Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Water heater replacement Date: April 11, 2007 Contractor: Boulder Housing Partners Client: Authority Housing | Applicant: Boulder Housing Partners | Permit type: Mechanical | Permit status: Cmp | Completion date: June 12, 2007 | Current use: Multifamily dwe | |||||
SCORE 98 Water heater replacement Client: Authority Housing | Permit type: Mechanical | Permit status: Cmp | Completion date: June 12, 2007 | Current use: Multifamily dwellings, existing | Permit id: Pmt2007-01284 | |||||
SCORE 65 Removal of an existing tub shower unit, installation of a roll-in shower liner, tile and relocated replacement anti-scald valve. Client: Authority Housing | Applicant: Rdm Construction | Permit type: Building, plumbing | Permit status: Cmp | Completion date: July 31, 2009 | Current use: Single family a | |||||
SCORE 65 Removal of an existing tub shower unit, installation of a roll-in shower liner, tile and relocated replacement anti-scald valve. Client: Authority Housing | Permit type: Building, plumbing | Permit status: Cmp | Completion date: July 31, 2009 | Current use: Single family attached dwelling, remodel | Permit id: Pmt2009-02805 | |||||
SCORE 95 Replacement of three, second story decks, types a, b and c. Client: Authority Housing | Applicant: Palace Construction Co Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 22, 2010 | Current use: Multifamily dwe | |||||
SCORE 68 Installation of six replacement forced-air furnaces in this multi-family building. And six new a c units. (13 seer minimum) (building 8 of the bridegwalk complex) each high efficiency furnace to be 60,0 btu. Units 101, 102, 103, 201, 202 and 203. Electrical work by separate permit. (lasalle mechanical & all green const) Date: September 16, 2011 Contractor: All Green Construction Client: Authority Housing | Applicant: All Green Construction | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 82 Remove existing shingles and re-roof multi-family residence with dimensional shingles. 27 squares, roof pitch represented by contractor to be 6:12. Date: September 28, 2011 Contractor: L H L Contractors Client: Authority Housing | Applicant: L H L Contractors | Permit type: Roofing | Permit status: Cmp | Completion date: February 22, 2012 | Current use: Multifamily dwe | |||||
SCORE 82 Building 8 -- installation of six standard replacement forced-air furnaces in this multi-family building. And six new a c units. (13 seer minimum) (building 8 of the bridgewalk complex) each furnace to be 60,0 btu. Units 101, 102, 103, 201, 202 and 203. Electrical work by separate permit. Date: October 14, 2011 Contractor: Golden Way Mechanical Inc Applicant: Golden Way Mechanical Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 28, 2012 | Current use: Multifamily dwe | |||||
SCORE 79 Building 8 -- bridgewalk complex -- installation of wiring, disconnects and circuit breakers for six a c units on this 6-plex building. Units 101, 102, 103, 201, 202 and 203. Date: October 14, 2011 Contractor: Colorado Mountain Electric Client: Authority Housing | Applicant: Colorado Mountain Electric | Permit type: Electrical | Permit status: Cmp | Completion date: February 22, 2012 | Current use: Multifamily dwe | |||||
SCORE 95 Building 8 -- on an existing multi-family dwelling unit, removal of existing exterior stairway components (railing, treads and risers) -- stringers to remain. Install replacement perforated metal treads, compliant guardrails and compliant handrails. Dimensions of stairway (riser hight, tread run,and width) to remain unchanged. Applicant: Palace Construction Co Inc | Permit type: Building | Permit status: Cmp | Completion date: December 2, 2011 | Current use: Multifamily dwe | |||||
SCORE 95 Addition of new wilkins 1. 5inch double check backflow preventor for multi-family residence Date: March 5, 2012 Contractor: Integrated Safety Services Client: Authority Housing | Applicant: Integrated Safety Services | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwe | |||||
SCORE 95 Addition of new wilkins 1. 5inch double check backflow preventor for multi-family residence Client: Authority Housing | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-00877 | |||||
SCORE 95 Replacement of three, second story decks, types a, b and c. Client: Authority Housing | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 22, 2010 | Current use: Multifamily dwellings, existing, deck, n | Permit id: Pmt2010-02260 | |||||
SCORE 82 Remove existing shingles and re-roof multi-family residence with dimensional shingles. 27 squares, roof pitch represented by contractor to be 6:12. Client: Authority Housing | Permit type: Roofing | Permit status: Cmp | Completion date: February 22, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04161 | |||||
SCORE 82 Building 8 -- installation of six standard replacement forced-air furnaces in this multi-family building. And six new a c units. (13 seer minimum) (building 8 of the bridgewalk complex) each furnace to be 60,0 btu. Units 101, 102, 103, 201, 202 and 203. Electrical work by separate permit. Permit type: Mechanical | Permit status: Cmp | Completion date: March 28, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04439 | |||||
SCORE 79 Building 8 -- bridgewalk complex -- installation of wiring, disconnects and circuit breakers for six a c units on this 6-plex building. Units 101, 102, 103, 201, 202 and 203. Client: Authority Housing | Permit type: Electrical | Permit status: Cmp | Completion date: February 22, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04451 | |||||
SCORE 98 Mechancial permit for replacement water heater. Client: Community Holiday | Permit type: Mechanical | Permit status: Cmp | Completion date: November 3, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-04124 | |||||
SCORE 68 Installation of six replacement forced-air furnaces in this multi-family building. And six new a c units. (13 seer minimum) (building 8 of the bridegwalk complex) each high efficiency furnace to be 60,0 btu. Units 101, 102, 103, 201, 202 and 203. Electrical work by separate permit. (lasalle mechanical & all green const) Value: $9,000 Contractor: All Green Construction Client: Authority Housing | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-03960 |