Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 9881 Lemon Ave La Mesa Ca 91941 Roof mount residential solar pv for existing sfd no. Of modules 48 no. Of inverters 2 total system size in kilowatts 15. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 15, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 6, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 77 Calle De La Estrella Pine Valley Ca 91962 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 87 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 15, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 4, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 7 Leland Pl El Cajon Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules 22 no. Of inverters 1 total system size in kilowatts 5. 17 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 8, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 18, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1193 Venture Valley Rd Julian Ca 92036 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 8, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 27, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1269 Tuttle Ln El Cajon Ca 92021 Roof mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters 1 total system size in kilowatts 6. 58 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 8, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 16, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 6279 Via Campo Verde Rancho Santa Fe Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 3 total system size in kilowatts 22. 9 misc elect for panel change out per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 6, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 19, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3127 Toyon Heights Dr Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 8 12. 27. 2012 changed to aleo modules ok per jra.. Lhg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 6, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 18, 2013 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 4028 Country Trails Bonita Ca 91902 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 5. 64 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 24, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 28, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 11674 Westhill Vista Lakeside Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 6. 87 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 24, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 3, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 11632 Westhill Vista Lakeside Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules 26 no. Of inverters 1 total system size in kilowatts 6. 11 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 24, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 9, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 9901 Helix Mont Dr La Mesa Ca 91941 Roof mount residential solar pv for existing sfd no. Of modules 16 no. Of inverters 1 total system size in kilowatts 4. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 23, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 8, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 13703 Whispering Meadows Ln Jamul Ca 91935 Roof mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters 2 total system size in kilowatts 5. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 18, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 7, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1319 Cadoglenn Dr El Cajon Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules 14 no. Of inverters 1 total system size in kilowatts 4. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 11, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 9, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3477 Barrett View Rd Alpine Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 6 total system size in kilowatts 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 8, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 1, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 4012 Rogers Rd Spring Valley Ca 91977 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 26, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 9, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 4585 Sleeping Indian Rd Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd and 2 amp service upgrade no. Of modules 21 no. Of inverters 6 total system size in kilowatts 6. 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 21, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 14, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 9371 Alto Dr La Mesa Ca 91941 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 21, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 15, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 12214 Green Top Ln El Cajon Ca 92020 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 8. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 21, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 27, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 358 Washington St Ramona Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 2 total system size in kilowatts 11. 8 electrical service upgrade to 225 amps per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 21, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 1, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 7807 Artesian Rd San Diego Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules 18 no. Of inverters 1 total system size in kilowatts 5. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 21, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 27, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2 Ramona Real Ramona Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 13 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 17, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 18, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 14423 Oak Meadow Rd Valley Center Ca 92082 Ground mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 9. 8 10 15 12 plan change rearrange see c of a... Vmd Date: September 17, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 30, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3139 San Souci Dr Escondido Ca 92029 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 4. 48 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 13, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 11, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 146 Lyons Valley Rd Jamul Ca 91935 Roof mount residential solar pv for existing sfd no. Of modules 35 no. Of inverters 2 total system size in kilowatts 4. 1 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 13, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 5, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 28942 Welcome View Escondido Ca 92026 Ground mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 11. 4 also, electrical upgrade to 2 amps service Date: September 5, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 18, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2196 Vista Grande Dr Vista Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules 35 no. Of inverters 1 total system size in kilowatts 11. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 5, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 18, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 10 Ocean Vista Way Ramona Ca 92065 Ground mount residential solar pv for existing sfd no. Of modules 31 no. Of inverters 1 total system size in kilowatts 11. 8 Date: September 5, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 15, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 18891 Los Hermanos Ranch Rd Valley Center Ca 92082 Roof mount residential solar pv for existing sfd (located on barn) no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 22, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 13, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 37 Avocado Blvd La Mesa Ca 91941 Ground mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters 1 total system size in kilowatts 8 Date: August 10, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 24, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2932 Via Loma Vista Escondido Ca 92029 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 86 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 10, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 27, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 15969 Winesprings Dr San Diego Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 86 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 3, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 17, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1954 Oak View Pl Alpine Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules 48 no. Of inverters 3 total system size in kilowatts 15. 6 also, electrical upgrade to 4 amps service. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 3, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 15, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 508 Alpine Heights Rd Alpine Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 87 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 3, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 28, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 10203 Winecreek Ct San Diego Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules 16 no. Of inverters 1 total system size in kilowatts 5. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 3, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 5, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1622 1/2 York Dr Vista Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 7. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 30, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 10, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 7588 Vista Rancho Ct Rancho Santa Fe Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules 56 no. Of inverters 2 total system size in kilowatts 18. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 8 10 12 plan change; see c of a... Vmt Date: July 25, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 23, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2822 Willow Glen Dr El Cajon Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters 1 total system size in kilowatts 9. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 25, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 14, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 13838 Cheryl Creek Dr El Cajon Ca 92021 Roof mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters 1 total system size in kilowatts 9. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 25, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 4, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 17625 Rancho De Oro Dr Ramona Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 16, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 31, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2325 Wind River Rd El Cajon Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules 16 no. Of inverters 1 total system size in kilowatts 5. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 16, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 25, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 16409 Via Cazadero Rancho Santa Fe Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules 66 no. Of inverters 3 total system size in kilowatts 18. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 26, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 13, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2161 Eucalyptus Ave Ground mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 6 Date: June 21, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 13, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 5217 Nannette St Bonita Ca 91902 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 7. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 21, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 17, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2012 Via Trueno Ground mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 9 Date: June 7, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 24, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 12622 Wildcat Canyon Rd Lakeside Ca 92040 Ground mount residential solar pv for existing sfd -- adding to existing system no. Of modules 28 no. Of inverters 1 total system size in kilowatts 6. 6 Date: June 7, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 29, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2921 Pioneer Way Jamul Ca 91935 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 8 10-23-14 permit renewed... Must call for a valid inspection within 1 days... Tlh per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 4, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 6, 2014 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 14838 Presilla Dr Jamul Ca 91935 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 9. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 4, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 23, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3905 Pala Mesa Dr Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters 1 total system size in kilowatts 9. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 06. 26. 2012 relocate existing panels and inverter location.. Lhg Date: May 24, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 9, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1815 Granite Hills Dr El Cajon Ca 92019 Roof mount residential solar pv for existing sfd (located on detached permitted garage) no. Of modules 35 no. Of inverters 1 total system size in kilowatts 11. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 21, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 6, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1283 Alpine Heights Rd Alpine Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 7 Date: May 21, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 27, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3215 Via Viejas Oeste Alpine Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 18 Date: May 21, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 27, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2465 Camino Del Vecino Ground mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 11, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 5, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3685 Valley Rd Bonita Ca 91902 Roof mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 75 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 3, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 17, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1411 Chase Trl El Cajon Ca 92020 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 27, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 8, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 61 Coronado View Rd Alpine Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 5. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 27, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 21, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3965 Carveacre Rd Alpine Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules 18 no. Of inverters 1 total system size in kilowatts 4. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 27, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 18, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 15836 El Monte Rd Lakeside Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules 48 no. Of inverters 1 total system size in kilowatts 10. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 27, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 18, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 24 Pine Dr Campo Ca 91906 Roof mount residential solar pv for existing sfd no. Of modules 27 no. Of inverters 1 total system size in kilowatts 6 2 amp subpanel per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 5 24 12 plan change -- strl only; see c of a... Vmt Date: April 16, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 29, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3002 Live Oak Park Rd Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 27 no. Of inverters 1 total system size in kilowatts 6. 1 also, 1 amp subpanel per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 12, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 15, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 13 Montecito Ln Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 1 total system size in kilowatts 10. 1 also, 1 amp subpanel per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 4 12 12 plan change; see c of a... Vmt Date: April 10, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 24, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1935 Fenoval Dr Borrego Springs Ca 92004 Roof mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 1 total system size in kilowatts 7. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 04. 10. 2012 plan change to relocate inverter and add ac disconnect... Lhg Date: April 3, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 2, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 897 Quail Hill Rd Fallbrook Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules 45 no. Of inverters 1 total system size in kilowatts 9. 4 Date: April 3, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 7, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1408 Rancho Serena Rd Rancho Santa Fe Ca 92067 Electrical vehicle charging station(s) - for existing sfd Date: March 29, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 2, 2012 | Permit id: Pds2012-1007-20 | |||||
