Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Replaxe fire alarm control and 4 hornstrobes. Date: August 17, 2010 Value: $1,534 Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: Efa38596 | Parcel: 0105013000 | |||||
SCORE 79 The work area is the rear elevation left hand corner facing the church from the parking lot side. We will be pressure washing the building repointing all lose motar joints and applying a waterproof sealer. Permit type: Interior/exterior wo | Permit status: Expired | Current use: Comm | Permit id: Sf98924 | Parcel: 0105013000 | |||||
SCORE 82 Removed all rotten wood soft boards from right side of building replace with azek pvc fasten to rafter tai;s. Install azek pvc boards for soft . Sawcut 2 1/2 round holes at 16" o. C. In soft removed approximate forty (40) damage and broken slates. Install new slates . Paint windows . Permit type: Other | Permit status: Open | Current use: Other | Permit id: Sf524548 | Parcel: 0105013000 | |||||
Date: November 27, 2012 Permit status: Na | Permit id: Alfob202507 | Parcel: 0105013000 | |||||
Relay gas main; 1925 x 2 rdwy; # 1366049831765; ds 2014-140-7111; extension Date: April 25, 2014 Permit type: Capital improvement | Permit status: Expired | Permit id: Exca-355878 | Parcel: 0105013000 | |||||
SCORE 86 Work to be done at 4 sumner: our lady of the assumption church. Wire a replacement boiler from oil to gas. Permit type: Electrical | Permit status: Expired | Current use: Other | Permit id: E394652 | Parcel: 0105013000 | |||||
SCORE 65 The palm sunday procession will be sunday april 13 2014 9: am. The procession will start at brophy and proceed on lampson st. To maverick st. Turning left onto orleans st. And left again at sumner st. Ending at our lady of the assumtion church. The number of the people attending thus will be between 50-100. The processtio will last more or less one(1) hour. This procession has been a long tradition in the roman catholic church and east boston. Date: April 9, 2014 Contractor: Benito Moreno Permit type: Special event | Permit status: Expired | Current use: Other | Permit id: Pub325245 | Parcel: 0105013000 | |||||
Boiler room entrance left hand rear of building Date: September 9, 2014 Permit status: Na | Permit id: Asb406018 | Parcel: 0105013000 | |||||
SCORE 98 Installation of backflow preventor with installation of burnham v907a gas boiler. This is for our lady of the assumption church at 4 sumner st east boston Permit type: Plumbing | Permit status: Expired | Current use: Other | Permit id: Pl394432 | Parcel: 0105013000 | |||||
SCORE 98 Replacement of oil fired heating system with burnham v907 boiler with powerflame jr50a gas burner. This is for our lady of the assumption church at 4 sumner st east boston Permit type: Gas | Permit status: Expired | Current use: Other | Permit id: G394429 | Parcel: 0105013000 | |||||
Our lady of the assumption parish wants to celebrate the feast of assumption of the virgin mary with procession on august 10th 2014 at 11:30am. For this reason we request permission to do this procession that will start in the our lady of the assumption on 404 sumner street and turning left onto lampson street and turning left on maverick street and continue onto orleans street and turning left on sumner street where the procession will end on the parish of the our lady of the assumption. The number of people attending this event will be around 50-1 people and duration of the event will be an hour (1 hour). Date: June 25, 2014 Permit type: Special event | Permit status: Expired | Permit id: Pub375784 | Parcel: 0105013000 |