SCORE

MELTON CONSTRUCTION INC

ABOUT MELTON CONSTRUCTION INC

Melton Construction Inc specializes in:

Melton Construction Inc offers services:

Based on the information received from , associated with Melton Construction Inc over the past .

If you are considering hiring Melton Construction Inc for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Melton Construction Inc has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
9 Aurora Boulder Co
Interior demolition of interior non-bearing walls in prepartion for work covered by pmt2006-02101.
Date:  June 1, 2006

Client: Academy The | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: Cls | Current use: Multifamily dwe
2006/06/0101009 Aurora Boulder CoMelton Construction Inc
SCORE
100
9 Aurora Boulder Co
Remodel approximately 7 sf & reconfiguration of several interior non-loadbearing walls, new lighting & outlets to be added, add bidet & sink, split shower tub combo into separate shower & tub. Interior finish.
Date:  June 21, 2006
Value:   $10,405

Client: Academy The | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 22, 2007 | Current use: Multifamily dwe
2006/06/21104051009 Aurora Boulder CoMelton Construction Inc
SCORE
100
18 Bluebell Av Boulder Co
Addition and remodel of sfd. Includes demolition of 4 sf, addition of 1107 sf with 484 sf attached garage, and remodel of existing kitchen.
Date:  June 27, 2006
Value:   $181,891

Client: G Meyer | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 7, 2007 | Current use: Single family d
2006/06/2718189110018 Bluebell Av Boulder CoMelton Construction Inc
SCORE
100
639 Mapleton Av Boulder Co
Repair decking, ceilingf, replace gutter and downspout on front porch. Paint to be white to match existing per lac.
Date:  April 7, 2006
Value:   $9,500

Client: Jacqueline Chillier | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: June 23, 2006 | Current use: Single family d
2006/04/079500100639 Mapleton Av Boulder CoMelton Construction Inc
SCORE
100
1458 Periwinkle Dr Boulder Co
Basement finish of existing sfd. Add fixture to roughed in full bath. Build bedroom and family room. One room will be storage only. No windows. 718 sf.
Date:  April 14, 2006
Value:   $31,425

Client: Mccarthy,Thomas Mccarthy | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 1, 2006 | Current use: Single family d
2006/04/14314251001458 Periwinkle Dr Boulder CoMelton Construction Inc
SCORE
100
2877 Tincup Cr Boulder Co
Build new unconditioned storage room to back of existing garage. 1 sf. Add new dormer for expansion of master bedroom. Remodel existing main level and basement bathrooms. Reconfigure bathrooms.
Date:  April 28, 2006
Value:   $76,073

Client: William Abbott,Jean Abbott | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 5, 2008 | Current use: Single family d
2006/04/28760731002877 Tincup Cr Boulder CoMelton Construction Inc
SCORE
100
34 Penrose Pl 107 Boulder Co
Interior remodel for 2 offices and an exray room only
Date:  March 29, 2006
Value:   $30,000

Client: Michael Jones | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 7, 2006 | Current use: Medical and den
2006/03/293000010034 Penrose Pl 107 Boulder CoMelton Construction Inc
SCORE
100
34 Penrose Pl 107 Boulder Co
Tenant remodel of existing dental office and 1 foot loft addition. Also includes removing a shower and adding a drinking fountain. See adr2006-00008 and adr2006-00009 for parking reduction and minor mod to pud.
Date:  April 5, 2006
Value:   $26,507

Client: Michael Jones | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 7, 2006 | Current use: Medical and den
2006/04/052650710034 Penrose Pl 107 Boulder CoMelton Construction Inc
SCORE
100
2995 Baseline Rd Boulder Co
Tenant remodel to install new shower, remove existing sink and reconfigure interior walls.
Date:  February 8, 2006
Value:   $20,000

Client: M Edward | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 7, 2008 | Current use: Office - techni
2006/02/08200001002995 Baseline Rd Boulder CoMelton Construction Inc
SCORE
100
2995 Baseline Rd Boulder Co
Demolition permit for interior non-structural walls.
Date:  January 27, 2006

Client: M Edward | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Current use: Office - techni
2006/01/2701002995 Baseline Rd Boulder CoMelton Construction Inc
SCORE
100
13 Fairfield Dr Boulder Co
Second story additon and remodel of single-family residence including relocation of full bath and 2 bedrooms, addition of one full and one half bath and one bedroom.
Date:  June 16, 2004
Value:   $153,000

Client: Arthur Veenendaal | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 25, 2005 | Current use: Single family d
2004/06/1615300010013 Fairfield Dr Boulder CoMelton Construction Inc
SCORE
100
48 Riverbend Rd Boulder Co
Interior non-structural demolition of partition walls, carpet and tile flooring for reconfigured office space.
Date:  December 23, 2005

Client: Riverbend 4820.0 | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: N&v | Current use: Office - profes
2005/12/23010048 Riverbend Rd Boulder CoMelton Construction Inc
SCORE
100
45 S 36th St Boulder Co
Installation of one egress window in existing finished basement.
Date:  January 25, 2006
Value:   $9,200

Client: Gloria Schurman | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: February 27, 2006 | Current use: Single family d
2006/01/25920010045 S 36th St Boulder CoMelton Construction Inc
SCORE
100
3765 Martin Dr Boulder Co
Remodel existing accessory building 4 sf. Add 1 2 bath. No change in envelope new heating system replace windows. Electric service upgrade
Date:  December 13, 2005
Value:   $15,000

Client: Edwin Parham,Angela Parham | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 22, 2006 | Current use: Single family d
2005/12/13150001003765 Martin Dr Boulder CoMelton Construction Inc
SCORE
100
175 Iroquois Dr Boulder Co
Bathroom remodel involving replacement of plumbing fixtures, installation of new bath vent fan, installation of gfci outlet.
Date:  October 12, 2005

Client: John Kleinbach,Marian Kleinbach | Applicant: Melton Construction, Inc. | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: December 2, 2005 | Current use: Single family d
2005/10/120100175 Iroquois Dr Boulder CoMelton Construction Inc
SCORE
100
6595 Odell Pl Boulder Co
Tenant remodel for boulder history museum storage facility. Work includes removal of non-load bearing interior walls to create open storage area with accessory office.
Date:  November 1, 2005
Value:   $40,000

Client: Odell 6595.0 | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 21, 2005 | Current use: Warehousing, re
2005/11/01400001006595 Odell Pl Boulder CoMelton Construction Inc
SCORE
100
6595 Odell Pl Boulder Co
Interior non-structural demolition of non-bearing walls for work proposed in pmt2005-03915
Date:  October 7, 2005

Client: Odell 6595.0 | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: March 3, 2008 | Current use: Warehousing, ex
2005/10/0701006595 Odell Pl Boulder CoMelton Construction Inc
SCORE
100
2346 18th St Boulder Co
Interior remodel of upper level to remove kitchen and add master bedroom.
Date:  December 1, 2005
Value:   $20,500

Client: Nancy Schimp | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 22, 2006 | Current use: Single family d
2005/12/01205001002346 18th St Boulder CoMelton Construction Inc
SCORE
100
3 29th St Boulder Co
Remodel of and 934 square foot two story addition over crawl space. Family dining room oon first level, master suite on the second. Second story deck over grade level
Date:  November 14, 2005
Value:   $303,721

Client: Kerry White,Greg White | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 16, 2006 | Current use: Single family d
2005/11/143037211003 29th St Boulder CoMelton Construction Inc
SCORE
100
34 Penrose Pl 103 Boulder Co
Remodel of existing dental office. Relocate plumbing fixtures add for new electrical circuits. Change cabinets etc.
Date:  September 19, 2005
Value:   $2,000

Client: Giles Horrocks | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 6, 2005 | Current use: Medical and den
2005/09/19200010034 Penrose Pl 103 Boulder CoMelton Construction Inc
SCORE
100
1665 Linden Av Boulder Co
Main level kitchen remodel, relocate kitchen sink, fridge, new vent hood, window, and sliding door.
Date:  September 14, 2005
Value:   $15,000

Client: Brian Opansky | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 31, 2006 | Current use: Single family d
2005/09/14150001001665 Linden Av Boulder CoMelton Construction Inc
SCORE
100
1322 Sandstone Ct Boulder Co
561 total square foot addition on two levels with second level deck off of second story bedroom.
Date:  October 12, 2005
Value:   $66,393

Client: Romney Philpott,Katherine Philpott | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 2, 2006 | Current use: Single family d
2005/10/12663931001322 Sandstone Ct Boulder CoMelton Construction Inc
SCORE
100
4 Gregory Ln Boulder Co
99 sf addition to sfd.
Date:  September 29, 2005
Value:   $50,140

Client: Randell Cain,Linda Cain | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 16, 2006 | Current use: Single family d
2005/09/29501401004 Gregory Ln Boulder CoMelton Construction Inc
SCORE
100
2346 18th St Boulder Co
Set dumpster from 12 8 05-12 23 05.
Date:  December 8, 2005

Client: Nancy Schimp | Applicant: Melton Construction, Inc | Permit type: Right-of-way | Permit status: Iss
2005/12/0801002346 18th St Boulder CoMelton Construction Inc
SCORE
100
403 Dewey Av Boulder Co
Permit to raise house, add 791 s. F. Finished basement (see bozaba case for setback variacnes). No work on the first and second floor are part of this permit.
Date:  June 22, 2005
Value:   $88,149

Client: John Kerschner | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 14, 2007 | Current use: Single family d
2005/06/2288149100403 Dewey Av Boulder CoMelton Construction Inc
SCORE
100
38 Armer St Boulder Co
One-story addition, 457 s. F. In size with a 3 s. F. Unfinished basement to single family residence containing master bedroom and new entry, and remodel of single family residence including alteration of garage door entry to northern facade, reside residence and replace windows.
Date:  May 26, 2005
Value:   $106,538

Client: Benton Self,Gabriela Self | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 21, 2007 | Current use: Single family d
2005/05/2610653810038 Armer St Boulder CoMelton Construction Inc
SCORE
100
5075 Chaparal Ct Boulder Co
Tenant remodel of existing space into offices. Remove sink and add shower. 362 sf. Modify fire sprinkler.
Date:  May 19, 2005
Value:   $6,000

Client: M,M Estate Holdings Llc | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 25, 2005 | Current use: Service industr
2005/05/1960001005075 Chaparal Ct Boulder CoMelton Construction Inc
SCORE
100
15 Oak Av Boulder Co
New 292 addition above existing two car garage. Modify existing bathroom and add oner new tub. Add new hot water baseboard heat to new area. See adr2005-00006 for admin setback variance.
Date:  April 7, 2005
Value:   $32,540

Client: Rosemarie Dieffenbach,Marc Schafer | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 13, 2006 | Current use: Single family d
2005/04/073254010015 Oak Av Boulder CoMelton Construction Inc
SCORE
100
28 Table Mesa Dr Boulder Co
Repair of 24 length of fence.
Date:  February 9, 2005

Client: Hans Bucher, Bucher | Applicant: Melton Construction, Inc. | Permit type: Fence | Permit status: Cmp | Completion date: March 24, 2005 | Current use: Single family d
2005/02/09010028 Table Mesa Dr Boulder CoMelton Construction Inc
SCORE
100
1035 Walnut St 1 Boulder Co
Set dumpster (7. 5 x 12) in walnut street on 2 10-2 17.
Date:  February 9, 2005

Client: Enterprise Traeger | Applicant: Melton Construction, Inc | Permit type: Right-of-way | Permit status: Iss
2005/02/0901001035 Walnut St 1 Boulder CoMelton Construction Inc
SCORE
100
1035 Walnut St 1 Boulder Co
Interior non-structural demolition of 773 square feet on the first level. Existing use is a restaurant. New use will be as well. See pmt 2005-00235 for build-back plans.
Date:  January 25, 2005

Client: Enterprise Traeger | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: N&v | Current use: Restaurant, exi
2005/01/2501001035 Walnut St 1 Boulder CoMelton Construction Inc
SCORE
100
1035 Walnut St 1 Boulder Co
Remodel exsiting panini sanwich restaurant into amante coffee shop on first level. Occupant load not to exceed 33 occupant.
Date:  February 9, 2005
Value:   $100,000

Client: Enterprise Traeger | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 27, 2005 | Current use: Restaurant, ten
2005/02/091000001001035 Walnut St 1 Boulder CoMelton Construction Inc
SCORE
100
2049 Hardscrabble Dr Boulder Co
Remove existing uncovered deck and replace with 2 s. F., single-story exercise room and entry, and remodel of existing kitchen and installation of new laundry sink.
Date:  February 3, 2005
Value:   $75,000

Client: Dale Lagow,Ellen Lagow | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 18, 2006 | Current use: Single family d
2005/02/03750001002049 Hardscrabble Dr Boulder CoMelton Construction Inc
SCORE
100
1105 Spruce St Boulder Co
Re[air to exterior. Gutter, fascia and soffitt. Cleaning and tuckpoint masonry. New copper pan for bay projection roof to front.
Date:  December 29, 2004
Value:   $7,012

Client: Bricks,Mortar Bricks | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Current use: Office - profes
2004/12/2970121001105 Spruce St Boulder CoMelton Construction Inc
SCORE
100
267 Spruce St Boulder Co
Reemodel second floor bathroom. No new plumbing fixtures. Install new gas log.
Date:  December 29, 2004
Value:   $13,851

Client: Hans Peterson,Patricia Cotrustees | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Townhomes, remo
2004/12/2913851100267 Spruce St Boulder CoMelton Construction Inc
SCORE
100
45 N Broadway Boulder Co
1608 square foot tenant finish for a restaurant serving coffee, sandwiches, and icecream named amonte.
Date:  January 4, 2005
Value:   $41,245

Client: Mile Four | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Co | Completion date: April 20, 2005 | Current use: Restaurant, ten
2005/01/044124510045 N Broadway Boulder CoMelton Construction Inc
SCORE
100
4091 57th St Boulder Co
Interior remodel to add three walls, relocate a light fixture, add one light fixture, and relocate a door and light switch.
Date:  November 17, 2004
Value:   $5,501

