Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 57 Install a satellite dish on the roof of the city of boulder library building at 10 canyon. Client: Of City | Applicant: Satellite Showcase Inc | Permit type: Antenna | Permit status: Cmp | Completion date: September 27, 2011 | Current use: Government uses | |||||
SCORE 57 Install a satellite dish on the roof of the city of boulder library building at 10 canyon. ![]() ![]() Client: Of City | Permit type: Antenna | Permit status: Cmp | Completion date: September 27, 2011 | Current use: Government uses, existing | Permit id: Pmt2000-00766 | |||||
SCORE 95 Replace two permanent free-standing electric sign reading "wells fargo". ![]() ![]() Client: Bank Intrawest | Applicant: Supersign, Inc. | Permit type: Electrical, sign | Permit status: N&v | Current use: Financial insti | |||||
SCORE 95 Replace two permanent free-standing electric sign reading inchwells fargoinch. Client: Bank Intrawest | Permit type: Electrical, sign | Permit status: N&v | Current use: Financial institution, existing | Permit id: Pmt2000-01054 | |||||
SCORE 100 Gart properties- runners choice 2 head addition and flow switch replaced ![]() ![]() Client: Village Gr | Applicant: Cleary Fire Protection Inc | Permit type: Fire | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 95 Fire sprinkler tenant finish ![]() ![]() Client: F Trotter | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: November 16, 2001 | Current use: Commercial/reta | |||||
SCORE 91 Tenant expansion of the existing mcguckins design center into adjacent space.. Add tenant space (23 x 64) to east of existing design center. Client: F Trotter | Applicant: Meeker Design Studio | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 23, 2001 | Current use: Commercial/reta | |||||
SCORE 95 Electrical permit to add receptacle and track lighting. ![]() ![]() Client: Village Gr | Applicant: Rollys Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: April 25, 2007 | Current use: Commercial/reta | |||||
SCORE 99 Exterior rehabilitation of 24 canyon -- "mcguckin design center bldg." new exterior canopies, addition of stone veneer, replacement of wall lighting sconces, add window mullions, paint & associated electrical. Client: Village Gr | Applicant: Boots Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 2, 2008 | Current use: Commercial/reta | |||||
SCORE 70 Alba full moon grill fire alarm ![]() ![]() Client: Village Gr | Applicant: Custom Electrical Cont Inc | Permit type: Fire | Permit status: Cmp | Completion date: August 28, 2007 | Current use: Restaurant, exi | |||||
SCORE 95 Tennant finish sprinkler system ![]() ![]() Client: Village Gr | Applicant: Code Fire Llc | Permit type: Fire | Permit status: Cmp | Completion date: August 28, 2007 | Current use: Office - profes | |||||
SCORE 59 Mechanical permit for kitchen hood - albas restaurant. See pmt2007-00953 for plans. ![]() ![]() Client: Village Gr | Applicant: Facility Environmental Systems Inc. | Permit type: Mechanical | Permit status: N&v | Current use: Restaurant, exi | |||||
SCORE 95 Hood suppression system casa-alba rest. ![]() ![]() Client: Village Gr | Applicant: Complete Fire Protection, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: March 30, 2011 | Current use: Restaurant, exi | |||||
SCORE 99 Demizing wall for seperation of restaurant from professional office use. Client: Village Gr | Applicant: Boots Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: May 6, 2011 | Current use: Office - profes | |||||
SCORE 95 New wall sign mckirnan bed and bath ![]() ![]() Client: Village Gri | Applicant: 20/ Communications | Permit type: Sign | Permit status: Cmp | Completion date: June 9, 2008 | Current use: Commercial/reta | |||||
SCORE 98 Alternating n. & w. Sidewalk closures @ corner of canyon and folsom for facade renovation work access ![]() ![]() Client: Village Gri | Applicant: Levi Contractors, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Installation of two signs "mcguckin design center" ![]() ![]() Client: Village Gri | Applicant: King Sign Llc | Permit type: Sign | Permit status: Cmp | Completion date: October 22, 2008 | Current use: Commercial/reta | |||||
SCORE 100 Replace damaged line to building ![]() ![]() Client: Village Gri | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 96 Installation of ten replacement gas lines at the southern edge of the mcguckin design center building. Presumably only one line is leaking, but all ten are being replaced as a preventative measure. ![]() ![]() Client: Village Gri | Applicant: Bernies Plumbing And Heating | Permit type: Mechanical | Permit status: Cmp | Completion date: July 29, 2011 | Current use: Commercial/reta | |||||
SCORE 95 Sign: two new non-illuminated wall signs for incheuro bath tileinch. One faces the corner of canyon and folsom. The second is interior and faces the village parking lot. ![]() ![]() Client: Village Gri | Applicant: 20/ Communications | Permit type: Sign | Permit status: Cmp | Completion date: February 25, 2010 | Current use: Commercial/reta | |||||
SCORE 87 Tenant remodel to create new rear entry and new front entry and relocate electrical panel on newly demised tenant space. Client: Village Gri | Applicant: Village Gri | Permit type: Building, electrical | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Installation of a sign for inchcolorado multisportinch -- west face of structure ![]() ![]() Client: Village Gri | Applicant: 20/ Communications | Permit type: Sign | Permit status: Iss | Current use: Commercial/reta | |||||
SCORE 95 Three new wall signs for forma furniture ![]() ![]() Client: Village Gri | Applicant: Signdealz Corp | Permit type: Sign | Permit status: Cmp | Completion date: June 13, 2013 | Current use: Commercial/reta | |||||
SCORE 100 Unit l4a -- tenant remodel of 1495 sf to create a storage room, offices, cashwrap area for a retail occupancy. Modify restroom for ansi compliance. No mechanical work -- existing bath fan & existing ductwork.. Client: Village Gri | Applicant: The Magnolia Building Company | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 28, 2012 | Current use: Commercial/reta | |||||
SCORE 98 Unit l4a -- interior demolition of non-structural interior partition walls and restroom area. Tenant finish under pmt2011-05004 ![]() ![]() Client: Village Gri | Applicant: Retail Resources, Inc | Permit type: Demolition | Permit status: Cmp | Completion date: January 8, 2015 | Current use: Commercial/reta | |||||
SCORE 100 Scope of work letter for suite 4a remove one sprinkler for new tennant finish ![]() ![]() Client: Village Gri | Applicant: Fire Defense, Inc | Permit type: Fire | Permit status: Iss | Current use: Office - profes | |||||
SCORE 100 Scope of work letter for kitchen and bath studio unit l3 addition of 4 new sprinkler heads for tennant finish ![]() ![]() Client: Village Gri | Applicant: Flow Fire Protection, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: August 2, 2012 | Current use: Commercial/reta | |||||
SCORE 100 Tenant remodel combine suites l-2 and l-3 for the kitchen and bath studio. Scope of work includes relocation of walls, bearing and non-bearing, structural augmentation of existing mezzanine, reconfigure two baths for accessibility, associated plumbing and electrical. Client: Village Gri | Applicant: The Magnolia Building Company | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 30, 2012 | Current use: Commercial/reta | |||||
SCORE 100 Interior, non-structural only demolition associated with tenant remodel proposed in pmt2012-02235. ![]() ![]() Client: Village Gri | Applicant: The Magnolia Building Company | Permit type: Demolition | Permit status: Cmp | Completion date: January 8, 2015 | Current use: Commercial/reta | |||||
SCORE 99 Installation of non-illuminated wall sign inchthe kb kitchen and bath studioinch ![]() ![]() Client: Plaza Waterstreet | Applicant: Advantage Sign Co., Inc. | Permit type: Sign | Permit status: Cmp | Completion date: April 19, 2013 | Current use: Commercial/reta | |||||
SCORE 100 Scope of work letter for kb studios unit l2 relocation of one sprinkler head and plug 2 ![]() ![]() Client: Village Gri | Applicant: Flow Fire Protection, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: August 2, 2012 | Current use: Office - profes | |||||
SCORE 71 Tenant remodel of unit l4 a & b for the brass bed retail store. Scope of work includes installation of interior non-bearing walls, upgrade mens and womens bathroom for accessibility, associated electrical, mechanical and plumbing work. Client: Village Gri | Applicant: Leonard Thomas | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 21, 2012 | Current use: Commercial/reta | |||||
SCORE 95 Install internally illuminated wall sign inchthe brass bed fine linens & furnishingsinch. ![]() ![]() Client: Village Gri | Applicant: Signdealz Corp | Permit type: Sign | Permit status: Cmp | Completion date: June 10, 2013 | Current use: Commercial/reta | |||||
SCORE 91 Interior non-structural demolition associated with remodel proposed in separate permit pmt2012-04262. ![]() ![]() Client: Village Gri | Applicant: Spectrum General Contractors Inc | Permit type: Demolition | Permit status: Cmp | Completion date: November 21, 2012 | Current use: Commercial/reta | |||||
SCORE 99 Fs - tf ![]() ![]() Client: Village Gri | Applicant: A B C Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: November 21, 2012 | Current use: Office - admini | |||||
SCORE 93 Erection of one permanent internally illuminated wall sign inchcharles schwab. Inch 16foot to top of sign. With approval of this sign the tenant has reached maximum allowable signage at this location (75 sf). ![]() ![]() Client: Village Gri | Applicant: Broomfield Sign Co, Inc | Permit type: Sign | Permit status: Cmp | Completion date: September 4, 2013 | Current use: Commercial/reta | |||||
Replace damaged line to building ![]() Client: Village Gri | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2009-00374 | |||||
SCORE 96 Installation of ten replacement gas lines at the southern edge of the mcguckin design center building. Presumably only one line is leaking, but all ten are being replaced as a preventative measure. Client: Village Gri | Permit type: Mechanical | Permit status: Cmp | Completion date: July 29, 2011 | Current use: Commercial/retail, existing | Permit id: Pmt2009-01272 | |||||
SCORE 95 Sign: two new non-illuminated wall signs for incheuro bath tileinch. One faces the corner of canyon and folsom. The second is interior and faces the village parking lot. Client: Village Gri | Permit type: Sign | Permit status: Cmp | Completion date: February 25, 2010 | Current use: Commercial/retail, existing | Permit id: Pmt2009-04641 | |||||
SCORE 80 Tenant remodel to create new rear entry and new front entry and relocate electrical panel on newly demised tenant space. Client: Village Gri | Permit type: Building, electrical | Permit status: N&v | Current use: Office - professional, tenant remodel | Permit id: Pmt2009-04814 | |||||
SCORE 95 Scope of work letter for kitchen and bath studio unit l3 addition of 4 new sprinkler heads for tennant finish Client: Village Gri | Permit type: Fire | Permit status: Cmp | Completion date: August 2, 2012 | Current use: Commercial/retail, existing | Permit id: Pmt2012-01268 | |||||