SCORE 100 6 Estrelita Dr Vista Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules 32 no. Of inverters 1 total system size in kilowatts 6. 72 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 29, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 27, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3088 Margarita Vista Fallbrook Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 1 total system size in kilowatts 7. 56 4 12 12 plan change; see c of a... Vmt Date: March 29, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 8, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3839 Ladera Vista Rd Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 5. 4 04. 05 plan change add subpanel... Lhg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 27, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 12, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 303 Summit Ave Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 27 no. Of inverters 1 total system size in kilowatts 6 electrical service upgrade to 2 amps per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 04. 03. 2012 plan change relocate inverter... Lhg Date: March 27, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 16, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 25037 Manzanita Ln Descanso Ca 91916 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 2 total system size in kilowatts 6. 2 05. 03. 2012 plan change add load center.... Lhg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 20, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 16, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1848 E Alvarado St Fallbrook Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 5. 4 Date: March 16, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 6, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 4046 Ladera Vista Rd Fallbrook Ca 92028 Roof mount residential solar pv for ag well (located on existing storage bldg under parcel 123-420-37- ) no. Of modules 66 no. Of inverters 2 total system size in kilowatts 15. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 04. 17. 2012 change to update correct address parcel on oermit... Lhg 04. 16. 2012 plan change change wire size... Lhg Date: March 16, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 19, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 4044 Ladera Vista Rd Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 84 no. Of inverters 3 total system size in kilowatts 30. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 16, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 23, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1003 S Ridge Dr Fallbrook Ca 92028 Replace main service panel (no upgrade -- 2 a to 2 a) also de-rating main breaker to 175 a. Solar pv under separate permit. Date: March 9, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 13, 2012 | Permit id: Pds2012-1007-20 | |||||
SCORE 100 Date: March 5, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 7, 2012 | Permit id: Pds2012-1007-20 | |||||
SCORE 100 Date: March 5, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 13, 2012 | Permit id: Pds2012-1007-20 | |||||
SCORE 100 28 Vista Del Rio Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 45 no. Of inverters 1 total system size in kilowatts per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 29, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 27, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 153 Vista Jamul Jamul Ca 91935 Ground mount residential solar pv for existing sfd no. Of modules no. Of inverters 2 total system size in kilowatts 18 cannot final before sfd still under construction 1003-20100007 5 20 13 permit renewal -- must call for inspection within 1 days & permit is good to 2 8 28 15... M1a Date: February 29, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 11, 2013 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1348 Banyan Dr Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 29, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 6, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 9386 Spencer Ct Lakeside Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules 22 no. Of inverters 1 total system size in kilowatts 5. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 24, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 3, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 4562 Calavo Dr La Mesa Ca 91941 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 22, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 13, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 4694 Sleeping Indian Rd Fallbrook Ca 92028 Roof mount residential solar pv for garage see 1006-20120014 under construction for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 7. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof.. 02. 22. 2012 plan change see conditions of approval ... Lhg Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 20, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 813 La Rue Ave Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 16 no. Of inverters 1 total system size in kilowatts 3. 14 04. 05. 2012 plan change add disconnect... Lhg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 12, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 7242 Via Mariposa Norte Bonsall Ca 92003 Ground mount residential solar pv for existing sfd no. Of modules 45 no. Of inverters 1 total system size in kilowatts 10. 1 Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 27, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1003 S Ridge Dr Fallbrook Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 10. 1 Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 15, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 19573 Paradise Mountain Rd Ground mount residential solar pv for existing sfd no. Of modules no. Of inverters 2 total system size in kilowatts 11. 7 03. 27. 2012 relocate panel location... Lhg 2 29 12 plan change; see c of a... Vmt Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 6, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 23932 Berryessa Ct Ramona Ca 92065 Roof mount residential solar pv add disconnect for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 02 16 12 plan change reduce mod and add disconnect see c of a... Vmd Date: January 26, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 29, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3968 Lorita Ln Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 5. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 26, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 9, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3945 Pala Mesa Dr Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 26, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 16, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 10268 Pinon Pl Lakeside Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 5. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 18, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 3, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 Date: January 13, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 18, 2012 | Permit id: Pds2012-1007-20 | |||||
SCORE 100 17116 Paseo Hermosa Rancho Santa Fe Ca 92067 Electrical vehicle charging station(s) - 1 in garage of sfd Date: January 13, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Issued invalid expired | Permit id: Pds2012-1007-20 | |||||
SCORE 100 4057 Ladera Vista Rd Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 48 no. Of inverters 1 total system size in kilowatts 10. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 02 16 12 plan change revise details on singular diagram see c of a... Vmd Date: January 12, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 21, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 23, 2012 | Permit id: Pds2012-1007-20 | |||||
SCORE 100 Date: January 12, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 18, 2012 | Permit id: Pds2012-1007-20 | |||||
SCORE 100 176 Rancho De Oro Dr Ramona Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules 32 no. Of inverters 1 total system size in kilowatts 6. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 11, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 27, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 4677 La Canada Rd Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 9. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 6, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 4, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 15819 Las Planideras Rancho Santa Fe Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules 64 no. Of inverters 2 total system size in kilowatts 14. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 04. 27. 2012 remove ac disconnect and change breaker from 1 amps to amps... Lhg Date: January 6, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 6, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1704 Rice Canyon Rd Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 1 total system size in kilowatts 8. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 6, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 15, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 4271 Tim St Bonita Ca 91902 Ground mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 5 21-feb-2012 plan change - structl only. Ksg Date: January 4, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 1, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2935 Vista Del Rio Fallbrook Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules 26 no. Of inverters 1 total system size in kilowatts 5. 2 Date: January 4, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 22, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 8125 Via Urner Way Bonsall Ca 92003 Roof mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 6 07-feb-2012 plan change to revise flashing detail per b. I. Comment. Ksg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 3, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 9, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2233 Audrey Ct Fallbrook Ca 92028 Roof mount residential solar pv on existing garage for existing sfd no. Of modules 32 no. Of inverters 1 total system size in kilowatts 6. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 3, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 24, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 15 Vista Del Lago Dr Fallbrook Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 1 total system size in kilowatts 8. 1 Date: December 20, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 26, 2012 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 1636 Cam De Nog Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 8 total system size in kilowatts 8. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 16, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 10, 2012 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 2933 Mackey Dr Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 5 total system size in kilowatts 5. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 16, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 23, 2012 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 839 Verde Ave Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 22 no. Of inverters 5 total system size in kilowatts 5. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 16, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 29, 2012 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 633 Bradford Rd El Cajon Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 2 total system size in kilowatts 18 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 14, 2012 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 4315 Conrad Dr Spring Valley Ca 91977 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 11. 25 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 02. 21. 2012 inverter relocated... Lhg Date: December 15, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 6, 2012 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 135 S Wisconsin Ave Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 19, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 3127 Vista Del Rio Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 7. 68 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 2, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 22, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 2 S Stage Coach Ln Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 27 no. Of inverters 1 total system size in kilowatts 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 2, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 23, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 3024 Sylvia St Bonita Ca 91902 Roof mount residential solar pv for existing sfd no. Of modules 32 no. Of inverters 1 total system size in kilowatts 7. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 30, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 15, 2012 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 1801 Redwing Way San Marcos Ca 92069 Roof mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters 1 total system size in kilowatts 6. 58 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 18, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2011-1031-20 | |||||
SCORE 100 2266 Gird Rd Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 18 no. Of inverters 1 total system size in kilowatts 3. 66 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 11. 09. 2011 plan change-see conditions of approval... Lhg Date: November 4, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 17, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 1691 Chandelle Ln Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 49 no. Of inverters 1 total system size in kilowatts 11 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 4, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 22, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 4033 Ladera Vista Rd Fallbrook Ca 92028 _roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 2 total system size in kilowatts 7. 87 11 17 11... Plan change, see c of a... Mls per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 21, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 21, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 8189 Lamour Ln San Diego Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 7. 87 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 21, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 1, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 1633 Chandelle Ln Roof mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 1 total system size in kilowatts 6. 29 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 21, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 6, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 8 El Camto Rd Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 23, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 27, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 2082 Honey Springs Rd Jamul Ca 91935 Roof _ mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 5 total system size in kilowatts 6 also replace existing 2 amp meter with new 2 amp meter per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 23, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 5, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 1 S Ridge Dr Fallbrook Ca 92028 Roof_ mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 23, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 3, 2012 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 3109 Miramontes Rd Jamul Ca 91935 Adding 9 modules to existing ground mount residential solar pv for existing sfd no. Of modules adding 9 to existing pv no. Of inverters no new inverter - using existing total system size in kilowatts 1. 9 9 8 11... Plan change, see c of a... Mls Date: August 11, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2011-1031-20 | |||||
