Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 4(kw) solar photovoltaic system will be installed on roof of residence. Date: November 29, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit issued | Expiration date: November 29, 2018 | Current use: Single family / duplex | Permit id: 6632636 | |||||
SCORE 99 125-amp panel replaced with new 125-amp main-breaker panel Date: August 31, 2011 Contractor: Mike Casassa Electric Permit type: Electrical | Permit status: Permit closed | Completion date: October 19, 2011 | Expiration date: August 30, 2012 | Current use: Single family / duplex | Permit id: 6294183 | |||||
SCORE 99 Wiring of kitchen remodel Date: July 11, 2011 Contractor: Mike Casassa Electric Permit type: Electrical | Permit status: Permit closed | Completion date: October 19, 2011 | Expiration date: July 11, 2012 | Current use: Single family / duplex | Permit id: 6288781 |