SCORE 100 Tenant remodel combine suites l-2 and l-3 for the kitchen and bath studio. Scope of work includes relocation of walls, bearing and non-bearing, structural augmentation of existing mezzanine, reconfigure two baths for accessibility, associated plumbing and electrical. Client: Village Gri | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: August 30, 2012 | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2012-02235 | |||||
SCORE 99 Installation of non-illuminated wall sign inchthe kb kitchen and bath studioinch Client: Plaza Waterstreet | Permit type: Sign | Permit status: Cmp | Completion date: April 19, 2013 | Current use: Commercial/retail, existing | Permit id: Pmt2012-02372 | |||||
SCORE 95 Scope of work letter for kb studios unit l2 relocation of one sprinkler head and plug 2 Client: Village Gri | Permit type: Fire | Permit status: Cmp | Completion date: August 2, 2012 | Current use: Office - professional, existing | Permit id: Pmt2012-02820 | |||||
SCORE 91 Tenant remodel of unit l4 a & b for the brass bed retail store. Scope of work includes installation of interior non-bearing walls, upgrade mens and womens bathroom for accessibility, associated electrical, mechanical and plumbing work. Client: Village Gri | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: November 21, 2012 | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2012-04262 | |||||
SCORE 95 Install internally illuminated wall sign inchthe brass bed fine linens & furnishingsinch. Client: Village Gri | Permit type: Sign | Permit status: Cmp | Completion date: June 10, 2013 | Current use: Commercial/retail, existing | Permit id: Pmt2012-04319 | |||||
SCORE 99 Fs - tf Client: Village Gri | Permit type: Fire | Permit status: Cmp | Completion date: November 21, 2012 | Current use: Office - administrative, existing | Permit id: Pmt2012-05041 | |||||
SCORE 95 Erection of one permanent internally illuminated wall sign inchcharles schwab. Inch 16foot to top of sign. With approval of this sign the tenant has reached maximum allowable signage at this location (75 sf). Client: Village Gri | Permit type: Sign | Permit status: Cmp | Completion date: September 4, 2013 | Current use: Commercial/retail, existing | Permit id: Pmt2012-05903 | |||||
SCORE 100 Gart properties- runners choice 2 head addition and flow switch replaced Client: Village Gr | Permit type: Fire | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2005-03947 | |||||
SCORE 95 Alternating n. & w. Sidewalk closures @ corner of canyon and folsom for facade renovation work access ![]() ![]() Client: Village Gri | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2008-00731 | |||||
SCORE 95 Installation of a sign for inchcolorado multisportinch -- west face of structure Client: Village Gri | Permit type: Sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2011-00518 | |||||
SCORE 95 Three new wall signs for forma furniture Client: Village Gri | Permit type: Sign | Permit status: Cmp | Completion date: June 13, 2013 | Current use: Commercial/retail, existing | Permit id: Pmt2011-02229 | |||||
SCORE 100 Unit l4a -- tenant remodel of 1495 sf to create a storage room, offices, cashwrap area for a retail occupancy. Modify restroom for ansi compliance. No mechanical work -- existing bath fan & existing ductwork.. Client: Village Gri | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: February 28, 2012 | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2011-05004 | |||||
SCORE 98 Unit l4a -- interior demolition of non-structural interior partition walls and restroom area. Tenant finish under pmt2011-05004 ![]() ![]() Client: Village Gri | Permit type: Demolition | Permit status: Cmp | Completion date: January 8, 2015 | Current use: Commercial/retail, existing | Permit id: Pmt2011-05005 | |||||
SCORE 95 Scope of work letter for suite 4a remove one sprinkler for new tennant finish Client: Village Gri | Permit type: Fire | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2011-05094 | |||||
SCORE 91 Tenant expansion of the existing mcguckins design center into adjacent space.. Add tenant space (23foot x 64foot) to east of existing design center. Client: F Trotter | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: November 23, 2001 | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2000-01561 | |||||
SCORE 95 Fire sprinkler tenant finish Client: F Trotter | Permit type: Fire | Permit status: Cmp | Completion date: November 16, 2001 | Current use: Commercial/retail, existing | Permit id: Pmt2000-03375 | |||||
SCORE 95 Electrical permit to add receptacle and track lighting. Client: Village Gr | Permit type: Electrical | Permit status: Cmp | Completion date: April 25, 2007 | Current use: Commercial/retail, existing | Permit id: Pmt2007-01292 | |||||
SCORE 99 Exterior rehabilitation of 24 canyon -- inchmcguckin design center bldg. Inch new exterior canopies, addition of stone veneer, replacement of wall lighting sconces, add window mullions, paint & associated electrical. Client: Village Gr | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 2, 2008 | Current use: Commercial/retail, remodel | Permit id: Pmt2007-02056 | |||||
SCORE 70 Alba full moon grill fire alarm Client: Village Gr | Permit type: Fire | Permit status: Cmp | Completion date: August 28, 2007 | Current use: Restaurant, existing | Permit id: Pmt2007-02343 | |||||
SCORE 95 Tennant finish sprinkler system Client: Village Gr | Permit type: Fire | Permit status: Cmp | Completion date: August 28, 2007 | Current use: Office - professional, existing | Permit id: Pmt2007-02377 | |||||
SCORE 59 Mechanical permit for kitchen hood - albafoots restaurant. See pmt2007-00953 for plans. Client: Village Gr | Permit type: Mechanical | Permit status: N&v | Current use: Restaurant, existing | Permit id: Pmt2007-02563 | |||||
SCORE 99 Hood suppression system casa-alba rest. Client: Village Gr | Permit type: Fire | Permit status: Cmp | Completion date: March 30, 2011 | Current use: Restaurant, existing | Permit id: Pmt2007-02845 | |||||
SCORE 99 Demizing wall for seperation of restaurant from professional office use. Client: Village Gr | Permit type: Building | Permit status: Cmp | Completion date: May 6, 2011 | Current use: Office - professional, remodel | Permit id: Pmt2007-03760 | |||||
SCORE 95 New wall sign mckirnan bed and bath Client: Village Gri | Permit type: Sign | Permit status: Cmp | Completion date: June 9, 2008 | Current use: Commercial/retail, existing | Permit id: Pmt2008-00273 | |||||
SCORE 95 Installation of two signs inchmcguckin design centerinch Client: Village Gri | Permit type: Sign | Permit status: Cmp | Completion date: October 22, 2008 | Current use: Commercial/retail, existing | Permit id: Pmt2008-03936 | |||||
SCORE 95 Overlay on a commercial retail building, 136 squares of epdm and 1 4inch densdeck on a pitch represented as 1 12. Scope includes removal of existing roof balast (ballast not to be re-installed). All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12 and pre-roof inspection required. Client: Plaza Waterstreet | Permit type: Roofing | Permit status: Iss | Current use: Commercial/retail, existing | Permit id: Pmt2017-03874 | |||||
SCORE 100 Installation of a replacement, 100k btu, 14 seer, 11. 7 eer, 81% efficient single package rtu, like for like in same location. Installation per manufacturerfoots specifications. No structural work changes are evident in the approved plans. No approval is given or implied for any structural changes whatsoever in the scope of this permit. Any such work must receive prior review and approval. Client: Plaza Waterstreet | Permit type: Mechanical | Permit status: Iss | Current use: Commercial/retail, existing | Permit id: Pmt2017-03983 | |||||
SCORE 90 Addition remodel to existing bank. See adr2005-00042 for approval of addition building area. Client: Bank Intrawest | Applicant: Delta Construction Co Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 19, 2005 | Current use: Financial insti | |||||
SCORE 95 Reroof of a commercial building, mil epdm, 63 squares, flat roof ![]() ![]() Client: Bank Intrawest | Applicant: B & M Roofing Of Colorado Inc | Permit type: Roofing | Permit status: Cmp | Current use: Commercial/reta | |||||
SCORE 100 Demolition and replacement of the existing stair guardrail assembly in the same location. Client: Schone Taggart | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: June 23, 2005 | Current use: Office - profes | |||||
SCORE 77 Installation of one new light pole with a fully cut-off shielded fixture, replacement of two fixtures on existing light poles and installation of five sconce lights. ![]() ![]() Client: Bank Intrawest | Applicant: Rme Electric Corp. | Permit type: Electrical | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 97 Lot lighting per adr 2002-00056 at the wells fargo bank. ![]() ![]() Client: Bank Intrawest | Applicant: All-Tech Electric, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: November 19, 2002 | Current use: Financial insti | |||||
SCORE 91 Fur out below canopy for new pneumatic tube service to each drie-thru island in accordance with administrative review adr2000-00100. No change to setbacks, building coverage or floor area. Client: Intrawest Bank Of Boulder Na | Applicant: Davis & Davis Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 15, 2001 | Current use: Financial insti | |||||
SCORE 98 Replacement comfort cooling ![]() ![]() Client: Karen Louis, Louis | Applicant: Save Home Heat Co, Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 4, 2013 | Current use: Single family d | |||||
SCORE 95 New wall sign for boulder dental center. ![]() ![]() Client: Louis,Karen Louis | Applicant: Ad Light + Sign Company Inc | Permit type: Sign | Permit status: Cmp | Completion date: September 4, 2013 | Current use: Medical and den | |||||
SCORE 91 Replace old electric wall sign with new channel lettering electric sign. Sign area of 47. 5 sq. Ft. ![]() ![]() Client: Schone Taggart | Applicant: Silversprings Signs & Graphics Inc | Permit type: Sign | Permit status: Iss | Current use: Office - profes | |||||
SCORE 100 Access mhfoots to verify conduit job#cms15022589 ![]() ![]() Client: Bank Intrawest | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Act | |||||
SCORE 91 Replace old electric wall sign with new channel lettering electric sign. Sign area of 47. 5 sq. Ft. Client: Schone Taggart | Permit type: Sign | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2014-01888 | |||||
SCORE 95 Replacement comfort cooling Client: Karen Louis | Permit type: Mechanical | Permit status: Cmp | Completion date: December 4, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20114 | |||||
SCORE 95 New wall sign for boulder dental center. Client: Louis | Permit type: Sign | Permit status: Cmp | Completion date: September 4, 2013 | Current use: Medical and dental clinics, existing | Permit id: Pmt2011-02234 | |||||
Access mhfoots to verify conduit job#cms15022589 ![]() Client: Bank Intrawest | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-03733 | |||||
Bore from mh 113foot crossing 17th south of canyon to existing box. Place new handhole, access mh on 17th & walnut for splicing ![]() Client: Schone Taggart | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-04534 | |||||
SCORE 91 Fur out below canopy for new pneumatic tube service to each drie-thru island in accordance with administrative review adr2000-00100. No change to setbacks, building coverage or floor area. Client: Intrawest Bank Of Boulder Na | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 15, 2001 | Current use: Financial institution, alteration | Permit id: Pmt2000-03437 | |||||