SCORE 100 6767 Las Ventanas Rancho Santa Fe Ca 92067 Ground mount residential solar pv for existing sfd no. Of modules 64 no. Of inverters 2 total system size in kilowatts 14. 4 upgrade to 225 amp Date: August 1, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 13, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 174 Standing Rock Rd Jamul Ca 91935 Ground mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 1 total system size in kilowatts 8. 5 Date: June 1, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 10, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 1334 Midway Dr Alpine Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters 1 total system size in kilowatts 6. 5 4 27 11... Plan change, see c of a... Mls Date: April 18, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 2, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 846 Evergreen Ln Vista Ca 92084 Ground mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 75 Date: April 15, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 11, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 27 High Mead Crk Vista Ca 92084 Ground mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 1 total system size in kilowatts 8. 5 5 3 11... Plan change (svc upgrade)... See c of a... Mls 4 27 11... Plan change... See c of a... Mls Date: April 15, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 12, 2014 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 24157 San Vicente Rd Ramona Ca 92065 Ground mount commercial solar pv no. Of modules 33 no. Of inverters 70 total system size in kilowatts 7. 75 Date: April 4, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 18, 2011 | Permit id: Pds2011-1007-20 | |||||
SCORE 100 1437 Windridge Dr El Cajon Ca 92020 Roof mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 75 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 1, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 18, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 10608 Aspen Glen Escondido Ca 92026 Roof mount residential solar pv for existing sfd no. Of modules 32 no. Of inverters 2 total system size in kilowatts 7. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 1, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 5, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 3048 Rancho Del Verde Pl Ground mount residential solar pv for existing sfd no. Of modules 78 no. Of inverters 2 (80 watt) total system size in kilowatts 18. 3 4 27 11... Plan change, see c of a... Mls 4 18 11... Plan change, see c of a... Mls Date: March 29, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 6, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 Date: March 10, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 11, 2011 | Permit id: Pds2011-1030-20 | |||||
SCORE 100 3347 Armagosa Way Jamul Ca 91935 Ground mount residential solar pv for existing sfd no. Of modules 55 no. Of inverters 1 total system size in kilowatts 11. 75 4-1-2011 plan change see conditions of approval vam 3 30 11... Plan change, see c of a... Mls Date: March 9, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 12, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 2641 Firebrand Way Alpine Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules 14 no. Of inverters 1 total system size in kilowatts 3. 3 Date: March 2, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 21, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 573 Anderson Rd Alpine Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 8 Date: March 2, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 14, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 2697 Firebrand Pl Alpine Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules 14 no. Of inverters 1 total system size in kilowatts 2. 7 03 25 2011 reinspection fee paid... 1jle per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 17, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 30, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 2696 Firebrand Pl Alpine Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules 14 no. Of inverters 1 total system size in kilowatts 2. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 14, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 7, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 50 Montiel Truck Trl Jamul Ca 91935 Ground mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 6. 5 03. 21. 2011 plan change to plot plan to show att structure on property... Lhg Date: February 14, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 29, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 3355 Emmanuel Way Alpine Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 75 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 4, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 17, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 12 Barbara Dr Vista Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules 26 no. Of inverters 1 total system size in kilowatts 6. 1 also upgrade to 2 amps per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 4, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 16, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 251 Poinsettia Ave Vista Ca 92083 Roof mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 1 total system size in kilowatts 8. 46 also upgrade to 200amp per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 4, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 17, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 146 Calle Diegueno Rancho Santa Fe Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 2 total system size in kilowatts 8. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 27, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 9, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 2453 Avnda Canora Alpine Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 5. 6 Date: January 27, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 8, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 1047 Gamble Ln Escondido Ca 92029 Roof mount residential solar pv for existing sfd no. Of modules 16 no. Of inverters 1 total system size in kilowatts 3. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 14, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 15, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 1812 Mil Sorpresas Dr San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 8 Date: January 14, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 31, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 1991 Pine View Rd Alpine Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules no. Of inverters 11. 4 total system size in kilowatts 9. 2 Date: January 11, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 31, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 3198 Blackwell Dr Vista Ca 92084 Ground mount residential solar pv for existing sfd no. Of modules 39 no. Of inverters 1 total system size in kilowatts 8. 9 increasing elec svc from 150amp to 200amp Date: December 1, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2010-1031-20 | |||||
SCORE 100 28718 Top Of The Pines Ln Pine Valley Ca 91962 Ground mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 8 upgrade from amp to 100amp 1 13 11... See c of a... Mls Date: November 23, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 21, 2011 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 16574 Cimarron Crest Dr San Diego Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules 22 no. Of inverters 1 total system size in kilowatts 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 23, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 11, 2011 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 13899 Rancho Vista Ct Jamul Ca 91935 Roof mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters 1 total system size in kilowatts 6. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 23, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 21, 2011 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 17366 San Pasqual Valley Rd Escondido Ca 92027 Ground mount commercial solar pv for san pasqual avocado company no. Of modules 378 no. Of inverters 1 total system size in kilowatts 86. 94 1 10 11... See c of a... Mls Permit type: Commercial alteration-addn | Permit status: Issued expired | Permit id: Pds2010-1031-20 | |||||
SCORE 100 2251 Doubletree Rd Spring Valley Ca 91978 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 2 total system size in kilowatts 5. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 15, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 18, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 3045 Via Viejas Oeste Alpine Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules 56 no. Of inverters 1 total system size in kilowatts 12. 9 also upgrading from 2 to 225 amp 11 10 10... See c of a... Mls Date: November 2, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 24, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 24023 Nectar Way Ramona Ca 92065 Ground mount residential solar pv for existing sfd no. Of modules 39 no. Of inverters 1 total system size in kilowatts 9 Date: November 1, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 19, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 1874 Tavern Ct Alpine Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules 18 no. Of inverters 1 total system size in kilowatts 4. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 1, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 9, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 17112 Blue Skies Rd San Diego Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules 22 no. Of inverters 1 total system size in kilowatts 5. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 15, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 9, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 16905 Silver Pine Rd San Diego Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 4. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 15, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 3, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 16347 Pinto Ridge Dr San Diego Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 3. 9 9 13 plan change, see c of a mls per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 10, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 23, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 15701 Via Salvador Valley Center Ca 92082 Ground mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 4. 5 Date: August 18, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 13, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 58 San Elijo Rancho Santa Fe Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules 63 no. Of inverters 2 total system size in kilowatts 12. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 10, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 13, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 3901 Viejas Creek Ln Alpine Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules 42 no. Of inverters 1 total system size in kilowatts 8. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 10, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 15, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 15632 El Monte Rd Lakeside Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 @ 40 watts total system size in kilowatts 4. 6 kwdc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 28, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 9, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 17114 Tallow Tree Ln San Diego Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters 1 @ 60 watts total system size in kilowatts 6. 4 kwdc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 28, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 9, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 Date: June 16, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Issued expired | Permit id: Pds2010-1007-20 | |||||
SCORE 100 11969 Paseo Fuerte El Cajon Ca 92020 Roof mount residential solar pv for existing sfd no. Of modules 48 no. Of inverters 1 total system size in kilowatts 11 06 16 plan change eliminate ac discon. Add sub-panel see c of a per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 11, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 7, 2011 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 15676 North Peak Rd Julian Ca 92036 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 4. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 28, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 15, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 3747 Putter Dr Bonita Ca 91902 Roof mount residential solar pv for existing sfd no. Of modules 18 no. Of inverters 1 total system size in kilowatts 4. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 28, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 11, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 2136 Camino Christina Ground mount residential solar pv for existing sfd no. Of modules 55 no. Of inverters 1 total system size in kilowatts 12. 6 Date: May 21, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 2, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 164 Dawn View Way El Cajon Ca 92021 Roof mount residential solar pv for existing sfd, misc electrical to add subpanel no. Of modules 26 no. Of inverters 1 total system size in kilowatts 5. 1 kwdc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 5 11 10, plan change, see c of a for details, mls Date: April 30, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 18, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 18629 Quail Tl Dr Jamul Ca 91935 Ground mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 5 total system size in kilowatts 5. 5 Date: April 23, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 26, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 1729 Smokey Ln Spring Valley Ca 91977 Roof mount residential solar pv for existing sfd no. Of modules 27 no. Of inverters 1 total system size in kilowatts 5. 67 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 23, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 9, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 6 Richland View Ct San Marcos Ca 92069 Ground mount residential solar pv for existing sfd note customer is using 6 richland view ln no. Of modules no. Of inverters 1 total system size in kilowatts 3. 957 Date: April 22, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 4, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 30912 Villa Toscana Bonsall Ca 92003 Ground mount residential solar pv for existing sfd no. Of modules 72 no. Of inverters 2 total system size in kilowatts 14. 2 4-22-20 plan change replace main from 2 to 125. Was original 125 just putting it back that way. Vam. Date: March 19, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 27, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 4333 North Ln Del Mar Ca 92014 Roof mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters i total system size in kilowatts 5. 5 kwdc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 12, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 22, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 16739 Wikiup Rd Ramona Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 5. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 5, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 23, 2010 | Permit id: Pds2010-1030-20 | |||||
SCORE 100 1307 Hidden Knoll Ct El Cajon Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules 39 no. Of inverters 1 total system size in kilowatts 7. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 29, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 2, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 1301 South Grade Rd Alpine Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules 28 no. Of inverters 1 60 watt total system size in kilowatts 5. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 22, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 3, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 9734 Red Pony Ln El Cajon Ca 92021 Ground mount residential solar pv, 1 sub panel and2 amp service upgrade for existing sfd no. Of modules 72 no. Of inverters 2 total system size in kilowatts 11. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 20, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 11, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 305 Palomar Vista Dr Valley Center Ca 92082 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 @ 50 watts total system size in kilowatts 4. 7 kwdc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 4, 2010 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 21, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 25 Majella Rd Vista Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules 48 no. Of inverters 2 total system size in kilowatts 15. 7 4 amps electrical upgrade under permit 1007-20040892 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 26, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Issued invalid expired | Permit id: Pds2012-1031-20 | |||||
