Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Entire structure demolition of a sfd as approved under his2011-00159 -- temporary electric power for demolition. Date: April 10, 2012 Contractor: Haul Away Recycling Inc Client: Mark Hesse,Julie Hesse | Applicant: Haul Away Recycling, Inc. | Permit type: Electrical, demoliti | Permit status: Cmp | Completion date: November 2, 2012 | Current use: Single family d | |||||
SCORE 100 Cut off gas service at main. Date: May 17, 2012 Contractor: Xcel Energy Client: Mark Hesse,Julie Hesse | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Two-story sfd, five bedrooms, 3. 5. Bathrooms, access variance (see adr2007-00099) 4007 sf finished, 971 sf unfinished basement, attached one-car garage 316sf, 2 sf in decks, patios & porches. Includes radiant geo-thermal heat system -- 10kw solar system by separate permit. Client: Mark Hesse,Julie Hesse | Applicant: Hughes Construction Co | Permit type: Building, electrical | Permit status: Co | Current use: Single family d | |||||
SCORE 99 Upgrade existing meter to 1inch meter pit. Replace sewer service up to back-of-curb. (fees and meter on pmt2012-02828) Date: October 16, 2012 Contractor: Rembrandt Excavating Inc Client: Mark Hesse,Julie Hesse | Applicant: Rembrandt Excavating, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 New 1 sf shed in rear yard of existing residence under construction. Electrical for overhead light and new 1 amp subpanel. Client: Mark Hesse,Julie Hesse | Applicant: Hughes Construction Co | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 10, 2014 | Current use: Single family d | |||||
SCORE 100 Installation of 9. 81kw, rooftop, grid-tied, flushmounted, solar energy system on residence with no portion of the panel array extending above the existing ridgeline. Date: December 13, 2012 Contractor: Independent Power Systems Client: Mark Hesse,Julie Hesse | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 31, 2014 | Current use: Single family d | |||||
SCORE 100 Renew gas main, road and sidewalk cut, open trench to customer property Date: December 26, 2012 Contractor: Xcel Energy Client: Mark Hesse,Julie Hesse | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Replace 4inch sewer service from tap to property Date: February 8, 2013 Contractor: Ez Excavating Inc Client: Mark Hesse,Julie Hesse | Applicant: E-Z Excavating, Inc | Permit type: Wastewater, right-of | Permit status: Iss | |||||
SCORE 95 Install new drive cut ramp access, r&r 30foot of curb & gutter, r&r 15foot of sidewalk see adr2007-00099 for access approval and associated building permit pmt2012-02828 Date: June 6, 2013 Contractor: Norris Concrete Contractors Llc Client: Mark Hesse,Julie Hesse | Applicant: Norris Concrete Contractors Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 New 6foot high cedar fence that is 70foot in length. Date: June 13, 2014 Contractor: Boulder Fence Company Client: Mark Hesse,Julie Hesse | Applicant: Boulder Fence Company | Permit type: Fence | Permit status: Iss | Current use: Single family d | |||||
SCORE 95 Replace 4inch sewer service from tap to property Date: February 8, 2013 Contractor: E Z Excavating Inc Client: Mark Hesse | Permit type: Wastewater, right-of-way | Permit status: Iss | Permit id: Pmt2013-00553 | |||||
SCORE 95 New 6foot high cedar fence that is 70foot in length. Client: Mark Hesse | Permit type: Fence | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-02775 | |||||
SCORE 99 Entire structure demolition of a sfd as approved under his2011-00159 -- temporary electric power for demolition. Date: April 10, 2012 Contractor: Haul Away Recycling, Inc Client: Mark Hesse | Permit type: Electrical, demolition | Permit status: Cmp | Completion date: November 2, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-01665 | |||||
Cut off gas service at main. Date: May 17, 2012 Client: Mark Hesse | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-02261 | |||||
SCORE 100 Two-story sfd, five bedrooms, 3. 5. Bathrooms, access variance (see adr2007-00099) 4007 sf finished, 971 sf unfinished basement, attached one-car garage 316sf, 2 sf in decks, patios & porches. Includes radiant geo-thermal heat system -- 10kw solar system by separate permit. Client: Mark Hesse | Permit type: Building, electrical, mechanical, plumbing, water, wastewater, siding, roofing | Permit status: Co | Current use: Single family detached dwelling, new | Permit id: Pmt2012-02828 | |||||
SCORE 95 Upgrade existing meter to 1inch meter pit. Replace sewer service up to back-of-curb. (fees and meter on pmt2012-02828) Date: October 16, 2012 Contractor: Rembrandt Excavating, Inc Client: Mark Hesse | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-05001 | |||||
SCORE 100 New 1 sf shed in rear yard of existing residence under construction. Electrical for overhead light and new 1 amp subpanel. Client: Mark Hesse | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 10, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05305 | |||||
SCORE 100 Installation of 9. 81kw, rooftop, grid-tied, flushmounted, solar energy system on residence with no portion of the panel array extending above the existing ridgeline. Client: Mark Hesse | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 31, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05965 | |||||
Renew gas main, road and sidewalk cut, open trench to customer property Date: December 26, 2012 Client: Mark Hesse | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-06043 |