SCORE 86 Lot lighting per adr 2002-00056 at the wells fargo bank. Client: Bank Intrawest | Permit type: Electrical | Permit status: Cmp | Completion date: November 19, 2002 | Current use: Financial institution, existing | Permit id: Pmt2002-03219 | |||||
SCORE 77 Installation of one new light pole with a fully cut-off shielded fixture, replacement of two fixtures on existing light poles and installation of five sconce lights. Client: Bank Intrawest | Permit type: Electrical | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2004-03339 | |||||
SCORE 95 Demolition and replacement of the existing stair guardrail assembly in the same location. Client: Schone Taggart | Permit type: Building | Permit status: Cmp | Completion date: June 23, 2005 | Current use: Office - professional, alteration | Permit id: Pmt2004-04089 | |||||
SCORE 95 Reroof of a commercial building, mil epdm, 63 squares, flat roof Client: Bank Intrawest | Permit type: Roofing | Permit status: Cmp | Current use: Commercial/retail, existing | Permit id: Pmt2005-01195 | |||||
SCORE 90 Addition remodel to existing bank. See adr2005-00042 for approval of addition building area. Client: Bank Intrawest | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: August 19, 2005 | Current use: Financial institution, addition and remo | Permit id: Pmt2005-01214 | |||||
SCORE 92 Replace old electric wall sign with new channel lettering electric sign. Sign area of 47. 5 sq. Ft. Client: Schone Taggart | Permit type: Sign | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2014-01888 | |||||
SCORE 95 Fire sprinkler system - control valves in each stairway ![]() ![]() Client: Six Apple | Applicant: Integrated Safety Services | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2006 | Current use: Motel/hotel/bed | |||||
SCORE 95 Addition of 3 notification appliances ![]() ![]() Client: Six Apple | Applicant: Integrated Safety Services | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2006 | Current use: Motel/hotel/bed | |||||
SCORE 97 Installation of two rooftop telecommunications equipment cabinets on the lower roof and the replacement of existing telecommunications antennae in their existing approved locations at the boulder marriott hotel. Client: Hotel Village | Applicant: Mountain Wireless Contractors | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 1, 2006 | Current use: Telecommunicati | |||||
SCORE 95 Fire sprinkler system - orginal pancake house ![]() ![]() Client: Hotel, Village | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: September 30, 2004 | Current use: Restaurant, exi | |||||
SCORE 56 Two new internally illuminated wall signs that read "the original pancake house". ![]() ![]() Client: Hotel, Village | Applicant: Jst Signs, Llc | Permit type: Electrical, sign | Permit status: Cmp | Completion date: June 21, 2007 | Current use: Restaurant, exi | |||||
SCORE 77 Install 3 type 1 hood in the original pancake house.{ sam dardano has looked at the plans and approved them. Sam has the plans and will have them for inspection} ![]() ![]() Client: Hotel, Village | Applicant: Economy A/c And Heating | Permit type: Mechanical | Permit status: Cmp | Completion date: February 10, 2005 | Current use: Restaurant, exi | |||||
SCORE 100 Fire alarm system - 1st floor remodel ![]() ![]() Client: Hotel, Village | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: April 12, 2004 | Current use: Motel/hotel/bed | |||||
SCORE 95 Fire sprinkler system - 1st floor remodel ![]() ![]() Client: Hotel, Village | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 24, 2004 | Current use: Motel/hotel/bed | |||||
SCORE 95 Interior demo only ![]() ![]() Client: Hotel, Village | Applicant: Wyatt Construction Company | Permit type: Demolition | Permit status: Cmp | Completion date: June 26, 2007 | Current use: Motel/hotel/bed | |||||
SCORE 97 Installation of wireless telecommunications equipment (one bts cabinet) per adr2003-00117. Client: Hotel, Village | Applicant: Mountain Wireless Contractors | Permit type: Building | Permit status: Cmp | Completion date: August 3, 2004 | Current use: Motel/hotel/bed | |||||
SCORE 95 Interior remodel of conference & pool area Client: Hotel, Village | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: N&v | Current use: Motel/hotel/bed | |||||
SCORE 99 Standard flood plain development permit. ![]() ![]() Client: Hotel, Village | Applicant: Phil Mcevoy | Permit type: Flood standard permi | Permit status: N&v | Current use: Motel/hotel/bed | |||||
SCORE 74 Fire alarm system - essential spa ![]() ![]() Client: Hotel, Village | Applicant: Alarm Monitoring Services, Inc | Permit type: Fire | Permit status: Cmp | Completion date: April 7, 2003 | Current use: Office - profes | |||||
SCORE 100 Fire sprinkler system ![]() ![]() Client: Hotel, Village | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: April 7, 2003 | Current use: Office - profes | |||||
SCORE 95 Tenant remodel, essentiels spa Client: Hotel, Village | Applicant: Coburn Development Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 3, 2003 | Current use: Motel/hotel/bed | |||||
SCORE 65 Tenant remodel to adjust demising wall enlarging essentiels spa to 1,2 square feet. Client: Hotel, Village | Applicant: Snow Goose Investments Llc | Permit type: Building | Permit status: Cmp | Completion date: June 6, 2003 | Current use: Personal servic | |||||
SCORE 95 Fire suppression system - pancake house ![]() ![]() Client: Hotel, Village | Applicant: Simplex Grinnell | Permit type: Fire | Permit status: Cmp | Completion date: September 30, 2004 | Current use: Restaurant, exi | |||||
SCORE 56 Install new telecommunications equipment, 16 antennas, and new screening wall. Reference adr2002-00054 and adr2002-00055. Client: Hotel, Village | Applicant: C.W. Rech & Company, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 20, 2002 | Current use: Telecommunicati | |||||
SCORE 95 Replace an existing permanent internally illuminated electrical sign reading "boulder mariott". ![]() ![]() Client: Village Hotel, Lllp | Applicant: Supersign, Inc. | Permit type: Electrical, sign | Permit status: N&v | Current use: Motel/hotel/bed | |||||
SCORE 95 Fire sprinkler system ![]() ![]() Client: Village Hotel, Lllp | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: May 15, 2001 | Current use: Office - profes | |||||
SCORE 95 Fire sprinkler system ![]() ![]() Client: Hotel, Village | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: May 15, 2001 | Current use: Commercial/reta | |||||
SCORE 59 Tenant remodel to locate clothing retailer in space a2. Client: Hotel, Village | Applicant: Snow Goose Companies Llc | Permit type: Building, electrical | Permit status: Act | Current use: Commercial/reta | |||||
SCORE 95 Fire sprinkler system - marrot hotel ![]() ![]() Client: Hotel, Village | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: May 15, 2001 | Current use: Office - profes | |||||
SCORE 65 Remodel of boulder marriott hotel to enclose breezeway, relocate administrative offices, and relocate one retail space, and spa remodel. Phase i only Client: Village Hotel, Lllp | Applicant: Snow Goose Investments Llc | Permit type: Building, electrical | Permit status: N&v | Current use: Motel/hotel/bed | |||||
SCORE 99 Interior, nonstructural demolition of a black eyed pea for a tenant remodel for the original pancake house. See pmt 2004-02589 for tenant remodel permit. ![]() ![]() Client: Hotel, Village | Applicant: Boots Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: June 26, 2007 | Current use: Restaurant, exi | |||||
SCORE 99 Remodel existing restaurant on the south east corner of 26th and canyon for the original pancake house. Was a black eyed pea. No change in the number of plumbing fixtures. Occupant load 286 Client: Hotel, Village | Applicant: Boots Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 22, 2005 | Current use: Restaurant, ten | |||||
SCORE 95 Removal of moldy drywall at fountain area in ladies locker room -- removal of fountain & plunge bath, installation of new drywall over existing & new studs, removal reinstallation of flooring material. No change in floor plan, corridor widths, etc allowed. Client: Six Apple | Applicant: Blue Spruce Design & Const | Permit type: Building | Permit status: Cmp | Completion date: December 8, 2008 | Current use: Commercial/reta | |||||
SCORE 65 Replace existing water heater with new 399k btu unit. Located in mechanical room in rear access from outdoors. ![]() ![]() Client: Six Apple | Applicant: Northstar Mechanical Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 7, 2014 | Current use: Restaurant, exi | |||||
SCORE 100 Interior remodel (150sf) and tenant finish (938sf) to existing restaurant (new location of inchthe buffinch, formerly inchthe original pancake houseinch). Scope of work includes new entry roof extension, addition of overhead door on west side (exits to patio), ada bathroom improvements (bringing building into full ada compliance), and lighting improvements. Please refer to minor mod approval under adr2013-00120 Client: Select Bre | Applicant: Faurot Construction Inc | Permit type: Building, electrical | Permit status: Co | Current use: Restaurant, rem | |||||
SCORE 100 Push pull cable on private property easement, traffic control sign setup ![]() ![]() Client: Select Bre | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Fs - tf for buff restaurant ![]() ![]() Client: Select Bre | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Cmp | Completion date: January 8, 2014 | Current use: Restaurant, exi | |||||
SCORE 100 Fa - installation of a new radio ![]() ![]() Client: Select Bre | Applicant: First Call Electric & Fire | Permit type: Fire | Permit status: Cmp | Completion date: January 8, 2014 | Current use: Restaurant, exi | |||||
SCORE 95 Sign permit for one projecting sign at the buff restaurant. ![]() ![]() Client: Select Bre | Applicant: King Sign Llc | Permit type: Electrical, sign | Permit status: Iss | Current use: Restaurant, exi | |||||
SCORE 95 Hoods ![]() ![]() Client: Select Bre | Applicant: Fire Stop Technologies | Permit type: Fire | Permit status: Cmp | Completion date: January 8, 2014 | Current use: Restaurant, exi | |||||
SCORE 99 Replace six (6) existing wall-mounted antennas with new models of the same size and mounted in the same locations and install three (3) new remote radio heads and three (3) new overvoltage protectors behind the parapet walls at the boulder marriott Client: Select Bre | Applicant: Western Telcom Inc | Permit type: Building | Permit status: Cmp | Completion date: June 16, 2014 | Current use: Telecommunicati | |||||
SCORE 87 Addition of one microwave antenna to rooftop cell site. Please refer to email correspondence in application materials for clarification on why no adr is requried. Client: Select Bre | Applicant: T-Rex Architex, P.C. | Permit type: Building, flood acce | Permit status: N&v | Current use: Motel/hotel/bed | |||||
