Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 65 1727 Superior St Chicago Il Repair replace roof, floor boards & railings on 1 story wood front porch (no structural work)- all work same as existing Permit type: Permit - easy permit | Permit id: 100489302 | |||||
SCORE 65 404 Sumner St Boston Ma 02128 The palm sunday procession will be sunday april 13 2014 9: am. The procession will start at brophy and proceed on lampson st. To maverick st. Turning left onto orleans st. And left again at sumner st. Ending at our lady of the assumtion church. The number of the people attending thus will be between 50-100. The processtio will last more or less one(1) hour. This procession has been a long tradition in the roman catholic church and east boston. Date: April 9, 2014 Contractor: Benito Moreno Permit type: Special event | Permit status: Expired | Current use: Other | Permit id: Pub325245 | Parcel: 0105013000 | |||||
SCORE 65 404 Sumner St East Boston Ma The palm sunday procession will be sunday april 13 2014 9: am. The procession will start at brophy and proceed on lampson st. To maverick st. Turning left onto orleans st. And left again at sumner st. Ending at our lady of the assumtion church. The number of the people attending thus will be between 50-100. The processtio will last more or less one(1) hour. This procession has been a long tradition in the roman catholic church and east boston. Date: April 9, 2014 Contractor: Benito Moreno Client: Zurek Andrew D | Permit type: Public event | Expiration date: April 13, 2014 | Current use: Other | Permit id: Pub325245 | Parcel: 0105013000 |