulder Co Installation of a 6. 54 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Date: August 7, 2012 Contractor: Independent Power Systems Client: Fiachra Stokes,Keeley Stokes | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 9, 2013 | Current use: Single family d | |||||
SCORE 100 57 Orchard Creek Ln Boulder Co Installation of a 6. 54 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Date: August 7, 2012 Contractor: Independent Power Systems Client: Andreas Hoenger,Regula Mueller | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 9, 2013 | Current use: Single family d | |||||
SCORE 100 1665 Quince Av Boulder Co Installation of a 2. 88 kw solar array, flush mounted and grid tied. Panels shall not exceed the existing roof ridge height. Date: August 7, 2012 Contractor: Independent Power Systems Client: Albert Kettner | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 28, 2013 | Current use: Single family d | |||||
SCORE 100 Date: September 21, 2012 Contractor: Independent Power Systems Client: Albert Kettner | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Iss | Current use: Single family d | |||||
SCORE 100 4593 Maple Ct Boulder Co Installation of flush mounted, grid-tied 7. 194kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: October 19, 2012 Contractor: Independent Power Systems Client: Scott Johnson,Myriam Johnson | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 7, 2012 | Current use: Single family d | |||||
SCORE 100 44 Applewood Ct Boulder Co Installation of flush mounted, grid-tied 7. 848kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: October 19, 2012 Contractor: Independent Power Systems Client: John Obrien, Obrien | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 7, 2012 | Current use: Single family d | |||||
SCORE 100 5741 N Orchard Creek Cr Boulder Co Installation of a flush mount, grid-tied 5. 886kw photovoltaic system. Arary to rmain belwo ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: October 19, 2012 Contractor: Independent Power Systems Client: Daniel Olech,Arlene Olech | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 9, 2013 | Current use: Single family d | |||||
SCORE 100 5791 S Orchard Creek Cr Boulder Co Installation of a flush mount, grid-tied 6. 54kw photovoltaic system. Arary to rmain belwo ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: October 19, 2012 Contractor: Independent Power Systems Client: Michael Vincent,Jennifer Vincent | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 7, 2012 | Current use: Single family d | |||||
SCORE 100 58 S Orchard Creek Cr Boulder Co Installation of a flush mount grid-tie 4. 578 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: October 23, 2012 Contractor: Independent Power Systems Client: Andrew Mattison | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 8, 2012 | Current use: Single family d | |||||
SCORE 100 1284 Bear Mountain Ct Boulder Co Installation of 9. 81 kw, flush mounted, grid tied, rooftop photovoltaic solar energy system and an electrical service change to a 1 amp service. Date: November 6, 2012 Contractor: Independent Power Systems Client: Sandra Singer | Applicant: Independent Power Systems | Permit type: Electrical, photovol | Permit status: Cmp | Completion date: August 29, 2013 | Current use: Single family d | |||||
SCORE 100 30 15th St Boulder Co Installation of 4. 905 kw rooftop, flushmounted, grid-tied photovoltaic solar energy system, with no portion of the panel array extending above the existing ridgeline of the residence. Date: December 13, 2012 Contractor: Independent Power Systems Client: Matthew Alfermann,Christina Alfermann | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Single family d | |||||
SCORE 100 3125 5th St Boulder Co Installation of 9. 81kw, rooftop, grid-tied, flushmounted, solar energy system on residence with no portion of the panel array extending above the existing ridgeline. Date: December 13, 2012 Contractor: Independent Power Systems Client: Mark Hesse,Julie Hesse | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 31, 2014 | Current use: Single family d | |||||
SCORE 100 4771 Mckinley Dr Boulder Co Installation of a flush mount grid-tied 6. 867 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: February 5, 2013 Contractor: Independent Power Systems Client: Jay Park,Amy Slaymaker | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 22, 2013 | Current use: Single family d | |||||
SCORE 100 4556 Sprucedale Pl Boulder Co Installation of a flush mount grid-tied 5. 88 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: February 25, 2013 Contractor: Independent Power Systems Client: Chris Hansen,Linda Hansen | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 14, 2014 | Current use: Single family d | |||||
SCORE 100 2324 Dennison Ln Boulder Co Installation of 6. 867 kw, grid-tied, low tilt, rooftop, photovoltaic, solar energy system on residence and install electric car charger in attached garage. Date: October 18, 2013 Contractor: Independent Power Systems Client: Karin Lindgren | Applicant: Independent Power Systems | Permit type: Electrical, photovol | Permit status: Cmp | Completion date: January 8, 2014 | Current use: Single family d | |||||
SCORE 100 3616 Roundtree Ct Boulder Co Installation of 5. 232 kw solar photovoltaic array on existing single family residence. Grid tied, flush mounted, installed per engineerfoots specifications. Date: October 21, 2013 Contractor: Independent Power Systems Client: Michael Knoelker,Elizabeth Knoelker | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 5, 2013 | Current use: Single family d | |||||
SCORE 100 3135 11th St Boulder Co Installation of 9. 8 kw, rooftop, flushmounted, grid tied, photovoltaic solar energy system with battery storage located in attached garage. Date: December 23, 2013 Contractor: Independent Power Systems Client: William Pearlman,Gail Pearlman | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 17, 2014 | Current use: Single family d | |||||
SCORE 100 2201 4th St Boulder Co Installation of a flush mount 9. 81 kw photovoltaic system. Array to be parallel to roof plane on a flat roof, grid tied and remain below ridge parapet, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Date: January 6, 2014 Contractor: Independent Power Systems Client: Steven Phillips,Tila Phillips | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 3, 2014 | Current use: Single family d | |||||
SCORE 100 2839 11th St Boulder Co Installation of a flush mount, grid-tied, 6 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: January 28, 2014 Contractor: Independent Power Systems Client: Robert Shires | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 13, 2014 | Current use: Single family d | |||||
SCORE 100 Date: April 24, 2014 Contractor: Independent Power Systems Client: Jove Oakley,Maggie Trust | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: May 6, 2014 | Current use: Single family d | |||||
SCORE 100 1175 Lee Hill Dr Boulder Co Installation of 55. 39 kw, rooftop, tilt-mounted, photovoltaic solar energy system on boulder housing partnerfoots transitional housing building. Date: July 10, 2014 Contractor: Independent Power Systems Client: Hill Lee | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 2, 2014 | Current use: Multifamily dwe | |||||
SCORE 100 555 Forest Av Boulder Co Installation of a flush mount 3. 924 kw photovoltaic system on a detached garage. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. No structural modifications approved under this permit. Contractor to maintain 12inch of space between the ridge and panels parallel to ridge along the length of the ridge and on either side of the ridge. Date: June 25, 2014 Contractor: Independent Power Systems Client: Keith Hartnett,Elizabeth Daly | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 3, 2014 | Current use: Single family d | |||||
SCORE 100 Date: August 13, 2014 Contractor: Independent Power Systems Client: Suzanne Balog,James Balog | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 1, 2015 | Current use: Single family d | |||||
SCORE 100 2686 4th St Boulder Co Installation of battery backup system for residential electrical service on sfdd. Date: September 23, 2014 Contractor: Independent Power Systems Client: Jonathan Webb,Pamela Webb | Applicant: Independent Power Systems | Permit type: Electrical | Permit status: Cmp | Completion date: October 16, 2014 | Current use: Single family d | |||||
SCORE 100 929 Pearl St Boulder Co Pv array, 17. 75kw associated with structural reinforcement tied to pmt2014-05354. Permit approval does not include the enclosure of the upper level outdoor patio, except as shown on the revised sheet s0. 1 (dated 2 11 15). Date: February 13, 2015 Contractor: Independent Power Systems Client: Pearl West | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 5, 2015 | Current use: Commercial/reta | |||||
SCORE 100 3231 4th St Boulder Co Installation of 6. 213 kw flush mount pv system on single family dwelling. System to also include battery back-up in utility room in basement. Date: January 13, 2015 Contractor: Independent Power Systems Client: Britt Drake,Daniel Drake | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2015 | Current use: Single family d | |||||
