Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding one dedicated amp breaker for solar pv system. Upgrading service entrance to 2 amp, with new meter base and mast. Upgrade existing breaker panel to 2 amp main breaker panel. Date: September 6, 2015 Contractor: West Seattle Natrl Energy Llc Permit type: Electrical | Permit status: Permit closed | Completion date: September 16, 2015 | Expiration date: September 5, 2016 | Current use: Single family / duplex | Permit id: 6493533 | |||||
SCORE 84 Sewer line repair Date: June 7, 2013 Contractor: Washington Sewer And Drain Llc Applicant: Washington Sewer & Drain Llc | Permit type: Side sewer | Permit status: Permit closed | Completion date: June 10, 2013 | Expiration date: December 7, 2014 | Current use: Single family / duplex | Permit id: 6368675 | |||||
SCORE 95 Full line Date: October 13, 2009 Contractor: Metropolitan Sewer Service Llc Applicant: Metropolitan Sewer Service Llc | Permit type: Side sewer | Permit status: Permit closed | Completion date: October 16, 2009 | Expiration date: April 13, 2011 | Current use: Single family / duplex | Permit id: 6230026 | |||||
SCORE 95 Install new gas furnace Date: December 30, 2008 Contractor: Brennan Heating And A C Llc Applicant: Brennan Heating & A/c Llc | Permit type: Mechanical | Permit status: Permit closed | Completion date: January 5, 2009 | Expiration date: June 30, 2010 | Current use: Single family / duplex | Permit id: 6204453 | |||||
SCORE 95 Add residential stairlift Date: July 22, 2005 Contractor: Thyssenkrupp Elevator Corp Applicant: Thyssenkrupp Elevator Corp | Permit type: Conveyance | Permit status: Permit finaled | Completion date: December 15, 2005 | Expiration date: January 22, 2007 | Permit id: 6066610 | |||||
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding one dedicated amp breaker for solar pv system. Upgrading service entrance to 2 amp, with new meter base and mast. Upgrade existing breaker panel to 2 amp main breaker panel. Date: September 6, 2015 Contractor: West Seattle Electric And Solar Permit type: Electrical | Permit status: Permit closed | Completion date: September 16, 2015 | Expiration date: September 5, 2016 | Current use: Single family / duplex | Permit id: 6493533 |