SCORE
68

GEOCONCEPTS ENGINEERING INC

ABOUT GEOCONCEPTS ENGINEERING INC

Geoconcepts Engineering Inc specializes in:

Geoconcepts Engineering Inc offers services:

Geoconcepts Engineering Inc's company name is: Geocapitol Engineering Llc.

Geoconcepts Engineering Inc completed most projects in 2017.

Based on the information received from Washington DC building department, there are 5 building permits associated with Geoconcepts Engineering Inc over the past 2 years .

If you are considering hiring Geoconcepts Engineering Inc for your home renovation project, we recommend using our bidding system to get competitive quotes.

QUALITY


Geoconcepts Engineering Inc has CheckPermit score of 68 which places them above 84% of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY


5 projects completed between 2015 and 2017.
 
An average 2 projects per year.
PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Loading, please wait...
Content
SCORE
68
6 699 Block Of New Jersey Avenue Nw Washington Dc
Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. Sidewalks in the work zone area will be closed for a maximum of 2 hours.
Date:  March 13, 2017

Client: Geoconcepts Engineering, Inc | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: May 12, 2017 | Permit id: Pa198724
SCORE
68
6 699 Block Of New Jersey Avenue Nw Washington Dc
Using hollow stem auger method, we will drill a geotechnical soil boring for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement.
Date:  January 3, 2017

Client: Geoconcepts Engineering, Inc | Permit type: Excavation; boring test pit (single) | Permit status: Assigned | Expiration date: April 30, 2017
SCORE
68
6 699 Block Of New Jersey Avenue Nw Washington Dc
Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement.
Date:  January 3, 2017

Client: Geoconcepts Engineering, Inc | Permit type: Excavation; boring test pit (single) | Permit status: Assigned | Expiration date: April 30, 2017
SCORE
68
6228 Eastern Avenue Ne Washington Dc
Using hollow stem auger method, we will drill nine 4-inch diameter test borings to a depth of 15 feet to evaluate the subsurface conditions in the proposed power line route. Drilling spoils will be containerized in 55-gallon drums. The drums will be removed from the site once chemical analysis is completed. The bore holes will be grouted with a 60: ratio of bentonite powder to cement. The top layer of the backfill will match the terrain in which the boring is located within. The 8 page boring location plan can be found in binder1 with the traffic control plan, as it was necessary for uploading under the file size limit.
Date:  December 18, 2015

Permit type: Excavation; bar & test boring | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa120799
SCORE
68

Permit status: 12 | Expiration date: September 6, 2017 | Permit id: 0
Showing 1 to 5 of 5 rows
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.
BESbswy