SCORE 100 3959 Springleaf Ln Boulder Co Installation of a flush mount 2. 16 kw photovoltaic system. Array to be parallel to plane of trellis, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Date: February 2, 2015 Contractor: Independent Power Systems Client: Farms Cunningham | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 15, 2015 | Current use: Single family d | |||||
SCORE 100 27 Stephens Rd Boulder Co Installation of a 2. 6 kw flush mount pv system on the south roof pitch of a single family detached dwelling. Array location on roof approved by fire marshal per attached documentation. Date: June 17, 2015 Contractor: Independent Power Systems Client: Beth Bennett,Ron Bennett | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 13, 2015 | Current use: Single family d | |||||
SCORE 100 4 Dewey Av Boulder Co Installation of a 2. 55 kw flush mount pv system in two arrays on detached garage for single family home. Date: August 10, 2015 Contractor: Independent Power Systems Client: Danielle Rocks,William Mueller | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Iss | Current use: Single family d | |||||
SCORE 100 Permit type: Addition/alteration | Completion date: November 15, 2013 | Current use: One-family | Parcel: 40202 | |||||
SCORE 100 Client: Kenneth Black | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 3, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-00069 | |||||
SCORE 100 635 Arapahoe Ave B Boulder Co Installation of a 4. 9 kw tilt-up ballasted pv system in two arrays on the roof of a three story duplex. Client: Priscilla Wild | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 22, 2016 | Current use: Single family attached dwelling, existin | Permit id: Pmt2016-00206 | |||||
SCORE 100 4 Utica Av Boulder Co Electrical permit to relocate electrical equipment associated with existing 7. 3 kw photovoltaic solar system. Panels not being altered or moved. Client: Joyce Mcdaniel | Permit type: Electrical | Permit status: Cmp | Completion date: June 16, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-01399 | |||||
SCORE 100 1048 Pearl St Boulder Co Installation of a 16. 43 kw grid tied ballasted tilt-up pv system on the roof of the new pearl west commercial building. Client: Eleven Ten | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 10, 2016 | Current use: Commercial/retail, existing | Permit id: Pmt2016-02028 | |||||
SCORE 100 2995 Wilderness Pl Boulder Co Installation of 50. 368 kw, rooftop, tilt-mounted (low pitch, degree) photovoltaic solar energy system on non-residential building. Client: One Railhead | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 1, 2016 | Current use: Existing | Permit id: Pmt2016-02661 | |||||
SCORE 100 2567 4th St Boulder Co Battery backup system to include inverter and critical load panel. Battery system to include connection to sump pump and a connection for a future generator. Separate permit required for pv. Client: Mark Olivier | Permit type: Electrical | Permit status: Cmp | Completion date: July 21, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-02750 | |||||
SCORE 100 801 Zamia Av Boulder Co Installation of a 5. 886 kw flush mount grid tied pv system on the roof of a single family detached dwelling in one array. Client: Sonntag White | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 22, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-02926 | |||||
SCORE 100 768 Ithaca Dr Boulder Co Installation of a flush mount 8. 97 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave, with battery bank in basement. Generator in rear yard to be installed under separate permit (pmt2016-03484). See engineerfoots letter and or drawing(s) for specific information. Client: Richard Taylor | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 30, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-03483 | |||||
SCORE 100 768 Ithaca Dr Boulder Co Installation of a 22 kw generator in the rear yard of a single family residence. Associated with pmt2016-03483. Client: Richard Taylor | Permit type: Mechanical | Permit status: Cmp | Completion date: August 30, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-03484 | |||||
SCORE 100 635 Arapahoe Ave A Boulder Co Installation of a 4. 905 kw grid tied tilt-up ballasted pv system on the roof of a single family attached dwelling in one array. Client: Priscilla Wild | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 26, 2016 | Current use: Single family attached dwelling, existin | Permit id: Pmt2016-03746 | |||||
SCORE 100 29 18th St Boulder Co Installation of a flush mount 3. 27 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 2, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-03868 | |||||
SCORE 100 2285 28th St Boulder Co Installation on a flat roof of a 9. 12 degree tilt-up 50. 25 kw photovoltaic system on a commercial building. Array to preserve allow appropriate roof drainage to interior roof drains and the shadow of the array will not leave the section of roof on which it is located. See engineerfoots letter and or drawing(s) for specific information. Client: Holdings Infinite | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 21, 2016 | Current use: Commercial/retail, existing | Permit id: Pmt2016-03871 | |||||
SCORE 100 16 Yellow Pine Av Boulder Co Installation of 20. 01 kw, flush-mounted, grid-tied, rooftop, photovoltaic solar system on the silver sage co-housing building located at the southwestern corner of yellowpine ave and 17th street Client: Sage Silver | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 19, 2016 | Current use: Multifamily dwellings, existing | Permit id: Pmt2016-04177 | |||||
SCORE 100 5541 Central Av Boulder Co Installation of 39. 24 kw, rooftop, low tilt (10-degrees), photovoltaic solar energy system on building. Client: Investment Flatiron | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 17, 2016 | Current use: Existing | Permit id: Pmt2016-04255 | |||||
SCORE 100 3265 30th St Boulder Co New 17. 33 kw pv system of the newly constructed community center addition (see pmt2015-03863.) Client: Communitie Boulder | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 2, 2016 | Current use: Amusement/recreational - indoor, existin | Permit id: Pmt2016-04649 | |||||
SCORE 100 3223 Arapahoe Av Boulder Co Installation of a 20. 4 kw, rooftop, tilt-mounted, photovoltaic solar energy system on commercial building. Client: Arapahoe | Permit type: Flood accessory/remodel, photovoltaic | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2016-05678 | |||||
SCORE 100 3 Linden Av Boulder Co Installation of 8. 8 kw, flush-mounted (low tilt less than degrees), rooftop, photovoltaic solar energy system on residence. Client: Farms Cunningham | Permit type: Photovoltaic | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-05679 | |||||
SCORE 100 Client: James Patrick | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 6, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-00158 | |||||
SCORE 100 1655 Walnut St Boulder Co Pv installation on mixed-use building (see adr2009-00 for minor mod approval). Ballast system, grid-tied with residential (1)7. 2 kw. Associated with system installed though pmt2009-01452. Unit 404 Client: Walnut Mcv | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 23, 2009 | Current use: Commercial/retail, existing | Permit id: Pmt2009-00354 | |||||
SCORE 100 29 Juilliard St Boulder Co Installation of 6. 44 flush mounted, rooftop photovoltaic grid-tied solar energy system Client: Patrick Owinter | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 29, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-01293 | |||||
SCORE 100 1626 North St Boulder Co Installation of 1. 575 kw flush-mounted, grid-tied photovoltaic solar energy system. Client: Regina Gray | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 29, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-01451 | |||||
SCORE 100 1655 Walnut St Boulder Co Pv installation on mixed-use building (see adr2009-00 for minor mod approval). Ballast system, grid-tied with residential 4. 05 kw. Associated with system installed through pmt2009-00354. Unit 302 Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 8, 2009 | Current use: Commercial/retail, existing | Permit id: Pmt2009-01452 | |||||
SCORE 100 2265 Vassar Dr Boulder Co Installation of 5. 04 kw rooftop, flush-mounted photovoltaic solar energy system. Client: Bruce Morley | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 24, 2009 | Current use: Single family detached dwelling | Permit id: Pmt2009-02565 | |||||
SCORE 100 Client: Brett Piane | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 17, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02797 | |||||
SCORE 100 Client: William Toor | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 2, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02933 | |||||
SCORE 100 Client: Ryan Artale | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 10, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02956 | |||||
SCORE 100 Client: Robert Tangen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 9, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-03177 | |||||
