Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 71 Temporary geotechnical soil borings number of borings: 1 depth of boring: ft drilling method: 3. 25 inch hollow stem auger hole diameter: 6 inches abandonment method: tremie grouting with bentonite grout Date: June 27, 2017 Contractor: Eoin Durcan Client: Embassy Of Latvia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700344 |