Client: Timothy Black,Theodore Black | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 8, 2005 | Current use: Service industr
2004/11/1755011004091 57th St Boulder CoMelton Construction Inc
SCORE
100
45 S 36th St Boulder Co
Re-side single-family residence with hardboard siding, insulate walls and install gutters.
Date:  November 4, 2004

Client: Barbara Hoyt,David Hoyt | Applicant: Melton Construction, Inc. | Permit type: Siding | Permit status: Cmp | Completion date: January 27, 2007 | Current use: Single family d
2004/11/04010045 S 36th St Boulder CoMelton Construction Inc
SCORE
100
16 Canyon Bl Boulder Co
Demolition and replacement of the existing stair guardrail assembly in the same location.
Date:  October 21, 2004
Value:   $1,000

Client: Schone Taggart | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: June 23, 2005 | Current use: Office - profes
2004/10/21100010016 Canyon Bl Boulder CoMelton Construction Inc
SCORE
100
19 Tincup Ct Boulder Co
Replacement of the existing uncovered exterior deck in the same location (same size and same height).
Date:  September 16, 2004
Value:   $6,395

Client: David Rudman,Susan Rudman | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: December 28, 2004 | Current use: Single family d
2004/09/16639510019 Tincup Ct Boulder CoMelton Construction Inc
SCORE
100
16 Linden Av Boulder Co
Replace 2 windows on first floor, below existing headers (same width) but taller (closer to floor), reside above brick veneer on all sides with hardi plank, replace front stoop.
Date:  September 8, 2004
Value:   $11,500

Client: David Russell,Rebecca Russell | Applicant: Melton Construction, Inc. | Permit type: Building, siding | Permit status: Cmp | Completion date: January 20, 2005 | Current use: Single family d
2004/09/081150010016 Linden Av Boulder CoMelton Construction Inc
SCORE
100
3223 3rd St Boulder Co
Two-story addition (237 s. F.) and remodel.
Date:  January 12, 2005
Value:   $61,411

Client: Mary Weston,Erik Gilbert | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 22, 2008 | Current use: Single family d
2005/01/12614111003223 3rd St Boulder CoMelton Construction Inc
SCORE
100
25 Central Av Boulder Co
Tenant remodel on second floor
Date:  July 20, 2004
Value:   $85,500

Client: Avenue Central | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 1, 2006 | Current use: Office - admini
2004/07/208550010025 Central Av Boulder CoMelton Construction Inc
SCORE
100
6 Pearl St Boulder Co
Repair replacement of east and west stairs in rear of condo building. Replacement to be same size, same location. Includes minor electrical rewire.
Date:  July 9, 2004
Value:   $41,000

Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 7, 2008 | Current use: Multifamily dwe
2004/07/09410001006 Pearl St Boulder CoMelton Construction Inc
SCORE
100
1085 14th St Boulder Co
Interior demolition (non-structural) for tenant finish
Date:  March 27, 2000

Client: Hill Building | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: N&v | Current use: Restaurant, ten
2000/03/2701001085 14th St Boulder CoMelton Construction Inc
SCORE
100
1718 Mapleton Av Boulder Co
Interior bathroom remodel, boiler installation and new roof.
Date:  June 23, 2004
Value:   $30,000

Client: Jennifer Abele | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 8, 2005 | Current use: Single family d
2004/06/23300001001718 Mapleton Av Boulder CoMelton Construction Inc
SCORE
100
2155 Walnut St Boulder Co
Replacement of the existing fence with a 6 tall, l. F. Cedar privacy fence.
Date:  June 7, 2004

Client: K F | Applicant: Melton Construction, Inc. | Permit type: Fence | Permit status: Cmp | Completion date: April 9, 2007 | Current use: Multifamily dwe
2004/06/0701002155 Walnut St Boulder CoMelton Construction Inc
SCORE
100
34 Penrose Pl 201 Boulder Co
Tenant remodel for dentist office, remodel includes partition walls and relocated plumbing fixtures and replacement of windows, and associated electrical and mechanical.
Date:  June 4, 2004
Value:   $81,500

Client: Rodney Tuenge | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 10, 2004 | Current use: Medical and den
2004/06/048150010034 Penrose Pl 201 Boulder CoMelton Construction Inc
SCORE
100
825 10th St Boulder Co
Interior remodel of single-family detached residence on the academy property. Remodel includes replacing bi-fold doors with swing doors, construction of non-load bearing wall for laundry room, installation of alcove area, new countertops, installation of 4 new electrical outlets.
Date:  June 2, 2004
Value:   $7,250

Client: Academy The | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 28, 2005 | Current use: Single family d
2004/06/027250100825 10th St Boulder CoMelton Construction Inc
SCORE
100
45 N Broadway Boulder Co
Install exterior rail for outside seating for the purpose of liquor license. Three tables for 4 persons. 12 total seats. Amante coffee.
Date:  August 10, 2005
Value:   $2,000

Client: Matthew Kareus | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: N&v | Current use: Restaurant, ten
2005/08/10200010045 N Broadway Boulder CoMelton Construction Inc
SCORE
100
5734 Orchard Creek Cr Boulder Co
Finish approximately 9 s. F. Of basment in single-family residence, including rec. Room, bedroom, full bath, and wet bar.
Date:  May 21, 2004
Value:   $29,000

Client: Steven Stolt,Christine Paul | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 20, 2005 | Current use: Single family d
2004/05/21290001005734 Orchard Creek Cr Boulder CoMelton Construction Inc
SCORE
100
4917 Franklin Dr Boulder Co
Repair to existing deck with addition of a pergola with privacy screens at north side of house, new pergola with privacy screens in west yard, replace existing window with sliding glass door, add overhang above on west side towards north corner.
Date:  May 4, 2004
Value:   $5,612

Client: Beth Wilson | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: September 23, 2004 | Current use: Single family d
2004/05/0456121004917 Franklin Dr Boulder CoMelton Construction Inc
SCORE
100
1611 Spruce St Boulder Co
Re-roof with three-tabs, 7 squares on a 3 12 pitch.
Date:  April 15, 2004

Client: C Galbraith | Applicant: Melton Construction, Inc. | Permit type: Roofing | Permit status: N&v | Current use: Single family a
2004/04/1501001611 Spruce St Boulder CoMelton Construction Inc
SCORE
100
2049 Hardscrabble Dr Boulder Co
Bedroom bathroom remodel including structural roof alterations per the engineers specifications.
Date:  March 25, 2004
Value:   $10,000

Client: Dale Lagow,Ellen Lagow | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 25, 2004 | Current use: Single family d
2004/03/25100001002049 Hardscrabble Dr Boulder CoMelton Construction Inc
SCORE
100
3164 10th St Boulder Co
Bathroom remodel to remove a closet partition wall and install an additional sink and shower. The scope also includes an electric service change to (2 amps).
Date:  February 5, 2004
Value:   $9,500

Client: Stuart Kerst | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 23, 2004 | Current use: Single family d
2004/02/0595001003164 10th St Boulder CoMelton Construction Inc
SCORE
100
3228 11th St Boulder Co
Repair water service line in 8. 5 foot easement.
Date:  January 27, 2004

Client: Thomas Boasberg,Carin Boasberg | Applicant: Melton Construction, Inc | Permit type: Water, right-of-way | Permit status: Iss | Current use: Single family d
2004/01/2701003228 11th St Boulder CoMelton Construction Inc
SCORE
100
2805 Pearl St Boulder Co
Remodel bathroom and replace planking and rails at entry deck only
Date:  January 20, 2004
Value:   $15,000

Client: Inc. Raffertys | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 25, 2004 | Current use: Restaurant, ten
2004/01/20150001002805 Pearl St Boulder CoMelton Construction Inc
SCORE
100
1535 Pearl St Boulder Co
Replace and paint windows and doors at the mountain sun.
Date:  November 6, 2003

Client: Robert Merchasin,Carol Merchasin | Applicant: Melton Construction, Inc | Permit type: Right-of-way | Permit status: Iss
2003/11/0601001535 Pearl St Boulder CoMelton Construction Inc
SCORE
100
5035 Chaparal Ct Boulder Co
Dumpster enclosure per adr 2003-00110. 5 high split-faced block with steel doors.
Date:  October 28, 2003

Client: Chaparral 5035.0 | Applicant: Melton Construction, Inc. | Permit type: Fence | Permit status: Cmp | Completion date: August 7, 2007 | Current use: Service industr
2003/10/2801005035 Chaparal Ct Boulder CoMelton Construction Inc
SCORE
100
14 Folsom St Boulder Co
Replacement of existing stairs in the identical location.
Date:  September 22, 2003
Value:   $3,200

Client: Folsom 1400.0 | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: March 24, 2004 | Current use: Office - profes
2003/09/22320010014 Folsom St Boulder CoMelton Construction Inc
SCORE
100
8 Pearl St Cu Boulder Co
Tenant remodel for an acupuncturists office, with accessory retail area.
Date:  September 10, 2003
Value:   $18,000

Client: Pearl Boulder | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 29, 2004 | Current use: Medical and den
2003/09/10180001008 Pearl St Cu Boulder CoMelton Construction Inc
SCORE
100
2575 Table Mesa Dr Boulder Co
Replace siding using hardi-board siding.
Date:  September 4, 2003

Client: Mark Keller,Evelyn Keller | Applicant: Melton Construction, Inc. | Permit type: Siding | Permit status: N&v | Current use: Single family d
2003/09/0401002575 Table Mesa Dr Boulder CoMelton Construction Inc
SCORE
100
5454 Illini Wy Boulder Co
Addition (164 s. F.) to an existing single-family residence within the greenbelt meadows planned unit development.
Date:  July 30, 2003
Value:   $80,000

Client: Doris Wu,Paul Schroeder | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 8, 2004 | Current use: Single family d
2003/07/30800001005454 Illini Wy Boulder CoMelton Construction Inc
SCORE
100
1001 8th St Boulder Co
Interior remodel 8 square feet in a single family detached dwelling.
Date:  May 21, 2003
Value:   $60,000

Client: Kara Mcdowell | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 12, 2003 | Current use: Single family d
2003/05/21600001001001 8th St Boulder CoMelton Construction Inc
SCORE
100
14 Folsom St Boulder Co
Remove and replace existing canopy and construct new wall and trellis.
Date:  March 13, 2003
Value:   $20,000

Applicant: Melton Construction, Inc. | Permit type: Building, flood over | Permit status: N&v | Current use: Office - profes
2003/03/132000010014 Folsom St Boulder CoMelton Construction Inc
SCORE
100
4081 St Petersburg St Boulder Co
Basement finish in single-family residence including one full bath, wet bar, two bedrooms, workout room.
Date:  February 6, 2003
Value:   $50,000

Client: David Tenzer,Anna Tenzer | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 20, 2003 | Current use: Single family d
2003/02/06500001004081 St Petersburg St Boulder CoMelton Construction Inc
SCORE
100
5075 Chaparal Ct Boulder Co
Remodel unit #3 to install office with storage loft above.
Date:  January 24, 2003
Value:   $5,000

Client: M,M Estate Holdings Llc | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 9, 2003 | Current use: Office - admini
2003/01/2450001005075 Chaparal Ct Boulder CoMelton Construction Inc
SCORE
100
14 Folsom St Boulder Co
Interior remodel
Date:  October 31, 2002
Value:   $190,000

Client: John Denesha | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 10, 2003 | Current use: Office - profes
2002/10/3119000010014 Folsom St Boulder CoMelton Construction Inc
SCORE
100
34 Penrose Pl 107 Boulder Co
Interior non-structural demolition in association with pmt2006-00643, tenant remodel.
Date:  February 23, 2006

Client: Michael Jones | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: November 2, 2006 | Current use: Medical and den
2006/02/23010034 Penrose Pl 107 Boulder CoMelton Construction Inc
SCORE
100
28 6th St Boulder Co
Interior remodel less than 5 square feet. Remove one bedroom, create master bath, and enlarge kitchen.
Date:  September 25, 2002
Value:   $66,334

Client: Randall Rothberg,Pauline Rothberg | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 28, 2003 | Current use: Single family d
2002/09/256633410028 6th St Boulder CoMelton Construction Inc
SCORE
100
Date:  September 16, 2002

Client: Richard Hall,Mary Hall | Applicant: Melton Construction, Inc. | Permit type: Right-of-way | Permit status: N&v
2002/09/1601002795 Dartmouth Av Boulder CoMelton Construction Inc
SCORE
100
3122 10th St Boulder Co
Second story addtion of 8 s. F. Including master bedroom and bathroom and guest bedroom, and interior remodel of 1132 s. F.
Date:  September 23, 2002
Value:   $180,000

Client: James Booth,Susie Booth | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d
2002/09/231800001003122 10th St Boulder CoMelton Construction Inc
SCORE
100
2795 Dartmouth Av Boulder Co
Remodel 2,192 s. F. Interior of single-family residence.
Date:  August 8, 2002
Value:   $100,000

Client: Richard Hall,Mary Hall | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 26, 2004 | Current use: Single family d
2002/08/081000001002795 Dartmouth Av Boulder CoMelton Construction Inc
SCORE
100
6 Poplar Av Boulder Co
Bathroom remodel on second floor, dining room remodel on first floor on first floor. Total affected area less than 5 square feet.
Date:  August 2, 2002
Value:   $19,500

Client: Michael Byrne,Brenda Byrne | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 21, 2003 | Current use: Single family d
2002/08/02195001006 Poplar Av Boulder CoMelton Construction Inc
SCORE
100
1999 Bluebell Av Boulder Co
Replace kitchen cabinets, install new gas cooktop, install new oven, remove half bath, replace two windows, and install new ventless gas fireplace.
Date:  July 30, 2002
Value:   $21,000

Client: Alan Roberts,June Roberts | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d
2002/07/30210001001999 Bluebell Av Boulder CoMelton Construction Inc
SCORE
100
5 S 45th St Boulder Co
Install 2 new egress windows in basement of single-family residence.
Date:  May 23, 2002
Value:   $7,140

Client: J Holliday | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: January 3, 2008 | Current use: Single family d
2002/05/2371401005 S 45th St Boulder CoMelton Construction Inc
SCORE
100
337 Arapahoe Av 301 Boulder Co
Construction of a balcony roof with four skylights in accordance with minor modification adr2002-00062.
Date:  May 23, 2002
Value:   $11,312

