SCORE 100 1 S 60th St Philadelphia Pa 191393036 Repair rear wall and roof as indicated in violation # 374739. Permit application in response to unsafe violations. To comply violation, completed work is to be inspected and approved as an appropriate repair to each violation. Engineers report submitted. Licensed contractor to assume responsibility of work. No other work this permit. Separate permits required for renovation. Date: April 16, 2013 Contractor: Melrose Group Inc Permit type: Alteration permit | Permit status: Completed | Completion date: June 28, 2014 | Permit id: 464016 | |||||
SCORE 100 1454 N 62nd St Philadelphia Pa 191513801 Interior alterations to a single family dwelling. Applicant agrees to limit the construction to comply with e-z permit standards for interior alterations dated feb, 2007. Any deviations from this standard will resulting the revocation of this permit and the imposition of further penalties. Date: April 21, 2010 Contractor: Melrose Group Inc Client: Wiggins Laverne | Permit type: Alteration permit | Permit status: Completed | Completion date: June 16, 2010 | Permit id: 274061 | |||||
SCORE 100 7121 Dungan Rd Philadelphia Pa 191110000 Ez permit,kitchen roof,window replacement,bathroom upgrade,patch drywall Date: October 15, 2009 Contractor: Melrose Group Inc Client: Stuanku Ana | Permit type: Alteration permit | Permit status: Completed | Completion date: April 8, 2010 | Permit id: 242663 | |||||
SCORE 100 Date: August 15, 2008 Contractor: Melrose Group Inc Client: W P R E Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: January 13, 2015 | Permit id: 169380 | |||||
SCORE 100 423 Howell St Philadelphia Pa 191200000 New wallboard in kitchen, bathroom. 6 sq. Ft new roof. 12 new replacement windows. Date: January 4, 2010 Contractor: Melrose Group Inc Client: Torres Richard L | Permit type: Alteration permit | Permit status: Completed | Completion date: June 22, 2010 | Permit id: 255614 | |||||
SCORE 100 Date: April 9, 2010 Contractor: Melrose Group Inc Client: Mitchell Francis | Permit type: Alteration permit | Permit status: Completed | Completion date: November 14, 2011 | Permit id: 213244 | |||||
SCORE 100 3909 Melon St Philadelphia Pa 191041809 Repair csu violations to comply case # 166083 additional permits required: plumbing, electrical warm air and an additional permit to cover the rehab of this property. Date: August 15, 2008 Contractor: Melrose Group Inc Client: W P R E Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: July 14, 2015 | Permit id: 169381 | |||||
SCORE 100 5236 Oakland St Philadelphia Pa 191241814 Interior renovation new drywall, windows,roof,tile,insulation no structural changes. Date: June 29, 2011 Contractor: Melrose Group Inc Client: Carr Darren C | Permit type: Alteration permit | Permit status: Completed | Completion date: December 16, 2011 | Permit id: 350322 | |||||
SCORE 100 2704 N 5th St Philadelphia Pa 191332701 To comply with e-z alterations permit. New drop ceiling on 1st floor. 5 8 type x gwb,where required. And stucco. Date: August 29, 2007 Contractor: Melrose Group Inc Client: Hispanic Association Of C | Permit type: Alteration permit | Permit status: Completed | Completion date: June 27, 2008 | Permit id: 99551 | |||||
SCORE 100 2215 Walnut St Philadelphia Pa 191034312 Asbestos abatement removal required prior to the commencement of any work interior alterations per plans approved by the philadelphia historical commission to create a total of six (6) dwelling units; building is to be fully sprinklered. Separate permits required for fire suppression system and any mechanical, electrical or plumbing work. Date: January 3, 2013 Contractor: Melrose Group Inc Permit type: Alteration permit | Permit status: Completed | Completion date: August 8, 2013 | Permit id: 431963 | |||||
SCORE 100 4223 Stirling St Philadelphia Pa 191353111 Interior renovation no structural changes. New drywall,bthrm, insulation,roof,window,interior clean out. Date: September 13, 2011 Contractor: Melrose Group Inc Client: Quiles Fernando Quiles Itchell | Permit type: Alteration permit | Permit status: Completed | Completion date: February 14, 2012 | Permit id: 362679 | |||||
SCORE 100 7766 Woodbine Ave Philadelphia Pa 191512723 Interior clean out new kitchen,windows,roof,bathrm. And drywall no structual changes. Date: April 13, 2012 Contractor: Melrose Group Inc Client: Allen Danita R | Permit type: Alteration permit | Permit status: Completed | Completion date: September 25, 2012 | Permit id: 398979 | |||||
