Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: May 26, 2016 Client: Mt Vernon Manor Ii Lp | Permit status: Active | Permit id: 687390 | |||||
Plumbing permit Date: July 5, 2016 Client: Mt Vernon Manor Ii Lp | Permit status: Active | Permit id: 680649 | |||||
Alteration permit Date: December 7, 2015 Client: Mt Vernon Manor Ii Lp | Permit status: Active | Permit id: 653541 | |||||
Mechanical permit Date: August 3, 2016 Client: Mt Vernon Manor Ii Lp | Permit status: Active | Permit id: 691318 | |||||
Electrical permit Date: February 5, 2016 Client: Mt Vernon Manor Ii Lp | Permit status: Completed | Permit id: 668314 | |||||
Alteration permit Date: December 7, 2015 Client: Mt Vernon Manor Ii Lp | Permit status: Completed | Permit id: 653541 | |||||
Plumbing permit Date: May 20, 2016 Client: Mt Vernon Manor Ii Lp | Permit status: Completed | Permit id: 693216 | |||||
Administrative permit Date: November 8, 2016 Client: Mt Vernon Manor Ii Lp | Permit status: Completed | Permit id: 735020 | |||||
Mechanical permit Date: August 3, 2016 Client: Mt Vernon Manor Ii Lp | Permit status: Completed | Permit id: 691318 | |||||
SCORE 86 3 new 300amp meter socket, branch circuit wiring, outlets, lighting, cable telephone drops, feeders recepts, switches & intercom as per 2008 nec (west district) install fire alarm system complete as per nfpa72 Date: May 26, 2016 Contractor: Aezi Electrical Services Llc Client: Mt Vernon Manor Ii Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 29, 2016 | Permit id: 687390 | |||||
SCORE 86 Alteration: interior plumbing of (18) dwelling units in a 3-story building (bldg. B). The installation will comply with the philadelphia plumbing code, 2004. Fuel gas piping and equipment is not included in this permit (mechanical permit required). Pvc pipe materials are not permited on this project, per code sections p-902. 5, p-1005. 5, & p-1102. 3. Date: July 5, 2016 Contractor: Bjk Mechanical Services Llc Client: Mt Vernon Manor Ii Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 6, 2016 | Permit id: 680649 | |||||
SCORE 100 For the installation of appliances with associated ductwork throughout multi-family dwelling. Applicances to be installed in accordance with manufacturers specifications. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for electrical and plumbing work. Date: August 3, 2016 Contractor: Celso B Bright Client: Mt Vernon Manor Ii Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 29, 2016 | Permit id: 691318 | |||||
Interior exterior alterations, interior demo & renovations to (30) apts(12) apts in building a, (18) apts in building b. First floor units in building b(6) accessible upgrades and new entry ramp, sidwalk replacement within lot, porch and concrete stairs ramp, site imrpovements, all other unit layouts to remain, replace fixtues and finishes in kitchen and bathrooms, replace windows, doors and roofing covering, new exterior stucco and brick facing, facade repairs, exterior perimeter drainage. Any storm water management drains sewer connection work approval is required by others (pwd). No change in use-occupancy, exisitng dwelling units (r-2). Co is attached only to update records. Separate permits required for : hvac, plumbing and electrical work. Date: December 7, 2015 Client: Mt Vernon Manor Ii Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: December 2, 2016 | Permit id: 653541 | |||||
SCORE 100 Replace rain conductor and 2 catch basins (apt bldg)the installation will comply with the philadelphia plumbing code 2004 Date: May 20, 2016 Contractor: Norman Cole Sr, Client: Mt Vernon Manor Ii Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 13, 2016 | Permit id: 693216 | |||||
SCORE 100 Building "a" - alteration: interior plumbing for (12) dwelling units in a 3-story building. (apt bldg). The installation will comply with the philadelphia plumbing code, 2004. Date: July 5, 2016 Contractor: Richards Barrymore Client: Mt Vernon Manor Ii Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 21, 2016 | Permit id: 682129 | |||||
SCORE 100 Tco for building a Date: November 8, 2016 Contractor: Melrose Group Inc Client: Mt Vernon Manor Ii Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 8, 2016 | Permit id: 735020 | |||||
SCORE 86 Temporary line to trailer with 2 meters to be fed from existing 200amp service and be in place for 8 months as per 2008 nec (west district) Date: February 5, 2016 Contractor: Mcnair Electrical And Mechanical Client: Mt Vernon Manor Ii Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 29, 2016 | Permit id: 668314 |