SCORE 100 19 Nicole St Ramona Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 5. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 9, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: October 30, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 3673 Fairview Dr Vista Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules 39 no. Of inverters 1 total system size in kilowatts 9. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 26, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Issued invalid expired | Permit id: Pds2012-1031-20 | |||||
SCORE 100 9405 Saguaro Rd Lakeside Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 13, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Issued invalid expired | Permit id: Pds2012-1031-20 | |||||
SCORE 100 32 Knottwood Way Fallbrook Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 26, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Issued invalid expired | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1336 Hidden Hollow Ct El Cajon Ca 92019 Roof mount residential solar pv for existing attached 2nd dwelling unit (using 1336 a hidden hollow ) no. Of modules 14 no. Of inverters 1 total system size in kilowatts 4. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 26, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 2, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2161 Eucalyptus Ave San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 6 Date: June 21, 2012 Contractor: Sullivan Electrical Permit type: Addn | Permit status: Completed | Completion date: July 13, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2012 Via Trueno San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 9 Date: June 7, 2012 Contractor: Sullivan Electrical Permit type: Addn | Permit status: Completed | Completion date: July 24, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 2465 Camino Del Vecino San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 11, 2012 Contractor: Sullivan Electrical Permit type: Addn | Permit status: Completed | Completion date: June 5, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 41272 De Luz Rd Fallbrook Ca 92028 Ground mount residential solar pv and upgrade elec 2 amp for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 4. 8 Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 12, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 19573 Paradise Mountain Rd San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules no. Of inverters 2 total system size in kilowatts 11. 7 03. 27. 2012 relocate panel location... Lhg 2 29 12 plan change; see c of a... Vmt Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Addn | Permit status: Completed | Completion date: April 6, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1633 Chandelle Ln San Diego Ca Roof mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 1 total system size in kilowatts 6. 29 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 21, 2011 Contractor: Sullivan Electrical Permit type: Addn | Permit status: Completed | Completion date: December 6, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 17366 San Pasqual Valley Rd Escondido Ca 92027 Ground mount commercial solar pv for san pasqual avocado company no. Of modules 1 no. Of inverters 1 total system size in kilowatts 32. 9 Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: March 6, 2012 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 3048 Rancho Del Verde Pl San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules 78 no. Of inverters 2 (80 watt) total system size in kilowatts 18. 3 4 27 11... Plan change, see c of a... Mls 4 18 11... Plan change, see c of a... Mls Date: March 29, 2011 Contractor: Sullivan Electrical Permit type: Addn | Permit status: Completed | Completion date: May 6, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 945 Deodar Rd Escondido Ca 92026 Ground mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 7. 75 relocating array placement. See appvd 1031-20110059 Date: November 4, 2011 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 15, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 2136 Camino Christina San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules 55 no. Of inverters 1 total system size in kilowatts 12. 6 Date: May 21, 2010 Contractor: Sullivan Electrical Permit type: Addn | Permit status: Completed | Completion date: July 2, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 16555 Woods Valley Rd Valley Center Ca 92082 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 1 total system size in kilowatts 9. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 5 21 12 plan change; see c of a... Vmt Date: June 4, 2012 Contractor: Sullivan Electrical Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 23, 2012 | Permit id: Pds2012-1031-20 | |||||
SCORE 100 1622 1 2 York Dr, Vista, Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules:24 no. Of inverters: 1 total system size in kilowatts: 7. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 30, 2012 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 184-050-12-00 | |||||
SCORE 100 1408 Rancho Serena Rd, Rancho Santa Fe, Ca 92067 Electrical vehicle charging station(s) - for existing sfd Date: March 29, 2012 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2012-1007-20 | Parcel: 262-130-07-00 | |||||
SCORE 100 1003 S Ridge Dr, Fallbrook, Ca 92028 Replace main service panel (no upgrade -- 2 a to 2 a) also de-rating main breaker to 175 a. Solar pv under separate permit. Date: March 9, 2012 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2012-1007-20 | Parcel: 105-220-52-00 | |||||
SCORE 100 Date: March 5, 2012 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2012-1007-20 | Parcel: 497-040-05-00 | |||||
SCORE 100 Date: March 5, 2012 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2012-1007-20 | Parcel: 184-213-06-00 | |||||
SCORE 100 17116 Paseo Hermosa, Rancho Santa Fe, Ca 92067 Electrical vehicle charging station(s) - 1 in garage of sfd Date: January 13, 2012 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Issued invalid expired | Permit id: Pds2012-1007-20 | Parcel: 269-181-70-00 | |||||
SCORE 100 Date: January 13, 2012 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2012-1007-20 | Parcel: 267-181-46-00 | |||||
SCORE 100 Date: January 12, 2012 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2012-1007-20 | Parcel: 266-041-06-00 | |||||
SCORE 100 Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2012-1007-20 | Parcel: 402-340-26-00 | |||||
SCORE 100 Date: March 10, 2011 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2011-1030-20 | Parcel: 402-340-12-00 | |||||
SCORE 100 Date: June 16, 2010 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Issued expired | Permit id: Pds2010-1007-20 | Parcel: 498-153-29-00 | |||||
SCORE 100 1301 South Grade Rd, Alpine, Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: 1 60 watt total system size in kilowatts: 5. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 22, 2010 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 404-332-34-00 | |||||
SCORE 100 9238 Rock Acre Dr, Lakeside, Ca 92040 Roof mount pv system for sfd - 32 modules, (1) 6k watt inverter, 5. 956 kw per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof Date: October 5, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 397-220-61-00 | |||||
SCORE 100 26 Via Viejas, Alpine, Ca 91901 Roof mount solar pv array 36 modules, 1 - 70 watt inverter, 8. 2 kwdc for existing sfd per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof. Date: September 23, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 404-270-08-00 | |||||
SCORE 100 105 Russell Rd, La Mesa, Ca 91941 Misc elec to add sub panel for solar pv (permit 1030-20090703) for existing sfd Date: September 16, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1007-20 | Parcel: 497-011-26-00 | |||||
SCORE 100 2208 Esplendido Ave, Vista, Ca 92084 36 modules, (1) 70 watt inverter, 6. 7 kw ac roof mount pv array system not to extend more than 5 above existing roof Date: September 3, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 184-213-06-00 | |||||
SCORE 100 8336 Oconnell Rd, El Cajon, Ca 92021 Roof mount solar pv 24 modules, 1 - 50 watt inverter, 4. 46 kw ac for existing sfd per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof. Date: August 25, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 388-572-26-00 | |||||
SCORE 100 15701 Via Salvador, Valley Center, Ca 92082 Ground mount solar pv 36 modules, 1 - 1700watt inverter, 6. 84 kw dc for existing sfd Date: August 18, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 188-321-27-00 | |||||
SCORE 100 14316 Twin Lakes Ct, Rancho Santa Fe, Ca 92067 Ground mount solar pv 87 modules, 3 inverters, 16 kw for existing sfd Date: August 12, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 305-090-03-00 | |||||
SCORE 100 13224 Blueberry Hill Ln, Valley Center, Ca 92082 Ground mount solar pv 36 modules, 1 inverter, 5. 1 kw for existing sfd Date: August 4, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 186-210-51-00 | |||||
SCORE 100 105 Russell Rd, La Mesa, Ca 91941 Roof mounted solar pv system with 1 - 70 watt inverter and 36 - 2 watt modules for existing sfd per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof Date: July 31, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 497-011-26-00 | |||||
SCORE 100 3031 Solar Ln, San Marcos, Ca 92069 Roof mounted solar pv system with 2 - 40 watt inverters and 44 - 216 watt modules for existing sfd per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof Date: July 31, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 178-190-09-00 | |||||
SCORE 100 1743 Smokey Ln, Spring Valley, Ca 91977 18 modules. 1 - 40 watt inverter, 3. 59 kw roof mount solar pv for existing sfd per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof Date: July 8, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 578-082-24-00 | |||||
SCORE 100 16556 Yermo Ct, San Diego, Ca 92127 33 modules, 1 inverter, 6 kw roof mount solar pv array for existing sfd per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof. Date: June 24, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 678-461-32-00 | |||||
SCORE 100 3114 Montesano Rd, Escondido, Ca 92029 44 modules, 2 inverters, 7. 9 kw roof mount solar pv array for existing sfd per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof. Date: June 24, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 270-281-30-00 | |||||
SCORE 100 15039 Moonglow Dr, Ramona, Ca 92065 Sanyo modules, 1 60 wat inverter, 5. 58 watt solar roof mount pv array for existing sfd per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof. Date: June 24, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 288-662-47-00 | |||||
SCORE 100 10057 Canyontop St, Spring Valley, Ca 91977 Roof mount solar pv for sfd -- modules 1 inverter 3. 65 kw Date: June 16, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 505-490-10-00 | |||||
SCORE 100 Date: June 16, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1007-20 | Parcel: 278-070-32-00 | |||||
SCORE 100 3418 Valley Rd, Bonita, Ca 91902 Roof mount solar pv, 28 modules. 28 inverters, 5 kw for existing sfd per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof Date: June 12, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 591-100-49-00 | |||||
SCORE 100 Date: May 26, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1007-20 | Parcel: 520-221-10-00 | |||||
SCORE 100 28 Via Viejas Oeste, Alpine, Ca 91901 Ground mount solar pv 56 modules, 2 inverters kw for existing sfd Date: May 1, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 520-221-10-00 | |||||
SCORE 100 21 Vista Del Coronados, El Cajon, Ca 92021 Roof mount solar pv modules, 1 inverter 5. 7 kw for existing sfd system not to exceed 5 above existing roof Date: May 1, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 509-010-61-00 | |||||
SCORE 100 15723 Salida Del Sol, Ramona, Ca 92065 66 modules, 2 inverters, 12 k ground mount pv array for existing sfd Date: April 23, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 278-070-32-00 | |||||
SCORE 100 Date: April 4, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 283-031-28-00 | |||||
SCORE 100 Date: March 12, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 279-160-32-00 | |||||
SCORE 100 Date: November 27, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 303-040-49-00 | |||||
SCORE 100 Date: October 10, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 182-200-41-00 | |||||
SCORE 100 1581 Shadow Knolls Dr, El Cajon, Ca 92020 H. R. A. Roof mount photo voltaic system. 33 modules, 1 inverter. 5. 7 kw 04 27 07 - plan change - electrical only - see condition of approval... Dah Date: April 17, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 498-340-73-00 | |||||
SCORE 100 1763 Star Valley Rd, Alpine, Ca 91901 To installa ground mounted ( modules, 3 inverters, 9. 3 kw) solar photovoltaic system for existing sfd. Date: February 6, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 406-200-19-00 | |||||
SCORE 100 Date: December 14, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 409-010-24-00 | |||||
SCORE 100 Date: October 26, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 596-241-21-00 | |||||
SCORE 100 13038 Ha Hana Rd, Lakeside, Ca 92040 Roof mount photo voltaic system - 15 modules, 1 inverter, 2. 5 kw Date: October 10, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 397-100-63-00 | |||||
SCORE 100 4623 Sun Valley Rd, Del Mar, Ca 92014 Roof mount photo voltaic (on existing detached shade structure) - 45 modules, 1 inverter, 5. 3 kw Date: October 10, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 302-201-23-00 | |||||
SCORE 100 8 Midway Ln, Alpine, Ca 91901 Ground mount pv system 2 inverters, modules for existing sfd... 08 14 06 Date: August 14, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 403-100-24-00 | |||||
SCORE 100 2634 Calle De Compadres, Alpine, Ca 91901 Modules, 2 inverters gound mount solar photo voltaic. Electrical upgrade to 2 amp service. Date: June 1, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 404-270-01-00 | |||||
SCORE 100 4961 Alzeda Dr, La Mesa, Ca 91941 22 modules 1 inverter ground mount pv system for existing sfd... 05 22 06 Date: May 22, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 497-020-21-00 | |||||
SCORE 100 4961 Alzeda Dr, La Mesa, Ca 91941 Electrical up grade from 1 amps to 2 amps for existing sfd... Replacement of e95005871... 05 22 06 Date: May 22, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1007-20 | Parcel: 497-020-21-00 | |||||
SCORE 100 3109 Miramontes Rd, Jamul, Ca 91935 Solar photovoltaic -ground mounted; 24 modules, one inverter, 3. 99 kw for existing sfd. Plan change; 3 30 06 added struts to frame work 1sdb Date: January 27, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 596-140-07-00 | |||||
SCORE 100 16716 Georgios Way, Ramona, Ca 92065 Modules, i inverter, 4. 3 kw ground mount solar pv system for existing sfd. Date: January 5, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 288-601-32-00 | |||||
SCORE 100 86 Harbison Canyon Rd Roof mounted solar photovoltaic (18 modules, one invertor -3. 1 kw) for existing sfd. The system does not extend more than 5 from the highest point of the roof. Date: January 4, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 404-100-16-00 | |||||
SCORE 100 1777 Star Valley Rd, Alpine, Ca 91901 10. 2kw ground mounted photovoltaic for existing sfd, modules 3 invertors Date: January 4, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 406-200-20-00 | |||||
SCORE 100 201 Scenic Dr, El Cajon, Ca 92021 Roof mounted solar photovoltaic ( 18 modules, 0ne invertor - 2. 46 kw) for existing sfd. The system does not extend more than 5 from the highest point of the roof. Date: January 4, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 509-053-13-00 | |||||
SCORE 100 1548 Shadow Knolls Dr, El Cajon, Ca 92020 Scope of work: roof mounted solar photovoltaic array (5. 66 kw ac grid tie-33 strings) for existing sfd. System is not more than 5 height above the highest point of the roof. 8 22 05-applicant in to add electric service upgrade to 2 amps-ded Date: July 15, 2005 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1030-20 | Parcel: 498-340-49-00 | |||||