SCORE 100 1309 Spruce St Philadelphia Pa 191075601 For the erection of a four (4) story structure to include a type b dwelling unit at ground floor level. Separate permits to be required for electrical, plumbing, mechanical, and fire suppression system installation. Date: October 8, 2014 Contractor: Melrose Group Inc Client: Wp Spruce Jg Llc | Permit type: New construction permit | Permit status: Completed | Completion date: September 23, 2015 | Permit id: 546568 | |||||
SCORE 100 4418 Saint Davids St Philadelphia Pa 191271333 Complete renovations including structural modifications to an existing three story structure. All work shall conform to the approved plans. Date: March 21, 2007 Contractor: Melrose Group Inc Client: Pagana Ashley Pagana Patrick | Permit type: Alteration permit | Permit status: Completed | Completion date: June 8, 2007 | Permit id: 62110 | |||||
SCORE 100 971 Wakeling St Philadelphia Pa 191242422 Ez permit,kitchen roof,window replacement,bathroom upgrade,patch drywall. Date: October 15, 2009 Contractor: Melrose Group Inc Client: Mangum Larue S | Permit type: Alteration permit | Permit status: Completed | Completion date: January 19, 2010 | Permit id: 242642 | |||||
SCORE 100 1138 Wilder St Philadelphia Pa 191475607 Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated feb. 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties. Date: April 4, 2012 Contractor: Melrose Group Inc Client: Uran Michael | Permit type: Alteration permit | Permit status: Completed | Completion date: July 31, 2012 | Permit id: 397152 | |||||
SCORE 100 2217 Catharine St Philadelphia Pa 191461703 Clean out house new interior framing,windows roof,drywall and trim. Elec,plmbng,hvac will pull seperate permits. Date: May 17, 2012 Contractor: Melrose Group Inc Client: Greenstein Ariel Dalin Patrick M | Permit type: Alteration permit | Permit status: Completed | Completion date: March 4, 2013 | Permit id: 405191 | |||||
SCORE 100 17 Catharine St Philadelphia Pa 191461924 Interior exterior alterations to existing single family, associated alterations to remove portion of rear exterior walls and sheathing, windows, doors,construct new addition at 2nd story and 3 story porition at rear, new rear exterior walls, new roof deck and pilot house stairs enclosure. Certified by designer of record alden blyth Date: March 27, 2015 Contractor: Melrose Group Inc Client: King Christopher Monteodorisio Kristen | Permit type: Addition permit | Permit status: Completed | Completion date: February 18, 2016 | Permit id: 593073 | |||||
SCORE 100 6 N 38th St Philadelphia Pa 191041867 Permit to make repairs as outlined within structural report prepared by knudsen engineering,inc dated july 13,2012. Separate permit required for interior renovations once structure is deemed safe by the department. Date: July 23, 2012 Contractor: Melrose Group Inc Client: Wpre Iv Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 11, 2014 | Permit id: 417823 | |||||
SCORE 100 925 S 23rd St Philadelphia Pa 191462538 Separate permit required for complete demolition. Underpinning required to be performed first. For the erection of a fully sprinkled attached two family dwelling with roof deck and roof deck access pilot house per submitted plan. Separate permit required for electric; plumbing; mechanical and sprinkler. Licensed city of philadelphia contractor performing the work required. Date: December 13, 2013 Contractor: Melrose Group Inc Client: Jib Partners Lp | Permit type: New construction permit | Permit status: Completed | Completion date: September 14, 2015 | Permit id: 509268 | |||||
SCORE 100 921 S 23rd St Philadelphia Pa 191462538 Erection of a new 3 story 2 family dwelling as per plans. See a p 173726 for plans. Date: September 30, 2008 Contractor: Melrose Group Inc Permit type: New construction permit | Permit status: Completed | Completion date: June 10, 2009 | Permit id: 178548 | |||||
SCORE 100 601 S 55th St Philadelphia Pa 191432503 Amend permit no. 36385 to remove sprinkler requirement as per variance. Date: February 7, 2007 Contractor: Melrose Group Inc Client: Neighborhood Restorations | Permit type: Administrative permit | Permit status: Completed | Completion date: November 8, 2007 | Permit id: 53634 | |||||
SCORE 100 1831 N 57th St Philadelphia Pa 191313410 Interior renovation new roof,windows,kitchen bathroom,drywall. No structural changes,replace a few floor joist. Date: February 26, 2013 Contractor: Melrose Group Inc Client: Hightower Isabell | Permit type: Alteration permit | Permit status: Completed | Completion date: August 28, 2013 | Permit id: 455690 | |||||