Client: Clark Roberts Mgmt. | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: October 11, 2002 | Current use: Multifamily dwe
2002/05/2311312100337 Arapahoe Av 301 Boulder CoMelton Construction Inc
SCORE
100
2182 Jordan Pl Boulder Co
Residential kitchen remodel including cabinet replacement, kitchen window and slider replacement and stove replacement (electric to gas). Remodeled area is approximately 2 s. F.
Date:  May 2, 2002
Value:   $12,500

Client: Andrew Lattanzi,Linda Lattanzi | Applicant: Melton Construction, Inc. | Permit type: Building, mechanical | Permit status: N&v | Current use: Single family d
2002/05/02125001002182 Jordan Pl Boulder CoMelton Construction Inc
SCORE
100
2489 Colorado Av Boulder Co
Construction of new, 1,493 s. F., detached accessory home office with a 1 2 bath and attached deck, unfinished basement for storage.
Date:  April 30, 2002
Value:   $150,000

Client: Karen Mcmurry | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d
2002/04/301500001002489 Colorado Av Boulder CoMelton Construction Inc
SCORE
100
403 Dewey Av Boulder Co
6 square foot second story addition (two bed. & one bath) and 13 square foot remodel of 1st flloor inc. Relocation of one bath. Replace existing covered porch on east side of structure (see admin. Variance)
Date:  May 7, 2002
Value:   $155,000

Client: John Kerschner | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 4, 2003 | Current use: Single family d
2002/05/07155000100403 Dewey Av Boulder CoMelton Construction Inc
SCORE
100
123 Mineola Ct Boulder Co
Kitchen remodel. Reroute 2 cold air returns, gas piping to new gas range.
Date:  December 4, 2001
Value:   $7,500

Client: Brad Udall,Jane Backer | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 22, 2002 | Current use: Single family a
2001/12/047500100123 Mineola Ct Boulder CoMelton Construction Inc
SCORE
100
1564 North St Boulder Co
Add covered porch to front entry and tear off and reshingle roof. Roof pitch is 4 12 and approximately 16 squares will be installed.
Date:  October 30, 2001
Value:   $10,500

Client: Kraig Washburn | Applicant: Melton Construction, Inc. | Permit type: Building, roofing | Permit status: Cmp | Completion date: April 19, 2002 | Current use: Single family d
2001/10/30105001001564 North St Boulder CoMelton Construction Inc
SCORE
100
Date:  October 24, 2001
Value:   $6,000

Client: Partnershi Pankove | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 7, 2001 | Current use: Office - techni
2001/10/2460001001711 15th St Boulder CoMelton Construction Inc
SCORE
100
6 Arapahoe Av Boulder Co
Replace and enlarge porch cover roof deck (minor modification to pud done throught adr2001-00140)
Date:  October 31, 2001
Value:   $10,000

Client: Patrick Perrin | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: N&v | Current use: Single family d
2001/10/31100001006 Arapahoe Av Boulder CoMelton Construction Inc
SCORE
100
402 Alpine Av Boulder Co
Remove existing gas stove and install forced air furnace, remodel bathroom, paint, texture and repair walls, and install new flooring. Add new and replace some existing electrical wiring. No plans required for this work.
Date:  October 9, 2001
Value:   $22,000

Client: Jennifer Deutsch,Eric Pringle | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 24, 2002 | Current use: Single family d
2001/10/0922000100402 Alpine Av Boulder CoMelton Construction Inc
SCORE
100
Date:  October 1, 2001

Client: Kraig Washburn | Applicant: Melton Construction, Inc | Permit type: Right-of-way | Permit status: Iss
2001/10/0101001564 North St Boulder CoMelton Construction Inc
SCORE
100
1001 8th St Boulder Co
Kitchen remodel including the removal of one partition wall, new cabinets, new flooring, replacement of plumbing fixtures and the addition of shelving in the livingroom area. Electric work includes the addition of a subpanel in the laundry room. Total remodel work is less than 5 square feet and is exempt from the 20 iecc code.
Date:  September 7, 2001
Value:   $30,000

Client: Harold Short | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 17, 2002 | Current use: Single family d
2001/09/07300001001001 8th St Boulder CoMelton Construction Inc
SCORE
100
715 Juniper Av Boulder Co
Install new cedar fencing from west side of ouse to property line. New plastic fencing from east side of house going east to property line, then north to existing shed.
Date:  August 30, 2001

Client: Tracy Gray,Lawrence Gray | Applicant: Melton Construction, Inc | Permit type: Fence | Permit status: Cmp | Completion date: April 18, 2002 | Current use: Single family d
2001/08/300100715 Juniper Av Boulder CoMelton Construction Inc
SCORE
100
2727 29th St Boulder Co
Tenant remodel, convert two existing raquet ball courts to gymnasiums for general use as exercise areas, including, but not limited to aerobics and weight training. Add one new interior stair way.
Date:  August 11, 2005
Value:   $35,000

Client: Health Boulder,Racquet I | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 16, 2005 | Current use: Amusement/recre
2005/08/11350001002727 29th St Boulder CoMelton Construction Inc
SCORE
100
4974 Dakota Bl Boulder Co
Install a direct vent gas fireplace, run gas piping to unit. Single family detached residence.
Date:  August 13, 2001
Value:   $6,000

Client: Ryan Lewis,Brook Ditmore | Applicant: Melton Construction, Inc. | Permit type: Building, mechanical | Permit status: N&v | Current use: Single family d
2001/08/1360001004974 Dakota Bl Boulder CoMelton Construction Inc
SCORE
100
1219 Pennsylvania Av Boulder Co
Storefront row- r r concrete, grade and excavate top soil and level existing flagstone
Date:  July 10, 2001

Client: Thomas Manteuffel, Manteuffel | Applicant: Melton Construction, Inc | Permit type: Right-of-way | Permit status: Iss
2001/07/1001001219 Pennsylvania Av Boulder CoMelton Construction Inc
SCORE
100
16 Linden Av Boulder Co
Install gas insert for fireplace, whole house fan, add light fixtures in living room and diining room.
Date:  May 31, 2001
Value:   $17,500

Client: David Russell,Rebecca Russell | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 17, 2001 | Current use: Single family d
2001/05/311750010016 Linden Av Boulder CoMelton Construction Inc
SCORE
100
30 17th St Boulder Co
Add deck to rear of house.
Date:  November 28, 2000
Value:   $4,000

Client: Richard Dissly,Lydia D | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: N&v | Current use: Single family d
2000/11/28400010030 17th St Boulder CoMelton Construction Inc
SCORE
100
525 Utica Av Boulder Co
Basement finish.
Date:  November 16, 2000
Value:   $10,000

Client: Michael Bayer,Deborah Bayer | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d
2000/11/1610000100525 Utica Av Boulder CoMelton Construction Inc
SCORE
100
28 6th St Boulder Co
Re-roof including tear-off (2 layers) and installation of asphalt shingles (12 squares) on a 4 12 pitch and epdm on a flat portion.
Date:  November 13, 2002

Client: Randall Rothberg,Pauline Rothberg | Applicant: Melton Construction, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: January 22, 2003 | Current use: Single family d
2002/11/13010028 6th St Boulder CoMelton Construction Inc
SCORE
100
25 Central Av Boulder Co
Partial interior remodel of second floor for future tenants. Mechanical work by separate permit. Rebuild bat partition walls and replace existing fixtures. Rebuild walls in stairways that were shortened.
Date:  June 2, 2004
Value:   $85,000

Client: Avenue Central | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 3, 2005 | Current use: Research & deve
2004/06/028500010025 Central Av Boulder CoMelton Construction Inc
SCORE
100
543 Linden Park Dr Boulder Co
Addition and structural upgrade to deck
Date:  June 30, 2000
Value:   $3,000

Client: Robert Feder,Andrea Feder | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: N&v | Current use: Single family d
2000/06/303000100543 Linden Park Dr Boulder CoMelton Construction Inc
SCORE
100
1326 College Av Boulder Co
Install outdoor patio railing
Date:  June 30, 2000
Value:   $400

Client: E P,College 1324.0 | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: N&v | Current use: Restaurant, exi
2000/06/304001001326 College Av Boulder CoMelton Construction Inc
SCORE
100
5 Mohawk 99 Boulder Co
Interior remodel including removal of non-structural walls, electrical and mechanical
Date:  June 20, 2000
Value:   $10,000

Client: Barry Collen | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Multifamily dwe
2000/06/20100001005 Mohawk 99 Boulder CoMelton Construction Inc
SCORE
100
695 Ithaca Dr Boulder Co
Second floor addition.
Date:  January 18, 2002
Value:   $100,000

Client: Gary Stetler,Deborah Stetler | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 13, 2002 | Current use: Single family d
2002/01/18100000100695 Ithaca Dr Boulder CoMelton Construction Inc
SCORE
100
21 Mesa Dr Boulder Co
Construction of a new cedar fence as shown on the attached ilc.
Date:  April 28, 2000

Client: John Hoeffler | Applicant: Melton Construction, Inc. | Permit type: Fence | Permit status: N&v | Current use: Single family d
2000/04/28010021 Mesa Dr Boulder CoMelton Construction Inc
SCORE
100
13 College Av Boulder Co
Tenant remodel of illegal petes
Date:  March 27, 2000
Value:   $8,500

Client: College 1310.0,Investment Hilltop | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Restaurant, rem
2000/03/27850010013 College Av Boulder CoMelton Construction Inc
SCORE
100
45 N Broadway Boulder Co
Tenant finish of unit d for hair salon. No nail polish.
Date:  November 1, 2006
Value:   $14,840

Client: Mile Four | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Current use: Personal servic
2006/11/011484010045 N Broadway Boulder CoMelton Construction Inc
SCORE
100
1316 Sandstone Ct Boulder Co
Interior remodel of sfd. Finish portion of basement into study. Kitchen remodel. Add exterior deck off main level.
Date:  November 6, 2006
Value:   $93,367

Client: Jane Mckinley,David Mckinley | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 21, 2007 | Current use: Single family d
2006/11/06933671001316 Sandstone Ct Boulder CoMelton Construction Inc
SCORE
100
878 Grant Pl Boulder Co
Remodel existing basement adding one bathroom sink and one floor drain. Enlarge egress windows. New boiler. 7 sf
Date:  November 27, 2006
Value:   $32,800

Client: Bridget Carlin,Robert Kanick | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 20, 2007 | Current use: Single family d
2006/11/2732800100878 Grant Pl Boulder CoMelton Construction Inc
SCORE
100
1941 Pearl St Boulder Co
Add privacy panels to second floor exterior decks of condo development.
Date:  December 18, 2006
Value:   $5,000

Client: King Crimson | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: N&v | Current use: Multifamily dwe
2006/12/1850001001941 Pearl St Boulder CoMelton Construction Inc
SCORE
100
18 Folsom St 1005 Boulder Co
Interior remodel of 801 sf and removal of interior partition wall between units #1004 & #1005 that will result in one combined unit that has the door of #1004 as the entryway. Kitchen of #1004 to be removed and a bar sink with maximum dimensions of 16" x 20" to be installed in old kitchen area. No mechanical modifications
Date:  February 27, 2007
Value:   $57,000

Client: V Berg,Donald Dvorak | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 14, 2007 | Current use: Multifamily dwe
2007/02/275700010018 Folsom St 1005 Boulder CoMelton Construction Inc
SCORE
100
705 Mapleton Av Boulder Co
Two vehicle garage 22 x 28, per conditions outlined by landmarks. To include associated electrical work and addition of a single sink, no water closet. Electric baseboard heat. No work on main structure this permit.
Date:  April 18, 2007
Value:   $17,217

Client: Jacqueline Schwarz | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 28, 2007 | Current use: Garage - detach
2007/04/1817217100705 Mapleton Av Boulder CoMelton Construction Inc
SCORE
100
18 Folsom St 1005 Boulder Co
Interior non-structural demolition in preparation of remodel work.
Date:  February 9, 2007

Client: V Berg,Donald Dvorak | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: July 3, 2008 | Current use: Multifamily dwe
2007/02/09010018 Folsom St 1005 Boulder CoMelton Construction Inc
SCORE
100
2805 Pearl St Boulder Co
Replace railing system aroung outdoor eck at turleys. No portion of existing deck is more than inches above grade.
Date:  February 28, 2007
Value:   $16,400

Client: Thomas Eldridge,Betty Eldridge | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: April 19, 2007 | Current use: Restaurant, rep
2007/02/28164001002805 Pearl St Boulder CoMelton Construction Inc
SCORE
100
1064 10th St Boulder Co
Finish basement in sfd add 3 4 bath.
Date:  March 12, 2007
Value:   $66,600

Client: Andrew Shoemaker,Phillisa Shoemaker | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 19, 2007 | Current use: Single family d
2007/03/12666001001064 10th St Boulder CoMelton Construction Inc
SCORE
100
2775 Emerson Av Boulder Co
Replace 2nd level windows with bay units, replace front door, and install new stoop cover.
Date:  April 4, 2007
Value:   $22,877

Client: Robert Stuenkel,Julie Stuenkel | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: N&v | Current use: Single family d
2007/04/04228771002775 Emerson Av Boulder CoMelton Construction Inc
SCORE
100
29 Island Dr Boulder Co
Addition of 12 s. F. To front entry to re-align front door, n ew 416 s. F. Second floor deck on rear of residence with patio below, exterior remodel including trim work and replacement of stone veneer. Includes associated electrical and plumbing for new hose bib.
Date:  April 10, 2007
Value:   $83,580

Client: Lewis Joel,Eletise Wolman | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 8, 2011 | Current use: Single family d
2007/04/108358010029 Island Dr Boulder CoMelton Construction Inc
SCORE
100
16 Linden Av Boulder Co
Bathroom remodel. Includes replacing existing fixtures, adding bathroom fan and electrical work.
Date:  April 24, 2007

Client: David Russell,Rebecca Russell | Applicant: Melton Construction, Inc. | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: September 24, 2007 | Current use: Single family d
2007/04/24010016 Linden Av Boulder CoMelton Construction Inc
SCORE
100
29 Island Dr Boulder Co
New 3 4" high fence. 18 feet long
Date:  April 24, 2007