SCORE 100 Client: Lucia De | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 8, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-03188 | |||||
SCORE 100 Client: James Hartman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 8, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-03191 | |||||
SCORE 100 Client: Barbara Engel | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 24, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-03789 | |||||
SCORE 100 39 Britting Av Boulder Co Installation of 3. 6 kw, rooftop, flushmounted, grid tied, photovoltaic solar system. Client: Joseph Maclennan | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-03790 | |||||
SCORE 100 4255 Eaton Ct Boulder Co Installation of 4. 7 kw, flush-mounted, rooftop photovoltaic solar system on a single-family residence. Client: Elizabeth White-Oconnor | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 21, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-03974 | |||||
SCORE 100 865 7th St Boulder Co Installation of 5. 4 kw, flush-mounted, rooftop photovoltaic solar system on a single-family residence. Client: Annette Ashley | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-03976 | |||||
SCORE 100 Client: David Turner | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 29, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04365 | |||||
SCORE 100 Client: Lorant Muth | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 19, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04366 | |||||
SCORE 100 Client: Mathias Thurmer | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 4, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04658 | |||||
SCORE 100 Client: Peter Olesen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 3, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04712 | |||||
SCORE 100 Client: Jeffrey Frykholm | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 11, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04713 | |||||
SCORE 100 7 Utica Av Boulder Co Pv installation on existing sfd. Tilt-up system ( degrees) on flat roof, grid-tied and 6. 75 kw. Client: William Ury | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 22, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04926 | |||||
SCORE 100 30 Valmont Rd Boulder Co Pv installation (meter #16) on commercial building. Tilt-up system, grid-tied and 9. 84 kw. Client: Llc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Commercial/retail, existing | Permit id: Pmt2009-05106 | |||||
SCORE 100 30 Valmont Rd Boulder Co Pv installation (meter #17) on commercial building. Tilt-up system, grid-tied and 9. 84 kw. Client: Llc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 30, 2009 | Current use: Commercial/retail, existing | Permit id: Pmt2009-05107 | |||||
SCORE 100 30 Valmont Rd Boulder Co Pv installation (meter #18) on commercial building. Tilt-up system, grid-tied and 9. 84 kw. Client: Llc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 30, 2009 | Current use: Commercial/retail, existing | Permit id: Pmt2009-05108 | |||||
SCORE 100 4771 Mckinley Dr Boulder Co Installation of a flush mount grid-tied 6. 867 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Jay Park | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 22, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-00503 | |||||
SCORE 100 4556 Sprucedale Pl Boulder Co Installation of a flush mount grid-tied 5. 88 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Chris Hansen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 14, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-00807 | |||||
SCORE 100 27 6th St Boulder Co Construction of new 357sf detached garage. Includes electrical. Revised size 10 15 13 to 399 square feet. Client: Jove Oakley | Permit type: Building, electrical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-03911 | |||||
SCORE 100 2324 Dennison Ln Boulder Co Installation of 6. 867 kw, grid-tied, low tilt, rooftop, photovoltaic, solar energy system on residence and install electric car charger in attached garage. Client: Karin Lindgren | Permit type: Electrical, photovoltaic | Permit status: Cmp | Completion date: January 8, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-05690 | |||||
SCORE 100 3616 Roundtree Ct Boulder Co Installation of 5. 232 kw solar photovoltaic array on existing single family residence. Grid tied, flush mounted, installed per engineerfoots specifications. Client: Michael Knoelker | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 5, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-05755 | |||||
SCORE 100 3135 11th St Boulder Co Installation of 9. 8 kw, rooftop, flushmounted, grid tied, photovoltaic solar energy system with battery storage located in attached garage. Client: William Pearlman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 17, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-07141 | |||||
SCORE 100 2201 4th St Boulder Co Installation of a flush mount 9. 81 kw photovoltaic system. Array to be parallel to roof plane on a flat roof, grid tied and remain below ridge parapet, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Client: Steven Phillips | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 3, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-00071 | |||||
SCORE 100 2839 11th St Boulder Co Installation of a flush mount, grid-tied, 6 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Robert Shires | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 13, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-00440 | |||||
SCORE 100 Client: Jove Oakley | Permit type: Electrical | Permit status: Cmp | Completion date: May 6, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-01823 | |||||
SCORE 100 1175 Lee Hill Dr Boulder Co Installation of 55. 39 kw, rooftop, tilt-mounted, photovoltaic solar energy system on boulder housing partnerfoots transitional housing building. Client: Hill Lee | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 2, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2014-02847 | |||||
SCORE 100 555 Forest Av Boulder Co Installation of a flush mount 3. 924 kw photovoltaic system on a detached garage. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. No structural modifications approved under this permit. Contractor to maintain 12inch of space between the ridge and panels parallel to ridge along the length of the ridge and on either side of the ridge. Client: Keith Hartnett | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 3, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-03007 | |||||
SCORE 100 Client: Suzanne Balog | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-03794 | |||||
SCORE 100 2686 4th St Boulder Co Installation of battery backup system for residential electrical service on sfdd. Client: Jonathan Webb | Permit type: Electrical | Permit status: Cmp | Completion date: October 16, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-04374 | |||||
SCORE 100 929 Pearl St Boulder Co Pv array, 17. 75kw associated with structural reinforcement tied to pmt2014-05354. Permit approval does not include the enclosure of the upper level outdoor patio, except as shown on the revised sheet s0. 1 (dated 2 11 15). Client: Pearl West | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 5, 2015 | Current use: Commercial/retail, existing | Permit id: Pmt2014-05616 | |||||
SCORE 100 4845 Qualla Dr Boulder Co Installation of 8. 32 kw, rooftop, flushmounted, grid-tied photovoltaic solar energy system on a single-family residence. Client: Levi Brown | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 8, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-00217 | |||||
SCORE 100 1294 Bear Mountain Ct Boulder Co Installation of a flush mount grid-tie 9. 2 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Niels Brunsgaard | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 21, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-00882 | |||||
SCORE 100 49 Franklin Dr Boulder Co Installation of rooftop, flushmounted, grid-tied, 8. 625 kw photovoltaic solar energy system on residence. Client: Tamara Barnes | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 9, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-01067 | |||||
SCORE 100 Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 11, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-01384 | |||||
SCORE 100 2151 Kincaid Pl Boulder Co Installation of 4. 578 kw, rooftop, flushmounted, photovoltaic solar energy system on residence. Client: Leann Richards | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 14, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-01574 | |||||
SCORE 100 Permit type: Electrical | Permit status: Cmp | Completion date: June 1, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-02137 | |||||
SCORE 100 Client: Michael Early | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 10, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-02471 | |||||
SCORE 100 7383 Augusta Dr Boulder Co Installation of 4. 578 kw flush mount, grid tied, pv array on an existing single family structure. Client: James Mao | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 20, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-03476 | |||||