SCORE 65 This is a building permit application to remodel the marriot lobby to include the restaurant. Additional work includes remodeling the entry facade. The interior remodel is 90 sq. Ft. And the exterior work is 1010. The work includes associated meps.-change of scope-11 06 2014-remove revolving door from scope. Change of scope ii - revolving door added back into scope now that minor mod approval has been obtained. Client: Select Bre | Applicant: Western Maintenance & Const | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 22, 2015 | Current use: Motel/hotel/bed | |||||
SCORE 65 Interior, non-strucutral demoliton associated with scope of work listed under pmt2014-04487. ![]() ![]() Client: Select Bre | Applicant: Western Maintenance & Const | Permit type: Demolition | Permit status: Iss | Current use: Motel/hotel/bed | |||||
SCORE 95 Fs - es - adding 29 spks and relocating for tf of marriott. ![]() ![]() Client: Select Bre | Applicant: Arapahoe Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2015 | Current use: Motel/hotel/bed | |||||
SCORE 100 Attach new aerial cable, push-pull new underground conduit. Job# 21239. ![]() ![]() Client: Select Bre | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Bore across 26th st to place new cable, pothole ![]() ![]() Client: Select Bre | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Fa - add two h s and two strobes to existing rps. Relocate others from existing facp. ![]() ![]() Client: Select Bre | Applicant: Arapahoe Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2015 | Current use: Motel/hotel/bed | |||||
SCORE 84 Zayo directional bore to bury fiber optic conduit and pothole ![]() ![]() Client: Select Bre | Applicant: Paonia Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Bore 268foot along 26th st , #21239 ![]() ![]() Client: Select Bre | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 62 Like for like replacement of air-cooled chiller. Client: Select Bre | Permit type: Electrical, mechanical, flood accessory/remodel | Permit status: Cmp | Completion date: April 29, 2016 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2016-01292 | |||||
Urgent sewer repair due to previous bore damage (according to centurylink & integrity underground) ![]() Client: Select Bre | Permit type: Wastewater, right-of-way | Permit status: Iss | Permit id: Pmt2016-02376 | |||||
SCORE 95 Permit for modification to existing at&t rooftop telecommunications facilities per administrative approvals adr2016-00059 and adr2016-00060. Client: Select Bre | Permit type: Antenna | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2016-04006 | |||||
SCORE 65 Electrcal work and plumbing work in rooms #502 and #504 at the marriot hotel. Plumbing scope includes replacement of lavs and toilets, and replacement of tubs with walk-in showers. Electrical scope includes replacement of devices and light fixtures. Client: Hospitalit Summit | Permit type: Building, electrical, plumbing | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, remodel | Permit id: Pmt2016-05627 | |||||
SCORE 65 Replace existing water heater with new 399k btu unit. Located in mechanical room in rear access from outdoors. Client: Six Apple | Permit type: Mechanical | Permit status: Cmp | Completion date: January 7, 2014 | Current use: Restaurant, existing | Permit id: Pmt2013-01576 | |||||
SCORE 100 Interior remodel (150sf) and tenant finish (938sf) to existing restaurant (new location of inchthe buffinch, formerly inchthe original pancake houseinch). Scope of work includes new entry roof extension, addition of overhead door on west side (exits to patio), ada bathroom improvements (bringing building into full ada compliance), and lighting improvements. Please refer to minor mod approval under adr2013-00120 Client: Select Bre | Permit type: Building, electrical, flood nonsubstantial mod/add | Permit status: Co | Current use: Restaurant, remodel | Permit id: Pmt2013-02977 | |||||
Push pull cable on private property easement, traffic control sign setup ![]() Client: Select Bre | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2013-05836 | |||||
SCORE 95 Fs - tf for buff restaurant Client: Select Bre | Permit type: Fire | Permit status: Cmp | Completion date: January 8, 2014 | Current use: Restaurant, existing | Permit id: Pmt2013-06552 | |||||
SCORE 59 Tenant remodel to locate clothing retailer in space a2. Client: Hotel, Village | Permit type: Building, electrical, mechanical, flood standard permit | Permit status: Act | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2001-00774 | |||||
SCORE 95 Fire sprinkler system Client: Hotel, Village | Permit type: Fire | Permit status: Cmp | Completion date: May 15, 2001 | Current use: Commercial/retail, existing | Permit id: Pmt2001-01413 | |||||
SCORE 95 Fire sprinkler system Client: Village Hotel, Lllp | Permit type: Fire | Permit status: Cmp | Completion date: May 15, 2001 | Current use: Office - professional, existing | Permit id: Pmt2001-01554 | |||||
SCORE 100 Fa - installation of a new radio Client: Select Bre | Permit type: Fire | Permit status: Cmp | Completion date: January 8, 2014 | Current use: Restaurant, existing | Permit id: Pmt2014-00011 | |||||
SCORE 95 Sign permit for one projecting sign at the buff restaurant. Client: Select Bre | Permit type: Electrical, sign | Permit status: Cmp | Completion date: November 16, 2015 | Current use: Restaurant, existing | Permit id: Pmt2014-00042 | |||||
SCORE 95 Hoods Client: Select Bre | Permit type: Fire | Permit status: Cmp | Completion date: January 8, 2014 | Current use: Restaurant, existing | Permit id: Pmt2014-00063 | |||||
Addition of one microwave antenna to rooftop cell site. Please refer to email correspondence in application materials for clarification on why no adr is requried. ![]() Client: Select Bre | Permit type: Building, flood accessory/remodel | Permit status: N&v | Current use: Motel/hotel/bed & breakfast, remodel | Permit id: Pmt2014-03159 | |||||
SCORE 65 This is a building permit application to remodel the marriot lobby to include the restaurant. Additional work includes remodeling the entry facade. The interior remodel is 90 sq. Ft. And the exterior work is 1010. The work includes associated meps.-change of scope-11 06 2014-remove revolving door from scope. Change of scope ii - revolving door added back into scope now that minor mod approval has been obtained. Client: Select Bre | Permit type: Building, electrical, mechanical, plumbing, siding | Permit status: Cmp | Completion date: May 22, 2015 | Current use: Motel/hotel/bed & breakfast, remodel | Permit id: Pmt2014-04487 | |||||
SCORE 99 Interior, nonstructural demolition of a black eyed pea for a tenant remodel for the original pancake house. See pmt 2004-02589 for tenant remodel permit. ![]() ![]() Client: Hotel, Village | Permit type: Demolition | Permit status: Cmp | Completion date: June 26, 2007 | Current use: Restaurant, existing | Permit id: Pmt2004-02590 | |||||
SCORE 95 Fire sprinkler system - orginal pancake house Client: Hotel, Village | Permit type: Fire | Permit status: Cmp | Completion date: September 30, 2004 | Current use: Restaurant, existing | Permit id: Pmt2004-03435 | |||||
Standard flood plain development permit. ![]() Client: Hotel, Village | Permit type: Flood standard permit | Permit status: N&v | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2003-04712 | |||||
SCORE 97 Installation of wireless telecommunications equipment (one bts cabinet) per adr2003-00117. Client: Hotel, Village | Permit type: Building | Permit status: Cmp | Completion date: August 3, 2004 | Current use: Motel/hotel/bed & breakfast, addition | Permit id: Pmt2003-05230 | |||||
SCORE 95 Removal of moldy drywall at fountain area in ladies locker room -- removal of fountain & plunge bath, installation of new drywall over existing & new studs, removal reinstallation of flooring material. No change in floor plan, corridor widths, etc allowed. Client: Six Apple | Permit type: Building | Permit status: Cmp | Completion date: December 8, 2008 | Current use: Commercial/retail, repair | Permit id: Pmt2008-04265 | |||||
SCORE 65 Tenant remodel to adjust demising wall enlarging essentiels spa to 1,2 square feet. Client: Hotel, Village | Permit type: Building | Permit status: Cmp | Completion date: June 6, 2003 | Current use: Personal service, remodel | Permit id: Pmt2002-05409 | |||||
SCORE 95 Fs - es - adding 29 spks and relocating for tf of marriott. Client: Select Bre | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2015 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2015-00469 | |||||
Attach new aerial cable, push-pull new underground conduit. Job# 21239. ![]() Client: Select Bre | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-00613 | |||||
Bore across 26th st to place new cable, pothole ![]() Client: Select Bre | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-01005 | |||||
SCORE 95 Fa - add two h s and two strobes to existing rps. Relocate others from existing facp. Client: Select Bre | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2015 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2015-01082 | |||||
SCORE 90 Zayo directional bore to bury fiber optic conduit and pothole ![]() ![]() Client: Select Bre | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-01375 | |||||
Bore 268foot along 26th st , #21239 ![]() Client: Select Bre | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-01626 | |||||
SCORE 84 Modification to an existing verizon wireless telecommunications site. Work includes removing (6) existing antennas and running all required power and signal cable from existing equipment room. Scope of work reviewed through administrative reviews adr2015-00206 and adr2015-00207. Client: Select Bre | Permit type: Antenna | Permit status: Cmp | Completion date: March 11, 2016 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2015-05113 | |||||
SCORE 95 Replace (9) antennas. Install 18 new rrhfoots on (6) new unistrut frames. Remove (1) gsm cabinet, install (2) new battery cabinets and new lte equipment in existing cabinets. Reference adr2017-00052 and adr2017-00053. Client: Hospitalit Summit | Permit type: Flood accessory/remodel, antenna | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, remodel | Permit id: Pmt2017-01574 | |||||
SCORE 59 Remodel of guest lounge on the fifth floor of the marriot motel. Scope includes the demolition and relocation of some interior walls, rewiring, replacement of bathroom fixtures, replacement of a fan-coil unit, and installation of a new ada ramp to the existing patio. Client: Hospitalit Summit | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, tenant remo | Permit id: Pmt2017-01339 | |||||
SCORE 62 Replacement of an existing rooftop chiller unit with similar sized unit on existing curb for the boulder marriot. Electrical work to be performed under separate permit. Client: Hospitalit Summit | Permit type: Mechanical | Permit status: Cmp | Completion date: March 9, 2017 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-00387 | |||||
SCORE 59 Interior, non-structural, tenant remodel of marriott club lounge, on the first floor, se corner of the building. Scope includes converting the existing pool into a new lounge area, converting the previous pool bathroom into a small retail shop, and installing a new ceiling (with a foot clearance) throughout the area of work; space above new ceiling to remain unused. Associated mepfoots covered within the scope of this permit, including re-wiring for new power receptacles and lights, new hvac, and installation of new plumbing fixtures in proposed pantry. Relocation of exterior wall door on the south patio under separate permit. ![]() ![]() Client: Hospitalit Summit | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Act | Current use: Motel/hotel/bed & breakfast, tenant remo | Permit id: Pmt2017-02209 | |||||