Client: Lewis Joel,Eletise Wolman | Applicant: Melton Construction, Inc. | Permit type: Fence | Permit status: Cmp | Completion date: August 22, 2007 | Current use: Single family d
2007/04/24010029 Island Dr Boulder CoMelton Construction Inc
SCORE
100
25 Arapahoe Av Boulder Co
Remodel of existing tenant space into retail wine shop 5726 sf
Date:  May 15, 2007
Value:   $65,000

Client: Retail Bpp | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 23, 2007 | Current use: Commercial/reta
2007/05/156500010025 Arapahoe Av Boulder CoMelton Construction Inc
SCORE
100
11 Balsam Av Boulder Co
Interior tenant remodel to change hallway to storage room. Includes removing exterior door.
Date:  May 29, 2007
Value:   $7,500

Client: Hospital Community | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 8, 2007 | Current use: Hospital/instit
2007/05/29750010011 Balsam Av Boulder CoMelton Construction Inc
SCORE
100
2325 13th St Boulder Co
2nd story addition comprised of new master bedroom of 244 sf, garden room of 243 sf and deck of 204 sf. One new sink in gardening room, w evaporative cooler.
Date:  June 19, 2007
Value:   $58,165

Client: Samuel Stein,Jill Jagemann | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d
2007/06/19581651002325 13th St Boulder CoMelton Construction Inc
SCORE
100
3165 Noble Ct Boulder Co
Elec work in kitchen lights switches plugs
Date:  August 1, 2007

Client: Thomas Isaacson | Applicant: Melton Construction, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: October 15, 2007 | Current use: Single family d
2007/08/0101003165 Noble Ct Boulder CoMelton Construction Inc
SCORE
100
37 N 26th St Boulder Co
Remodel sunroom into office and addtion of 138 s. F. Uncovered deck, less than 30" in height.
Date:  August 30, 2007
Value:   $16,634

Client: Robert Fraley,Debra Anderson | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 21, 2007 | Current use: Single family d
2007/08/301663410037 N 26th St Boulder CoMelton Construction Inc
SCORE
100
1323 Wildwood Ct Boulder Co
Remodel of single-family residence including window replacement, reside portion of house with stucco, replace front deck and addition to front porch, and installation of snowmelt system in driveway.
Date:  October 19, 2007
Value:   $85,000

Client: Daniel Shea,Patricia Shea | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 17, 2011 | Current use: Single family d
2007/10/19850001001323 Wildwood Ct Boulder CoMelton Construction Inc
SCORE
100
9 Aurora Av Boulder Co
Building permit to partially brick in two existing window openings and create a window unit comprised of 3 windows, in the area between the the two former lower floor windows.
Date:  November 7, 2007
Value:   $16,000

Client: Of University | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: July 9, 2010 | Current use: Multifamily dwe
2007/11/07160001009 Aurora Av Boulder CoMelton Construction Inc
SCORE
100
2365 Grape Av Boulder Co
Remodel of bath in sfd. No change in plumbing fixtures. 55 sf
Date:  February 25, 2008
Value:   $6,000

Client: Richard Johnson | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Single family d
2008/02/2560001002365 Grape Av Boulder CoMelton Construction Inc
SCORE
100
5108 Ellsworth Pl Boulder Co
Remodel of master bathroom to create a separate shower & separate tub, and add one vanity, add wall & doorway to a relocated master closet.
Date:  March 31, 2008
Value:   $33,950

Client: Dorothy Faris | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 24, 2008 | Current use: Single family d
2008/03/31339501005108 Ellsworth Pl Boulder CoMelton Construction Inc
SCORE
100
3795 Emerson Av Boulder Co
Reconfiguration of interior walls on 2nd floor to modify study, closet & storage areas to create a 3 4 bath. Layout of an existing bathroom to be modified.
Date:  June 23, 2008
Value:   $19,500

Client: Pamela Nebgen | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 17, 2008 | Current use: Single family d
2008/06/23195001003795 Emerson Av Boulder CoMelton Construction Inc
SCORE
100
28 6th St Boulder Co
Remove and replace existin fence with cedar privacy fence. 6 feet in height and 45 feet in length.
Date:  August 18, 2008

Client: Charles Barclay | Applicant: Melton Construction, Inc. | Permit type: Fence | Permit status: Cmp | Completion date: November 26, 2012 | Current use: Single family d
2008/08/18010028 6th St Boulder CoMelton Construction Inc
SCORE
100
494 Locust Pl Boulder Co
Remodel of kitchen only, revised scope of work, no new square footage.
Date:  October 8, 2008
Value:   $30,771

Client: Phillip Stroup,Deborah Stroup | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 23, 2009 | Current use: Single family d
2008/10/0830771100494 Locust Pl Boulder CoMelton Construction Inc
SCORE
100
44 Osage Dr Boulder Co
Bathroom remodel to include addition of one sink and new lighting.
Date:  October 30, 2008

Client: Courtney Schafer, Schafer | Applicant: Melton Construction, Inc. | Permit type: Electrical, plumbing | Permit status: Cmp | Completion date: December 8, 2008 | Current use: Single family d
2008/10/30010044 Osage Dr Boulder CoMelton Construction Inc
SCORE
100
1745 Sunset Bl Boulder Co
Replace existing patio cover and reroof entire house. Mid-roof inspection required.
Date:  April 1, 2009
Value:   $4,868

Client: William Cramer,Jane Mcdonald | Applicant: Melton Construction, Inc. | Permit type: Building, roofing | Permit status: Cmp | Completion date: June 19, 2009 | Current use: Single family d
2009/04/0148681001745 Sunset Bl Boulder CoMelton Construction Inc
SCORE
100
702 Spruce St Boulder Co
Partial demolition of historic garage. Removal of eastern 204 sf to an existing interior wall which will remain. See his2008-00246.
Date:  March 26, 2009

Client: Edward Brentari,Marjorie Brentari | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: N&v | Current use: Garage - detach
2009/03/260100702 Spruce St Boulder CoMelton Construction Inc
SCORE
100
702 Spruce St Boulder Co
Addition to existing fence in eastern portion of rear yard and southern portion of eastern side yard to infill where garage was demolished. Cedar fence to be 6-feet in height, 30-feet in length.
Date:  April 3, 2009

Client: Edward Brentari,Marjorie Brentari | Applicant: Melton Construction, Inc. | Permit type: Fence | Permit status: Cmp | Completion date: June 5, 2009 | Current use: Single family d
2009/04/030100702 Spruce St Boulder CoMelton Construction Inc
SCORE
100
2995 Baseline Rd Boulder Co
Tenant remodel for 1604 sf professional office space. Lighting compliance per pmt2008-05460.
Date:  April 30, 2009
Value:   $88,068

Client: M Edward | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Office - profes
2009/04/30880681002995 Baseline Rd Boulder CoMelton Construction Inc
SCORE
100
3024 Jefferson St Boulder Co
Rmove interior walls and add beam support per engineerfoots letter between study and bedroom on north side of home. Englarge opening between living room and dining room on south side of home. Addition of gas fireplace, replacement furnace.
Date:  May 7, 2009
Value:   $11,989

Client: Deborah Arhelger,Wayne Citrin | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 4, 2009 | Current use: Single family d
2009/05/07119891003024 Jefferson St Boulder CoMelton Construction Inc
SCORE
100
4699 Nautilus Ct S Boulder Co
Tenant remodel of unit 104 for use as a brewery. To include addition of frp panels, electrical, plumbing, and gas.
Date:  June 4, 2009

Client: Lakes Twin | Applicant: Melton Construction, Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: May 14, 2013 | Current use: Manufacturing,
2009/06/0401004699 Nautilus Ct S Boulder CoMelton Construction Inc
SCORE
100
1848 30th St Boulder Co
Tenant remodel of 745 sf adjacent to an existing tanning salon to create a total salon area of 16 sf. Includes electrical work, minor mechanical (relocate ductwork). No plumbing.
Date:  May 28, 2009
Value:   $51,133

Client: Market Boulder | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Personal servic
2009/05/28511331001848 30th St Boulder CoMelton Construction Inc
SCORE
100
641 S Broadway Boulder Co
Tenant remodel for kim and jakefoots cakes. No baking to occur on-site, scope of work includes relocation of interior walls, installation of sinks in sales and kitchen area, associated electrical and plumbing work and finishes.
Date:  July 24, 2009
Value:   $25,126

Client: Mesa Table | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 7, 2010 | Current use: Commercial/reta
2009/07/2425126100641 S Broadway Boulder CoMelton Construction Inc
SCORE
100
7 Grape Av Boulder Co
Kitchen remodel, to include gas piping for range, new hood, upgrade electrical and replacement of refrigerator and faucet. No structural work.
Date:  July 1, 2009

Client: Linnea Simons,Eric Simons | Applicant: Melton Construction, Inc. | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: September 2, 2009 | Current use: Single family d
2009/07/0101007 Grape Av Boulder CoMelton Construction Inc
SCORE
100
3795 Britting St Boulder Co
Addition and remodel to sfd. Addition is the enclosure of space between house and garage (no new roof). Includes a remodel of two bathrooms.
Date:  July 16, 2009
Value:   $28,054

Client: Robert Nebgen | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 10, 2009 | Current use: Single family d
2009/07/16280541003795 Britting St Boulder CoMelton Construction Inc
SCORE
100
731 Pine St Boulder Co
Partial structure demo, to remove portions of existing second story decking only for structural investigation. Deck to be repalcement through separate permit as approved by landmarks.
Date:  July 16, 2009

Client: Kimberly Carter | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: November 18, 2009 | Current use: Single family d
2009/07/160100731 Pine St Boulder CoMelton Construction Inc
SCORE
100
731 Pine St Boulder Co
Replace second story deck with concrete tile system over epdm with new steel railing to replace existing wood railing.
Date:  July 24, 2009
Value:   $2,138

Client: Kimberly Carter | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: November 18, 2009 | Current use: Deck, new
2009/07/242138100731 Pine St Boulder CoMelton Construction Inc
SCORE
100
19 Oak Av Boulder Co
Basement remodel of 4 sf to include installation of two (2) gas fireplaces, new egress window in bonus room, replacement windows in family room, bathroom remodel (tub shower to shower stall), and new bar sink.
Date:  August 31, 2009
Value:   $23,498

Client: Richard Hopkins,Donna Hopkins | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 22, 2009 | Current use: Single family d
2009/08/312349810019 Oak Av Boulder CoMelton Construction Inc
SCORE
100
1323 Wildwood Ct Boulder Co
Demolition of an existing deck off the rear of the house and construction of a new 294 sf deck. Relocation of a c unit & lines, includes associated electrical for lighting and bbq, extend gas piping for bbq for future firepit (by separate permit). Stucco rear of house. Construction of a concrete replacement retaining wall -- same dimensions, same location as exisiting (to be demolished railroad tie wall)
Date:  September 24, 2009
Value:   $5,612

Client: Daniel Shea,Patricia Shea | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d
2009/09/2456121001323 Wildwood Ct Boulder CoMelton Construction Inc
SCORE
100
53 Arapahoe Av Boulder Co
Tenant remodel of 309 sf for a tattoo parlor. (tenant space previously used as a printing shop). Install gfci outlets, 2 outlets in office.
Date:  November 20, 2009
Value:   $11,591

Client: Arapahoe 5360.0 | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 17, 2009 | Current use: Personal servic
2009/11/201159110053 Arapahoe Av Boulder CoMelton Construction Inc
SCORE
100
11 Oakdale Pl Boulder Co
Remodel of an existing 3 4 bathroom --relocate water closet, remove existing shower, install new renconfigured shower -- sink to remain in same location.
Date:  December 16, 2009
Value:   $1,272

Client: Scott Candrian | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 23, 2013 | Current use: Townhomes, exis
2009/12/16127210011 Oakdale Pl Boulder CoMelton Construction Inc
SCORE
100
1221 Pennsylvania Av Boulder Co
Tenant remodel for tanning salon inchsol tansinch. Includes replacement of slab and replacement of wall section with glass storefront and minor electrical.
Date:  December 18, 2009
Value:   $20,000

Client: Pennsylvan 1221.0 | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Personal servic
2009/12/18200001001221 Pennsylvania Av Boulder CoMelton Construction Inc
SCORE
100
8 Racquet Ln Boulder Co
Remodel of master bath and closet area. Additional work not requiring permit to include new cabinets in kitchen, new flooring, paint, doors and trim.
Date:  February 8, 2010
Value:   $23,675

Client: Roger King,Wendy Goldschmidt | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 1, 2010 | Current use: Single family d
2010/02/08236751008 Racquet Ln Boulder CoMelton Construction Inc
SCORE
100
1811 Pearl St Boulder Co
Tenant remodel in office space for law office. Scope of work includes installation of non-bearing walls for offices on first floor and conference on loft level. Includes associated electrical, mechanical and plumbing.
Date:  February 22, 2010
Value:   $65,803

Client: Judith Conyers | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 28, 2010 | Current use: Office - profes
2010/02/22658031001811 Pearl St Boulder CoMelton Construction Inc
SCORE
100
1011 Walnut St 4 Boulder Co
Tenant remodel - to relocate glass walls in office and reception areas and convert two offices to three and one offic into two. Includes associated electrical.
Date:  March 31, 2010
Value:   $15,000

Client: Walnut 1007.0 | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 25, 2010 | Current use: Office - profes
2010/03/31150001001011 Walnut St 4 Boulder CoMelton Construction Inc
SCORE
100
1002 Spruce St Boulder Co
Construction of a 64 square foot addition on east side of home. Setback variance approved by boza. See his2009-00202 and his2010-00078 for landmarks approval. Permit to include foundation repair, addition of gable dormer on second floor and replacement of windows and doors.
Date:  May 27, 2010
Value:   $100,000

Client: Laurence Lackey | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d
2010/05/271000001001002 Spruce St Boulder CoMelton Construction Inc
SCORE
100
1002 Spruce St Boulder Co
New inch high steel fence, 102 feet in length. See his2009-00202 and his2010-00078 for landmarks approval.
Date:  May 27, 2010