SCORE 100 4487 Applewood Ct Boulder Co Installation of a 5. 886 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Client: Stephen Crider | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 7, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-03808 | |||||
SCORE 100 45 Maple Ct Boulder Co Installation of a 7. 848 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Client: Steven Pagnotta | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 14, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-03810 | |||||
SCORE 100 5851 S Orchard Creek Cr Boulder Co Installation of a 9. 81 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Client: Sky Canyon | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 8, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-03820 | |||||
SCORE 100 5709 Orchard Creek Cr Boulder Co Installation of a 5. 559 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Client: Jeffrey Franke | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 20, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-03821 | |||||
SCORE 100 5822 S Orchard Creek Cr Boulder Co Installation of a 6. 54 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Client: Fiachra Stokes | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 9, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-03822 | |||||
SCORE 100 57 Orchard Creek Ln Boulder Co Installation of a 6. 54 kw solar array, flush mounted and grid tied. Panels not to exceed existing roof ridge height. Client: Andreas Hoenger | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 9, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-03823 | |||||
SCORE 100 1665 Quince Av Boulder Co Installation of a 2. 88 kw solar array, flush mounted and grid tied. Panels shall not exceed the existing roof ridge height. Client: Albert Kettner | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 28, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-03835 | |||||
SCORE 100 Client: Albert Kettner | Permit type: Electrical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-04618 | |||||
SCORE 100 4593 Maple Ct Boulder Co Installation of flush mounted, grid-tied 7. 194kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Scott Johnson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 7, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05088 | |||||
SCORE 100 44 Applewood Ct Boulder Co Installation of flush mounted, grid-tied 7. 848kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: John Obrien | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 7, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05090 | |||||
SCORE 100 5741 N Orchard Creek Cr Boulder Co Installation of a flush mount, grid-tied 5. 886kw photovoltaic system. Arary to rmain belwo ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Daniel Olech | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 9, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05092 | |||||
SCORE 100 5791 S Orchard Creek Cr Boulder Co Installation of a flush mount, grid-tied 6. 54kw photovoltaic system. Arary to rmain belwo ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Michael Vincent | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 7, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05093 | |||||
SCORE 100 58 S Orchard Creek Cr Boulder Co Installation of a flush mount grid-tie 4. 578 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Andrew Mattison | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 8, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05158 | |||||
SCORE 100 1284 Bear Mountain Ct Boulder Co Installation of 9. 81 kw, flush mounted, grid tied, rooftop photovoltaic solar energy system and an electrical service change to a 1 amp service. Client: Sandra Singer | Permit type: Electrical, photovoltaic | Permit status: Cmp | Completion date: August 29, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05380 | |||||
SCORE 100 30 15th St Boulder Co Installation of 4. 905 kw rooftop, flushmounted, grid-tied photovoltaic solar energy system, with no portion of the panel array extending above the existing ridgeline of the residence. Client: Matthew Alfermann | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05962 | |||||
SCORE 100 3125 5th St Boulder Co Installation of 9. 81kw, rooftop, grid-tied, flushmounted, solar energy system on residence with no portion of the panel array extending above the existing ridgeline. Client: Mark Hesse | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 31, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05965 | |||||
SCORE 100 Client: Elise Sachs | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 8, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00300 | |||||
SCORE 100 Client: Deborah Kershner | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 18, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00448 | |||||
SCORE 100 4894 Brandon Creek Dr Boulder Co Installation of 3. 22 kw solar array, flush mounted and grid tied. Approved through adr2010-00009. Client: William Torrie | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 18, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00449 | |||||
SCORE 100 1885 Del Rosa Ct Boulder Co Installation of flushmounted, 2. 52 kw rooftop photovoltaic solar system. Client: Richard Quick | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 12, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00825 | |||||
SCORE 100 Client: Douglas Yager | Permit type: Electrical | Permit status: Cmp | Completion date: April 6, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00826 | |||||
SCORE 100 Client: Douglas Yager | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00827 | |||||
SCORE 100 1526 Spruce St Boulder Co Installation of 9. 2 kw solar array. Tilted at a degree angle, not to exceed existing roof parapet. The panels do not add to building height. Second system through pmt2010-01663 on seperate meter. Client: Spruce | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2010 | Current use: Office - professional, existing | Permit id: Pmt2010-01336 | |||||
SCORE 100 Client: Stories Three | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 1, 2010 | Current use: Existing | Permit id: Pmt2010-01382 | |||||
SCORE 100 2944 Tincup Cr Boulder Co Pv installation on sfd. Flush mounted, grid-tied, and 4. 41 kw. Also includes service change to 2 amps. Client: Karl Kellogg | Permit type: Electrical, photovoltaic | Permit status: Cmp | Completion date: May 4, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-01495 | |||||
SCORE 100 Client: Pamela Hill | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 14, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-01496 | |||||
SCORE 100 Client: David Simon | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 25, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-01795 | |||||
SCORE 100 Client: Nathaniel Burger | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 27, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-01861 | |||||
SCORE 100 Client: Lisa Bennett | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-01895 | |||||
SCORE 100 6 Benthaven Pl Boulder Co Installation of 7. 2 kw flushmounted, grid-tied photovoltaic solar system on detached garage. Client: Cheryl Cox | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 1, 2010 | Current use: Townhomes, existing, garage - detached, | Permit id: Pmt2010-01933 | |||||
SCORE 100 7 Juniper Av Boulder Co Installation of rooftop, flush-mounted, 5. 16 kw photovoltaic solar system on single-family residence. Client: Thomas Daly | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 10, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-02222 | |||||
SCORE 100 Client: Molly Brodin | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 29, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-02568 | |||||
SCORE 100 2155 Poplar Av Boulder Co Installation of 2. 3 kw, rooftop, flushmounted photovoltaic solar energy system on single-family residence. Client: Lisa Morzel | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 19, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-02726 | |||||
SCORE 100 Client: Jane Greenfield | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 8, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-02771 | |||||
SCORE 100 Client: Leo Nelsen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 14, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-03534 | |||||
SCORE 100 48 Qualla Dr Boulder Co Electrical permit - for service change only to 2 amps for sfd. See pv under separate. Client: Leo Nelsen | Permit type: Electrical | Permit status: Cmp | Completion date: September 14, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-03610 | |||||
SCORE 100 Client: Elizabeth Blumenthal | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 8, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-03611 | |||||
SCORE 100 Client: Cynthia Stevenson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-03721 | |||||