SCORE 100 4602 La Orilla, Rancho Santa Fe, Ca 92067 108 modules 3 inverter 15. 7 kw ground mount photovotaic system... Dah 04 11 05 Date: April 11, 2005 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1030-20 | Parcel: 268-021-15-00 | |||||
SCORE 100 113 Meadow View Rd, El Cajon, Ca 92020 35 watt roof mounted solar pv system; 28 modules, & 1 inverter. (hra) Date: February 11, 2005 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1030-20 | Parcel: 498-091-11-00 | |||||
SCORE 100 Date: April 4, 2008 Contractor: Sullivan Electrical Permit type: Electrical only | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 2830312800 | |||||
SCORE 100 Date: December 14, 2006 Contractor: Sullivan Electrical Permit type: Electrical only | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 4090102400 | |||||
SCORE 100 13038 Hahana Rd, Lakeside, Ca 92040 Roof mount photo voltaic system - 15 modules, 1 inverter, 2. 5 kw Date: October 10, 2006 Contractor: Sullivan Electrical Permit type: Electrical only | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 3971006300 | |||||
SCORE 100 1622 1/2 York Dr, Vista, Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 7. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 30, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 1840501200 | |||||
SCORE 100 1633 Chandelle Ln Roof mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 1 total system size in kilowatts: 6. 29 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 21, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-491-03-00 | |||||
SCORE 100 3048 Rancho Del Verde Pl Ground mount residential solar pv for existing sfd no. Of modules: 78 no. Of inverters: 2 (80 watt) total system size in kilowatts: 18. 3 4 27 11... Plan change, see c of a... Mls 4 18 11... Plan change, see c of a... Mls Date: March 29, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 237-161-18-00 | |||||
SCORE 100 4102 Avoyer Pl, La Mesa, Ca 91941 36 modules, 2 inverters, 5. 95 kw roof mount solar photo voltaic system (hra) system not to extend more than 5 above existing roof Date: March 6, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 501-103-08-00 | |||||
SCORE 100 4 Taylor St, Vista, Ca 92084 Modules, 1 invertor, 3. 35 kw, ground mount pv system for existing sfd (hra) Date: July 7, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 171-161-09-00 | |||||
SCORE 100 1785 Quiet View Ln, Alpine, Ca 91901 Ground mount solar pv system, 44 modules, 2 inverters, 76 kw system (hra) Date: July 20, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 404-331-54-00 | |||||
SCORE 100 2708 Country Club Dr, Escondido, Ca 92029 Ground mount solar pv system, 33 modules, & 1 inverter (hra) Date: July 20, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 235-032-21-00 | |||||
SCORE 100 14285 Rancho Santa Fe Lake Dr Roof & ground mount solar pv system w 2 inverters & 73 modules. (hra) pv sytem not to extend more than 5 above existing roof Date: November 16, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 305-090-21-00 | |||||
SCORE 100 1024 Old Mtn View Rd Roof mount solar pv system 1 inverter & 34 modules (hra) system not to extend more than 5 above roof Date: November 16, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 401-060-69-00 | |||||
SCORE 100 225 Coulter Ridge Dr, Julian, Ca 92036 Hra -solar photovoltaic system ( ground mounted on galvanized tubing. ) 24 panels, one inverter, 3. 3 kw for sfd in progress. -- do not final until sfd finaled... Jrj srs. Date: October 31, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Issued expired | Permit id: Pds2008-1030-20 | Parcel: 292-151-29-00 | |||||
SCORE 100 9734 Sierra Madre Rd, Spring Valley, Ca 91977 Hra- solar photovoltaic system -roof mounted ( 36 panels, one inverter, 198 watt) . Additionally, 2 amperes service upgrade for existing meter sfd panel. Date: July 29, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 500-143-17-00 | |||||
SCORE 100 8321 Solomon Ave, El Cajon, Ca 92021 To instal a (hra) solar photovoltaic system-roof mounted (3. 1 kw w modules and one inverter) for existing sfd. Date: April 9, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 388-572-39-00 | |||||
SCORE 100 1958 Highlands View Rd, Alpine, Ca 91901 Hra -roof mounted solar photovoltaic system (48 modules, 2 inverters, 8. 73 kw) for existing sfd. Per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof. Date: October 10, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 404-210-38-00 | |||||
SCORE 100 9936 Javelin Way, Spring Valley, Ca 91977 Roof mounted photvoltaic (solar) 1 inverter and 24 modules. 4. 2 kw (hra) Date: October 26, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 580-171-39-00 | |||||
SCORE 100 184 Rancho Vista Dr, Ramona, Ca 92065 Hra roof mount solar photovoltaic system (24 modules, 1 inverter,4. 5 kw) system not to extend more than 5 ft above existing roof Date: September 25, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 281-490-61-00 | |||||
SCORE 100 166 Daza Dr, Ramona, Ca 92065 Hra roof mount solar photovoltaic system (18 modules, 1 inverter, 3 kw) system not to extend more than 5 ft above existing roof Date: September 25, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 288-601-51-00 | |||||
SCORE 100 875 Peutz Valley Rd, Alpine, Ca 91901 Roof mount photvoltaic system---15 modules 1 inverter, 2. 5 kw (hra) Date: December 15, 2005 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1030-20 | Parcel: 402-220-36-00 | |||||
SCORE 100 13242 Old Barona Rd, Lakeside, Ca 92040 Roof mount solar photo voltaic (44 panels--2 arrays). Note: system does not extend more than 5 above existing roof. Date: December 9, 2005 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1030-20 | Parcel: 329-150-04-00 | |||||
SCORE 100 10336 Oak Grove Dr, Descanso, Ca 91916 Hra- solar photovoltaic -roof mounted (34 panels, one inverter, 142 watt) for existing sfd. Date: July 29, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 405-340-33-00 | |||||
SCORE 100 Date: November 7, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 596-280-07-00 | |||||
SCORE 100 2136 Camino Christina Ground mount residential solar pv for existing sfd no. Of modules: 55 no. Of inverters: 1 total system size in kilowatts: 12. 6 Date: May 21, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 404-471-01-00 | |||||
SCORE 100 112 Lorena Ln, El Cajon, Ca 92020 Hra ground-mount solar photovoltaic, sharp system, for sfd-ded, 3 9 05. Date: March 9, 2005 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1030-20 | Parcel: 497-172-07-00 | |||||
SCORE 100 1368 Wenatchee Ave, El Cajon, Ca 92021 Roof mount solar pv system (39 modules, 1 inverter, 6. 8 kw) note: system does not extend more than 5 above existing roof. Date: October 15, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 388-500-48-00 | |||||
SCORE 100 10505 Valle Vista Rd, Lakeside, Ca 92040 Roof mount solar pv system partially on on existing m-h & partially on sitck built addn.(hra) system does not extend more than 5 above existing roof Date: April 24, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 379-093-35-00 | |||||
SCORE 100 13207 Barona Rd, Lakeside, Ca 92040 26 modules 1 inverter 3. 6 kw roof monted pv system... Dah09 08 05 03-apr-2006: flag cleared so inspections can be scheduled via civic ivr. This property was affected by the cedar fire and should continue to receive the benefit of any related special considerations. Any questions, please call scott gilmore (858-694-3847) or building division (858-565-5920).--1d1a Date: September 8, 2005 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1030-20 | Parcel: 329-150-09-00 | |||||
SCORE 100 95 Chestnut St, Spring Valley, Ca 91977 Roof mount solar photo voltaic system for existing sfd (hra). System must not extend more than 5 above highest point of existing roof 27-aug-2007: add to permit sfd svc upgrade to 125 amps. Ksg Date: August 7, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 579-376-20-00 | |||||
SCORE 100 80 Th Bar Ranch Trl, Alpine, Ca 91901 On-grid roof mounted solar photovoltaic -hra, 31. 9 amp ( 34 modules-two strings and one inverter) for two det. Residential structures & upgrade of service to 2 amps. 1 25 07: plan change see conditions of approval for details. 1srs Date: December 14, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Issued expired | Permit id: Pds2006-1030-20 | Parcel: 404-100-16-00 | |||||
SCORE 100 3017 Anderson St, Bonita, Ca 91902 Hra roof mount sloar photovoltaic system (26 panels, 2 inverters and 3. 8 kw) and misc elect service upgrade from 125 to 2 amps system not to extend more than 5 ft above exisitng roof Date: November 19, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 590-040-02-00 | |||||
SCORE 100 615 Harbison Canyon Rd, El Cajon, Ca 92019 Roof mounted photovoltaic system --- (hra) 12 modules 1 inverter 2. 1 kw Date: December 15, 2005 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1030-20 | Parcel: 399-250-09-00 | |||||
SCORE 100 1 N Kalbaugh St, Ramona, Ca 92065 Roof mount solar pv system (33 modules, 1 inverter, 5. 7 kw). Note: system does not extend more than 5 above existing roof. Date: October 15, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 282-160-76-00 | |||||
SCORE 100 4588 Conrad Dr, La Mesa, Ca 91941 Roof mounted solar photovoltaic system,sharp, sma america, (sunny boy) for sfd & upgrade main service to 2 amps. Note: system does not extend more than 5 above existing roof. 2 23 06: plan change see conditions of approval for details. 1srs Date: February 14, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 496-222-02-00 | |||||
SCORE 100 4214 Lovett Ln, La Mesa, Ca 91941 Roof mount solar pv system -- 24 modules, 1 inverter, 3. 3 kw (hra); also, relocate & upgrade electrical panel to 2 amps service. Note: system does not extend more than 5 above existing roof. Date: July 16, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1007-20 | Parcel: 501-101-24-00 | |||||
SCORE 100 4 Peutz Valley Rd, Alpine, Ca 91901 Hra photo-voltaic system, roof mounted, for sfd.-ded, 8 4 05 there is an existing fico on property, not related to photo-voltaic permit. It was lifted temporarily per pam elias so this permit could be pulled and will be replaced after issuance of this permit. Date: August 4, 2005 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2005-1030-20 | Parcel: 402-220-11-00 | |||||
SCORE 100 4871 Rancho Viejo Dr, Del Mar, Ca 92014 Roof mount solar pv system for sfd. Note: system does not extend more than 5 above existing roof. Date: February 8, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 302-222-11-00 | |||||
SCORE 100 9147 Bubbling Wells Rd, Lakeside, Ca 92040 Hra-solar photovoltaic system -roof mounted ( one string w 24 modules and 1 inverter) for existing sfd. Date: February 26, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 397-232-05-00 | |||||
SCORE 100 19573 Paradise Mountain Rd Ground mount residential solar pv for existing sfd no. Of modules: 60 no. Of inverters: 2 total system size in kilowatts: 11. 7 03. 27. 2012: relocate panel location... Lhg 2 29 12: plan change; see c of a... Vmt Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 191-180-16-00 | |||||
SCORE 100 2457 Avnda Canora, Alpine, Ca 91901 Hra -to install solar photovoltaic system array -roof mounted ( 28 modules, two inverters, 13. 08 kw) for existing sfd. Date: October 27, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 404-280-04-00 | |||||
SCORE 100 4363 Vista Way, La Mesa, Ca 91941 Ground mount photo voltaic system (15 modules, 1 inverter)--hra; also, electrical upgrade to 2 amps. Date: January 17, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 501-034-02-00 | |||||
SCORE 100 1106 Alpine Oaks Dr, Alpine, Ca 91901 Hra roof mount solar photovoltaic system ( modules, 2 inverter, kw) system not to extend more than 5 ft above existing roof Date: September 25, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 520-030-59-00 | |||||
SCORE 100 2229 San Diego Ave, Ramona, Ca 92065 Hra on grid roof-mounted photo-voltaic system - 18 panel array (sharp nd200), invertor for sfd - ded, 3 16 06 Date: March 16, 2006 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2006-1030-20 | Parcel: 282-233-48-00 | |||||
SCORE 100 1405 Fuerte Heights Ln, El Cajon, Ca 92019 H. R. A. Roof mount photo voltaic system. 33 modules, 1 inverter. 5. 7 kw note: system does not extend more than 5 above existing roof. Date: May 4, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 498-371-28-00 | |||||
SCORE 100 2012 Via Trueno Ground mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 6. 9 Date: June 7, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 520-230-22-00 | |||||
SCORE 100 3662 Tuk A Wile Dr, Jamul, Ca 91935 Hra roof mount solar photvoltaic system (18 modules, 1 inverter, 3 kw) system not to extend more than 5 ft above existing roof Date: November 17, 2008 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 519-071-30-00 | |||||
SCORE 100 2465 Camino Del Vecino Ground mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 11, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 404-470-20-00 | |||||
SCORE 100 1263 Keyes Rd, Ramona, Ca 92065 Roof mount solar pv system. 44 modules, 2 inverters. Also upgrade sfd svc panel from 1 to 2 amps. Pv system only is hra no fee. Date: November 27, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1007-20 | Parcel: 284-020-20-00 | |||||
SCORE 100 2161 Eucalyptus Ave Ground mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 6 Date: June 21, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 235-202-75-00 | |||||
SCORE 100 744 Quiet Hills Farm Rd, Escondido, Ca 92029 Hra on-grid roof-mounted solar photo-voltaic system, including 3. 6 kw system, modules and 1 invertor, for sfd. Roof mounted solar voltaic per section 4620(1) of the zoning ordinance the photo voltaic system is not to extend greater than 5 feet above the highest point of the existing roof. Date: March 19, 2007 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2007-1030-20 | Parcel: 270-261-08-00 | |||||
SCORE 100 28718 Top Of The Pines Ln, Pine Valley, Ca 91962 Ground mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 8 upgrade from amp to 100amp 1 13 11... See c of a... Mls Date: November 23, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 410-052-60-00 | |||||
SCORE 100 3905 Pala Mesa Dr, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: 1 total system size in kilowatts: 9. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 06. 26. 2012: relocate existing panels and inverter location.. Lhg Date: May 24, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 125-020-33-00 | |||||
SCORE 100 77 Calle De La Estrella, Pine Valley, Ca 91962 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 6. 87 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 15, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 410-200-01-00 | |||||
SCORE 100 9881 Lemon Ave, La Mesa, Ca 91941 Roof mount residential solar pv for existing sfd no. Of modules: 48 no. Of inverters: 2 total system size in kilowatts: 15. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 15, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 496-040-26-00 | |||||
SCORE 100 1193 Venture Valley Rd, Julian, Ca 92036 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 8, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 251-120-41-00 | |||||
SCORE 100 7 Leland Pl, El Cajon, Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules: 22 no. Of inverters: 1 total system size in kilowatts: 5. 17 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 8, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 493-120-12-00 | |||||
SCORE 100 1269 Tuttle Ln, El Cajon, Ca 92021 Roof mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: 1 total system size in kilowatts: 6. 58 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 8, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 388-130-20-00 | |||||
SCORE 100 6279 Via Campo Verde, Rancho Santa Fe, Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules: 70 no. Of inverters: 3 total system size in kilowatts: 22. 9 misc elect for panel change out per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 6, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 269-182-19-00 | |||||
SCORE 100 3127 Toyon Heights Dr, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 8 12. 27. 2012: changed to aleo modules ok per jra.. Lhg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 6, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 105-780-15-00 | |||||