Client: Laurence Lackey | Applicant: Melton Construction, Inc. | Permit type: Fence | Permit status: N&v | Current use: Single family d
2010/05/2701001002 Spruce St Boulder CoMelton Construction Inc
SCORE
100
4337 Vinca Ct Boulder Co
Reconfiguration of an existing bathroom -- move sink, modify shower and rotate tub. Install a new window ihn the north window of the bathroom -- see engineerfoots letter for specifics.
Date:  June 9, 2010
Value:   $12,200

Client: Rohit Diesh,Diane Diesh | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 17, 2010 | Current use: Single family d
2010/06/09122001004337 Vinca Ct Boulder CoMelton Construction Inc
SCORE
100
2014 Balsam Dr Boulder Co
2nd story additon of 831 sf consisting of a master suite w 4 piece bathroom, office and transform a powder room off the garage to a mudroom, kitchen remodel to relocate applicances & plumbing. Replacement furnace, replacement on-demand water heater,
Date:  August 6, 2010
Value:   $88,808

Client: Steven Peterson | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 22, 2011 | Current use: Single family d
2010/08/06888081002014 Balsam Dr Boulder CoMelton Construction Inc
SCORE
100
2014 Balsam Dr Boulder Co
Demo permit - for interior non-structural demo of walls (see pmt2010-02354).
Date:  July 7, 2010

Client: Steven Peterson | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: December 28, 2010 | Current use: Single family d
2010/07/0701002014 Balsam Dr Boulder CoMelton Construction Inc
SCORE
100
2344 Pearl St Boulder Co
Tenant remodel to convert former auto repair to a fly fishing store.
Date:  September 29, 2010
Value:   $300,000

Client: Bryan Telea,Ronald Fiske | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 18, 2011 | Current use: Commercial/reta
2010/09/293000001002344 Pearl St Boulder CoMelton Construction Inc
SCORE
100
2344 Pearl St Boulder Co
Interior component demolition for removal of interior finish, portions of two interior bearing walls associated with remodel proposed in pmt2010-03421 (engineer to inspect).
Date:  August 13, 2010

Client: Bryan Telea,Ronald Fiske | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: February 26, 2013 | Current use: Commercial/reta
2010/08/1301002344 Pearl St Boulder CoMelton Construction Inc
SCORE
100
5344 Desert Mountain Ct Boulder Co
Deck permit and garage door permit - for replacement of existing deck 15 inches high and 3 sf in area on rear (east) side of sfd. Work also includes moving header on garage door up by 1-foot and reconstruction of two (2) window wells.
Date:  November 1, 2010
Value:   $12,000

Client: Brian Hansen,Ann Hansen | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: December 23, 2010 | Current use: Single family d
2010/11/01120001005344 Desert Mountain Ct Boulder CoMelton Construction Inc
SCORE
100
6 Ithaca Dr Boulder Co
Addition and remodel to existing sfd to include 1,612 sf for 2nd floor addition and 3 sf remodel to existing 1st floor. Includes electrical, mechanical, and plumbing and 3 new bathrooms.
Date:  December 22, 2010
Value:   $255,000

Client: J Beaver | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 8, 2011 | Current use: Single family d
2010/12/222550001006 Ithaca Dr Boulder CoMelton Construction Inc
SCORE
100
3267 28th St Boulder Co
Interior non-structural demolition permit to open floor plan for future remodel. No occupancy until completion of separate tenant remodel.
Date:  December 27, 2010

Client: Stephen Tebo | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: April 15, 2011 | Current use: Restaurant, exi
2010/12/2701003267 28th St Boulder CoMelton Construction Inc
SCORE
100
3267 28th St Boulder Co
Tenant remodel for new moefoots bagel restaurant with 26 seats. Hood permit through pmt2011-00562.
Date:  March 11, 2011
Value:   $156,049

Client: Stephen Tebo | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 15, 2011 | Current use: Restaurant, ten
2011/03/111560491003267 28th St Boulder CoMelton Construction Inc
SCORE
100
3745 Silver Plume Ln Boulder Co
Addition of 262 sf to an existing sfd to create a bedroom and full bathroom on ground level (through conversion of a recreation room), increase size of kitchen and add deck over new bedroom area. Remodel of 145 sf
Date:  March 3, 2011
Value:   $35,469

Client: Emily Brinkman,Gregory Brinkman | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 29, 2011 | Current use: Single family d
2011/03/03354691003745 Silver Plume Ln Boulder CoMelton Construction Inc
SCORE
100
6899 Winchester Cr Boulder Co
Tenant remodel of 14,0 square foot office space. To include division of existing office spaces and associated electrical and mechanical work.
Date:  February 15, 2011
Value:   $100,000

Client: Borealis Sovereign | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 22, 2011 | Current use: Office - admini
2011/02/151000001006899 Winchester Cr Boulder CoMelton Construction Inc
SCORE
100
3745 Silver Plume Ln Boulder Co
Addition of a 47 square foot at grade deck on northwest side of house. Deck not to exceed inches above grade.
Date:  April 12, 2011
Value:   $909

Client: Emily Brinkman,Gregory Brinkman | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: June 1, 2011 | Current use: Single family d
2011/04/129091003745 Silver Plume Ln Boulder CoMelton Construction Inc
SCORE
100
26 Kohler Dr Boulder Co
Fill in existing swimming pool with dirt and concrete above. Addition of electrical outlets for unconditioned sunroom.
Date:  April 27, 2011
Value:   $2,524

Client: Aaron Brasket | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 24, 2011 | Current use: Single family d
2011/04/27252410026 Kohler Dr Boulder CoMelton Construction Inc
SCORE
100
38 N 26th St Boulder Co
Removal of an attached inchsunroominch or inchgreenhouseinch on the front (south) side of the house, removal of an at grade wooden deck, removal of an existing 2nd story deck adjacent to at grade deck & inchgreenhouseinch. Pour concrete pad at location of at-grade deck, rebuild 2nd story deck -- same square footage and dimensions, construct new exterior wall (at opening previously used to get into inchgreenhouseinch, demolish south wall of existing powder room, reconfigure bathroom fixtures. Includes associated electrical. No mechanical. New siding and stucco at area of modifications.
Date:  June 2, 2011
Value:   $30,870

Client: Roger Kipfer, Kipfer | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 24, 2011 | Current use: Single family d
2011/06/023087010038 N 26th St Boulder CoMelton Construction Inc
SCORE
100
1619 Columbine Av Boulder Co
Addition and alteration permit - for addition of second story cantilevered balcony to front of sfd, replacement of second story side yard deck, replacement of side yard patio with porch, addition of front deck, and removal of eifs and replacement with cement based stucco. Includes epdm under second story deck and shingles for eyebrow.
Date:  May 17, 2011
Value:   $55,000

Client: Robert Surles,Jennifer Surles | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 21, 2012 | Current use: Single family d
2011/05/17550001001619 Columbine Av Boulder CoMelton Construction Inc
SCORE
100
44 Chippewa Dr Boulder Co
Addition and remodel of existing single family dwelling. Addition of 1 square feet for master bedroom and square feet for mudroom. To include vaulted ceiling in living room, dining room and kitchen. Proposal includes converting garage from 2-car to a single car garage.
Date:  July 7, 2011
Value:   $112,711

Client: Emil Rinaldi, Rinaldi | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 12, 2012 | Current use: Single family d
2011/07/0711271110044 Chippewa Dr Boulder CoMelton Construction Inc
SCORE
100
24 Broadway Boulder Co
Interior tenant remodel of suite 2 to install and relocate interior non-bearing walls and upgrade bathroom for accessibility. Scope of work includes associated electrical
Date:  June 21, 2011
Value:   $21,760

Client: North 2430.0 | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 21, 2011 | Current use: Office - profes
2011/06/212176010024 Broadway Boulder CoMelton Construction Inc
SCORE
100
27 Broadway Boulder Co
Tenant remodel for physical therapy office space. To include tear out of existing wall and replacement with soffit and closing in one doorway.
Date:  June 13, 2011
Value:   $12,598

Client: Med Boulder | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: July 5, 2011 | Current use: Personal servic
2011/06/131259810027 Broadway Boulder CoMelton Construction Inc
SCORE
100
3745 Silver Plume Ln Boulder Co
Installation of a gas-fired decorative fireplace and meter release for a newly established gas service line.
Date:  June 22, 2011

Client: Emily Brinkman,Gregory Brinkman | Applicant: Melton Construction, Inc. | Permit type: Mechanical | Permit status: Cmp | Completion date: August 9, 2011 | Current use: Single family d
2011/06/2201003745 Silver Plume Ln Boulder CoMelton Construction Inc
SCORE
100
3765 Wild Plum Ct Boulder Co
Remodel of the main level of the house 2172 sf -- reconfiguration of interior walls, removal of windows & walls (northwest wall), (replace with nanowall), removal of external trellis and build new trellis in same location, remodel kitchen (not to include prep sink) , demo a portion of the existing wood masonry fireplace and install gas fireplace.
Date:  August 4, 2011
Value:   $150,000

Client: Fernando Urquiza | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 20, 2012 | Current use: Single family d
2011/08/041500001003765 Wild Plum Ct Boulder CoMelton Construction Inc
SCORE
100
1529 Spruce St 7 Boulder Co
Installation of a ductless a c unit -- exterior unit on deck and interior units mounted to walls in upper and main level bedrooms.
Date:  July 13, 2011

Client: Jean Baker | Applicant: Melton Construction, Inc. | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: September 6, 2011 | Current use: Multifamily dwe
2011/07/1301001529 Spruce St 7 Boulder CoMelton Construction Inc
SCORE
100
825 Hartford Dr Boulder Co
Fence permit - for replacement with 6-foot tall cedar privacy fence 2 feet long along rear (southwest) and sides (southeast and northwest) of single-family lot.
Date:  July 15, 2011

Client: Cynthia Allison | Applicant: Melton Construction, Inc. | Permit type: Fence | Permit status: Cmp | Completion date: September 30, 2011 | Current use: Single family d
2011/07/150100825 Hartford Dr Boulder CoMelton Construction Inc
SCORE
100
1011 Walnut St Boulder Co
Suite 401 -- interior work only. Tenant remodel to demo relocate three walls at existing office spaces, add walls to split three exising offices into six offices. Add glass sidelights. No plumbing, no mechanical -- includes assocaited electrical (add outlets) -- project will utilize existing lighting fixtures -- no new lighting.
Date:  July 15, 2011
Value:   $50,000

Client: Walnut 1007.0 | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 31, 2011 | Current use: Office - profes
2011/07/15500001001011 Walnut St Boulder CoMelton Construction Inc
SCORE
100
19 9th St Boulder Co
Tenant remodel of 7 sf to create a conference room. Copy production area and two offices out of a lobby area and existing offices. Lighting to remain unchanged , installation of 9 outlets-- no mechanical or plumbing.
Date:  August 30, 2011
Value:   $42,814

Client: Walnut 901.0 | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 21, 2011 | Current use: Office - profes
2011/08/304281410019 9th St Boulder CoMelton Construction Inc
SCORE
100
24 30th St Boulder Co
Tenant remodel of 3 sf to create ansi compliant menfoots & womenfoots restrooms, one ansi shower area and an additional shower area.
Date:  September 20, 2011
Value:   $21,207

Client: William Wise | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 3, 2011 | Current use: Amusement/recre
2011/09/202120710024 30th St Boulder CoMelton Construction Inc
SCORE
100
19 9th St Boulder Co
Place dumpster in paid parking space on 9th st.
Date:  September 22, 2011

Client: Walnut 901.0 | Applicant: Melton Construction, Inc | Permit type: Right-of-way | Permit status: Iss | Current use: Office - profes
2011/09/22010019 9th St Boulder CoMelton Construction Inc
SCORE
100
803 Spruce St Boulder Co
Drill 4inch hole 25 ft deep for soil testing
Date:  September 22, 2011

Client: Thomas Steenland | Applicant: Melton Construction, Inc | Permit type: Right-of-way | Permit status: Iss | Current use: Single family d
2011/09/220100803 Spruce St Boulder CoMelton Construction Inc
SCORE
100
1745 Sunset Bl Boulder Co
Interior remodel of kitchen within single-family residence only including removal of portion of non-bearing wall, rolocation of appliances, replace fixtures, associated finishes, electrical for new lighting and outlets, mechanical for vent fan, plumbing for waterline.
Date:  September 23, 2011
Value:   $11,000

Client: William Cramer,Jane Mcdonald | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 17, 2011 | Current use: Single family d
2011/09/23110001001745 Sunset Bl Boulder CoMelton Construction Inc
SCORE
100
17 Hawthorn Pl Boulder Co
Basement finish of 644 sf with an unfinished area of 217 sf (storage area & mechanical room) to create to bedrooms w compliant egress. Includes associated electrical & mechanical. No plumbing.
Date:  September 29, 2011
Value:   $52,009

Client: Barbara Bennett,Michael Chapman | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 26, 2012 | Current use: Single family d
2011/09/295200910017 Hawthorn Pl Boulder CoMelton Construction Inc
SCORE
100
751 Grant Pl Boulder Co
Roof repair & interior restoration remodel of kitchen area -- repair fire damage, demo walls, install l-shaped cabinetry, removal of bathtub, relocate kitchen sink. New truss roof over kitchen area -- roof pitch, layout & configuration will not be changed. No mechanical.
Date:  November 17, 2011
Value:   $60,400

Client: James Stinson, Stinson | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 27, 2012 | Current use: Single family d
2011/11/1760400100751 Grant Pl Boulder CoMelton Construction Inc
SCORE
100
1565 Wildwood Ln Boulder Co
Removal of an existing deck and roofing system (roof decking, densedeck & epdm) above existing interior conditioned floor area. Repair roof leak damage (ceiling sheetrock) repair replace compromised ceiling joists, reinstall new roof decking material, densdeck, epdm and reconstruct deck. Replacement deck (235 sf) to be smaller than existing (285 sf) (steps to grade omitted from final design).
Date:  November 23, 2011
Value:   $22,000

Client: John Hamilton | Applicant: Melton Construction, Inc. | Permit type: Building, roofing | Permit status: Cmp | Completion date: February 22, 2012 | Current use: Single family d
2011/11/23220001001565 Wildwood Ln Boulder CoMelton Construction Inc
SCORE
100
7348 Island Green Dr Boulder Co
Total tear off and reroof of existing single family dwelling. Dimensional shingles, 17 squares, 4 12 pitch as indicated on permit application.
Date:  December 1, 2011