SCORE 100 5985 Brandywine Ct Boulder Co Installation of 8. 5 kw flushmounted, rooftop photovoltaic solar system on single-family residence. Client: Anthony Kos | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-03895 | |||||
SCORE 100 1332 Scrub Oak Cr Boulder Co Installation of a 3. 78 kw flush-mount grid-tie photovoltaic system -- system to remain below the ridge, inside the rakes and above the eave. Client: Boulos Ayad | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 1, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04012 | |||||
SCORE 100 28 Stanford Av Boulder Co Installation of 9. 6 kw, flush-mounted, rooftop photovoltaic solar energy system. Client: Jeffrey Mckinny | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 10, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04141 | |||||
SCORE 100 1535 Pearl St Boulder Co Pv installation on restaurant inchmountain suninch. Tilt-up ( degrees), grid-tied, and 9. 856 kw. Client: Storage Sunspot | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 28, 2010 | Current use: Restaurant, existing | Permit id: Pmt2010-04280 | |||||
SCORE 100 5 Juniper Av Boulder Co Installation of rooftop, flushmounted photovoltaic 7. 392 kw solar energy system on a single-family residence. Client: Mary Beitner | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 18, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04756 | |||||
SCORE 100 28 Stanford Av Boulder Co Electrical service change to install 2 amp service on single-family residence. Client: Jeffrey Mckinny | Permit type: Electrical | Permit status: Cmp | Completion date: November 10, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04758 | |||||
SCORE 100 Client: Patricia Nielsen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 9, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04837 | |||||
SCORE 100 Client: Don Reed | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 9, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04860 | |||||
SCORE 100 4845 Lee Cr Boulder Co Installation of flushmounted, 5. 85 kw, rooftop photovoltaic solar energy system on single-family residence. Client: Susan Wu | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 15, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04867 | |||||
SCORE 100 53 Holmes Pl Boulder Co Installation of a 4. 83 kw flush-mount grid tie photovoltaic array. Array to remain insdied of the rakes, below the ridge and above the eave. Client: Baptist Second | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 2, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05258 | |||||
SCORE 100 2102 Kalmia Av Boulder Co Installation of flush-mounted, rooftop, grid tied, rooftop photovoltaic solar energy system on single-family residence. Client: John Ruger | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 2, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05427 | |||||
SCORE 100 Client: Jean Briant | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 18, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05490 | |||||
SCORE 100 1647 Pearl St Boulder Co Installation of 3. 72 kw solar awning. See rev2010-000 for revocable permit. Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 3, 2011 | Current use: Commercial/retail, existing | Permit id: Pmt2010-05575 | |||||
SCORE 100 Client: James Booth | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 14, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05812 | |||||
SCORE 100 Client: Edward Schwalenberg | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 28, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05813 | |||||
SCORE 100 Client: Josh Wurman | Permit type: Electrical | Permit status: Cmp | Completion date: February 6, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-05199 | |||||
SCORE 100 Client: Robert Webb | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 22, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00115 | |||||
SCORE 100 Client: Liwen Pan | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 24, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00554 | |||||
SCORE 100 3015 10th St Boulder Co Installation of 2. 142 kw solar array, flush mounted and grid tied. Not to exceed roof pitch. Client: Wei Hintsa | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 24, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00572 | |||||
SCORE 100 Client: Albin Gasiewski | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 2, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00637 | |||||
SCORE 100 Client: Richard Stone | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 28, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00638 | |||||
SCORE 100 5101 E Euclid Av Boulder Co Installation of 4. 83 kw solar array, flush mounted and grid tied. Not to exceed existing roof height. Client: Donald Durso | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 24, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00640 | |||||
SCORE 100 Client: Wendy Rochman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 28, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00688 | |||||
SCORE 100 Client: Aron Ralston | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 29, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00697 | |||||
SCORE 100 Client: Catherine Swanson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 4, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00743 | |||||
SCORE 100 Client: Ken Kreidl | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 18, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00906 | |||||
SCORE 100 15 Findlay Wy Boulder Co Installation of 7. 14 kw, flush-mounted, rooftop, photovoltaic solar system on single-family residence. Client: Cynthia Covell | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 8, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-01018 | |||||
SCORE 100 Client: Cynthia Covell | Permit type: Electrical | Permit status: Cmp | Completion date: July 8, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-01028 | |||||
SCORE 100 Client: Brent Cullimore | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 6, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-01084 | |||||
SCORE 100 437 Pine St Boulder Co Installation of a 5. 98 kw solar array, flush mounted and grid tied. In accordance with landmarks approval his2010-00256. Client: Christina Cheatham | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 19, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-01113 | |||||
SCORE 100 4645 Broadway A1 Boulder Co Installation of 2. 76 kw, tilt-mounted, rooftop, photovoltaic solar energy system on mixed use building. Client: Duzer Van | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 12, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-01151 | |||||
SCORE 100 14 Yaupon Av Boulder Co Installation of a flush-mount, grid tie 3. 22 phototvoltaic system. Array to remain below ridge, inside of rake edges and above eave. Client: Developmen Flathead | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 20, 2011 | Current use: Single family detached dwelling | Permit id: Pmt2011-01248 | |||||
SCORE 100 2212 Juniper Ct Boulder Co Installation of a flush-mount, grid tie 7. 52 phototvoltaic system. Array to remain below ridge, inside of rake edges and above eave. Client: John Ellwood | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 14, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-01249 | |||||
SCORE 100 1445 Riverside Av Boulder Co Installation of a 5. 52 kw flush-mount grid tie photovoltaic system -- array to remain below ridge, inside of rakes edges of roof and above eave. See enginnerfoots letter for specific attachment details. Client: Mary Gorman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 10, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-01451 | |||||
SCORE 100 14 Yaupon Av Boulder Co Addition of two panels to an existing flush-mount, grid tie 3. 22 phototvoltaic system. New panels (. 46 kw) to remain below ridge, inside of rake edges and above eave. Total yield existing & proposed 3. 68 kw. Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 22, 2011 | Current use: Single family detached dwelling | Permit id: Pmt2011-01541 | |||||
SCORE 100 Client: Toan Nguyen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 10, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-01936 | |||||
SCORE 100 2895 Lagrange Cr Boulder Co Installation of a flush-mount grid-tie 6. 44 kw photovoltaic system -- array to remain below ridge, inside of rakes & hips, and above eave. See engineerfoots letter for specific details. Client: Robert Cifelli | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 11, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02144 | |||||
SCORE 100 715 Willowbrook Rd Boulder Co Pv installation over garage on sfd. Flush mounted, grid-tied, and 2. 25 kw. Client: Albin Gasiewski | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 23, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02202 | |||||
SCORE 100 Client: Brian Volkman | Permit type: Electrical | Permit status: Cmp | Completion date: July 11, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02204 | |||||