SCORE 100 3005 S 74th St Philadelphia Pa 191532709 Interior renovations applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated feb. 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties. Date: September 16, 2010 Contractor: Melrose Group Inc Client: Empsey Caryn | Permit type: Alteration permit | Permit status: Completed | Completion date: December 1, 2010 | Permit id: 301448 | |||||
SCORE 100 Date: September 16, 2010 Contractor: Melrose Group Inc Client: Empsey Caryn | Permit type: Alteration permit | Permit status: Completed | Completion date: December 1, 2010 | Permit id: 301450 | |||||
SCORE 100 2826 Diamond St Philadelphia Pa 191211208 Interior dry work, insulation and paint. No structural work. Interior fit-out. Date: March 14, 2007 Contractor: Melrose Group Inc Client: Project H.O.M.E. Community Development | Permit type: Alteration permit | Permit status: Completed | Completion date: September 15, 2009 | Permit id: 59869 | |||||
SCORE 100 N 41st St Philadelphia Pa 191042201 For selective interior demolition and for prescriptive alterations to updated an existing office space. Separate permits required for mechanical, electrical, plumbing, and fire suppression systems. Date: July 28, 2016 Contractor: Melrose Group Inc Permit type: Alteration permit | Permit status: Completed | Completion date: January 27, 2017 | Permit id: 695225 | |||||
SCORE 100 Date: July 30, 2008 Contractor: Melrose Group Inc Client: Moran James J Iii Moran Nicole E | Permit type: Demolition permit | Permit status: Completed | Completion date: December 18, 2008 | Permit id: 168143 | |||||
SCORE 100 1921 Manning St Philadelphia Pa 191035728 Interior demolition non-bearing partitions only. No window or door removal Date: February 3, 2015 Contractor: Melrose Group Inc Client: Solomon Richard Solomon Donna | Permit type: Demolition permit | Permit status: Completed | Completion date: June 5, 2015 | Permit id: 588185 | |||||
SCORE 100 976 Carver St Philadelphia Pa 191241038 << Date: December 15, 2010 Contractor: Melrose Group Inc Client: Martinez-Vazquez Ada | Permit type: Alteration permit | Permit status: Completed | Completion date: April 12, 2011 | Permit id: 316558 | |||||
SCORE 100 1923 Pemberton St Philadelphia Pa 191461825 Addition to an existing attached single family dwelling with a roof deck. Interior - exterior alterations throughout. Separate permits required for electric; plumbing and mechanical work. Date: April 18, 2013 Contractor: Melrose Group Inc Client: Shapiro William Marc Wexler Jane | Permit type: Addition permit | Permit status: Completed | Completion date: April 21, 2014 | Permit id: 461674 | |||||
SCORE 100 2653 E Monmouth St Philadelphia Pa 191344831 For renovations of an existing residential structure to include repairs to deteriorated wall and roof systems. No change to the height or area of the building. All work shall comply with the approved plans. This activity shall be performed by contractor & sub-contractors licensed by the city of philadelphia. Date: December 1, 2011 Contractor: Melrose Group Inc Client: Campbell James | Permit type: Alteration permit | Permit status: Completed | Completion date: April 11, 2012 | Permit id: 370655 | |||||
SCORE 100 N 41st St Philadelphia Pa 191042201 Interior alterations 5th floor portion space, new partitions, fit out, finishes, furnishings as per submitted plans. Additional permits req: electrical, plumbing, hvac, sprinklers. Remaining 5th floor area requires future fit out Date: April 14, 2015 Contractor: Melrose Group Inc Permit type: Alteration permit | Permit status: Completed | Completion date: May 29, 2016 | Permit id: 600541 | |||||
SCORE 100 1 Mcclellan St Philadelphia Pa 191481902 Selective demolition and structural repairs stabilization under the direction of a registered architect. Work to include removal replacement of damaged structural elements, roofing, including rafters and decking, stairs masonry repairs anf floors. All work to be certified upon completion by the architect of record. Date: December 14, 2009 Contractor: Melrose Group Inc Client: Canfield Patricia L Hicks Jason | Permit type: Alteration permit | Permit status: Completed | Completion date: April 29, 2010 | Permit id: 253222 | |||||
SCORE 100 2122 Locust St Philadelphia Pa 191034803 For the reconstruction of an existing structure due to damage caused by fire. Work to include structural framing work, building envelope work, new roof, new exterior walls, and all other work as per approved plans historical commission approval. Separate permit required for fit-out and certificate of occupancy asbestos abatement required prior to commencement of work a covered walkway or sidewalk closure shall be required within 12. 5 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required Date: March 15, 2017 Contractor: Melrose Group Inc Permit type: New construction permit | Permit status: Active | Completion date: July 25, 2017 | Permit id: 733881 | |||||