Client: Alan Ward, Ward | Applicant: Melton Construction, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: February 23, 2012 | Current use: Single family d
2011/12/0101007348 Island Green Dr Boulder CoMelton Construction Inc
SCORE
100
3647 Larkwood Ct Boulder Co
Replace gas fireplace in first floor family room with direct vent unit.
Date:  December 2, 2011

Client: Kristine Larson,George Larson | Applicant: Melton Construction, Inc. | Permit type: Mechanical | Permit status: Cmp | Completion date: December 21, 2011 | Current use: Single family d
2011/12/0201003647 Larkwood Ct Boulder CoMelton Construction Inc
SCORE
100
19 Stony Hill Rd Boulder Co
Remodel kitchen including new lighting, flooring cabinets, countertops. Remove existing wall w two openings and replaced w engineered beam.
Date:  December 19, 2011
Value:   $67,894

Client: Kevin Mcgraw,Laurie S | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 20, 2012 | Current use: Single family d
2011/12/196789410019 Stony Hill Rd Boulder CoMelton Construction Inc
SCORE
100
19 Oak Av Boulder Co
Remodel two bathrooms -- reconfigure powder room fixture locations, master bath area -- remove tub, add shower w prefabricated shower pan, add two sinks and water closet.
Date:  January 12, 2012
Value:   $34,178

Client: Richard Hopkins,Donna Hopkins | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d
2012/01/123417810019 Oak Av Boulder CoMelton Construction Inc
SCORE
100
18 Folsom St 11 Boulder Co
Interior remodel to enhance accessibility in condo unit. Scope of work includes relocation of non-bearing walls in hallway and interior doorways to increase width, replace bathroom fixtures including replacement of tub shower combo with roll-in shower .
Date:  February 7, 2012
Value:   $35,900

Client: John Murphy,Isabel Murphy | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 20, 2012 | Current use: Multifamily dwe
2012/02/073590010018 Folsom St 11 Boulder CoMelton Construction Inc
SCORE
100
5218 Pinehurst Dr Boulder Co
Interior kitchen remodel in residence including removal of non-bearing pantry walls, remove soffit, replace fixtures, finishes, cabinetry, countertops, associated electrical, mechanical for vent hood and duct alteration, plumbing for relocated water line for refridgerator.
Date:  February 10, 2012
Value:   $10,000

Client: Rebecca Fossel | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 11, 2012 | Current use: Single family d
2012/02/10100001005218 Pinehurst Dr Boulder CoMelton Construction Inc
SCORE
100
2036 Mapleton Av Boulder Co
Carport addition over existing concrete of an existing alley-loaded garage and modify roof structure.
Date:  July 12, 2012
Value:   $20,000

Client: Lynn Mcinnes | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 25, 2013 | Current use: Single family d
2012/07/12200001002036 Mapleton Av Boulder CoMelton Construction Inc
SCORE
100
245 Abbey Pl Boulder Co
Kitchen remodel, to include removal a non-structural portion of wall, beam and post to remain. Includes associated mechanical, electrical and plumbing work. Plumbing fixture relocate only.
Date:  February 27, 2012
Value:   $26,000

Client: Sumi Bitner,Robert Jamieson | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 24, 2012 | Current use: Single family d
2012/02/2726000100245 Abbey Pl Boulder CoMelton Construction Inc
SCORE
100
3237 Broadway Boulder Co
Single-story, 652 s. F. Addition, 145 s. F. Remodel and 154 s. F. Side porch on residence. Scope of project includes master bedroom bath, additional bedroom and covered porch.
Date:  April 10, 2012
Value:   $96,434

Client: Jonathan Schimek | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 24, 2012 | Current use: Single family d
2012/04/10964341003237 Broadway Boulder CoMelton Construction Inc
SCORE
100
1803 Mapleton Av Boulder Co
Addition remodel of an existing sfd -- modiifcation of roof elements to create new floor area inside of existing east wall, relocate the south wall 8foot 4inch to create an office area on main level and bedroom above. Dismantle existing staircase -- rebuild new stairway, add gas fireplace, add 2nd floor bathroom, remodel bathrooms -- relocate fixtures.
Date:  May 3, 2012
Value:   $136,000

Client: Robert Cory,Laura Cory | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 28, 2012 | Current use: Single family d
2012/05/031360001001803 Mapleton Av Boulder CoMelton Construction Inc
SCORE
100
25 Arapahoe Av Boulder Co
Demolition of existing office spaces and patching for future tenant. To include relocation of power pole, addition of outlet for second register and installation of frog eyes. Coolers through separate permit.
Date:  April 12, 2012
Value:   $40,565

Client: Co-Arapaho Fw | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 1, 2012 | Current use: Commercial/reta
2012/04/124056510025 Arapahoe Av Boulder CoMelton Construction Inc
SCORE
100
4249 Tamarack Ct Boulder Co
Removal of an existing built-in tub and installation of a free-standing tub, removal of a portion of a non-loadbearing wall, demo existing shower -- pour new shower pan, new tile & fixtures. Remove existing window and raise sill height -- width to remain unchanged, install new window. Electrical unchanges -- no work, includes minor mechanical and plumbing. No net gain of plumbing fixtures.
Date:  April 18, 2012
Value:   $15,248

Client: David Jacobson,Teresa Jacobson | Applicant: Melton Construction, Inc. | Permit type: Building, mechanical | Permit status: Cmp | Completion date: November 27, 2012 | Current use: Single family d
2012/04/18152481004249 Tamarack Ct Boulder CoMelton Construction Inc
SCORE
100
2229 Broadway Boulder Co
Tenant remodel of existing office space including relocation of interior office walls and installation of exterior ramp. Scope of work includes associated electrical and mechanical.
Date:  May 10, 2012
Value:   $74,200

Client: Broadway 2229.0 | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 1, 2013 | Current use: Office - profes
2012/05/10742001002229 Broadway Boulder CoMelton Construction Inc
SCORE
100
2887 Tincup Cr Boulder Co
Addition of 75 square foot mud room and 82 square foot garage storage area. To include addition of 96 square foot covered front porch. See adr2012-00078 for minor modification approval.
Date:  May 18, 2012
Value:   $33,466

Client: James Arnow,Patricia Arnow | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 20, 2012 | Current use: Single family d
2012/05/18334661002887 Tincup Cr Boulder CoMelton Construction Inc
SCORE
100
7247 Augusta Dr Boulder Co
Electrical work related to the remodel of a kitchen -- new cabinets & countertops, appliances & sink to remain in existing locations.
Date:  May 2, 2012

Client: Sean Merrigan,Patricia Merrigan | Applicant: Melton Construction, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: September 7, 2012 | Current use: Single family d
2012/05/0201007247 Augusta Dr Boulder CoMelton Construction Inc
SCORE
100
3082 Sterling Cr Boulder Co
Tenant remodel for melton construction office. To include associated electrical and plumbing work.
Date:  May 10, 2012
Value:   $56,000

Client: Mcberne Sterling | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 2, 2012 | Current use: Office - admini
2012/05/10560001003082 Sterling Cr Boulder CoMelton Construction Inc
SCORE
100
25 Agate Ln Boulder Co
Kitchen and family room remodel -- work requiring a permit includes electrical modifications (relocated oven -- 220v), remove existing gas fireplace, reframe wall and install replacement gas fireplace, reframe west wall of kitchen. Sink and the rest of appliances are staying in the same locations. No structural modifications proposed or authorized under the scope of this permit.
Date:  May 22, 2012
Value:   $10,603

Client: Robert Johnston | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 27, 2012 | Current use: Single family d
2012/05/221060310025 Agate Ln Boulder CoMelton Construction Inc
SCORE
100
47 W Moorhead Cr Boulder Co
Remodel kitchen and two bathrooms -- work requiring a permit includes relocated sink & dishwasher, relocated oven (modified electrical), remove three non-loadbearing walls (two at kitchen, one at bathroom).
Date:  May 22, 2012
Value:   $5,615

Client: Heather Ralston,James Stack | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 13, 2012 | Current use: Single family d
2012/05/22561510047 W Moorhead Cr Boulder CoMelton Construction Inc
SCORE
100
1275 Albion Wy Boulder Co
Remodel of two bathrooms on the main level and 1 bathroom in the basement level. Replacement of plumbing fixtures in exact same locations. Total of 1 square feet of remodel. Patch and repair drywall as needed. Addition of electrical outlets.
Date:  June 6, 2012
Value:   $6,689

Client: James Gilbert,Patricia Gilbert | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 13, 2012 | Current use: Single family d
2012/06/0666891001275 Albion Wy Boulder CoMelton Construction Inc
SCORE
100
2945 Jefferson St Boulder Co
Total demolition of an existing sfd as approved under his2012-00011.
Date:  June 15, 2012

Client: Germain St, St | Applicant: Melton Construction, Inc | Permit type: Demolition | Permit status: Cmp | Completion date: February 14, 2014 | Current use: Single family d
2012/06/1501002945 Jefferson St Boulder CoMelton Construction Inc
SCORE
100
48 N Nautilus Ct Boulder Co
Mezzanine level addition to create supplemental administrative offices for boulde country day school -- 196 sf. Includes associated electrical and mechanical.
Date:  July 13, 2012
Value:   $25,000

Client: For Fund | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 22, 2012 | Current use: Office - admini
2012/07/132500010048 N Nautilus Ct Boulder CoMelton Construction Inc
SCORE
100
2909 10th St Boulder Co
Addition to, and remodel of an existing sfd. Main floor additions to include 306 sf mudroom, 214 sf recreation room and upstairs addition of 168 sf to create a bedroom. Main structure remodel square footage of 208 sf. 386 sf in decks and porches. Addition remodel work in detached garage studio by separate permit (same set of plans) new service on garage -- convert existing service on house to subpanel.
Date:  August 27, 2012
Value:   $200,000

Client: Kari Santos | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 26, 2013 | Current use: Single family d
2012/08/272000001002909 10th St Boulder CoMelton Construction Inc
SCORE
100
2909 10th St Boulder Co
Main level addition of 84 to the existing garage, and a 2nd story addition of 4 sf to create a studio with a half-bath, with a exterior staircase to grade below.(45 sf). Electric baseboard heat.
Date:  September 28, 2012
Value:   $48,544

Client: Kari Santos | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2012/09/28485441002909 10th St Boulder CoMelton Construction Inc
SCORE
100
2945 Jefferson St Boulder Co
Construction of new, two-story, single-family residence with partially finished basement, 5 bedrooms with main level office bedroom, 4 baths, attached 2 car garage.
Date:  August 23, 2012
Value:   $416,980

Client: Germain St, St | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Co | Current use: Single family d
2012/08/234169801002945 Jefferson St Boulder CoMelton Construction Inc
SCORE
100
1275 Albion Wy Boulder Co
Installation of an egress window in an area of the adjacent to the bathroom -- in the sec of the basement. See engineerfoots letter for supplemental information.
Date:  August 14, 2012
Value:   $2,000

Client: James Gilbert,Patricia Gilbert | Applicant: Melton Construction, Inc. | Permit type: Building | Permit status: Cmp | Completion date: September 13, 2012 | Current use: Single family d
2012/08/1420001001275 Albion Wy Boulder CoMelton Construction Inc
SCORE
100
1847 Pine St Boulder Co
Removal of existing siding, and three windows on an enclosed front porch.
Date:  September 26, 2012

Client: Randall Rogers | Applicant: Melton Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: March 18, 2013 | Current use: Single family d
2012/09/2601001847 Pine St Boulder CoMelton Construction Inc
SCORE
100
7 11th St Boulder Co
Construction of a 484 sf detached garage. Remove existing service drop from house, install new drop to relocated service on garage, run new underground to old service location on house for a subpanel. No mechanical or plumbing.
Date:  October 30, 2012
Value:   $26,284

Client: Jeff Scarborough, Scarborough | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 12, 2013 | Current use: Single family d
2012/10/30262841007 11th St Boulder CoMelton Construction Inc
SCORE
100
1064 10th St Boulder Co
Removal of interior load bearing wall separating kitchen and dining room and installation of new beam. Mechanical for new hood for cooktop. Electrical for outlet relocation.
Date:  October 12, 2012
Value:   $3,500

Client: Andrew Shoemaker,Phillisa Shoemaker | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 8, 2013 | Current use: Single family d
2012/10/1235001001064 10th St Boulder CoMelton Construction Inc
SCORE
100
17 Lehigh St Boulder Co
Basement finish of 638 sf to create a recreation room and bedroom area (with compliant egress --see engineerfoots letter for foundation ) and install rough-ins for a future 3 4 bathroom installation. Unfinished utility storage area of 549 sf. Includes associated electrical -- modify hvac ductwork, add bathroom fan.
Date:  November 1, 2012
Value:   $52,527

Client: Laurie Sleeper | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 22, 2013 | Current use: Single family d
2012/11/015252710017 Lehigh St Boulder CoMelton Construction Inc
SCORE
100
1311 Oakleaf Cr Boulder Co
Interior remodel of 293 square feet of existing kitchen to include new interior opening to dining room. Replacement of exterior sliding door and kitchen windows. Replacement of firplace. Replacement of guardrail at stairway. Includes associated electrical, mechanical, and plumbing.
Date:  November 26, 2012
Value:   $49,500

Client: Cynthia Moomaw,Robert Moomaw | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 24, 2013 | Current use: Single family d
2012/11/26495001001311 Oakleaf Cr Boulder CoMelton Construction Inc
SCORE
100
811 Hawthorn Av Boulder Co
Interior remodel of kitchen, main level bathroom and master bathroom. Total remodel area to be 293 s. F. And will convert main level bath from full bath to 1 2 bath, remove and relocate non-bearing walls, enlarge pantry and remove dining room closet. Scope of work includes associated electrical and plumbing work.
Date:  January 11, 2013
Value:   $24,250

Client: Sarah Dayem | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 10, 2013 | Current use: Single family d
2013/01/1124250100811 Hawthorn Av Boulder CoMelton Construction Inc
SCORE
100
29 Jefferson St Boulder Co
Basement finish in residence including installation of bedroom, 3 4 bath, family room and storage areas.
Date:  January 14, 2013
Value:   $73,469