SCORE 100 1051 Tantra Park Cr Boulder Co Installation of a flush mount grid-tie 9. 2 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawings for specific information. Client: Brian Vickers | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 24, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02243 | |||||
SCORE 100 1315 5th St Boulder Co Installation of a flush mount grid-tie 4. 32 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Dennis Mcgilvray | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 24, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02274 | |||||
SCORE 100 Client: James Parra | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 19, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02430 | |||||
SCORE 100 Client: William Paradise | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 1, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02431 | |||||
SCORE 100 Client: Stephen Gombosi | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 26, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02470 | |||||
SCORE 100 Client: Thomas Volckhausen | Permit type: Electrical | Permit status: Cmp | Completion date: August 12, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02510 | |||||
SCORE 100 2636 5th St Boulder Co Installation of 4. 56 kw flushmounted, rooftop, photovoltaic solar energy system on single-family residence. Client: Thomas Volckhausen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 10, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02511 | |||||
SCORE 100 3005 18th St Boulder Co Installation of 1. 38 kw, (actually 1. 84 kw -- revised 10 19 2011) rooftop, low-slope tilt mounted solar photovoltaic system on single-family residence. Client: Larry Macarthur | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 1, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02795 | |||||
SCORE 100 Client: Stephen Gombosi | Permit type: Electrical | Permit status: Cmp | Completion date: July 26, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-03065 | |||||
SCORE 100 47 Shoup Pl Boulder Co Electrical service change to upgrade to 2 amp service on a single-family residence. Client: Sam Richman | Permit type: Electrical | Permit status: Cmp | Completion date: August 12, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-03176 | |||||
SCORE 100 47 Shoup Pl Boulder Co Installation of 6. 44 kw, rooftop, flushmounted photovoltaic solar system on single-family residence. Client: Sam Richman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 12, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-03177 | |||||
SCORE 100 47 Holiday Dr 302 Boulder Co Installation of a 5. 47 kw solar array, tilted at degrees as approved through adr2011-00117. Client: Maureen Cassulo | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 16, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-03286 | |||||
SCORE 100 Client: Paul Waskiewwicz | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 12, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-03288 | |||||
SCORE 100 28 Iliff St Boulder Co Installation of rooftop, flushmounted photovoltaic solar energy system, 4. 6 kw, on single-family residence. Client: Thomas Windham | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 9, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-03664 | |||||
SCORE 100 Client: Andrew Pfouts | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 20, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-03821 | |||||
SCORE 100 Client: Darwin Pruisner | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 10, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-03822 | |||||
SCORE 100 Client: Francis Bergen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 10, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-04229 | |||||
SCORE 100 2 Abbey Pl Boulder Co Installation of a flush mount grid-tie 9. 66 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Bernard Bloom | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 31, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-04488 | |||||
SCORE 100 Client: John Zola | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-04939 | |||||
SCORE 100 Client: Kirk Johnson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 21, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-04942 | |||||
SCORE 100 40 Darley Av Boulder Co Installation of flush mounted, grid tied, 3. 36 kw, photovoltaic solar system. Client: Alston Williamson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 4, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-05007 | |||||
SCORE 100 1245 Berea Dr Boulder Co Installation of a flush mount grid-tie 4. 6 kw photovoltaic system array to remain below ridge, mostly below hips (slight protrusion beyond hip) and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Jason Vogel | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 21, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-05185 | |||||
SCORE 100 Client: Elroy Quenroe | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 8, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-05253 | |||||
SCORE 100 Client: Roger Barry | Permit type: Photovoltaic | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-05322 | |||||
SCORE 100 Client: Family Thompson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 27, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-05537 | |||||
SCORE 100 3231 4th St Boulder Co Installation of 6. 213 kw flush mount pv system on single family dwelling. System to also include battery back-up in utility room in basement. Client: Britt Drake | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-00106 | |||||
SCORE 100 3959 Springleaf Ln Boulder Co Installation of a flush mount 2. 16 kw photovoltaic system. Array to be parallel to plane of trellis, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Client: Farms Cunningham | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 15, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-00310 | |||||
SCORE 100 27 Stephens Rd Boulder Co Installation of a 2. 6 kw flush mount pv system on the south roof pitch of a single family detached dwelling. Array location on roof approved by fire marshal per attached documentation. Client: Beth Bennett | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 13, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-02426 | |||||
SCORE 100 4 Dewey Av Boulder Co Installation of a 2. 55 kw flush mount pv system in two arrays on detached garage for single family home. Client: Danielle Rocks | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 7, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-03377 | |||||
SCORE 100 2156 Tamarack Av Boulder Co Installation of a flush mount 3. 92 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Client: Tracey Beck | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 20, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-04226 | |||||
SCORE 100 3025 24th St Boulder Co Installation of an 8. 64 kw grid tied flush mount pv system on the roof of a single family dwelling in one array. Client: Adam Ross | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 20, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-00459 | |||||
SCORE 100 525 Kalmia Av Boulder Co Installation of a flush mount 19. 43 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Resubmittal 4 6 17 to relocate electrical equipment and submit revised 1-line drawing. Client: Specific Quite | Permit type: Photovoltaic | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-03996 | |||||
SCORE 100 2831 Kenyon Cr Boulder Co Installation of a flush mount 9. 145 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. No structural modifications approved under this permit. Contractor to maintain min. 12inch of space between the ridge and panels parallel to ridge along the length of the ridge and on either side of the ridge. A 30inch min. Pathway must be provided at the edge of the roof, perpendicular to the ridge on one side only. Client: Richard Feit | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 1, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-00940 | |||||
SCORE 100 Client: Joanna Rosenblum | Permit type: Electrical, photovoltaic | Permit status: Cmp | Completion date: October 1, 2006 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-02733 | |||||
SCORE 100 18 Sumac Ave Boulder Co Electrical permit for tilt-mounted solar photovoltaic system on roof. No increase in building height or solar shadow. Client: Peter Rodgers | Permit type: Electrical, photovoltaic | Permit status: Cmp | Completion date: August 8, 2006 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-02734 | |||||
SCORE 100 Client: Lois Edgar | Permit type: Electrical, photovoltaic | Permit status: Cmp | Completion date: January 28, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-04306 | |||||
SCORE 100 Client: Bud Wonsiewicz | Permit type: Electrical, photovoltaic | Permit status: Cmp | Completion date: January 2, 2007 | Current use: Single family attached dwelling, existin | Permit id: Pmt2006-04366 | |||||
SCORE 100 Client: Demos Bell | Permit type: Electrical | Permit status: Cmp | Completion date: January 7, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-04701 | |||||