SCORE 100 11632 Westhill Vista, Lakeside, Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules: 26 no. Of inverters: 1 total system size in kilowatts: 6. 11 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 24, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 382-122-85-00 | |||||
SCORE 100 4028 Country Trails, Bonita, Ca 91902 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 5. 64 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 24, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 594-250-18-00 | |||||
SCORE 100 11674 Westhill Vista, Lakeside, Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 6. 87 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 24, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 382-122-83-00 | |||||
SCORE 100 9901 Helix Mont Dr, La Mesa, Ca 91941 Roof mount residential solar pv for existing sfd no. Of modules: 16 no. Of inverters: 1 total system size in kilowatts: 4. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 23, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 501-012-31-00 | |||||
SCORE 100 13703 Whispering Meadows Ln, Jamul, Ca 91935 Roof mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: 2 total system size in kilowatts: 5. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 18, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 597-180-22-00 | |||||
SCORE 100 1319 Cadoglenn Dr, El Cajon, Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules: 14 no. Of inverters: 1 total system size in kilowatts: 4. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 11, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 514-441-12-00 | |||||
SCORE 100 19 Nicole St, Ramona, Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 5. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 9, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 279-121-19-00 | |||||
SCORE 100 3477 Barrett View Rd, Alpine, Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 6 total system size in kilowatts: 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 8, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 524-171-21-00 | |||||
SCORE 100 4012 Rogers Rd, Spring Valley, Ca 91977 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 6. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 26, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 500-133-25-00 | |||||
SCORE 100 3673 Fairview Dr, Vista, Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules: 39 no. Of inverters: 1 total system size in kilowatts: 9. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 26, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Issued invalid expired | Permit id: Pds2012-1031-20 | Parcel: 126-340-29-00 | |||||
SCORE 100 9371 Alto Dr, La Mesa, Ca 91941 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 6. 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 21, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 495-100-86-00 | |||||
SCORE 100 4585 Sleeping Indian Rd, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd and 2 amp service upgrade no. Of modules: 21 no. Of inverters: 6 total system size in kilowatts: 6. 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 21, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 121-080-50-00 | |||||
SCORE 100 358 Washington St, Ramona, Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 2 total system size in kilowatts: 11. 8 electrical service upgrade to 225 amps per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 21, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 279-120-47-00 | |||||
SCORE 100 12214 Green Top Ln, El Cajon, Ca 92020 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 8. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 21, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 498-270-93-00 | |||||
SCORE 100 7807 Artesian Rd, San Diego, Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules: 18 no. Of inverters: 1 total system size in kilowatts: 5. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 21, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 267-146-03-00 | |||||
SCORE 100 2 Ramona Real, Ramona, Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules: 40 no. Of inverters: 1 total system size in kilowatts: 13 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 17, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 279-121-31-00 | |||||
SCORE 100 14423 Oak Meadow Rd, Valley Center, Ca 92082 Cole valley rd description of work ground mount residential solar pv for existing sfd no. Of modules: no. Of inverters: 1 total system size in kilowatts: 9. 8 10 15 12 plan change rearrange see c of a... Vmd Date: September 17, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 133-351-07-00 | |||||
SCORE 100 3139 San Souci Dr, Escondido, Ca 92029 Roof mount residential solar pv for existing sfd no. Of modules: 20 no. Of inverters: 1 total system size in kilowatts: 4. 48 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 13, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 270-340-20-00 | |||||
SCORE 100 9405 Saguaro Rd, Lakeside, Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 6. 0 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 13, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Issued invalid expired | Permit id: Pds2012-1031-20 | Parcel: 382-290-67-00 | |||||
SCORE 100 146 Lyons Valley Rd, Jamul, Ca 91935 Roof mount residential solar pv for existing sfd no. Of modules: 35 no. Of inverters: 2 total system size in kilowatts: 4. 1 6. 0 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 13, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 519-260-62-00 | |||||
SCORE 100 10 Ocean Vista Way, Ramona, Ca 92065 Ground mount residential solar pv for existing sfd no. Of modules: 31 no. Of inverters: 1 total system size in kilowatts: 11. 8 Date: September 5, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 244-100-27-00 | |||||
SCORE 100 28942 Welcome View, Escondido, Ca 92026 Ground mount residential solar pv for existing sfd no. Of modules: 40 no. Of inverters: 1 total system size in kilowatts: 11. 4 also, electrical upgrade to 2 amps service Date: September 5, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 186-021-13-00 | |||||
SCORE 100 2196 Vista Grande Dr, Vista, Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules: 35 no. Of inverters: 1 total system size in kilowatts: 11. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 5, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 171-100-12-00 | |||||
SCORE 100 18891 Los Hermanos Ranch Rd, Valley Center, Ca 92082 Roof mount residential solar pv for existing sfd (located on barn) no. Of modules: 21 no. Of inverters:1 total system size in kilowatts: 6. 0 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 22, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 189-300-25-00 | |||||
SCORE 100 2932 Via Loma Vista, Escondido, Ca 92029 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 6. 86 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 10, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 270-211-19-00 | |||||
SCORE 100 37 Avocado Blvd, La Mesa, Ca 91941 Ground mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: 1 total system size in kilowatts: 8 Date: August 10, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 501-282-39-00 | |||||
SCORE 100 508 Alpine Heights Rd, Alpine, Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 6. 87 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 3, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 404-340-61-00 | |||||
SCORE 100 10203 Winecreek Ct, San Diego, Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules: 16 no. Of inverters: 1 total system size in kilowatts: 5. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 3, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 312-283-01-00 | |||||
SCORE 100 1954 Oak View Pl, Alpine, Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules: 48 no. Of inverters: 3 total system size in kilowatts: 15. 6 also, electrical upgrade to 4 amps service. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 3, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 404-210-03-00 | |||||
SCORE 100 15969 Winesprings Dr, San Diego, Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 6. 86 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 3, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 312-280-09-00 | |||||
SCORE 100 2822 Willow Glen Dr, El Cajon, Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: 1 total system size in kilowatts: 9. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 25, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 518-020-62-00 | |||||
SCORE 100 13838 Cheryl Creek Dr, El Cajon, Ca 92021 Roof mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: 1 total system size in kilowatts: 9. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 25, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 398-540-15-00 | |||||
SCORE 100 7588 Vista Rancho Ct, Rancho Santa Fe, Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules: 56 no. Of inverters: 2 total system size in kilowatts: 18. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 8 10 12: plan change; see c of a... Vmt Date: July 25, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 265-480-10-00 | |||||
SCORE 100 17625 Rancho De Oro Dr, Ramona, Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 6. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 16, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 283-032-41-00 | |||||
SCORE 100 2325 Wind River Rd, El Cajon, Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules: 16 no. Of inverters: 1 total system size in kilowatts: 5. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 16, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 518-112-12-00 | |||||
SCORE 100 32 Knottwood Way, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 6. 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 26, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Issued invalid expired | Permit id: Pds2012-1031-20 | Parcel: 124-393-32-00 | |||||
SCORE 100 25 Majella Rd, Vista, Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules: 48 no. Of inverters: 2 total system size in kilowatts: 15. 7 4 amps electrical upgrade under permit 1007-20040892 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 26, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Issued invalid expired | Permit id: Pds2012-1031-20 | Parcel: 159-210-14-00 | |||||
SCORE 100 5217 Nannette St, Bonita, Ca 91902 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 7. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 21, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 590-020-20-00 | |||||
SCORE 100 2161 Eucalyptus Ave San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules 24 no. Of inverters 1 total system size in kilowatts 6 Date: June 21, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 2352027500 | |||||
SCORE 100 12622 Wildcat Canyon Rd, Lakeside, Ca 92040 Ground mount residential solar pv for existing sfd -- adding to existing system no. Of modules: 28 no. Of inverters: 1 total system size in kilowatts: 6. 6 Date: June 7, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 329-140-39-00 | |||||
SCORE 100 2012 Via Trueno San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules 21 no. Of inverters 1 total system size in kilowatts 6. 9 Date: June 7, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 5202302200 | |||||
SCORE 100 14838 Presilla Dr, Jamul, Ca 91935 Roof mount residential solar pv for existing sfd no. Of modules: 30 no. Of inverters: 1 total system size in kilowatts: 9. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 4, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 597-262-16-00 | |||||
SCORE 100 2921 Pioneer Way, Jamul, Ca 91935 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 6. 8 10-23-14 permit renewed... Must call for a valid inspection within 1 days... Tlh per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 4, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 597-220-35-00 | |||||
SCORE 100 3215 Via Viejas Oeste, Alpine, Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules: 80 no. Of inverters: 1 total system size in kilowatts: 18 Date: May 21, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 520-223-20-00 | |||||
SCORE 100 1815 Granite Hills Dr, El Cajon, Ca 92019 Roof mount residential solar pv for existing sfd (located on detached permitted garage) no. Of modules: 35 no. Of inverters: 1 total system size in kilowatts: 11. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 21, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 511-240-23-00 | |||||
SCORE 100 1283 Alpine Heights Rd, Alpine, Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 7 Date: May 21, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 404-143-15-00 | |||||
SCORE 100 2465 Camino Del Vecino San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules 33 no. Of inverters 1 total system size in kilowatts 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 11, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 4044702000 | |||||
SCORE 100 3685 Valley Rd, Bonita, Ca 91902 Roof mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 75 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 3, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 591-112-03-00 | |||||
SCORE 100 15836 El Monte Rd, Lakeside, Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules: 48 no. Of inverters: 1 total system size in kilowatts: 10. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 27, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 390-060-05-00 | |||||
SCORE 100 61 Coronado View Rd, Alpine, Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 5. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 27, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 520-100-27-00 | |||||
SCORE 100 3965 Carveacre Rd, Alpine, Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules: 18 no. Of inverters: 1 total system size in kilowatts: 4. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 27, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 524-150-26-00 | |||||
SCORE 100 1411 Chase Trl, El Cajon, Ca 92020 Roof mount residential solar pv for existing sfd no. Of modules: 40 no. Of inverters: 1 total system size in kilowatts: 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 27, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 514-062-49-00 | |||||
SCORE 100 24 Pine Dr, Campo, Ca 91906 Roof mount residential solar pv for existing sfd no. Of modules: 27 no. Of inverters: 1 total system size in kilowatts: 6 2 amp subpanel per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 5 24 12: plan change -- strl only; see c of a... Vmt Date: April 16, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 606-053-20-00 | |||||
SCORE 100 16555 Woods Valley Rd, Valley Center, Ca 92082 Roof mount residential solar pv for existing sfd no. Of modules: 40 no. Of inverters: 1 total system size in kilowatts: 9. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 5 21 12: plan change; see c of a... Vmt Date: June 4, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 189-180-43-00 | |||||
SCORE 100 3002 Live Oak Park Rd, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 27 no. Of inverters: 1 total system size in kilowatts: 6. 1 also, 1 amp subpanel per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 12, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 105-700-16-00 | |||||
SCORE 100 13 Montecito Ln, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 1 total system size in kilowatts: 10. 1 also, 1 amp subpanel per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 4 12 12: plan change; see c of a... Vmt Date: April 10, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 123-510-03-00 | |||||
SCORE 100 1935 Fenoval Dr, Borrego Springs, Ca 92004 Roof mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 1 total system size in kilowatts: 7. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 04. 10. 2012: plan change to relocate inverter and add ac disconnect... Lhg Date: April 3, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 141-330-09-00 | |||||
SCORE 100 897 Quail Hill Rd, Fallbrook, Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules: 45 no. Of inverters: 1 total system size in kilowatts: 9. 4 Date: April 3, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 105-560-12-00 | |||||
SCORE 100 6 Estrelita Dr, Vista, Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules: 32 no. Of inverters: 1 total system size in kilowatts: 6. 72 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 29, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 184-280-25-00 | |||||
SCORE 100 3088 Margarita Vista, Fallbrook, Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 1 total system size in kilowatts: 7. 56 4 12 12: plan change; see c of a... Vmt Date: March 29, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 105-772-33-00 | |||||