Client: Zachary Mitchell,Gloria Mitchell | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 26, 2013 | Current use: Single family d
2013/01/147346910029 Jefferson St Boulder CoMelton Construction Inc
SCORE
100
3965 Wonderland Hill Av Boulder Co
Interior remodel to the kitchen and a main level bathroom of 205 sf. Relocate water closet and tub.
Date:  January 30, 2013
Value:   $85,000

Client: Luke Comer | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 16, 2013 | Current use: Single family a
2013/01/30850001003965 Wonderland Hill Av Boulder CoMelton Construction Inc
SCORE
100
57 Benthaven Pl Boulder Co
Addition and remodel in existing townhouse. Scope of work includes creation of loft area (144sf), window additions, and bathroom remodel (total of 72sf of remodel). Associated mechanical, plumbing and electrical also included. Please refer to adr2013-00012 for minor modification approval.
Date:  February 14, 2013
Value:   $19,597

Client: Janet Wahr | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 5, 2013 | Current use: Townhomes, addi
2013/02/141959710057 Benthaven Pl Boulder CoMelton Construction Inc
SCORE
100
2221 19th St Boulder Co
Removal of two deteriorated landscaping timber window wells on the south side of the structure and install two replacement concrete window wells. Replacement window wells to be the same size and configuration as the original window wells, and preservation of all aspects of a compliant egress system is required. See engineerfoots letter for supplemental information.
Date:  February 12, 2013
Value:   $7,500

Client: Wayne Phillips,Julie Phillips | Applicant: Melton Construction, Inc | Permit type: Building | Permit status: Cmp | Completion date: August 12, 2013 | Current use: Single family d
2013/02/1275001002221 19th St Boulder CoMelton Construction Inc
SCORE
100
2259 Nicholl St Boulder Co
In an existing sfd structure, garage modifications to include removal of existing wall sheetrock, install additional rafters, install insulation in ceiling and walls, sheetrock the entire interior, replace garage door with insulated garage door, install an electric kiln and associated venting. Kiln, relays and ignition sources to be elevated at least 18inch above garage floor -- a 9foot x 19foot parking area is to be preserved. Electrical work permitted under pmt2013-00829.
Date:  March 5, 2013
Value:   $25,103

Client: April Alstrin | Applicant: Melton Construction, Inc. | Permit type: Building, mechanical | Permit status: Cmp | Completion date: April 11, 2013 | Current use: Single family d
2013/03/05251031002259 Nicholl St Boulder CoMelton Construction Inc
SCORE
100
2227 Bluff St Boulder Co
Remodel of sfd, total of 209sf including replacement of one exterior door, one interior door, and windows, infill of wall, new sink, new flooring and insulation and new drywalled ceiling. Scope of work includes replacement of existing electrical panel.
Date:  March 29, 2013
Value:   $49,904

Client: Michael Lipney,Kathryn Bennin | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 23, 2013 | Current use: Single family d
2013/03/29499041002227 Bluff St Boulder CoMelton Construction Inc
SCORE
100
6 Streamside Ln Boulder Co
Interior, non-structural remodel. Scope of work includes replacement gas fireplace, new and replacement electrical fixtures and switches, drywall and sound insulation replacement resulting from water damage.
Date:  April 17, 2013
Value:   $12,500

Client: Alan Bueltel | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 3, 2014 | Current use: Single family d
2013/04/17125001006 Streamside Ln Boulder CoMelton Construction Inc
SCORE
100
3082 Sterling Cr Boulder Co
Sign. Installation of non-electric monument sign inchmelton design buildinch
Date:  July 29, 2013

Client: M,M Estate Holdings Llc | Applicant: Melton Construction, Inc | Permit type: Sign | Permit status: Cmp | Completion date: March 18, 2014 | Current use: Existing
2013/07/2901003082 Sterling Cr Boulder CoMelton Construction Inc
SCORE
100
21 Poplar Av Boulder Co
Addition of mudroom within envelope of existing attached garage of sfd. This will create 90sf of new conditioned space. Scope of work includes associated mechanical and electrical.
Date:  May 15, 2013
Value:   $9,534

Client: Nicholas Quatrochi, Quatrochi | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 26, 2013 | Current use: Single family d
2013/05/15953410021 Poplar Av Boulder CoMelton Construction Inc
SCORE
100
21 Poplar Av Boulder Co
Construction of 35lf replacement of six-foot tall cedar fence.
Date:  May 15, 2013

Client: Nicholas Quatrochi, Quatrochi | Applicant: Melton Construction, Inc | Permit type: Fence | Permit status: Cmp | Completion date: June 24, 2013 | Current use: Single family d
2013/05/15010021 Poplar Av Boulder CoMelton Construction Inc
SCORE
100
3082 Sterling Cr Boulder Co
Remove existing window on eastern elevation of building, enlarge opening, and install overhead door.
Date:  May 17, 2013
Value:   $4,500

Client: M,M Estate Holdings Llc | Applicant: Melton Construction, Inc | Permit type: Building | Permit status: Iss | Current use: Office - techni
2013/05/1745001003082 Sterling Cr Boulder CoMelton Construction Inc
SCORE
100
2463 Powderhorn Ln Boulder Co
Addition (396sf) and remodel (129sf) of existing sfd. Scope of work includes addition of new sewing room over existing attached garage and remodel of master bathroom and closet on second floor. Also includes remodel of front entry, new balcony guardrail for master bedroom, and window replacement. Scope also includes all associated meps.
Date:  June 18, 2013
Value:   $150,000

Client: Carol Hegner | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 4, 2013 | Current use: Single family d
2013/06/181500001002463 Powderhorn Ln Boulder CoMelton Construction Inc
SCORE
100
2945 Jefferson St Boulder Co
Construction of a new six-foot tall, 96lf cedar privacy fence running along north rear yard, and in the side yards running north-south adjacent to house.
Date:  May 24, 2013

Client: Richard Johnson | Applicant: Melton Construction, Inc | Permit type: Fence | Permit status: Cmp | Completion date: August 12, 2013 | Current use: Single family d
2013/05/2401002945 Jefferson St Boulder CoMelton Construction Inc
SCORE
100
3228 11th St Boulder Co
Non-structural interior remodel to existing sfd. Scope of work includes redesign of kitchen and upstairs master bedroom. Scope also includes installation of a new guridrail around balcony deck.
Date:  July 17, 2013
Value:   $15,000

Client: Calvin Gauss, Gauss | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 5, 2013 | Current use: Single family d
2013/07/17150001003228 11th St Boulder CoMelton Construction Inc
SCORE
100
19 9th St Boulder Co
Interior, non-structural remodel (300sf) to existing professional office space. Scope of work includes addition of three new security doors, relocation of bathroom door, demolition and relocation of several interior walls and associated electrical upgrades.
Date:  August 19, 2013
Value:   $30,000

Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 11, 2014 | Current use: Office - profes
2013/08/193000010019 9th St Boulder CoMelton Construction Inc
SCORE
100
4273 Vinca Ct Boulder Co
Interior remodel of existing 475 sf kitchen. To include relocated fridge, relocated oven with hood, removal of wet bar. Includes demolition of interior non-load bearing walls and decorative columns. Includes associated mep.
Date:  September 10, 2013
Value:   $25,158

Client: Josephine Warfield | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 19, 2013 | Current use: Single family d
2013/09/10251581004273 Vinca Ct Boulder CoMelton Construction Inc
SCORE
100
13 Fairfield Dr Boulder Co
Interior remodel of 103 square feet of kitchen to remove non-load bearing wall and install new skylights. No structural changes. Includes associated mep for kitchen remodel.
Date:  October 9, 2013
Value:   $20,000

Client: Trisha Mckean | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 24, 2013 | Current use: Single family d
2013/10/092000010013 Fairfield Dr Boulder CoMelton Construction Inc
SCORE
100
3011 Broadway Boulder Co
Interior, non-structural remodel to exsiting administrative office space (4,668 sf). Scope of work includes reconfiguration relocation of a non-load bearing wall at the first floor bathroom to establish an ansi a117. 1 compliant single user bathroom, replacement of existing suspended ceiling system with gypsum board ceilings, replacement of kitchenette and bath fixtures, lighting updates, new casework, floor finishes, paint, interior door and hardware replacement. No external changes allowed, no window replacement allowed under the scope of thie permit.
Date:  February 4, 2014
Value:   $140,000

Client: Llc Newlands | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 31, 2014 | Current use: Office - admini
2014/02/041400001003011 Broadway Boulder CoMelton Construction Inc
SCORE
100
5709 Orchard Creek Cr Boulder Co
Basement finish including bedroom, 3 4 bath, wet bar playroom rec room, unfinished storage area. Scope of work includes associated electrical, mechanical and plumbing.
Date:  December 23, 2013
Value:   $61,500

Client: Jeffrey Franke,Amy Franke | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Single family d
2013/12/23615001005709 Orchard Creek Cr Boulder CoMelton Construction Inc
SCORE
100
275 Kiowa Pl Boulder Co
New small addition (181 s. F.) and remodel master bath, master bedroom and hall bath (588 s. F.). Upsize gas line to 1inch from meter. Scope of work to also include placing new beam above existing stair.
Date:  February 3, 2014
Value:   $102,000

Client: Kevin Holtzclaw,Jane Holtzclaw | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 17, 2014 | Current use: Single family d
2014/02/03102000100275 Kiowa Pl Boulder CoMelton Construction Inc
SCORE
100
2931 14th St Boulder Co
Basement finish of 1,256 s. F. In residence including bedroom, full bath, family room, and workshop area. Additional scope of work includes minor interior remodel on first floor to install mudroom and pantry and second floor to for master closet laundry room. Permit includes associated electrical, mechanical and plumbing work.
Date:  December 27, 2013
Value:   $91,000

Client: Kristina Eschmeyer | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 19, 2014 | Current use: Single family d
2013/12/27910001002931 14th St Boulder CoMelton Construction Inc
SCORE
100
26 Cornell Cr Boulder Co
Remodel and addition to existing single family residence. Basement remodel includes 946 s. F., first floor includes 621 s. F. Of additions, second floor includes 734 s. F. Master suite. Historic approval under his2014-00014 change in scope - 7 3 14 - addition of three foot cantilever (41 sf) at study at rear of sfdd.
Date:  February 19, 2014
Value:   $350,000

Client: Property Newlands | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 6, 2015 | Current use: Single family d
2014/02/1935000010026 Cornell Cr Boulder CoMelton Construction Inc
SCORE
100
2247 Juniper Ct Boulder Co
Interior, non-structural remodel (335sf) of existing sfd. Scope of work includes kitchen reconfiguration and bathroom reconfiguration (net loss of one tub and replacment of window in shower). Includes associated meps (including gas piping run from mechanical room to gas range in kitchen).
Date:  January 31, 2014
Value:   $35,000

Client: Raul Chavez,Danielle Chavez | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 21, 2014 | Current use: Single family d
2014/01/31350001002247 Juniper Ct Boulder CoMelton Construction Inc
SCORE
100
1521 Dellwood Av Boulder Co
Interior remodel of existing master bathroom - square feet. Includes associated electrical and plumbing - no mechanical.
Date:  February 19, 2014
Value:   $25,466

Client: Paul Hogan,Tracie Bascom | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 15, 2014 | Current use: Single family d
2014/02/19254661001521 Dellwood Av Boulder CoMelton Construction Inc
SCORE
100
5709 Orchard Creek Cr Boulder Co
Replacement of existing forced air furnace with new 98% unit. Basement finish under separate permit.
Date:  February 19, 2014

Client: Jeffrey Franke,Amy Franke | Applicant: Melton Construction, Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Single family d
2014/02/1901005709 Orchard Creek Cr Boulder CoMelton Construction Inc
SCORE
100
3175 10th St Boulder Co
Interior remodel of second floor bathroom including removing portion of non-bearing wall and replacement with wall and pocket door, installation of additional sink to make 4 piece bath, relocation and replacement of existing fixtures and finishes. Scope of work includes associated electrical and plumbing work.
Date:  February 21, 2014
Value:   $24,000

Client: David 2004.0 | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 13, 2014 | Current use: Single family d
2014/02/21240001003175 10th St Boulder CoMelton Construction Inc
SCORE
100
48 Nautilus Ct N Boulder Co
Installation of storefront doorway inside school with access control.
Date:  March 14, 2014
Value:   $1,908

Client: For Fund | Applicant: Melton Construction, Inc | Permit type: Building | Permit status: Cmp | Completion date: May 9, 2014 | Current use: Schools/educati
2014/03/14190810048 Nautilus Ct N Boulder CoMelton Construction Inc
SCORE
100
1121 13th St Boulder Co
Remodel of existing commercial space including upgrade of two existing bathrooms to fully meet accessibility requirements, interior remodel for future retail tenant, remodel front facade and parapet, associated trim and finishes, mechanical, electrical and plumbing work.
Date:  April 14, 2014
Value:   $148,000

Client: Heights Thompson | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 16, 2015 | Current use: Commercial/reta
2014/04/141480001001121 13th St Boulder CoMelton Construction Inc
SCORE
100
4192 Amber Pl Boulder Co
Electrical permit for two new outlets and two new switches in sfd.
Date:  March 27, 2014

Client: Margaret Bruehl,Paul Strupp | Applicant: Melton Construction, Inc | Permit type: Electrical | Permit status: Cmp | Completion date: July 9, 2014 | Current use: Single family d
2014/03/2701004192 Amber Pl Boulder CoMelton Construction Inc
SCORE
100
28 Regis Dr Boulder Co
Electrical and mechanical permits for new recessed can lights and installation of gas fireplace insert, respectively.
Date:  April 9, 2014

Client: Carolyn Schauble | Applicant: Melton Construction, Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 18, 2014 | Current use: Single family d
2014/04/09010028 Regis Dr Boulder CoMelton Construction Inc
SCORE
100
805 Union Av Boulder Co
Kitchen remodel in existing sfd. Refer to attached structural drawings. Includes associated meps.
Date:  April 9, 2014
Value:   $31,376

Client: William Burrows,Ana Burrows | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 17, 2014 | Current use: Single family a
2014/04/0931376100805 Union Av Boulder CoMelton Construction Inc
SCORE
100
695 11th St Boulder Co
Remove and replace stucco on existing sfd.
Date:  May 14, 2014
Value:   $23,800