SCORE 100 14 Zamia Av Boulder Co Installation of a flush mounted 3. 4 kw photovoltaic system on roof of structure. Inspector: details of installation requirements in permit packet. Client: Neighborho Holiday | Permit type: Electrical, photovoltaic | Permit status: Cmp | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-05161 | |||||
SCORE 100 436 Utica Av Boulder Co Installation of a flush mounted 9. 675kw photovoltaic system on roof of structure. Inspector: details of installation requirements in permit packet. Client: James Newcomb | Permit type: Electrical, photovoltaic | Permit status: Cmp | Completion date: February 25, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-05162 | |||||
SCORE 100 Client: Richard Fetter | Permit type: Electrical | Permit status: Cmp | Completion date: March 2, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-05249 | |||||
SCORE 100 Client: Condominiu Canyon | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 27, 2007 | Current use: Commercial/retail, existing | Permit id: Pmt2007-00760 | |||||
SCORE 100 Client: Neighborho Holiday | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 11, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-01273 | |||||
SCORE 100 1446 Zamia Av Boulder Co Installation of a 4. 3 kw flush mounted photovoltaic system w section of buried conductor between garage & main structure. Client: Neighborho Holiday | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 29, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-01549 | |||||
SCORE 100 Client: Joyce Mcdaniel | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 3, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-02116 | |||||
SCORE 100 1474 Easy Rider Ln Boulder Co Electrical permit for flush mounted solar pv system on existing roof. 4. 3 kw Client: Neighborho Holiday | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 18, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-02851 | |||||
SCORE 100 1466 Easy Rider Ln Boulder Co Electrical permit for flush mounted solar pv system on existing roof. 4. 3 kw Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 24, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-02852 | |||||
SCORE 100 Client: Josh Wurman | Permit type: Building, photovoltaic | Permit status: Cmp | Completion date: October 24, 2007 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2007-03342 | |||||
SCORE 100 Client: Darlene Mitchell | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 14, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-03511 | |||||
SCORE 100 6 Locust Av Boulder Co Installation of 3. 5 kw rooftop photovoltaic system. (includes a battery storage system)(ventilated according to engineerfoots supplementary report & paperwork). Client: Darlene Mitchell | Permit type: Building, photovoltaic | Permit status: Cmp | Completion date: July 10, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-03518 | |||||
SCORE 100 Client: David Brandt | Permit type: Building, photovoltaic | Permit status: Cmp | Completion date: February 19, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-03631 | |||||
SCORE 100 Client: Maureen Cassulo | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 21, 2008 | Current use: Multifamily dwellings, existing | Permit id: Pmt2007-03936 | |||||
SCORE 100 Client: Anthony Boniface | Permit type: Building, photovoltaic | Permit status: Cmp | Completion date: October 8, 2007 | Current use: Townhomes, remodel | Permit id: Pmt2007-04169 | |||||
SCORE 100 Client: Josh Wurman | Permit type: Electrical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-04349 | |||||
SCORE 100 Client: David Sawyer | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 5, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-04444 | |||||
SCORE 100 Client: Ryan Lewis | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 30, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-04646 | |||||
SCORE 100 1505 Pearl St Boulder Co Installation of a 48. 3 kw grid-tie photovoltaic system. Roof mounted tilt-up system at a 12 degree angle. Client: Pearl | Permit type: Photovoltaic | Permit status: Cls | Completion date: April 30, 2008 | Current use: Commercial/retail, existing, multifamily | Permit id: Pmt2007-05274 | |||||
SCORE 100 Client: Josh Wurman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 6, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-05451 | |||||
SCORE 100 805 Union Av Boulder Co Installation of a 2. 8 kw flush-mounted grid-tie, battery back-up photovoltaic system. Battery enclosure to remian outside of structure; plumbing & mechanical vents, intakes & exhaust not allowed to be covered by solar array or associated equipment. Client: Ellen Mitchell | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 9, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-00520 | |||||
SCORE 100 906 Union Av Boulder Co Installation of a flush-mount grid-tie photovoltaic system, 6. 3 kw, no battery tie-in. Client: James Pettit | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 30, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-01381 | |||||
SCORE 100 Client: James Hartman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-01989 | |||||
SCORE 100 Client: Charles Keller | Permit type: Photovoltaic | Permit status: Cmp | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02257 | |||||
SCORE 100 2825 6th St Boulder Co Installation of a flush-mount grid-tie photovoltaic system, 6 kw (no battery tie-in) Client: Jon Brandon | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02290 | |||||
SCORE 100 Client: Neighborho Holiday | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 12, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02680 | |||||
SCORE 100 Client: Neighborho Holiday | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 4, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02681 | |||||
SCORE 100 Client: Angela Giustina | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 4, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02917 | |||||
SCORE 100 Client: Ball Charlotte | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 30, 2008 | Current use: Commercial/retail, existing | Permit id: Pmt2008-02939 | |||||
SCORE 100 Client: Ranch Ponderrosa | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 12, 2008 | Current use: Office - professional, existing | Permit id: Pmt2008-03124 | |||||
SCORE 100 Client: Brad Segal | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 13, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-03275 | |||||
SCORE 100 4234 26th St Boulder Co Installation of 3. 68 kw photovoltaic solar energy system on single-family residence. System to be flush-mounted on rooftop, grid-tied. Client: Douglas Ginley | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 13, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-03395 | |||||
SCORE 100 1321 Cedar Av Boulder Co Installation of grid-tied, flushmounted solar photovoltaic system, 1. 84 kw. Client: Paul Heller | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 2, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-03420 | |||||
SCORE 100 31 Lane Ct Boulder Co Installation of a flush-mount photo-voltaic system. 2. 2 kw grid-tie, no battery tie-in. Client: Michael Walker | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 17, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-03622 | |||||
SCORE 100 2292 Vineyard Pl Boulder Co Installation of a grid-tie 3. 6 kw photo-voltaic system, no battery tie-in. Client: Joanne Tilley | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 6, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-03623 | |||||
SCORE 100 Client: Diane Rosenthal | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 23, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-03862 | |||||
SCORE 100 31 Lane Ct Boulder Co Installation of a 4. 14 kw flush-mount grid-tie photovoltaic system. Must be installed in accordance with conditions specified in administrative solar exception adr2008-00168 Client: Marilyn Ramsey | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 15, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04365 | |||||
SCORE 100 Client: Adam Sak | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 13, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04468 | |||||
SCORE 100 Client: Neighborho Holiday | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 7, 2008 | Current use: Multifamily dwellings, existing | Permit id: Pmt2008-04673 | |||||
SCORE 100 Client: Lynn Guissinger | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 8, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04785 | |||||
SCORE 100 Client: Erik Johnson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 7, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-05263 | |||||
SCORE 100 Client: James Leftwich | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 18, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-05393 | |||||
SCORE 100 48 N Broadway Boulder Co Installation of new battery backup, generator system, to be located inside the existing parking garage. Resubmittal on 7 5 17 to relocate generator outside garage building. Client: Authority Housing | Permit type: Electrical | Permit status: Iss | Current use: Parking garage, existing | Permit id: Pmt2017-02398 | |||||