SCORE 95 Tree trimming traffic control impacts ![]() ![]() Client: Hospitalit Summit | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-00824 | |||||
Addition of one microwave antenna to rooftop cell site. Please refer to email correspondence in application materials for clarification on why no adr is requried. ![]() Client: Select Bre | Permit type: Building, flood accessory/remodel | Permit status: N&v | Current use: Motel/hotel/bed & breakfast, remodel | Permit id: Pmt2014-03159 | |||||
SCORE 65 Remodel of boulder marriott hotel to enclose breezeway, relocate administrative offices, and relocate one retail space, and spa remodel. Phase i only Client: Village Hotel, Lllp | Permit type: Building, electrical, mechanical, plumbing, flood standard permit | Permit status: N&v | Current use: Motel/hotel/bed & breakfast, remodel | Permit id: Pmt2000-03713 | |||||
SCORE 95 Fire sprinkler system - marrot hotel Client: Hotel, Village | Permit type: Fire | Permit status: Cmp | Completion date: May 15, 2001 | Current use: Office - professional, existing | Permit id: Pmt2000-04986 | |||||
SCORE 95 Replace an existing permanent internally illuminated electrical sign reading inchboulder mariottinch. Client: Village Hotel, Lllp | Permit type: Electrical, sign | Permit status: N&v | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2002-00266 | |||||
SCORE 91 Install new telecommunications equipment, 16 antennas, and new screening wall. Reference adr2002-00054 and adr2002-00055. Client: Hotel, Village | Permit type: Building, electrical, flood over-the-counter permit | Permit status: Cmp | Completion date: November 20, 2002 | Current use: Telecommunications, addition | Permit id: Pmt2002-02612 | |||||
SCORE 95 Tenant remodel, essentiels spa Client: Hotel, Village | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: April 3, 2003 | Current use: Motel/hotel/bed & breakfast, tenant remo | Permit id: Pmt2003-00254 | |||||
SCORE 95 Fire sprinkler system Client: Hotel, Village | Permit type: Fire | Permit status: Cmp | Completion date: April 7, 2003 | Current use: Office - professional, existing | Permit id: Pmt2003-00708 | |||||
SCORE 74 Fire alarm system - essential spa Client: Hotel, Village | Permit type: Fire | Permit status: Cmp | Completion date: April 7, 2003 | Current use: Office - professional, existing | Permit id: Pmt2003-00762 | |||||
SCORE 95 Interior remodel of conference & pool area Client: Hotel, Village | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Motel/hotel/bed & breakfast, addition an | Permit id: Pmt2003-05162 | |||||
SCORE 95 Fire sprinkler system - 1st floor remodel Client: Hotel, Village | Permit type: Fire | Permit status: Cmp | Completion date: March 24, 2004 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2004-00379 | |||||
SCORE 95 Fire alarm system - 1st floor remodel Client: Hotel, Village | Permit type: Fire | Permit status: Cmp | Completion date: April 12, 2004 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2004-00505 | |||||
SCORE 99 Remodel existing restaurant on the south east corner of 26th and canyon for the original pancake house. Was a black eyed pea. No change in the number of plumbing fixtures. Occupant load 286 Client: Hotel, Village | Permit type: Building, electrical, mechanical, plumbing, flood not required | Permit status: Cmp | Completion date: April 22, 2005 | Current use: Restaurant, tenant remodel | Permit id: Pmt2004-02589 | |||||
SCORE 56 Two new internally illuminated wall signs that read inchthe original pancake houseinch. Client: Hotel, Village | Permit type: Electrical, sign | Permit status: Cmp | Completion date: June 21, 2007 | Current use: Restaurant, existing | Permit id: Pmt2004-02638 | |||||
SCORE 77 Install 3 type 1 hood in the original pancake house.{ sam dardano has looked at the plans and approved them. Sam has the plans and will have them for inspection} Client: Hotel, Village | Permit type: Mechanical | Permit status: Cmp | Completion date: February 10, 2005 | Current use: Restaurant, existing | Permit id: Pmt2004-03371 | |||||
SCORE 95 Fire suppression system - pancake house Client: Hotel, Village | Permit type: Fire | Permit status: Cmp | Completion date: September 30, 2004 | Current use: Restaurant, existing | Permit id: Pmt2004-03594 | |||||
SCORE 97 Installation of two rooftop telecommunications equipment cabinets on the lower roof and the replacement of existing telecommunications antennae in their existing approved locations at the boulder marriott hotel. Client: Hotel Village | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 1, 2006 | Current use: Telecommunications, alteration | Permit id: Pmt2004-04378 | |||||
SCORE 95 Addition of 3 notification appliances Client: Six Apple | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2006 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2006-00577 | |||||
SCORE 95 Fire sprinkler system - control valves in each stairway Client: Six Apple | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2006 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2006-01207 | |||||
Addition of one microwave antenna to rooftop cell site. Please refer to email correspondence in application materials for clarification on why no adr is requried. ![]() Client: Select Bre | Permit type: Building, flood accessory/remodel | Permit status: N&v | Current use: Motel/hotel/bed & breakfast, remodel | Permit id: Pmt2014-03159 | |||||
SCORE 95 Void..... Road closure for tree pruning ![]() Client: Hospitalit Summit | Permit type: Right-of-way | Permit status: N&v | Permit id: Pmt2017-00415 | |||||
Interior, non-structural, tenant remodel of marriott club lounge, on the first floor, se corner of the building. Scope includes converting the existing pool into a new lounge area, converting the previous pool bathroom into a small retail shop, and installing a new ceiling (with a foot clearance) throughout the area of work; space above new ceiling to remain unused. Associated mepfoots covered within the scope of this permit, including re-wiring for new power receptacles and lights, new hvac, and installation of new plumbing fixtures in proposed pantry. Relocation of exterior wall door on the south patio under separate permit. ![]() Client: Hospitalit Summit | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Act | Current use: Motel/hotel/bed & breakfast, tenant remo | Permit id: Pmt2017-02209 | |||||
Interior, non-structural remodel of the existing marriott hotel. Construction includes the relocation of existing power receptacles and lights, relocating shower controls, replacing all plumbing and electrical fixtures, and installing new finishes furnishings. No mechanical scope proposed. No structural scope proposed. ![]() Client: Hospitalit Summit | Permit type: Building, electrical, plumbing, flood accessory/remodel | Permit status: Act | Current use: Motel/hotel/bed & breakfast, tenant remo | Permit id: Pmt2017-04517 | |||||
Interior, non-structural remodel of the existing marriott hotel. Construction includes the conversion of (10) small rooms into new guest rooms. Upgrading fixtures and finishes. Associated mepfoots covered within the scope of this permit, including core drilling pt slab for installation of new plumbing lines and electrical wiring. ![]() Client: Hospitalit Summit | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Act | Current use: Motel/hotel/bed & breakfast, tenant remo | Permit id: Pmt2017-04521 | |||||
SCORE 100 Temporary construction power for a temporary job trailer. ![]() ![]() Applicant: W L Contractors, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: May 19, 2004 | Current use: Office - profes | |||||
SCORE 99 Temporary construction power for a temporary job trailer. Client: Kraemer & Sons | Permit type: Electrical | Permit status: Cmp | Completion date: May 19, 2004 | Current use: Office - professional, existing | Permit id: Pmt2002-04134 | |||||
SCORE 72 Grand opening banner starting august 2 for days. Sf max. ![]() ![]() Client: Cavatebo Della | Applicant: Cava/tebo Della | Permit type: Sign | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 95 Move one existing free-standing to a new location. Sign reads "coldwell banker". ![]() ![]() Client: Cavatebo Della | Applicant: King Sign Llc | Permit type: Electrical, sign | Permit status: N&v | Current use: Financial insti | |||||
SCORE 95 Erect a new internally illuminated wall sign reading "coldwell banker". Similar sign permitted by pmt 2005-02744. ![]() ![]() Client: Cavatebo Della | Applicant: Gordon Sign Company | Permit type: Electrical, sign | Permit status: N&v | Current use: Financial insti | |||||
SCORE 95 One new sign caldwell banker at the corner of 28th and canyon. ![]() ![]() Client: Cavatebo Della | Applicant: Gordon Sign Company | Permit type: Electrical, sign | Permit status: N&v | Current use: Financial insti | |||||
SCORE 95 Free standing sign on canyon: canyon gate plaza ![]() ![]() Client: Cavatebo Della | Applicant: King Sign Llc | Permit type: Electrical, sign | Permit status: Cmp | Completion date: August 2, 2007 | Current use: Commercial/reta | |||||
SCORE 100 Tenant finish ![]() ![]() Client: Cavatebo Della | Applicant: Fire Alarm Services, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: August 1, 2005 | Current use: Office - profes | |||||
SCORE 100 Fire sprinkler system - coldwell banker (2nd floor) ![]() ![]() Client: Cavatebo Della | Applicant: Jacobs Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: August 1, 2005 | Current use: Office - profes | |||||
SCORE 74 Tenant finish for coldwell banker real estate brokerage on second floor of canyon gate plaza. Client: Cavatebo Della | Applicant: Tenant Finish Specialties Inc | Permit type: Building, electrical | Permit status: Co | Current use: Office - profes | |||||
SCORE 96 Fire sprinkler system - twin teriyaki ![]() ![]() Client: Cavatebo Della | Applicant: Code Fire Systems, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: March 24, 2005 | Current use: Restaurant, exi | |||||
SCORE 95 Fire sprinkler system - eb games ![]() ![]() Client: Della Cavatebo Development Co Llc | Applicant: Code Fire Llc | Permit type: Fire | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 74 Fire alarm system - st. 115 ![]() ![]() Client: Cavatebo Della | Applicant: K P S Electric. Inc. | Permit type: Fire | Permit status: Cmp | Completion date: March 10, 2003 | Current use: Commercial/reta | |||||
SCORE 95 Installtion of new wall sign (72 s. F.) for "cost plus world market" along the east facade of the canyon gate plaza building. ![]() ![]() Client: Cavatebo Della | Applicant: King Sign Llc | Permit type: Electrical, sign | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 95 Install internally illuminated wall sign "americas mattress" in canyon gate plaza ![]() ![]() Client: Cavatebo Della | Applicant: Ad Light Sign Company, Inc. | Permit type: Electrical, sign | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 72 Interior commercial tenant finish for a new "mountain mattress" retail space (2,075 s. F.) at canyon gate plaza. Client: Cavatebo Della | Applicant: Cava/tebo Della | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 4, 2008 | Current use: Commercial/reta | |||||