SCORE 100 1553 E Luzerne St Philadelphia Pa 191245349 Interior alterations. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated feb. 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties. Date: September 30, 2010 Contractor: Melrose Group Inc Client: Castro Yadira Castro Luis | Permit type: Alteration permit | Permit status: Completed | Completion date: March 17, 2011 | Permit id: 303856 | |||||
SCORE 100 Date: February 24, 2009 Contractor: Melrose Group Inc Client: Moiyallah Amelia S | Permit type: Alteration permit | Permit status: Completed | Completion date: January 13, 2015 | Permit id: 202347 | |||||
SCORE 100 5928 Reach St Philadelphia Pa 191201115 Interior renovations including bathroom, kitchen laminate wallboard thru out with some selective interior demolition of ceillings and walls. New windows and new roof. Date: May 3, 2011 Contractor: Melrose Group Inc Client: Aponte Maribel | Permit type: Alteration permit | Permit status: Completed | Completion date: December 16, 2011 | Permit id: 338774 | |||||
SCORE 100 2635 E Monmouth St Philadelphia Pa 191344831 To amend permit#370655 to reflect correct address of 2635 e monmouth st the previously approved plans for permit #370655 shall reflect the approved actitiy at the corrected address. Date: January 24, 2012 Contractor: Melrose Group Inc Client: Ferino Andrew | Permit type: Administrative permit | Permit status: Completed | Completion date: April 11, 2012 | Permit id: 384634 | |||||
SCORE 100 1809 Mascher St Philadelphia Pa 191222413 << Date: December 22, 2010 Contractor: Melrose Group Inc Client: Romano John Jr | Permit type: Alteration permit | Permit status: Completed | Completion date: April 12, 2011 | Permit id: 317745 | |||||
SCORE 100 Date: November 8, 2016 Contractor: Melrose Group Inc Client: Mt Vernon Manor Ii Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 8, 2016 | Permit id: 735020 | |||||
SCORE 100 Date: July 21, 2010 Contractor: Melrose Group Inc Client: Wpre Ii Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: January 13, 2015 | Permit id: 292168 | |||||
SCORE 100 Date: June 29, 2009 Contractor: Melrose Group Inc Client: Moiyallah Amelia S | Permit type: Alteration permit | Permit status: Completed | Completion date: September 15, 2009 | Permit id: 219692 | |||||
SCORE 100 3431 Mount Vernon St Philadelphia Pa 191041912 New interior partitions, flooring, stairs, windows and doors, new electrical and mechanical systems no change in height or area to comply with easy permit regulations Date: October 6, 2011 Contractor: Melrose Group Inc Client: Wpre Iii L P | Permit type: Alteration permit | Permit status: Completed | Completion date: April 25, 2012 | Permit id: 367256 | |||||
SCORE 100 Date: December 3, 2007 Contractor: Melrose Group Inc Permit type: Alteration permit | Permit status: Completed | Completion date: June 5, 2014 | Permit id: 82580 | |||||
SCORE 100 259 S 60th St Philadelphia Pa 191393844 Level iii interior alterations to create a new mixed-use structure with an accessible bathroom, new interior partitions, windows & doors. Building to be fully sprinklered. Separate permits required for plumbing, hvac, electrical and fire suppression systems. All asbestos to be treated removed prior to commencement of work. Date: August 23, 2013 Contractor: Melrose Group Inc Permit type: Alteration permit | Permit status: Completed | Completion date: June 25, 2014 | Permit id: 456017 | |||||
SCORE 100 Date: August 18, 2010 Contractor: Melrose Group Inc Client: Wpre Lp Ii | Permit type: Alteration permit | Permit status: Completed | Completion date: January 13, 2015 | Permit id: 296896 | |||||
SCORE 100 2049 Catharine St Philadelphia Pa 191461328 Erect addition on existing two story including partial third story addition as shown on zoning plan. Erect pilot house. New framing, roofing, stairs and interior partitions. New windows and doors. Erect 6 high chain link fence at side. Date: March 27, 2017 Contractor: Melrose Group Inc Client: Solomon Pascal Property M | Permit type: Addition permit | Permit status: Completed | Completion date: October 20, 2017 | Permit id: 763464 | |||||
SCORE 100 532 S Salford St Philadelphia Pa 191431143 New interior partitions, flooring, stairs, windows and doors, new electrical and mechanical systems no change in height or area easy alterations regulations Date: October 6, 2011 Contractor: Melrose Group Inc Client: Wpre Iii L P | Permit type: Alteration permit | Permit status: Completed | Completion date: June 23, 2012 | Permit id: 367257 | |||||