SCORE 100 303 Summit Ave, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 27 no. Of inverters: 1 total system size in kilowatts: 6 electrical service upgrade to 2 amps per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 04. 03. 2012: plan change relocate inverter... Lhg Date: March 27, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 104-010-08-00 | |||||
SCORE 100 3839 Ladera Vista Rd, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 5. 4 04. 05: plan change add subpanel... Lhg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 27, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 123-420-22-00 | |||||
SCORE 100 25037 Manzanita Ln, Descanso, Ca 91916 Roof mount residential solar pv for existing sfd no. Of modules: 30 no. Of inverters: 2 total system size in kilowatts: 6. 2 05. 03. 2012: plan change add load center.... Lhg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 20, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 408-231-17-00 | |||||
SCORE 100 4044 Ladera Vista Rd, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 84 no. Of inverters: 3 total system size in kilowatts: 30. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: March 16, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 123-420-37-00 | |||||
SCORE 100 1848 E Alvarado St, Fallbrook, Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 5. 4 Date: March 16, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 105-473-27-00 | |||||
SCORE 100 4046 Ladera Vista Rd, Fallbrook, Ca 92028 Roof mount residential solar pv for ag well (located on existing storage bldg under parcel 123-420-37- ) no. Of modules: 66 no. Of inverters: 2 total system size in kilowatts: 15. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 04. 17. 2012: change to update correct address parcel on oermit... Lhg 04. 16. 2012: plan change change wire size... Lhg Date: March 16, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 123-420-36-00 | |||||
SCORE 100 28 Vista Del Rio, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 45 no. Of inverters: 1 total system size in kilowatts: 10 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 29, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 102-750-11-00 | |||||
SCORE 100 1348 Banyan Dr, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 29, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 105-363-03-00 | |||||
SCORE 100 153 Vista Jamul, Jamul, Ca 91935 Ground mount residential solar pv for existing sfd no. Of modules: 80 no. Of inverters: 2 total system size in kilowatts: 18 cannot final before sfd still under construction 1003-20100007 5 20 13: permit renewal -- must call for inspection within 1 days & permit is good to 2 8 28 15... M1a Date: February 29, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 597-101-13-00 | |||||
SCORE 100 9386 Spencer Ct, Lakeside, Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules: 22 no. Of inverters: 1 total system size in kilowatts: 5. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 24, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 394-570-33-00 | |||||
SCORE 100 4562 Calavo Dr, La Mesa, Ca 91941 Roof mount residential solar pv for existing sfd no. Of modules: 40 no. Of inverters: 1 total system size in kilowatts: 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 22, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 497-116-42-00 | |||||
SCORE 100 7242 Via Mariposa Norte, Bonsall, Ca 92003 Camino del rey description of work ground mount residential solar pv for existing sfd no. Of modules: 45 no. Of inverters: 1 total system size in kilowatts: 10. 1 Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 127-500-14-00 | |||||
SCORE 100 1003 S Ridge Dr, Fallbrook, Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules: 40 no. Of inverters: 1 total system size in kilowatts: 10. 1 Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 105-220-52-00 | |||||
SCORE 100 813 La Rue Ave, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 16 no. Of inverters: 1 total system size in kilowatts: 3. 14 04. 05. 2012: plan change add disconnect... Lhg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 105-841-19-00 | |||||
SCORE 100 4694 Sleeping Indian Rd, Fallbrook, Ca 92028 Roof mount residential solar pv for garage see 1006-20120014 under construction for existing sfd no. Of modules: 40 no. Of inverters: 1 total system size in kilowatts: 7. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof.. 02. 22. 2012: plan change see conditions of approval ... Lhg Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 121-080-76-00 | |||||
SCORE 100 41272 De Luz Rd, Fallbrook, Ca 92028 Ground mount residential solar pv and upgrade elec 2 amp for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 4. 8 Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 101-210-24-00 | |||||
SCORE 100 19573 Paradise Mountain Rd San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules no. Of inverters 2 total system size in kilowatts 11. 7 03. 27. 2012 relocate panel location... Lhg 2 29 12 plan change; see c of a... Vmt Date: February 15, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 1911801600 | |||||
SCORE 100 23932 Berryessa Ct, Ramona, Ca 92065 Roof mount residential solar pv add disconnect for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 02 16 12 plan change reduce mod and add disconnect see c of a... Vmd Date: January 26, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 288-411-10-00 | |||||
SCORE 100 3945 Pala Mesa Dr, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 40 no. Of inverters: 1 total system size in kilowatts: 9 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 26, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 125-020-32-00 | |||||
SCORE 100 3968 Lorita Ln, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 5. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 26, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 108-223-03-00 | |||||
SCORE 100 10268 Pinon Pl, Lakeside, Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 5. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 18, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 379-341-38-00 | |||||
SCORE 100 4057 Ladera Vista Rd, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 48 no. Of inverters: 1 total system size in kilowatts: 10. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 02 16 12 plan change revise details on singular diagram see c of a... Vmd Date: January 12, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 123-420-28-00 | |||||
SCORE 100 176 Rancho De Oro Dr, Ramona, Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules: 32 no. Of inverters: 1 total system size in kilowatts: 6. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 11, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 283-032-67-00 | |||||
SCORE 100 1704 Rice Canyon Rd, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 1 total system size in kilowatts: 8. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 6, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 108-310-47-00 | |||||
SCORE 100 4677 La Canada Rd, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 40 no. Of inverters: 1 total system size in kilowatts: 9. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 6, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 123-340-60-00 | |||||
SCORE 100 4271 Tim St, Bonita, Ca 91902 Ground mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 5 21-feb-2012: plan change - structl only. Ksg Date: January 4, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 594-303-09-00 | |||||
SCORE 100 2935 Vista Del Rio, Fallbrook, Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules: 26 no. Of inverters: 1 total system size in kilowatts: 5. 2 Date: January 4, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 102-610-30-00 | |||||
SCORE 100 2233 Audrey Ct, Fallbrook, Ca 92028 Roof mount residential solar pv on existing garage for existing sfd no. Of modules: 32 no. Of inverters: 1 total system size in kilowatts: 6. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 3, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 105-291-10-00 | |||||
SCORE 100 8125 Via Urner Way, Bonsall, Ca 92003 Roof mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 6 07-feb-2012: plan change to revise flashing detail per b. I. Comment. Ksg per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 3, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 127-060-71-00 | |||||
SCORE 100 15 Vista Del Lago Dr, Fallbrook, Ca 92028 Ground mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 1 total system size in kilowatts: 8. 1 Date: December 20, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-020-34-00 | |||||
SCORE 100 1636 Cam De Nog, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 8 total system size in kilowatts: 8. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 16, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 106-200-27-00 | |||||
SCORE 100 839 Verde Ave, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 22 no. Of inverters: 5 total system size in kilowatts: 5. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 16, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 121-180-01-00 | |||||
SCORE 100 2933 Mackey Dr, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 5 total system size in kilowatts: 5. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 16, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 123-390-18-00 | |||||
SCORE 100 4315 Conrad Dr, Spring Valley, Ca 91977 Roof mount residential solar pv for existing sfd no. Of modules: 50 no. Of inverters: 1 total system size in kilowatts: 11. 25 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 02. 21. 2012: inverter relocated... Lhg Date: December 15, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 500-052-58-00 | |||||
SCORE 100 633 Bradford Rd, El Cajon, Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules: 80 no. Of inverters: 2 total system size in kilowatts: 18 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 512-030-24-00 | |||||
SCORE 100 135 S Wisconsin Ave, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 15, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 103-301-05-00 | |||||
SCORE 100 2 S Stage Coach Ln, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 27 no. Of inverters: 1 total system size in kilowatts: 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 2, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-281-02-00 | |||||
SCORE 100 3127 Vista Del Rio, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 7. 68 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 2, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 102-521-13-00 | |||||
SCORE 100 3024 Sylvia St, Bonita, Ca 91902 Roof mount residential solar pv for existing sfd no. Of modules: 32 no. Of inverters: 1 total system size in kilowatts: 7. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 30, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 590-031-05-00 | |||||
SCORE 100 1801 Redwing Way, San Marcos, Ca 92069 Roof mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: 1 total system size in kilowatts: 6. 58 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 18, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Issued expired | Permit id: Pds2011-1031-20 | Parcel: 222-143-10-00 | |||||
SCORE 100 2266 Gird Rd, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 18 no. Of inverters: 1 total system size in kilowatts: 3. 66 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 11. 09. 2011: plan change-see conditions of approval... Lhg Date: November 4, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 107-220-57-00 | |||||
SCORE 100 1691 Chandelle Ln, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 49 no. Of inverters: 1 total system size in kilowatts: 11 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 4, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-491-02-00 | |||||
SCORE 100 8189 Lamour Ln, San Diego, Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules: 40 no. Of inverters: 1 total system size in kilowatts: 7. 87 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 21, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 267-180-12-00 | |||||
SCORE 100 1633 Chandelle Ln San Diego Ca Roof mount residential solar pv for existing sfd no. Of modules 36 no. Of inverters 1 total system size in kilowatts 6. 29 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 21, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 1054910300 | |||||
SCORE 100 4033 Ladera Vista Rd, Fallbrook, Ca 92028 _roof mount residential solar pv for existing sfd no. Of modules: 40 no. Of inverters: 2 total system size in kilowatts: 7. 87 11 17 11... Plan change, see c of a... Mls per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 21, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 123-420-41-00 | |||||
SCORE 100 1 S Ridge Dr, Fallbrook, Ca 92028 Roof_ mount residential solar pv for existing sfd no. Of modules: 20 no. Of inverters: 1 total system size in kilowatts: 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 23, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-700-21-00 | |||||
SCORE 100 8 El Camto Rd, Fallbrook, Ca 92028 Roof mount residential solar pv for existing sfd no. Of modules: 20 no. Of inverters: 1 total system size in kilowatts: 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 23, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-261-18-00 | |||||
SCORE 100 2082 Honey Springs Rd, Jamul, Ca 91935 Roof _ mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 5 total system size in kilowatts: 6 also replace existing 2 amp meter with new 2 amp meter per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 23, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 600-030-20-00 | |||||
SCORE 100 3109 Miramontes Rd, Jamul, Ca 91935 Adding 9 modules to existing ground mount residential solar pv for existing sfd no. Of modules: adding 9 to existing pv no. Of inverters: no new inverter - using existing total system size in kilowatts: 1. 9 9 8 11... Plan change, see c of a... Mls Date: August 11, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Issued expired | Permit id: Pds2011-1031-20 | Parcel: 596-140-07-00 | |||||
SCORE 100 6767 Las Ventanas, Rancho Santa Fe, Ca 92067 Ground mount residential solar pv for existing sfd no. Of modules: 64 no. Of inverters: 2 total system size in kilowatts: 14. 4 upgrade to 225 amp Date: August 1, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 303-061-13-00 | |||||
SCORE 100 174 Standing Rock Rd, Jamul, Ca 91935 Ground mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 1 total system size in kilowatts: 8. 5 Date: June 1, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 522-260-11-00 | |||||
SCORE 100 1334 Midway Dr, Alpine, Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: 1 total system size in kilowatts: 6. 5 4 27 11... Plan change, see c of a... Mls Date: April 18, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 403-381-20-00 | |||||
SCORE 100 17366 San Pasqual Valley Rd, Escondido, Ca 92027 Ground mount commercial solar pv for san pasqual avocado company no. Of modules: 140 no. Of inverters: 1 total system size in kilowatts: 32. 9 Permit type: Solar photovoltaic comml (non-hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 242-080-09-00 | |||||
SCORE 100 846 Evergreen Ln, Vista, Ca 92084 Ground mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 75 Date: April 15, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 170-020-12-00 | |||||
SCORE 100 27 High Mead Crk, Vista, Ca 92084 Ground mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 1 total system size in kilowatts: 8. 5 5 3 11... Plan change (svc upgrade)... See c of a... Mls 4 27 11... Plan change... See c of a... Mls Date: April 15, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 170-142-14-00 | |||||
SCORE 100 24157 San Vicente Rd, Ramona, Ca 92065 Ground mount commercial solar pv no. Of modules: 33 no. Of inverters: 7000 total system size in kilowatts: 7. 75 Date: April 4, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic comml (non-hra) | Permit status: Completed | Permit id: Pds2011-1007-20 | Parcel: 288-320-09-00 | |||||
SCORE 100 10608 Aspen Glen, Escondido, Ca 92026 Roof mount residential solar pv for existing sfd no. Of modules: 32 no. Of inverters: 2 total system size in kilowatts: 7. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 1, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 186-741-09-00 | |||||
SCORE 100 1437 Windridge Dr, El Cajon, Ca 92020 Roof mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 75 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 1, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 514-050-43-00 | |||||
