Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 84 Place 11 of (1) 5" 3-way fiber optic conduit roadway and sidewalk of new york avenue ne this construction permit requires a separate occupancy permit. The attached plans and conditions are apart of this permit. If steel plates are used at this job site an additional permit is needed. Date: August 20, 2012 Contractor: Joe Marchio Permit type: Excavation; electric ml conduit (trench) | Permit status: Cancel/withdrawn | Expiration date: December 10, 2012 | |||||
SCORE 95 Build 15 of mainline conduit to connect 20-t florida avenue, n. E. With temporary underground service; sidewalk of florida avenue east of new york aavenue, n. E. Wr #3383709 tcp -see attached cut #27743 stephen j. Park (202) 388-2573 sjpark@pepco. Com this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed Date: September 27, 2012 Contractor: Pepco Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: January 29, 2013 | Permit id: Pa75677 | |||||
SCORE 59 A sign will be installed on the metropolitan branch trail overpass at florida avenue, ne. This sign will announce the trail and let people know where it is. The sign will be made of vinyl and will be installed using an adhesive. It will be installed over night on a sunday, after 10p, and will take no longer than five and a half hours to complete. Installation of the overpass sign will consist of three phases. Phase 1 will start in the outer two eastbound lanes, where we will close down traffic. Phase 1 will consist of two installers up in the lift and one below, as the spotter. Phase 1 will take approximately an hour and a half. Phase 2 will consist of closing down the center two lanes of traffic. Like phase 1 there will be two installers inside the lift installing the graphics with one spotter on the ground. Phase 2 will take approximately one hour to one and a half hours. Phase 3, and the final phase, we will close down the outer two westbound lanes of traffic. Again, there will be t Date: October 21, 2016 Contractor: John Stricker Permit type: Fixture; sign-free standing | Permit status: Assigned | Expiration date: November 21, 2016 | |||||
SCORE 95 Construction staging area Date: November 19, 2012 Contractor: Donna Graham Permit status: Expired | Expiration date: December 24, 2012 | Permit id: Pa10079059 | |||||
SCORE 59 Fixture; sign-free standing Date: December 19, 2016 Contractor: John Stricker Permit status: 8 | Expiration date: December 23, 2016 | Permit id: Pa185518 | |||||
SCORE 84 Excavation; electric ml conduit (trench) Contractor: Joe Marchio Permit status: 3 | Expiration date: December 10, 2012 | Permit id: 0 | |||||
SCORE 84 Place 11 of (1) 5" 3-way fiber optic conduit roadway and sidewalk of new york avenue ne this construction permit requires a separate occupancy permit. The attached plans and conditions are apart of this permit. If steel plates are used at this job site an additional permit is needed. Contractor: Joe Marchio Permit status: Cancel/withdrawn | Expiration date: December 10, 2012 | Permit id: 0 | |||||
SCORE 84 Place 11 of (1) 5" 3-way fiber optic conduit roadway and sidewalk of new york avenue ne this construction permit requires a separate occupancy permit. The attached plans and conditions are apart of this permit. If steel plates are used at this job site an additional permit is needed. Date: August 20, 2012 Contractor: Joe Marchio Permit type: Excavation; electric ml conduit (trench) | Permit status: Cancel/withdrawn | Expiration date: December 10, 2012 | Permit id: 0 | |||||
SCORE 84 Excavation; electric ml conduit (trench) Contractor: Joe Marchio Permit status: 3 | Expiration date: December 10, 2012 | Permit id: 0 | |||||
SCORE 95 Build 15 of mainline conduit to connect 20-t florida avenue, n. E. With temporary underground service; sidewalk of florida avenue east of new york aavenue, n. E. Wr #3383709 tcp -see attached cut #27743 stephen j. Park (202) 388-2573 sjpark@pepco. Com this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed Date: October 19, 2012 Contractor: Pepco Permit status: Permit expired | Expiration date: January 29, 2013 | Permit id: Pa75677 | |||||
SCORE 84 Place 11 of (1) 5" 3-way fiber optic conduit roadway and sidewalk of new york avenue ne this construction permit requires a separate occupancy permit. The attached plans and conditions are apart of this permit. If steel plates are used at this job site an additional permit is needed. Contractor: Joe Marchio Permit status: Cancel/withdrawn | Expiration date: December 10, 2012 | Permit id: 0 |