Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 68 Using hollow stem auger method, we will drill a geotechnical soil boring for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. ![]() ![]() Client: Geoconcepts Engineering, Inc | Permit type: Excavation; boring test pit (single) | Permit status: Assigned | Expiration date: April 30, 2017 | |||||
SCORE 68 Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. ![]() ![]() Client: Geoconcepts Engineering, Inc | Permit type: Excavation; boring test pit (single) | Permit status: Assigned | Expiration date: April 30, 2017 | |||||
SCORE 68 Excavation; boring test pit (single) ![]() Permit status: 12 | Expiration date: September 6, 2017 | Permit id: 0 | |||||
SCORE 80 Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. Sidewalks in the work zone area will be closed for a maximum of 2 hours. ![]() ![]() Permit status: Permit expired | Expiration date: May 12, 2017 | Permit id: Pa198724 | |||||
SCORE 68 Using hollow stem auger method, we will drill a 6 inch diameter geotechnical soil boring to a depth of feet for subsurface investigation of the proposed pepco project. All spoils will be containerized in 55-gallon drums and removed from site upon the results of environmental classification. Boreholes will be backfilled with a 60: ratio of bentonite powder to cement for paved areas and grouted with 2 pounds of bentonite powder to 1 gallon of water for non-paved areas. Paved areas will also include a concrete plug and an asphalt or concrete surface patch to match the surrounding pavement. Sidewalks in the work zone area will be closed for a maximum of 2 hours. ![]() ![]() Client: Geoconcepts Engineering, Inc | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: May 12, 2017 | Permit id: Pa198724 | |||||
SCORE 86 Other reserved parking ![]() ![]() Permit status: Permit expired | Expiration date: August 25, 2017 | Permit id: Pa10454650 | |||||
SCORE 78 Other reserved parking ![]() ![]() Permit status: Permit expired | Expiration date: August 25, 2017 | Permit id: Pa10454655 | |||||
SCORE 79 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: August 7, 2017 | Permit id: Pa10428552 |