Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 6-12-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 7. 8 kw solar photovoltaic system on roof of residence. Date: May 30, 2017 Contractor: Pugetsoundsolar Permit type: Electrical | Permit status: Permit closed | Completion date: June 14, 2017 | Expiration date: May 30, 2018 | Current use: Single family / duplex | Permit id: 6599756 |