SCORE 100 717 17th St Boulder Co Installation of a 3. 705 kw grid tied flush mount pv system on the roof of a single family detached dwelling in two arrays. Client: Developmen Brown | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 11, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-02969 | |||||
SCORE 100 891 12th St Boulder Co Installation of a 4. 32 kw grid tied flush mount pv system in one array on the flat roof section of the se wing of a multifamily building. Client: Range Front | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 31, 2017 | Current use: Multifamily dwellings, existing | Permit id: Pmt2017-03292 | |||||
SCORE 100 2985 E Aurora Av Boulder Co Installation of a new, ballasted, 190. 08 kw solar photovoltaic system. Installation per engineerfoots specifications. Client: Shot Crack | Permit type: Photovoltaic | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2017-03576 | |||||
SCORE 100 603 Dewey Av Boulder Co Installation of a new, flush-mounted, grid-tied, 5. 52 kw photovoltaic system on an existing single-family dwelling. Installation per independent power systems engineerfoots specifications. No structural reinforcement proposed. Approval is for principle structure only. Client: Russell Forrest | Permit type: Photovoltaic | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-04280 | |||||
SCORE 100 Parcel: 43042 0001 | |||||
SCORE 100 Parcel: 42029 0012 | |||||
SCORE 100 Parcel: 530 0006 | |||||
SCORE 100 Parcel: 81051 0094 | |||||
SCORE 100 Parcel: 42024 0012 | |||||
SCORE 100 Parcel: 62001 0017 | |||||
SCORE 100 Parcel: 64019 0006 | |||||
SCORE 100 Parcel: 62024 0017 | |||||
SCORE 100 Parcel: 53034a0011 | |||||
SCORE 100 Client: Debarshi Nandy | Client Address: 16 Green Lane Lexington Ma | |||||
SCORE 100 Client: John Sterman | Client Address: 11 Bloomfield Street Lexington Ma | |||||
SCORE 100 Client: Nagaraj Setty Holalkere | Client Address: 27 Stimson Avenue Lexington Ma | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: October 12, 2009 | Permit id: Bp-09-1047 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: October 7, 2010 | Permit id: Bp-10-1602 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: July 2, 2015 | Permit id: Bp-10-1259 | |||||
SCORE 100 Date: May 20, 2009 Contractor: Independent Power Systems Permit type: Solar electrical system | Permit status: Close | Completion date: July 30, 2009 | Permit id: Bp-09-0599 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: October 2, 2009 | Permit id: Bp-09-0882 | |||||
SCORE 100 3909 Pebble Beach Drive Longmont Co Solar pv array 6. 44kw flush roof mounted, grid tied on residence Permit type: Solar electrical system | Permit status: Permit closed | Completion date: December 3, 2010 | Permit id: Bp-10-2046 | |||||
SCORE 100 Date: October 21, 2009 Contractor: Independent Power Systems Permit type: Solar electrical system | Permit status: Close | Completion date: December 15, 2009 | Permit id: Bp-09-1560 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: November 12, 2009 | Permit id: Bp-09-1447 | |||||
SCORE 100 Permit type: Generator | Permit status: Permit complete | Completion date: September 17, 2010 | Permit id: Bp-10-1142 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: March 1, 2010 | Permit id: Bp-10-0110 | |||||
SCORE 100 5376 Gunbarrel Circle Longmont Co Solar pv system 4. 515kw flush roof mounted, grid tied on residence Permit type: Solar electrical system | Permit status: Close | Completion date: February 16, 2010 | Permit id: Bp-09-1616 | |||||
SCORE 100 Date: May 17, 2017 Contractor: Independent Power Systems Permit type: Residential roof mounted solar electrical system | Permit status: Permit issued | Permit id: Bp-17-0957 | |||||
SCORE 100 Permit type: Residential roof mounted solar electrical system | Permit status: Permit complete | Completion date: May 22, 2017 | Permit id: Bp-17-0522 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: April 18, 2017 | Permit id: Bp-17-0147 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: December 15, 2009 | Permit id: Bp-09-1560 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: November 12, 2009 | Permit id: Bp-09-1447 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: March 1, 2010 | Permit id: Bp-10-0110 | |||||
SCORE 100 Permit type: Electrical service change | Permit status: Withdrawn | Permit id: Bp-10-0998 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: August 4, 2010 | Permit id: Bp-10-1000 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: August 25, 2010 | Permit id: Bp-10-1106 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: September 1, 2010 | Permit id: Bp-10-1116 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: March 23, 2011 | Permit id: Bp-10-2325 | |||||
SCORE 100 Permit type: Electrical service change | Permit status: Permit closed | Completion date: March 28, 2011 | Permit id: Bp-11-0298 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: July 29, 2011 | Permit id: Bp-11-0782 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: September 2, 2011 | Permit id: Bp-11-0986 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: August 25, 2011 | Permit id: Bp-11-1268 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: January 6, 2012 | Permit id: Bp-11-1933 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: May 4, 2012 | Permit id: Bp-12-0531 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit issued | Expiration date: January 23, 2013 | Permit id: Bp-12-1271 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: December 27, 2012 | Permit id: Bp-12-1286 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: February 6, 2013 | Permit id: Bp-12-2021 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: January 10, 2013 | Permit id: Bp-12-2084 | |||||
SCORE 100 3645 Plateau Road Longmont Co Additional 2. 76 kw solar pv system - flush mounted, grid tied to 15. 64 kw (bp-12-2084) Permit type: Solar electrical system | Permit status: Permit complete | Completion date: January 10, 2013 | Permit id: Bp-12-2205 | |||||
SCORE 100 Permit type: Commercial electric | Permit status: Permit complete | Completion date: August 13, 2014 | Permit id: Bp-13-1833 | |||||
SCORE 100 Permit type: Electrical service change | Permit status: Permit complete | Completion date: January 10, 2013 | Permit id: Bp-13-0025 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: March 1, 2013 | Permit id: Bp-13-0131 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: May 8, 2013 | Permit id: Bp-13-0466 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: July 11, 2013 | Permit id: Bp-13-0879 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: August 30, 2013 | Permit id: Bp-13-1015 | |||||
SCORE 100 55 Magnolia Drive Nederland Co Solar pv system 8. 502kw flush roof mounted, grid tied on barn (bp-13-2019) Permit type: Solar electrical system | Permit status: Permit complete | Completion date: March 6, 2014 | Permit id: Bp-13-1112 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: October 8, 2014 | Permit id: Bp-14-1599 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: December 16, 2014 | Permit id: Bp-14-1663 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: December 30, 2014 | Permit id: Bp-14-2125 | |||||
SCORE 100 3197 Nelson Road Longmont Co 17. 004kw solar pv system ground mounted with battery backup (sprw-15-0018) including 14 kw generator use for charging batteries Permit type: Solar electrical system | Permit status: Permit complete | Completion date: July 14, 2015 | Permit id: Bp-15-0629 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: January 19, 2016 | Permit id: Bp-15-1695 | |||||
SCORE 100 Permit type: Generator | Permit status: Permit complete | Completion date: October 21, 2015 | Permit id: Bp-15-1916 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit complete | Completion date: January 26, 2016 | Permit id: Bp-15-1779 | |||||
SCORE 100 Permit type: Generator | Permit status: Permit complete | Completion date: December 30, 2015 | Permit id: Bp-15-1983 | |||||
SCORE 100 16724 Indiana Gulch Road Jamestown Co Solar pv system 5. 232 kw ground mounted, off grid system (sprw-15-0046) Permit type: Solar electrical system | Permit status: Permit complete | Completion date: December 30, 2015 | Permit id: Bp-15-2478 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit issued | Permit id: Bp-16-0108 | |||||
SCORE 100 Permit type: Electrical service change | Permit status: Permit complete | Completion date: July 13, 2016 | Permit id: Bp-16-0849 | |||||
SCORE 100 7197 Mount Meeker Road Longmont Co Relocate electric meter from inside house to outside on the north side of house Permit type: Electrical service change | Permit status: Complete | Completion date: October 12, 2009 | Permit id: Bp-09-1371 | |||||
SCORE 100 Date: May 26, 2017 Contractor: Independent Power Systems Permit type: Residential roof mounted solar electrical system | Permit status: Permit issued | Permit id: Bp-17-1051 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: July 30, 2009 | Permit id: Bp-09-0599 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: October 2, 2009 | Permit id: Bp-09-0882 |