SCORE 97 Install new floor sink w floor drain, run new cold water supply lines. (twin teriyaki restaurant) ![]() ![]() Client: Cavatebo Della | Applicant: Bernies Plbg & Htg | Permit type: Plumbing | Permit status: N&v | Current use: Restaurant, exi | |||||
SCORE 95 2 replacement signs eb games ![]() ![]() Client: Cavatebo Della | Applicant: Davinci Sign Systems Inc | Permit type: Sign | Permit status: Cmp | Completion date: March 14, 2008 | Current use: Commercial/reta | |||||
SCORE 96 Fire sprinkler system - twin teriyaki Client: Cava Tebo Della | Permit type: Fire | Permit status: Cmp | Completion date: March 24, 2005 | Current use: Restaurant, existing | Permit id: Pmt2005-00323 | |||||
SCORE 95 One new sign caldwell banker at the corner of 28th and canyon. Client: Cava Tebo Della | Permit type: Electrical, sign | Permit status: N&v | Current use: Financial institution, existing | Permit id: Pmt2005-02744 | |||||
Grand opening banner starting august 2 for days. Sf max. ![]() ![]() Client: Cava Tebo Della | Permit type: Sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2006-03117 | |||||
SCORE 95 Interior commercial tenant finish for a new inchmountain mattressinch retail space (2,075 s. F.) at canyon gate plaza. Client: Cava Tebo Della | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: January 4, 2008 | Current use: Commercial/retail, tenant finish | Permit id: Pmt2003-00208 | |||||
SCORE 95 Install internally illuminated wall sign inchamericafoots mattressinch in canyon gate plaza Client: Cava Tebo Della | Permit type: Electrical, sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2003-00464 | |||||
SCORE 95 Installtion of new wall sign (72 s. F.) for inchcost plus world marketinch along the east facade of the canyon gate plaza building. ![]() ![]() Client: Cava Tebo Della | Permit type: Electrical, sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2003-00519 | |||||
SCORE 74 Fire alarm system - st. 115 Client: Cava Tebo Della | Permit type: Fire | Permit status: Cmp | Completion date: March 10, 2003 | Current use: Commercial/retail, existing | Permit id: Pmt2003-00765 | |||||
SCORE 95 Fire sprinkler system - eb games Client: Della Cava Tebo Development Co Llc | Permit type: Fire | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2003-02737 | |||||
SCORE 74 Tenant finish for coldwell banker real estate brokerage on second floor of canyon gate plaza. Client: Cava Tebo Della | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - professional, tenant finish | Permit id: Pmt2005-00604 | |||||
SCORE 100 Fire sprinkler system - coldwell banker (2nd floor) Client: Cava Tebo Della | Permit type: Fire | Permit status: Cmp | Completion date: August 1, 2005 | Current use: Office - professional, existing | Permit id: Pmt2005-01082 | |||||
SCORE 95 Tenant finish Client: Cava Tebo Della | Permit type: Fire | Permit status: Cmp | Completion date: August 1, 2005 | Current use: Office - professional, existing | Permit id: Pmt2005-01864 | |||||
SCORE 95 Free standing sign on canyon: canyon gate plaza Client: Cava Tebo Della | Permit type: Electrical, sign | Permit status: Cmp | Completion date: August 2, 2007 | Current use: Commercial/retail, existing | Permit id: Pmt2005-02037 | |||||
SCORE 95 Erect a new internally illuminated wall sign reading inchcoldwell bankerinch. Similar sign permitted by pmt 2005-02744. Client: Cava Tebo Della | Permit type: Electrical, sign | Permit status: N&v | Current use: Financial institution, existing | Permit id: Pmt2005-03475 | |||||
SCORE 95 Move one existing free-standing to a new location. Sign reads inchcoldwell bankerinch. Client: Cava Tebo Della | Permit type: Electrical, sign | Permit status: N&v | Current use: Financial institution, existing | Permit id: Pmt2005-03546 | |||||
SCORE 97 Install new floor sink w floor drain, run new cold water supply lines. (twin teriyaki restaurant) Client: Cava Tebo Della | Permit type: Plumbing | Permit status: N&v | Current use: Restaurant, existing | Permit id: Pmt2006-03952 | |||||
SCORE 95 2 replacement signs eb games Client: Cava Tebo Della | Permit type: Sign | Permit status: Cmp | Completion date: March 14, 2008 | Current use: Commercial/retail, existing | Permit id: Pmt2007-02097 | |||||
SCORE 95 Total tear off and overlay with epdm, squares, flat roof. ![]() ![]() Client: Roger Stevens | Applicant: C J Roofing Company | Permit type: Roofing | Permit status: Cmp | Completion date: August 2, 2007 | Current use: Multifamily dwe | |||||
SCORE 100 Install street lights and pedestal box ![]() ![]() Client: Roger Stevens | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Repair of sewer service in property only. ![]() ![]() Client: Roger Stevens | Applicant: Pipeline Industries, Inc | Permit type: Wastewater | Permit status: Act | Current use: Multifamily dwe | |||||
SCORE 95 Replace water damaged 199,0 btu, boiler in exterior mechanical room, sw building. ![]() ![]() Client: Robert Poston | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: November 13, 2013 | Current use: Multifamily dwe | |||||
SCORE 95 Replace water damaged 285,0 btu, boiler in exterior mechanical room, east building. ![]() ![]() Client: Robert Poston | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: November 13, 2013 | Current use: Multifamily dwe | |||||
SCORE 95 Replace water damaged 199,0 btu, boiler in exterior mechanical room, sw building. Client: Robert Poston | Permit type: Mechanical | Permit status: Cmp | Completion date: November 13, 2013 | Current use: Multifamily dwellings, existing | Permit id: Pmt2013-05697 | |||||
SCORE 95 Replace water damaged 285,0 btu, boiler in exterior mechanical room, east building. Client: Robert Poston | Permit type: Mechanical | Permit status: Cmp | Completion date: November 13, 2013 | Current use: Multifamily dwellings, existing | Permit id: Pmt2013-05698 | |||||
Install street lights and pedestal box ![]() Client: Roger Stevens | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2004-00159 | |||||
SCORE 95 Repair of sewer service in property only. ![]() ![]() Client: Roger Stevens | Permit type: Wastewater | Permit status: Act | Current use: Multifamily dwellings, existing | Permit id: Pmt2003-02209 | |||||
SCORE 95 Total tear off and overlay with epdm, squares, flat roof. Client: Roger Stevens | Permit type: Roofing | Permit status: Cmp | Completion date: August 2, 2007 | Current use: Multifamily dwellings, existing | Permit id: Pmt2004-02824 | |||||
SCORE 100 Locate and repair gas leak ![]() ![]() Client: Broadway Vail | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 896 square foot remodel on lower level, 357 square foot remodel on upper level. All changes to below grid walls. Client: Family Schuricht | Applicant: Sand Construction, Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 6, 2004 | Current use: Office - profes | |||||
SCORE 95 Roofing permit for total tear off and overlay of 33 squares of ear asphalt shingles at a 5:12 slope ![]() ![]() Client: Family Schuricht | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: October 10, 2008 | Current use: Office - profes | |||||
Placing 94foot of aerial in alley between folsom and goss. New sidewalk anchor and down guy to be placed at pole 2345ar ![]() Client: Partnershi Tebo | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-03208 | |||||
Locate and repair gas leak ![]() Client: Broadway Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2004-01140 | |||||
SCORE 99 896 square foot remodel on lower level, 357 square foot remodel on upper level. All changes to below grid walls. Client: Family Schuricht | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 6, 2004 | Current use: Office - professional, tenant remodel | Permit id: Pmt2004-00221 | |||||
SCORE 95 Roofing permit for total tear off and overlay of 33 squares of ear asphalt shingles at a 5:12 slope Client: Family Schuricht | Permit type: Roofing | Permit status: Cmp | Completion date: October 10, 2008 | Current use: Office - professional, existing | Permit id: Pmt2007-02117 | |||||
SCORE 60 Extension of one existing drain and one existing vent at the roof to facilitate installation of telecommunications equipment. ![]() ![]() Client: Hotel Village | Applicant: Pride Plumbing Company, Llc | Permit type: Plumbing | Permit status: N&v | Current use: Motel/hotel/bed | |||||
SCORE 95 Installation of wireless telecommunications facility on the boulder mariott hotel. Equipment to be located in 3rd floor addition, and new panel antennas to be mounted to side of building per adr2003-00128. Client: Hotel, Village | Applicant: Verizon Wireless | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 28, 2004 | Current use: Motel/hotel/bed | |||||
Floodplain development permit: emergency operations plan for the boulder residence inn. Client: Village Gri | Permit type: Flood emg ops plan/evac | Permit status: Act | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2016-00151 | |||||
SCORE 65 Erosion stormwater for the marriott hotel project state permit #cor03o627 ![]() ![]() Client: Village Gri | Permit status: Iss | Permit id: Pmt2016-00281 | |||||
SCORE 95 Tree trimming ![]() ![]() Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-00958 | |||||
SCORE 74 4inch domestic meter & vault, 3 4inch irrigation meter & pit, 2 fire hydrants. Includes water, sewer, storm drain, & fire services with appurtenances. In associateion with tec2015-000 and pmt2015-04065 (parts released and meters approved on building permit) ![]() ![]() Client: Village Gri | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-01335 | |||||
Installation of wireless telecommunications facility on the boulder mariott hotel. Equipment to be located in 3rd floor addition, and new panel antennas to be mounted to side of building per adr2003-00128. ![]() ![]() Client: Hotel, Village | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: December 28, 2004 | Current use: Motel/hotel/bed & breakfast, addition | Permit id: Pmt2004-00635 | |||||
SCORE 60 Extension of one existing drain and one existing vent at the roof to facilitate installation of telecommunications equipment. Client: Hotel Village | Permit type: Plumbing | Permit status: N&v | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2004-01698 | |||||
SCORE 65 Grading and excavation only permit associated with case number pmt2015-04065 (inchboulder residence inninch). See also tec2015-00010. Erosion control under separate permit. Client: Village Gri | Permit type: Flood accessory/remodel, grading | Permit status: Iss | Permit id: Pmt2015-04107 | |||||
SCORE 80 Fs - es - new spk system for marriott residence inn Client: Village Gri | Permit type: Fire | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2016-04239 | |||||
Floodplain development permit: emergency operations plan for the boulder residence inn. Client: Village Gri | Permit type: Flood emg ops plan/evac | Permit status: Cmp | Completion date: March 30, 2017 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2016-00151 | |||||
Bore 137foot & place one new vault for new comcast service to 25 canyon blvd, job# 40790 ![]() Client: Village Gri | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-01723 | |||||
SCORE 56 Fa - es - new system for residence inn Client: Village Gri | Permit type: Fire | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-00135 | |||||
