Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 N a Date: May 23, 2016 Contractor: Marty Lapointe Permit type: Right of way | Permit status: Denied | Completion date: June 30, 2016 | Current use: Right of way | Permit id: Eng2016-00868 | |||||
SCORE 89 Installation of conduit and fiber optics along wakara way and chipeta way. Field contact chris caraway 602-717-4135. Drawings have been approved by john miller. -fibertel applied for the same permit (eng2016-01314). Work was never done on this permit Date: August 9, 2016 Contractor: Marty Lapointe Permit type: Right of way | Permit status: Denied | Completion date: July 15, 2016 | Current use: Right of way | Permit id: Eng2016-00983 | |||||
SCORE 61 Jeff 801-403-8335 remove and replace ramps to comply with ada. Plans attached in permit. Change dates to june 4th through 11th Date: June 8, 2017 Contractor: David Harrison Permit type: Right of way | Permit status: Passed warranty | Completion date: June 11, 2014 | Current use: Right of way | Permit id: Eng2014-00245 | |||||
SCORE 72 Install fiber in park strip for 3 ft to existing building (2 pits) park strip on north side. Date: September 2, 2014 Contractor: Chris Gee Permit type: Right of way | Permit status: Passed warranty | Completion date: July 22, 2014 | Current use: Right of way | Permit id: Eng2014-01099 |