Building Permits at Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
67
Installation of 18 geotechnicial borings at the south corrodon project stage-1-b-site in support of design for the proposed suitland parkway interstate 295 interchange improvement. Borings diameter eight inches by feet deep. The work will take place in different section i-295/anacostia fwy, howard road se, suitland parkway se and mlk jr. Ave se, as per site plans, work plans report, de well construction form and schematic form; this project is for ddot. (dcka-2011-q-0241)
Date:  May 21, 2012
Contractor: Hsa Inc. Hsa Inc

Client: Ddot Ddot | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: January 31, 2013
2012/05/21067Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcHsa Inc. Hsa Inc
SCORE
82
Installation of 18 geotechnicial borings at the south corrodon project stage-1-b-site in support of design for the proposed suitland parkway interstate 295 interchange improvement. Borings diameter eight inches by feet deep. The work will take place in different section i-295 anacostia fwy, howard road se, suitland parkway se and mlk jr. Ave se, as per site plans, work plans report, de well construction form and schematic form; this project is for ddot. (dcka-2011-q-0241)
Date:  May 21, 2012
Contractor: Hsa, Inc. Hsa, Inc

Client: Ddot Ddot | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: January 31, 2013
2012/05/21082Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcHsa, Inc. Hsa, Inc
SCORE
82
Excavation; boring test pit (single)
Contractor: Hsa, Inc. Hsa, Inc

Permit status: 3 | Expiration date: January 31, 2013 | Permit id: 0
082Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcHsa, Inc. Hsa, Inc
SCORE
82
Installation of 18 geotechnicial borings at the south corrodon project stage-1-b-site in support of design for the proposed suitland parkway interstate 295 interchange improvement. Borings diameter eight inches by feet deep. The work will take place in different section i-295 anacostia fwy, howard road se, suitland parkway se and mlk jr. Ave se, as per site plans, work plans report, de well construction form and schematic form; this project is for ddot. (dcka-2011-q-0241)
Contractor: Hsa, Inc. Hsa, Inc

Permit status: Cancel/withdrawn | Expiration date: January 31, 2013 | Permit id: 0
082Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcHsa, Inc. Hsa, Inc
SCORE
79
On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon 1 monitoring well (sac-101). The well is located adjacent to suitland parkway and howard rd se. The monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division a are now complete. Therefore, the wells installed as part of this division are no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry. Monitoring wells will be abandoned following doee regulations. See attached work plan for more details.
Date:  July 18, 2017
Contractor: Siva Balu

Client: Dc Water Carlton Ray Co Christopher Gerber | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: September 29, 2017 | Permit id: Pa219170
2017/07/18079Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcSiva Balu
SCORE
66
Scb will perform 3 borings will extend to the depth of feet and 4 borings to feet unless refusal is encountered at shallower depths. The borings will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. Borings located in potentially contaminated areas will use cased mud-rotary methods. The borings will be performed utilizing a truck-mounted drill rig and will generate an approximately 6-inch diameter annulus. Sampling will be conducted using a 2-inch o. D., split-barrel sampler driven into the soil a distance of 18 or 24 inches by a 140-pound hammer falling inches.
Date:  August 14, 2017
Contractor: Chirs Giese

Permit type: Excavation; boring test pit (each addl) | Permit status: Cancel/withdrawn | Expiration date: November 30, 2017 | Permit id: 0
2017/08/14066Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcChirs Giese
SCORE
82
Excavation; boring test pit (single)
Contractor: Hsa, Inc. Hsa, Inc

Permit status: 3 | Expiration date: January 31, 2013 | Permit id: 0
082Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcHsa, Inc. Hsa, Inc
SCORE
79
Excavation; boring test pit (single)
Date:  July 26, 2017
Contractor: Siva Balu

Permit status: 8 | Expiration date: September 29, 2017 | Permit id: Pa219170
2017/07/26079Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcSiva Balu
SCORE
66
Excavation; boring test pit (each addl)
Contractor: Chirs Giese

Permit status: 3 | Expiration date: November 30, 2017 | Permit id: 0
066Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcChirs Giese
SCORE
82
Installation of 18 geotechnicial borings at the south corrodon project stage-1-b-site in support of design for the proposed suitland parkway interstate 295 interchange improvement. Borings diameter eight inches by feet deep. The work will take place in different section i-295 anacostia fwy, howard road se, suitland parkway se and mlk jr. Ave se, as per site plans, work plans report, de well construction form and schematic form; this project is for ddot. (dcka-2011-q-0241)
Contractor: Hsa, Inc. Hsa, Inc

Permit status: Cancel/withdrawn | Expiration date: January 31, 2013 | Permit id: 0
082Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcHsa, Inc. Hsa, Inc
SCORE
79
On behalf of the district of columbia water and sewer authority (dc water), the dc clean rivers (dccr) project requests the approval to abandon 1 monitoring well (sac-101). The well is located adjacent to suitland parkway and howard rd se. The monitoring well was installed by dccr during the investigation and design phase to provide information regarding subsurface conditions. Construction of the tunnel and near surface structures under division a are now complete. Therefore, the wells installed as part of this division are no longer needed and will be abandoned. The monitoring well will be abandoned by either removing the well casing or perforating the well casing in the screened interval and filling the well with a cement bentonite slurry. Monitoring wells will be abandoned following doee regulations. See attached work plan for more details.
Date:  July 26, 2017

Permit status: Permit expired | Expiration date: September 29, 2017 | Permit id: Pa219170
2017/07/26079Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcJamie Miller, Aecom
SCORE
66
Scb will perform 3 borings will extend to the depth of feet and 4 borings to feet unless refusal is encountered at shallower depths. The borings will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. Borings located in potentially contaminated areas will use cased mud-rotary methods. The borings will be performed utilizing a truck-mounted drill rig and will generate an approximately 6-inch diameter annulus. Sampling will be conducted using a 2-inch o. D., split-barrel sampler driven into the soil a distance of 18 or 24 inches by a 140-pound hammer falling inches.
Contractor: Chirs Giese

Permit status: Cancel/withdrawn | Expiration date: November 30, 2017 | Permit id: 0
066Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcChirs Giese
SCORE
99
Construction staging area
Date:  August 2, 2017
Contractor: E2cr C O Siva Balu

Permit status: Permit expired | Expiration date: September 9, 2017 | Permit id: Pa10454740
2017/08/02099Suitland Parkway Se And Ramp To Howard Road Se Eastbound Washington DcE2cr C O Siva Balu
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.