Installation of wireless telecommunications facility on the boulder mariott hotel. Equipment to be located in 3rd floor addition, and new panel antennas to be mounted to side of building per adr2003-00128. ![]() ![]() Client: Hotel, Village | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: December 28, 2004 | Current use: Motel/hotel/bed & breakfast, addition | Permit id: Pmt2004-00635 | |||||
SCORE 65 New 155 room hotel (inchmarriott residence inninch) with underground garage. Excavation and grading under separate case number. Please refer to lur2013-00057, tec2015-000 and lur2015-00035 (floodplain development permit). Interior swimming pool brought in as deferred submittal - 2 9 17 Client: Village Gri | Permit type: Building, electrical, mechanical, plumbing, fire, water, wastewater | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, new, swimmi | Permit id: Pmt2015-04065 | |||||
SCORE 65 Floodplain development permit construction of a new hotel to provide the first level finish floor 2foot minimum above fema established base flood elevations. Emergency management plan to be submitted under separate permit. ![]() Client: Village Gri | Permit type: Flood floodproof structure | Permit status: Act | Current use: Motel/hotel/bed & breakfast, new | Permit id: Pmt2015-04882 | |||||
Floodplain development permit: emergency operations plan for the boulder residence inn. Client: Village Gri | Permit type: Flood emg ops plan/evac | Permit status: Cmp | Completion date: March 30, 2017 | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2016-00151 | |||||
SCORE 95 Sign - three wall signs (signs a- channel letters, electric, b - vinyl, and c - plaque) for the residence inn marriott, one electric. All three are located on the east elevation and read inchresidence inn marriottinch. Client: Lodging Boulder | Permit type: Electrical, sign | Permit status: Hld | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-02786 | |||||
SCORE 95 Sign - three wall signs for inchresidence inn marriottinch (signs d - illuminated channel letters, e- wall plaque, f - illuminated channel letters). Sign f on east elevation, d and e are on west elevation. Client: Lodging Boulder | Permit type: Electrical, sign | Permit status: Hld | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-02787 | |||||
SCORE 95 Sign - three signs (g - wall plaque, h - illuminated channel letters, and i - wall plaque) for inchresidence inn marriottinch. G is on north elevation, h and i are on south elevation. Client: Lodging Boulder | Permit type: Electrical, sign | Permit status: Rev | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-02788 | |||||
SCORE 65 Replace city sidewalk & transportation improvements per approved tec-doc drawings ![]() ![]() Client: Village Gri | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-03486 | |||||
Trenching 12foot from existing hh9504 to intercept cbo for fiber to residence inn, job# n. 258873 ![]() Client: Village Gri | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-03545 | |||||
SCORE 95 Ansul piranha kitchen hood fire suppression system. Residence inn ![]() ![]() Client: Village Gri | Permit type: Fire | Permit status: Iss | Current use: Motel/hotel/bed & breakfast, existing | Permit id: Pmt2017-03901 | |||||
SCORE 87 Remodel of existing public library ground floor to create office spacee. Add two windows to interior. No structural changes. Client: Of City | Applicant: Bill Boyes | Permit type: Building, electrical | Permit status: Cmp | Current use: Government uses | |||||
SCORE 64 Interior remodel to install new edit room for channel 8 offices. Client: Of City | Applicant: Innovative Interiors & Const. Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 22, 2007 | Current use: Government uses | |||||
SCORE 94 Remodel of first floor office in library for new art dept. Office. Scope of work includes installation of non-bearing walls, associated electrical and mechanical work. Client: Of City | Applicant: Array Construction, Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 15, 2007 | Current use: Government uses | |||||
SCORE 95 Tennant finish coity of boulder library ![]() ![]() Client: Of City | Applicant: Integrated Safety Services | Permit type: Fire | Permit status: Cmp | Completion date: August 28, 2007 | Current use: Government uses | |||||
SCORE 100 Tenant remodel of boulder public library, 2nd floor. Installation of 6 new windows, new doorways to computer room, training classroom. No modifiaction to eletrical, plumbing or mechanical systems. Client: Of City | Applicant: Of City | Permit type: Building, flood acce | Permit status: Cmp | Completion date: January 15, 2008 | Current use: Government uses | |||||
SCORE 100 Flat roof overlay manville, fibertite, 422 squares - library ![]() ![]() Client: Of City | Applicant: Arapahoe Roofing & Sheet Metal | Permit type: Roofing | Permit status: Cmp | Completion date: July 14, 2009 | Current use: Government uses | |||||
SCORE 95 Intallation of temporary electric power for boulder creek festival at 9th and canyon. ![]() ![]() Client: Of City | Applicant: Southpaw Electric Co | Permit type: Electrical | Permit status: Cmp | Completion date: July 10, 2014 | Current use: Government uses | |||||
SCORE 95 Electrical permit - for temporary electrical power for the home town fair. ![]() ![]() Client: Of City | Applicant: Southpaw Electric Co | Permit type: Electrical | Permit status: Cmp | Completion date: July 10, 2014 | Current use: Government uses | |||||
SCORE 98 Fa - tf for library ![]() ![]() Client: Of City | Applicant: Integrated Safety Services Llc | Permit type: Fire | Permit status: Iss | Current use: Schools/educati | |||||
SCORE 98 Fa - tf for library Client: Of City | Permit type: Fire | Permit status: Iss | Current use: Schools/educational, existing | Permit id: Pmt2014-03368 | |||||
SCORE 95 Tennant finish coity of boulder library Client: Of City | Permit type: Fire | Permit status: Cmp | Completion date: August 28, 2007 | Current use: Government uses, existing | Permit id: Pmt2007-03217 | |||||
SCORE 95 Electrical permit - for temporary electrical power for the home town fair. Client: Of City | Permit type: Electrical | Permit status: Cmp | Completion date: July 10, 2014 | Current use: Government uses, existing | Permit id: Pmt2011-03767 | |||||
SCORE 64 Interior remodel to install new edit room for channel 8 offices. Client: Of City | Permit type: Building, electrical, flood accessory/remodel | Permit status: Cmp | Completion date: May 22, 2007 | Current use: Government uses, remodel | Permit id: Pmt2004-04513 | |||||
SCORE 82 Remodel of existing public library ground floor to create office spacee. Add two windows to interior. No structural changes. Client: Of City | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Current use: Government uses, tenant remodel | Permit id: Pmt2006-00250 | |||||
SCORE 98 Remodel of first floor office in library for new art dept. Office. Scope of work includes installation of non-bearing walls, associated electrical and mechanical work. Client: Of City | Permit type: Building, electrical, mechanical, flood accessory/remodel | Permit status: Cmp | Completion date: October 15, 2007 | Current use: Government uses, remodel | Permit id: Pmt2007-03182 | |||||
SCORE 98 Tenant remodel of boulder public library, 2nd floor. Installation of 6 new windows, new doorways to computer room, training classroom. No modifiaction to eletrical, plumbing or mechanical systems. Client: Of City | Permit type: Building, flood accessory/remodel | Permit status: Cmp | Completion date: January 15, 2008 | Current use: Government uses, tenant remodel | Permit id: Pmt2007-03533 | |||||
SCORE 100 Flat roof overlay manville, fibertite, 422 squares - library Client: Of City | Permit type: Roofing | Permit status: Cmp | Completion date: July 14, 2009 | Current use: Government uses, existing | Permit id: Pmt2008-05162 | |||||
SCORE 94 Tenant finish at building "m" at 24 canyon "alba restaurant". 2479 sf, 84 seats on the interior, 56 seats outdoors. Client: Village Gr | Applicant: Jim Bray | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 23, 2008 | Current use: Restaurant, ten | |||||
SCORE 94 Exterior remodel of building m. Client: Village Gr | Applicant: Jim Bray | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 1, 2007 | Current use: Commercial/reta | |||||
SCORE 95 Installation of 3, non-illuminated wall signs "alba" ![]() ![]() Client: Village Gr | Applicant: 20/ Communications | Permit type: Sign | Permit status: Cmp | Completion date: March 14, 2008 | Current use: Restaurant, exi | |||||
SCORE 91 Tenant remodel of suite 1 for financial advisors office. 4937 sf. Adding 1 sink interior remodel only Client: Village Gr | Applicant: Davis & Davis Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 26, 2007 | Current use: Office - profes | |||||
SCORE 98 Mechannical permit for new gas fire place on outdoor patio. ![]() ![]() Client: Village Gri | Applicant: L I D Landscapes, Inc. | Permit type: Mechanical | Permit status: Cmp | Completion date: January 14, 2008 | Current use: Restaurant | |||||
SCORE 95 Tennant finish sprinkler charles schwab office ![]() ![]() Client: Village Gri | Applicant: Arapahoe Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 14, 2007 | Current use: Office - profes | |||||
SCORE 100 Tennant finish fire alarm for charles schwab suite m4 ![]() ![]() Client: Village Gri | Applicant: Safe Systems, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: December 14, 2007 | Current use: Office - profes | |||||
SCORE 95 Sign permit for new internally illuminated wall sign for charles schwab ![]() ![]() Client: Village Gri | Applicant: Husky Signs & Graphics Inc | Permit type: Sign | Permit status: Cmp | Completion date: July 10, 2008 | Current use: Personal servic | |||||
SCORE 95 Tenant remodel of suite m3 as leasing office. Client: Village Gri | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 19, 2009 | Current use: Office - profes | |||||
SCORE 100 Tennant finish sprinkler residences at boulder creek lease office ![]() ![]() Client: Village Gri | Applicant: Fire Defense, Inc | Permit type: Fire | Permit status: Iss | Current use: Office - profes | |||||
SCORE 100 Tennant finish fire alarm for rbc sales office ![]() ![]() Client: Village Gri | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Office - profes | |||||
SCORE 95 Sign - for new non-electric wall sign for inchthe carillon at boulder creekinch. ![]() ![]() Client: Village Gri | Applicant: 20/ Communications | Permit type: Sign | Permit status: Cmp | Completion date: November 25, 2009 | Current use: Office - admini | |||||
SCORE 99 Tenant remodel of space m2 for colorado multisport, a retail bicycle and accessories store. Scope of work includes installation of dressing room, new finishes and lighting. Client: Village Gri | Applicant: Boots Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 28, 2011 | Current use: Commercial/reta | |||||
SCORE 99 Tenant remodel of 575 sf to remove a portion of an existing demising wall, install wall to create a storage area and modify interior lighting system. Remove existing grid ceiling, modify hvac ductwork -- includes associated electrical. Client: Village Gri | Applicant: Boots Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 14, 2012 | Current use: Commercial/reta | |||||
