Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd no. Of modules: 30 no. Of inverters: 2 total system size in kilowatts: 6. 2 05. 03. 2012: plan change add load center.... Lhg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 20, 2012 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: May 16, 2012 | Permit id: Pds2012-1031-20 | |||||
Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 2 total system size in kilowatts 6. 2 05. 03. 2012 plan change add load center.... Lhg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 20, 2012 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 16, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 2 total system size in kilowatts 6. 2 05. 03. 2012 plan change add load center.... Lhg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 20, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 16, 2012 | Permit id: Pds2012-1031-20 | |||||
Final Date: May 16, 2012 Permit status: Pass | Permit id: Pds2012-1031-20 | |||||
Final Date: March 8, 2009 Permit status: Pass | Permit id: Pds2008-1005-20 |