SCORE 100 1535 N Alden St Philadelphia Pa 191313814 New interior partitions, flooring, stairs, windows and doors, new electrical and mechanical systems no change in height or area ez alterations regulations Date: October 6, 2011 Contractor: Melrose Group Inc Client: Wpre Iii L P | Permit type: Alteration permit | Permit status: Completed | Completion date: June 27, 2012 | Permit id: 367238 | |||||
SCORE 100 Date: June 1, 2007 Contractor: Melrose Group Inc Client: Neighborhood Restorations | Permit type: Alteration permit | Permit status: Completed | Completion date: November 9, 2007 | Permit id: 79258 | |||||
SCORE 100 Date: December 23, 2010 Contractor: Melrose Group Inc Client: Wpre Iii L P | Permit type: Alteration permit | Permit status: Completed | Completion date: January 13, 2015 | Permit id: 318104 | |||||
SCORE 100 1536 Catharine St Philadelphia Pa 191462139 Asbestos removal abatement required prior to the commencement of any work. For the erection of a one story addition on the third floor level with the erection of a roof deck accessed by a pilot house. Structure for the use of a vacant commercial space on the first floor level (separate use permit and certificate of occupancy required) and a two family dwelling from the second through third floor level. All work to be done per approved plans. If field conditions vary contact structural engineer prior to the start of any work. Fire supression system to be installed in the residential portion. Separate permits required for mechanical, electrical, plumbing and fire supression. Date: January 23, 2015 Contractor: Melrose Group Inc Permit type: Addition permit | Permit status: Completed | Completion date: May 3, 2016 | Permit id: 574767 | |||||
SCORE 100 Date: June 1, 2007 Contractor: Melrose Group Inc Client: Neighborhood Restorations | Permit type: Alteration permit | Permit status: Completed | Completion date: November 9, 2007 | Permit id: 79257 | |||||
SCORE 100 2919 W Girard Ave Philadelphia Pa 191301119 Remove 1 story section at 1st floor rear. Erect new 256sf, 1 story section with bay at 3rd floor rear above existing 2nd floor. New electrical and mechanical systems. New roofing, stairs, interior partitions windows and doors. Date: November 2, 2012 Contractor: Melrose Group Inc Client: Solomon Pascal Property M | Permit type: Alteration permit | Permit status: Completed | Completion date: June 5, 2013 | Permit id: 426692 | |||||
SCORE 100 3821 Aspen St Philadelphia Pa 191041637 Clean out of property, removal of plaster from walls, removal of non-bearing partitions. Date: July 19, 2010 Contractor: Melrose Group Inc Client: Wpre Ii Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: February 24, 2011 | Permit id: 291671 | |||||
SCORE 100 Date: July 21, 2010 Contractor: Melrose Group Inc Client: Wpre Lp Ii | Permit type: Alteration permit | Permit status: Completed | Completion date: January 13, 2015 | Permit id: 292175 | |||||
SCORE 100 3216 Byberry Rd Philadelphia Pa 191541816 Cleanout of house, new roof, siding, kitchen bathroom renovation, drywall throughout w no new partitions Date: June 11, 2010 Contractor: Melrose Group Inc Client: Elez Ralph E | Permit type: Alteration permit | Permit status: Completed | Completion date: September 27, 2010 | Permit id: 284693 | |||||
SCORE 100 7342 Brookhaven Rd Philadelphia Pa 191512205 Interior alterations to a single family dwelling. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated feb. 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties. Interior renovation no structual changes. New bthrm, kit,roof, window other trades will pull there own. Date: March 25, 2011 Contractor: Melrose Group Inc Client: Walton Joyce | Permit type: Alteration permit | Permit status: Completed | Completion date: October 12, 2011 | Permit id: 331761 | |||||
SCORE 100 5237 Addison St Philadelphia Pa 191431516 Exterior alterations re-open front porch, interior demo, new stairs, partitions . Stairs and roof Date: September 19, 2011 Contractor: Melrose Group Inc Client: Wpre Iii L P | Permit type: Alteration permit | Permit status: Completed | Completion date: September 24, 2012 | Permit id: 353451 | |||||
SCORE 100 1115 Atwood Rd Philadelphia Pa 191513108 Interior renovations thru out, new bathroom, kitchen, laminate wallboard with limited ceilling demolition. No new structural changes or changes to floor layout. New windows, and new roof. Date: May 3, 2011 Contractor: Melrose Group Inc Client: Watson Denise | Permit type: Alteration permit | Permit status: Completed | Completion date: December 20, 2011 | Permit id: 338765 |