SCORE 100 3048 Rancho Del Verde Pl San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules 78 no. Of inverters 2 (80 watt) total system size in kilowatts 18. 3 4 27 11... Plan change, see c of a... Mls 4 18 11... Plan change, see c of a... Mls Date: March 29, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 2371611800 | |||||
SCORE 100 3347 Armagosa Way, Jamul, Ca 91935 Ground mount residential solar pv for existing sfd no. Of modules: 55 no. Of inverters: 1 total system size in kilowatts: 11. 75 4-1-2011 plan change see conditions of approval vam 3 30 11... Plan change, see c of a... Mls Date: March 9, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 596-280-09-00 | |||||
SCORE 100 573 Anderson Rd, Alpine, Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 8 Date: March 2, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 402-340-12-00 | |||||
SCORE 100 2641 Firebrand Way, Alpine, Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules: 14 no. Of inverters: 1 total system size in kilowatts: 3. 3 Date: March 2, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 520-271-30-00 | |||||
SCORE 100 2697 Firebrand Pl, Alpine, Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules: 14 no. Of inverters: 1 total system size in kilowatts: 2. 7 03 25 2011 reinspection fee paid... 1jle per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 17, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 520-272-07-00 | |||||
SCORE 100 50 Montiel Truck Trl, Jamul, Ca 91935 Ground mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 6. 5 03. 21. 2011: plan change to plot plan to show att structure on property... Lhg Date: February 14, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 521-110-63-00 | |||||
SCORE 100 2696 Firebrand Pl, Alpine, Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules: 14 no. Of inverters: 1 total system size in kilowatts: 2. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 14, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 520-272-08-00 | |||||
SCORE 100 251 Poinsettia Ave, Vista, Ca 92083 Roof mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 1 total system size in kilowatts: 8. 46 also upgrade to 200amp per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 4, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 217-093-32-00 | |||||
SCORE 100 12 Barbara Dr, Vista, Ca 92084 Roof mount residential solar pv for existing sfd no. Of modules: 26 no. Of inverters: 1 total system size in kilowatts: 6. 1 also upgrade to 2 amps per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 4, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 180-200-17-00 | |||||
SCORE 100 3355 Emmanuel Way, Alpine, Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 75 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 4, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 524-060-11-00 | |||||
SCORE 100 2453 Avnda Canora, Alpine, Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 5. 6 Date: January 27, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 404-280-05-00 | |||||
SCORE 100 146 Calle Diegueno, Rancho Santa Fe, Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules: 36 no. Of inverters: 2 total system size in kilowatts: 8. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 27, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 303-040-52-00 | |||||
SCORE 100 945 Deodar Rd, Escondido, Ca 92026 Ground mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 75 relocating array placement. See appvd 1031-20110059 Date: November 4, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 228-110-18-00 | |||||
SCORE 100 1812 Mil Sorpresas Dr, San Diego, Ca Ground mount residential solar pv for existing sfd no. Of modules: 33 no. Of inverters: 1 total system size in kilowatts: 7. 8 Date: January 14, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 105-020-55-00 | |||||
SCORE 100 1047 Gamble Ln, Escondido, Ca 92029 Roof mount residential solar pv for existing sfd no. Of modules: 16 no. Of inverters: 1 total system size in kilowatts: 3. 3 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 14, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 238-090-05-00 | |||||
SCORE 100 1991 Pine View Rd, Alpine, Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules: 40 no. Of inverters: 11. 4 total system size in kilowatts: 9. 2 Date: January 11, 2011 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 404-220-20-00 | |||||
SCORE 100 15701 Via Salvador, Valley Center, Ca 92082 Ground mount residential solar pv for existing sfd no. Of modules: 20 no. Of inverters: 1 total system size in kilowatts: 4. 5 Date: August 18, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 188-321-27-00 | |||||
SCORE 100 58 San Elijo, Rancho Santa Fe, Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules: 63 no. Of inverters: 2 total system size in kilowatts: 12. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 10, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 265-120-12-00 | |||||
SCORE 100 3901 Viejas Creek Ln, Alpine, Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules: 42 no. Of inverters: 1 total system size in kilowatts: 8. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: August 10, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 404-240-29-00 | |||||
SCORE 100 17114 Tallow Tree Ln, San Diego, Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: 1 @ 60 watts total system size in kilowatts: 6. 4 kwdc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 28, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 678-430-03-00 | |||||
SCORE 100 15632 El Monte Rd, Lakeside, Ca 92040 Roof mount residential solar pv for existing sfd no. Of modules: 20 no. Of inverters: 1 @ 40 watts total system size in kilowatts: 4. 6 kwdc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 28, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 390-050-17-00 | |||||
SCORE 100 11969 Paseo Fuerte, El Cajon, Ca 92020 Roof mount residential solar pv for existing sfd no. Of modules: 48 no. Of inverters: 1 total system size in kilowatts: 11 06 16 plan change eliminate ac discon. Add sub-panel see c of a per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 11, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 498-153-29-00 | |||||
SCORE 100 15676 North Peak Rd, Julian, Ca 92036 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 4. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 28, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 294-151-22-00 | |||||
SCORE 100 3747 Putter Dr, Bonita, Ca 91902 Roof mount residential solar pv for existing sfd no. Of modules: 18 no. Of inverters: 1 total system size in kilowatts: 4. 8 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: May 28, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 570-262-04-00 | |||||
SCORE 100 2136 Camino Christina San Diego Ca Ground mount residential solar pv for existing sfd no. Of modules 55 no. Of inverters 1 total system size in kilowatts 12. 6 Date: May 21, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 4044710100 | |||||
SCORE 100 164 Dawn View Way, El Cajon, Ca 92021 Roof mount residential solar pv for existing sfd, misc electrical to add subpanel no. Of modules: 26 no. Of inverters: 1 total system size in kilowatts: 5. 1 kwdc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 5 11 10, plan change, see c of a for details, mls Date: April 30, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 401-090-73-00 | |||||
SCORE 100 1729 Smokey Ln, Spring Valley, Ca 91977 Roof mount residential solar pv for existing sfd no. Of modules: 27 no. Of inverters: 1 total system size in kilowatts: 5. 67 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: April 23, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 578-082-29-00 | |||||
SCORE 100 18629 Quail Tl Dr, Jamul, Ca 91935 Ground mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 5 total system size in kilowatts: 5. 5 Date: April 23, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 600-210-20-00 | |||||
SCORE 100 6 Richland View Ct, San Marcos, Ca 92069 Ground mount residential solar pv for existing sfd note: customer is using 6 richland view ln no. Of modules: 20 no. Of inverters: 1 total system size in kilowatts: 3. 957 Date: April 22, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 182-310-53-00 | |||||
SCORE 100 30912 Villa Toscana, Bonsall, Ca 92003 Ground mount residential solar pv for existing sfd no. Of modules: 72 no. Of inverters: 2 total system size in kilowatts: 14. 2 4-22-20 plan change replace main from 2 to 125. Was original 125 just putting it back that way. Vam. Date: March 19, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 127-590-15-00 | |||||
SCORE 100 4333 North Ln, Del Mar, Ca 92014 Roof mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: i total system size in kilowatts: 5. 5 kwdc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 12, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 298-200-11-00 | |||||
SCORE 100 16739 Wikiup Rd, Ramona, Ca 92065 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 total system size in kilowatts: 5. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: February 5, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1030-20 | Parcel: 288-462-05-00 | |||||
SCORE 100 1307 Hidden Knoll Ct, El Cajon, Ca 92019 Roof mount residential solar pv for existing sfd no. Of modules: 39 no. Of inverters: 1 total system size in kilowatts: 7. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 29, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 514-402-16-00 | |||||
SCORE 100 9734 Red Pony Ln, El Cajon, Ca 92021 Ground mount residential solar pv, 1 sub panel and2 amp service upgrade for existing sfd no. Of modules: 72 no. Of inverters: 2 total system size in kilowatts: 11. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 20, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 396-180-26-00 | |||||
SCORE 100 1336 Hidden Hollow Ct, El Cajon, Ca 92019 Roof mount residential solar pv for existing attached 2nd dwelling unit (using 1336 a hidden hollow ) no. Of modules:14 no. Of inverters: 1 total system size in kilowatts: 4. 6 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 26, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 514-420-22-00 | |||||
SCORE 100 16409 Via Cazadero, Rancho Santa Fe, Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules: 66 no. Of inverters: 3 total system size in kilowatts: 18. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: June 26, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 269-201-46-00 | |||||
SCORE 100 29 Harris Dr, Vista, Ca 92084 (hra) roof mount solar pv 24 modules & 1 inverter 3. 4 kw for existing sfd system not to extend more than 5 above existing roof Date: June 19, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 170-080-50-00 | |||||
SCORE 100 15819 Las Planideras, Rancho Santa Fe, Ca 92067 Roof mount residential solar pv for existing sfd no. Of modules: 64 no. Of inverters: 2 total system size in kilowatts: 14. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. 04. 27. 2012: remove ac disconnect and change breaker from 1 amps to amps... Lhg Date: January 6, 2012 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2012-1031-20 | Parcel: 268-260-11-00 | |||||
SCORE 100 12616 Sierra Rojo Rd, Valley Center, Ca 92082 Hra ground-mount solar photovoltaic panels including: modules, 1 inverter, 4. 295 watt. On grid. For (e) sfd. Date: May 26, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 185-351-17-00 | |||||
SCORE 100 4938 San Jacinto East Crk, Fallbrook, Ca 92028 Hra ground-mounted photo-voltaic system for (e) sfd (42 modules, 1 inverter, 7 kws ) system is on-grid. 5 1 09: plan change see conditions of approval. 1srs Date: March 30, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 121-230-33-00 | |||||
SCORE 100 2855 Via Viejas Oeste, Alpine, Ca 91901 Hra -solar photovoltaic array - ground mounted ( 56 modules, 2 inverters, kw) for existing det sfd. Date: March 24, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 520-221-11-00 | |||||
SCORE 100 16421 Road To Bali, San Diego, Ca 92127 53 modules, 1 inverter, 6 kw roof mounted solar pv array (hra) system not to extend more than 5 above existing roof Date: March 3, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 267-181-41-00 | |||||
SCORE 100 1002 S Ridge Dr, Fallbrook, Ca 92028 Hra -solar photovoltaic system -roof mounted ( 43 modules, one inverter, 7. 4 kw) for sfd, to be located on existing det. Accessory building. Date: February 9, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 105-220-07-00 | |||||
SCORE 100 24023 Nectar Way, Ramona, Ca 92065 Ground mount residential solar pv for existing sfd no. Of modules: 39 no. Of inverters: 1 total system size in kilowatts: 9 Date: November 1, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 288-672-12-00 | |||||
SCORE 100 305 Palomar Vista Dr, Valley Center, Ca 92082 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 1 @ 50 watts total system size in kilowatts: 4. 7 kwdc per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 4, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 133-510-12-00 | |||||
SCORE 100 6487 Primero Izquierdo, Rancho Santa Fe, Ca 92067 Hra -solar photovoltaic system -ground mounted ( 72 modules, 2 inverters, 13. 6 kw ) for existing sfd. Date: January 8, 2009 Contractor: Sullivan Electrical Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2009-1030-20 | Parcel: 265-432-03-00 | |||||
SCORE 100 3198 Blackwell Dr, Vista, Ca 92084 Ground mount residential solar pv for existing sfd no. Of modules: 39 no. Of inverters: 1 total system size in kilowatts: 8. 9 increasing elec svc from 150amp to 200amp Date: December 1, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Issued expired | Permit id: Pds2010-1031-20 | Parcel: 170-030-07-00 | |||||
SCORE 100 16574 Cimarron Crest Dr, San Diego, Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules: 22 no. Of inverters: 1 total system size in kilowatts: 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 23, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 678-590-30-00 | |||||
SCORE 100 13899 Rancho Vista Ct, Jamul, Ca 91935 Roof mount residential solar pv for existing sfd no. Of modules: 28 no. Of inverters: 1 total system size in kilowatts: 6. 4 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 23, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 596-062-53-00 | |||||
SCORE 100 17366 San Pasqual Valley Rd, Escondido, Ca 92027 Ground mount commercial solar pv for san pasqual avocado company no. Of modules: 378 no. Of inverters: 1 total system size in kilowatts: 86. 94 1 10 11... See c of a... Mls Permit type: Solar photovoltaic comml (non-hra) | Permit status: Issued expired | Permit id: Pds2010-1031-20 | Parcel: 242-080-04-00 | |||||
SCORE 100 2251 Doubletree Rd, Spring Valley, Ca 91978 Roof mount residential solar pv for existing sfd no. Of modules: 24 no. Of inverters: 2 total system size in kilowatts: 5. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 15, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 580-153-02-00 | |||||
SCORE 100 3045 Via Viejas Oeste, Alpine, Ca 91901 Ground mount residential solar pv for existing sfd no. Of modules: 56 no. Of inverters: 1 total system size in kilowatts: 12. 9 also upgrading from 2 to 225 amp 11 10 10... See c of a... Mls Date: November 2, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 520-222-15-00 | |||||
SCORE 100 1874 Tavern Ct, Alpine, Ca 91901 Roof mount residential solar pv for existing sfd no. Of modules: 18 no. Of inverters: 1 total system size in kilowatts: 4. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 1, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 403-510-03-00 | |||||
SCORE 100 16905 Silver Pine Rd, San Diego, Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules: 21 no. Of inverters: 1 total system size in kilowatts: 4. 5 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 15, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 678-630-59-00 | |||||
SCORE 100 17112 Blue Skies Rd, San Diego, Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules: 22 no. Of inverters: 1 total system size in kilowatts: 5. 2 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 15, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 265-510-13-00 | |||||
SCORE 100 16347 Pinto Ridge Dr, San Diego, Ca 92127 Roof mount residential solar pv for existing sfd no. Of modules: 20 no. Of inverters: 1 total system size in kilowatts: 3. 9 9 13 plan change, see c of a mls per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: September 10, 2010 Contractor: Sullivan Electrical Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2010-1031-20 | Parcel: 678-561-38-00 |