SCORE 100 Installation of a flush mount, grid-tied 6. 54kw photovoltaic system. Arary to rmain belwo ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: October 19, 2012 Contractor: Independent Power Systems Client: Michael Vincent,Jennifer Vincent | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 7, 2012 | Current use: Single family d | |||||
SCORE 100 Installation of a flush mount, grid-tied 6. 54kw photovoltaic system. Arary to rmain belwo ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Michael Vincent | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 7, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05093 |