SCORE 84 Installation of a replacement 199k btu gas fired water heater. Located in mechanical closet room. ![]() ![]() Client: Village Gri | Applicant: Hot & Cold Mechanical | Permit type: Mechanical | Permit status: Iss | Current use: Commercial/reta | |||||
SCORE 95 Unit m-1 - volta restaurant. At the entryway, removal of a portion or a wall, install a tempered laminated glass panel at section of the wall removal, reverse door swing at existing storage room and maintain inward swing of door, remove section of wall at storage room and install insulated glass to create wine storage room. Minor electrical work to relocate modify fixtures, switches and outlets at bar area. No mechanical or plumbing work. Client: Village Gri | Applicant: Horizon Builders | Permit type: Building, electrical | Permit status: Iss | Current use: Restaurant, ten | |||||
SCORE 100 Overlay carlisle ,0 mil epdm on existing roof. 124 squares, 1 4:1 roof pitch. ![]() ![]() Client: Village Gri | Applicant: D & D Roofing, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: April 6, 2015 | Current use: Commercial/reta | |||||
Installing new gas main using directional bore. ![]() Client: Village Gri | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-03972 | |||||
SCORE 95 Tenant remodel of suite m3 as leasing office. Client: Village Gri | Permit type: Building, electrical, mechanical, plumbing, water, flood accessory/remodel | Permit status: Cmp | Completion date: November 19, 2009 | Current use: Office - professional, tenant remodel | Permit id: Pmt2009-02692 | |||||
SCORE 95 Tennant finish sprinkler residences at boulder creek lease office Client: Village Gri | Permit type: Fire | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2009-03243 | |||||
SCORE 95 Tennant finish fire alarm for rbc sales office Client: Village Gri | Permit type: Fire | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Office - professional, existing | Permit id: Pmt2009-03367 | |||||
SCORE 95 Sign - for new non-electric wall sign for inchthe carillon at boulder creekinch. Client: Village Gri | Permit type: Sign | Permit status: Cmp | Completion date: November 25, 2009 | Current use: Office - administrative, existing | Permit id: Pmt2009-03965 | |||||
SCORE 95 Unit m-1 - volta restaurant. At the entryway, removal of a portion or a wall, install a tempered laminated glass panel at section of the wall removal, reverse door swing at existing storage room and maintain inward swing of door, remove section of wall at storage room and install insulated glass to create wine storage room. Minor electrical work to relocate modify fixtures, switches and outlets at bar area. No mechanical or plumbing work. Client: Village Gri | Permit type: Building, electrical | Permit status: Iss | Current use: Restaurant, tenant remodel | Permit id: Pmt2013-04653 | |||||
SCORE 100 Overlay carlisle ,0 mil epdm on existing roof. 124 squares, 1 4:1 roof pitch. Client: Village Gri | Permit type: Roofing | Permit status: Cmp | Completion date: April 6, 2015 | Current use: Commercial/retail, existing | Permit id: Pmt2014-04914 | |||||
SCORE 99 Tenant remodel of space m2 for colorado multisport, a retail bicycle and accessories store. Scope of work includes installation of dressing room, new finishes and lighting. Client: Village Gri | Permit type: Building, electrical, flood accessory/remodel | Permit status: Cmp | Completion date: February 28, 2011 | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2011-00310 | |||||
SCORE 99 Tenant remodel of 575 sf to remove a portion of an existing demising wall, install wall to create a storage area and modify interior lighting system. Remove existing grid ceiling, modify hvac ductwork -- includes associated electrical. Client: Village Gri | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: June 14, 2012 | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2011-04049 | |||||
SCORE 99 Tenant finish at building inchminch at 24 canyon inchalba restaurantinch. 2479 sf, 84 seats on the interior, 56 seats outdoors. Client: Village Gr | Permit type: Building, electrical, mechanical, plumbing, wastewater, flood accessory/remodel | Permit status: Cmp | Completion date: December 23, 2008 | Current use: Restaurant, tenant remodel | Permit id: Pmt2007-00953 | |||||
SCORE 99 Exterior remodel of building m. Client: Village Gr | Permit type: Building, electrical, flood accessory/remodel | Permit status: Cmp | Completion date: November 1, 2007 | Current use: Commercial/retail, remodel | Permit id: Pmt2007-01490 | |||||
SCORE 95 Installation of 3, non-illuminated wall signs inchalbainch Client: Village Gr | Permit type: Sign | Permit status: Cmp | Completion date: March 14, 2008 | Current use: Restaurant, existing | Permit id: Pmt2007-02891 | |||||
SCORE 91 Tenant remodel of suite 1 for financial advisors office. 4937 sf. Adding 1 sink interior remodel only Client: Village Gr | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: November 26, 2007 | Current use: Office - professional, tenant remodel | Permit id: Pmt2007-03396 | |||||
SCORE 98 Mechannical permit for new gas fire place on outdoor patio. Client: Village Gri | Permit type: Mechanical | Permit status: Cmp | Completion date: January 14, 2008 | Current use: Restaurant | Permit id: Pmt2007-03965 | |||||
SCORE 95 Tennant finish sprinkler charles schwab office Client: Village Gri | Permit type: Fire | Permit status: Cmp | Completion date: December 14, 2007 | Current use: Office - professional, existing | Permit id: Pmt2007-04340 | |||||
SCORE 95 Tennant finish fire alarm for charles schwab suite m4 Client: Village Gri | Permit type: Fire | Permit status: Cmp | Completion date: December 14, 2007 | Current use: Office - professional, existing | Permit id: Pmt2007-04428 | |||||
SCORE 95 Sign permit for new internally illuminated wall sign for charles schwab Client: Village Gri | Permit type: Sign | Permit status: Cmp | Completion date: July 10, 2008 | Current use: Personal service, existing, existing | Permit id: Pmt2007-04478 | |||||
SCORE 84 Installation of a replacement 199k btu gas fired water heater. Located in mechanical closet room. ![]() ![]() Client: Village Gri | Permit type: Mechanical | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2013-03485 | |||||
Cut & cap service at the main, job# 12551830 ![]() Client: Village Gri | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-03140 | |||||
SCORE 99 Entire structure demolition of former bennigans restaurant. ![]() ![]() Client: Village Gri | Applicant: Boots Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Current use: Restaurant, exi | |||||
SCORE 99 Entire structure demolition of former benniganfoots restaurant. ![]() ![]() Client: Village Gri | Permit type: Demolition | Permit status: Cmp | Current use: Restaurant, existing | Permit id: Pmt2007-05072 | |||||
SCORE 100 Smart grid u222 bore1237 ![]() ![]() Client: R Name | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 87 Replace 6 panel antenna and installation of fiber optic cable at existing cellular telecommunications site. Client: Village Gri | Applicant: Village Gri | Permit type: Building | Permit status: Cmp | Completion date: September 22, 2011 | Current use: Telecommunicati | |||||
Replace 6 panel antenna and installation of fiber optic cable at existing cellular telecommunications site. ![]() ![]() Client: Village Gri | Permit type: Building | Permit status: Cmp | Completion date: September 22, 2011 | Current use: Telecommunications, alteration | Permit id: Pmt2009-03960 | |||||
SCORE 100 Electrical permit for spinkler pedestal corrections at canyon park (north of canyon at 21st street) ![]() ![]() Client: Of City | Applicant: Excel Electric, Inc | Permit type: Electrical | Permit status: Cmp | Completion date: July 10, 2014 | Current use: Government uses | |||||
SCORE 60 Floodplain development permit: playground improvements at canyon park including replace sidewalk, installation of new playground equipment, and replace existing pea gravel playground surfacing with 1,5 s. F. Of porous rubberized safety surfacing. ![]() ![]() Client: Of City | Applicant: Doug Godfrey | Permit type: Flood accessory/remo | Permit status: Iss | Current use: Government uses | |||||
SCORE 99 Rehabilitation of the park at 21st and canyon -- revised playground equipment, flatwork, removal of existing playground sand surface, install inchpoured in placeinch rubberized play surface at playground equipment area. Client: Of City | Applicant: Keene Concrete, Inc | Permit type: Building, flood fenc | Permit status: Iss | Current use: Amusement/recre | |||||
SCORE 95 Electrical permit for spinkler pedestal corrections at canyon park (north of canyon at 21st street) Client: Of City | Permit type: Electrical | Permit status: Cmp | Completion date: July 10, 2014 | Current use: Government uses, existing | Permit id: Pmt2012-00992 | |||||
Floodplain development permit: playground improvements at canyon park including replace sidewalk, installation of new playground equipment, and replace existing pea gravel playground surfacing with 1,5 s. F. Of porous rubberized safety surfacing. ![]() Client: Of City | Permit type: Flood accessory/remodel | Permit status: Iss | Current use: Government uses, existing | Permit id: Pmt2012-03894 | |||||
SCORE 95 Rehabilitation of the park at 21st and canyon -- revised playground equipment, flatwork, removal of existing playground sand surface, install inchpoured in placeinch rubberized play surface at playground equipment area. Client: Of City | Permit type: Building, flood fence flood permit, sitework | Permit status: N&v | Current use: Amusement/recreational - outdoor, altera | Permit id: Pmt2012-04040 | |||||
SCORE 94 Conversion of existing retail space into eight new residential units. Scope of work includes an upper level addition and roof re-configuration, remodel of existing space, and all associated meps. Also includes unit-specific entry decks. Client: Canyon 1580.0 | Applicant: Rex Olson | Permit type: Building, electrical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 88 Conversion of existing retail space into eight new residential units. Scope of work includes an upper level addition and roof re-configuration, remodel of existing space, and all associated meps. Also includes unit-specific entry decks. ![]() ![]() Client: Canyon | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Multifamily dwellings, addition and remo | Permit id: Pmt2013-03889 | |||||
SCORE 95 Roofing permit for total tear off an reroof of multi-family structure, tpo, 61 squares, contractor indicates 1 4:12 pitch. ![]() ![]() Client: Canyon 2200.0 | Applicant: B&m Roofing Of Colorado Inc | Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 95 Duplicate permit null & void ![]() ![]() Client: Canyon 2200.0 | Applicant: Taddiken Tree Company Inc | Permit type: Right-of-way | Permit status: N&v | |||||
SCORE 95 Roofing permit for total tear off an reroof of multi-family structure, tpo, 61 squares, contractor indicates 1 4:12 pitch. Client: Canyon | Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2014-04795 | |||||
SCORE 95 Duplicate permit null & void ![]() Client: Canyon | Permit type: Right-of-way | Permit status: N&v | Permit id: Pmt2015-02131 | |||||
Directional bore for gas service renewal with one 5x5 street cut & three potholes, job# 12522802 ![]() Client: Canyon | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-02664 |