Client: Charles Marcy | Applicant: Melton Construction, Inc | Permit type: Building | Permit status: Cmp | Completion date: October 10, 2014 | Current use: Single family d
2014/05/1423800100695 11th St Boulder CoMelton Construction Inc
SCORE
100
1121 13th St Boulder Co
Temp closure of sidewalk to install breakdown pedestrian tunnel
Date:  May 19, 2014

Client: Heights Thompson | Applicant: Melton Construction, Inc | Permit type: Right-of-way | Permit status: Iss
2014/05/1901001121 13th St Boulder CoMelton Construction Inc
SCORE
100
4 Oneida St Boulder Co
4 sq. Ft. Of basement finish to include associated meps and the replacement of an existing window with an egress window.
Date:  May 21, 2014
Value:   $23,834

Client: Waldo Wedel | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 21, 2014 | Current use: Single family d
2014/05/21238341004 Oneida St Boulder CoMelton Construction Inc
SCORE
100
1505 Lodge Ct Boulder Co
325 sq. Ft. Of remodel to include drywall of basement ceiling and electrical wiring in both the basement and kitchen.
Date:  May 21, 2014
Value:   $17,214

Client: Lloyd Botway | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 21, 2014 | Current use: Single family d
2014/05/21172141001505 Lodge Ct Boulder CoMelton Construction Inc
SCORE
100
36 19th St Boulder Co
Interior remodel, including the demolition of a load bearing wall in kitchen. Scope of work includes reconfiguration of kitchen and laundry room on first floor. Includes meps - 600cfm kitchen hood, no net change in plumbing fixture count.
Date:  July 18, 2014
Value:   $28,804

Client: Nicole Cooper,Jeffrey Cooper | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 6, 2014 | Current use: Single family d
2014/07/182880410036 19th St Boulder CoMelton Construction Inc
SCORE
100
275 Kiowa Pl Boulder Co
Kitchen remodel (494 s. F.) scope of work includes electrical, mechanical and plumbing. Gas line to new range location approved under pmt2014-07166. Scope of work includes refacing existing living room fireplace enclosure. Replacement of gas fireplace insert by others under separate permit.
Date:  July 22, 2014
Value:   $27,811

Client: Kevin Holtzclaw,Jane Holtzclaw | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 5, 2014 | Current use: Single family d
2014/07/2227811100275 Kiowa Pl Boulder CoMelton Construction Inc
SCORE
100
11 Linden Av Boulder Co
Interior remodel of sfdd to include relocation of stairway, relocation of one bath and laundry room, remodel of kitchen and mudroom, and addition of second furnace.
Date:  August 7, 2014
Value:   $85,000

Client: Christine Suchor,Matthew Suchor | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 5, 2015 | Current use: Single family d
2014/08/078500010011 Linden Av Boulder CoMelton Construction Inc
SCORE
100
2125 Pine St Boulder Co
Rebuild existing front porch, reusing existing footings.. Scope to include modification (lowering) of roof line above porch only. Scope of work includes roof repair from removal of non-structural railing on garage - the repair includes installation of 1 square of asphalt shingles - the contractor indicates a roof pitch of 4 12.
Date:  August 27, 2014
Value:   $15,912

Client: Dagny Scott | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 2, 2014 | Current use: Porch, remodel
2014/08/27159121002125 Pine St Boulder CoMelton Construction Inc
SCORE
100
455 Hawthorn Av Boulder Co
This is an interior remodel of 4 sq. Ft. The project is to raise the ceiling in two bedrooms and a hallway, and to install 4 new windows and update the electrical.
Date:  September 4, 2014
Value:   $24,364

Client: Scott Robertson,Barbara Robertson | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 24, 2014 | Current use: Single family d
2014/09/0424364100455 Hawthorn Av Boulder CoMelton Construction Inc
SCORE
100
5195 Ingersoll Pl Boulder Co
Interior, non-structural remodel to existing sfd (320sf). Scope of work includes work on both main level and upper level, including demolition of existing non-load bearing walls, and construction of new walls in both kitchen and master suite. Includes associated meps (no net change in plumbing fixture count ; replacement kitchen hood).
Date:  August 26, 2014
Value:   $85,000

Client: Carolyn Girvin | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 17, 2014 | Current use: Single family d
2014/08/26850001005195 Ingersoll Pl Boulder CoMelton Construction Inc
SCORE
100
345 S 36th St Boulder Co
Addition (162sf) and remodel (182sf) of existing sfd. Scope of work includes total tear off and reroof, and all associated meps.
Date:  October 2, 2014
Value:   $54,000

Client: Judith Waller | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 13, 2015 | Current use: Single family d
2014/10/0254000100345 S 36th St Boulder CoMelton Construction Inc
SCORE
100
3225 Arnett St Boulder Co
Addition (26sf) and remodel (426sf) to existing sfd. Scope includes small pop-top addition to accomodate a new upstairs bath shower, and refurbishment of main level bath, replacement of several windows, one replacement exterior door, relocate laundry room, and all associated meps (including replacement forced-air furnace).
Date:  October 9, 2014
Value:   $27,000

Client: Matthew Farrar | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 14, 2015 | Current use: Single family d
2014/10/09270001003225 Arnett St Boulder CoMelton Construction Inc
SCORE
100
1055 6th St Boulder Co
This is a building permit application to remodel 2 existing bathrooms, add a new window, re-configure non-load-bearing wall(s), and add a new a c system. Work includes associated meps to include a sub-panel
Date:  September 24, 2014
Value:   $75,000

Client: Andrew Montes | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 3, 2015 | Current use: Single family d
2014/09/24750001001055 6th St Boulder CoMelton Construction Inc
SCORE
100
5362 Deer Creek Ct Boulder Co
Structural repair of damaged basement foundation wall. Scope of work includes electrical wiring repair and re-ducting.
Date:  September 24, 2014
Value:   $25,000

Client: Thomas Lindahl,Miriam Lindahl | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 18, 2014 | Current use: Single family d
2014/09/24250001005362 Deer Creek Ct Boulder CoMelton Construction Inc
SCORE
100
1645 Bear Mountain Dr Boulder Co
Kitchen remodel and improvement of finishes in powder room and laundry room, and lighting in kitchen and sunroom. Reroof of entire house in scope.
Date:  September 30, 2014
Value:   $40,000

Client: Jeffrey Linsky,Lois Linsky | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 17, 2015 | Current use: Single family d
2014/09/30400001001645 Bear Mountain Dr Boulder CoMelton Construction Inc
SCORE
100
31 23rd St Boulder Co
Interior home remodel renovation to include kitchen, two baths on the main floor. Mechanical, and laundry relocates, add basement bath, egress window to basement bedroom, new sliding glass door at dining room, and new skylights.
Date:  October 28, 2014
Value:   $123,043

Client: Christophe Hansen | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 4, 2015 | Current use: Single family d
2014/10/2812304310031 23rd St Boulder CoMelton Construction Inc
SCORE
100
1041 10th St Boulder Co
Flood repair permit to repair drywall, insulation, and leaking water pipes. This permit includes the removal of a shower. See recorded declaration of use limiting the property to one detached dwelling unit on the property.
Date:  October 20, 2014
Value:   $5,975

Client: Anne Barrett | Applicant: Melton Construction, Inc | Permit type: Building, plumbing | Permit status: Cmp | Completion date: December 22, 2014 | Current use: Single family d
2014/10/2059751001041 10th St Boulder CoMelton Construction Inc
SCORE
100
2229 Broadway Boulder Co
Interior, non-structural tenant remodel to existing professional office space (1678sf). Scope of work includes reconfiguration of interior walls, new kitchenette, upgrade to lighting, and all other associated meps.
Date:  April 6, 2015
Value:   $97,265

Client: Re Minot | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Office - profes
2015/04/06972651002229 Broadway Boulder CoMelton Construction Inc
SCORE
100
3633 21st St Boulder Co
Minor interior remodel (250sf) and large new deck (1,616 sf) for sfd. Includes electrical work.
Date:  January 30, 2015
Value:   $150,000

Client: Mar Del | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/01/301500001003633 21st St Boulder CoMelton Construction Inc
SCORE
100
1162 12th St Boulder Co
Interior remodel of existing sorority house (692sf) consisting of kitchen renovation. Exterior remodel to support mechanical equipment (60sf). Includes associated meps.
Date:  December 12, 2014
Value:   $200,000

Client: Chapter Nu | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Wdn | Current use: Multifamily dwe
2014/12/122000001001162 12th St Boulder CoMelton Construction Inc
SCORE
100
3778 Wonderland Hill Av Boulder Co
Remodel of existing 3rd level finished attic space including replacement of windows and balcony door, alteration of existing dormer eaves to include returns to match original house design, remodel of 1 2 bath, new water heater, infill skylight, associated trim and finishes, and electrical, mechanical and plumbing.
Date:  January 30, 2015
Value:   $150,000

Client: Sarah Lesley | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/01/301500001003778 Wonderland Hill Av Boulder CoMelton Construction Inc
SCORE
100
2655 Briarwood Dr Boulder Co
Interior remodel of residence including kitchen and master bedroom, master bath and main floor poweder room, new guest bathroom on second floor, replacement of windows and front porch and new second floor balcony off rear of residence.
Date:  February 27, 2015
Value:   $136,000

Client: Thomas Mason,Katherine Whidden | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/02/271360001002655 Briarwood Dr Boulder CoMelton Construction Inc
SCORE
100
4337 Vinca Ct Boulder Co
Kitchen remodel (325 s. F.). Scope of work to include mepfoots, removal of windows in breakfast nook, opeings to be covered and insulated. Remodel project also includes replacement of windows. Replacement windows to fit in existing openings. No apparent structural work changes are evident in the approved plans.
Date:  January 16, 2015
Value:   $49,734

Client: Rohit Diesh,Diane Diesh | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 22, 2015 | Current use: Single family d
2015/01/16497341004337 Vinca Ct Boulder CoMelton Construction Inc
SCORE
100
705 10th St Boulder Co
Create new window opening in existing foundation wall, replace existing window with new door. Create new exterior stair to new door.
Date:  April 3, 2015
Value:   $12,946

Client: Paul Thompson | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 19, 2015 | Current use: Single family d
2015/04/0312946100705 10th St Boulder CoMelton Construction Inc
SCORE
100
234 Mohawk Dr Boulder Co
Kitchen remodel for single family detached dwelling (215 sqft). Scope to include new island with down-draft requiring make-up air. Handrail at stairs will be rebuilt as well.
Date:  April 1, 2015
Value:   $46,613

Client: Frank Harmon,Lauren Harmon | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 17, 2015 | Current use: Single family d
2015/04/0146613100234 Mohawk Dr Boulder CoMelton Construction Inc
SCORE
100
2515 7th St Boulder Co
Addition and remodel of existing residence. Addition of 492 square feet on main level and 409 square feet in basement. Remodel of 409 square feet of main level of existing residence and 1 square feet of basement. Resulting residence to be 2 bed, 2 bath. See boz2014-00007 and his2015-00042.
Date:  April 13, 2015
Value:   $177,000

Client: Jennifer Kilbury | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Den | Current use: Single family d
2015/04/131770001002515 7th St Boulder CoMelton Construction Inc
SCORE
100
1121 13th St Boulder Co
Lower level remodel of 378 sq. Ft. - build hallway in basement. Remove structural wall staircase and replace with new drop beam. Electrical work to include re-wiring of 4 existing lights, new exit and emergency lighting, and new switches. Fire sprinkler work under separate permit.
Date:  June 4, 2015
Value:   $16,536

Client: Heights Thompson | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Commercial/reta
2015/06/04165361001121 13th St Boulder CoMelton Construction Inc
SCORE
100
5 S 41st St Boulder Co
Main level remodel of kitchen and bath. Scope of work includes removal of bearing wall, relocation of fixtures, installation of new 1 2 wall, cabinetry, countertops, associated finishes and replace shower. Scope of work includes associated electrical, plumbing and mechanical.
Date:  May 8, 2015
Value:   $24,614

Client: Gregory Bock,Joseffa Bock | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/05/08246141005 S 41st St Boulder CoMelton Construction Inc
SCORE
100
1162 12th St Boulder Co
Interior kitchen remodel to alpha chi omega sorority houst. Total of 692 sf, includes associated meps and sitework. Please refer to lur2015-00017 for non-conforming use review approval.
Date:  August 14, 2015
Value:   $100,000

Client: Chapter Nu | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Multifamily dwe
2015/08/141000001001162 12th St Boulder CoMelton Construction Inc
SCORE
100
5148 2nd St Boulder Co
New split-story sfd (4,898 sf) with attached garage, five bed, six bath. Full finished basement (1,512 sf) including bedroom and bath. Main level of 2,142 sf including great room, kitchen, master bed and bath, and training room - and garage of 507 sf. Upper level includes three bed, two bath. New deck and porch areas totalling 731 sf.
Date:  August 17, 2015
Value:   $543,000

Client: Mirinda Carfrae | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/08/175430001005148 2nd St Boulder CoMelton Construction Inc
SCORE
100
30 24th St Boulder Co
Kitchen remodel for single family detached dwelling. Scope includes replacement of portion of bearing wall with flush beam, per engineerfoots specifications.
Date:  May 14, 2015
Value:   $15,000

Client: David Payne | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 31, 2015 | Current use: Single family d
2015/05/141500010030 24th St Boulder CoMelton Construction Inc
SCORE
100
48 6th St Boulder Co
Remodel master and hall bath to include new fixtures, tile, lighting, heated floor (master bath), total s. F. Is 2 s. F.
Date:  May 18, 2015
Value:   $35,450

Client: Zhe Chang,Jing Chang | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 14, 2015 | Current use: Single family d
2015/05/183545010048 6th St Boulder CoMelton Construction Inc
SCORE
100
5488 Omaha Pl Boulder Co
Second story additions to a single family detached dwelling to add two bedrooms and playroom above existing attached garage and to add a master suite above the existing main level. Scope also includes remodel of kitchen.
Date:  July 15, 2015
Value:   $124,723

Client: Sami Jallad | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/07/151247231005488 Omaha Pl Boulder CoMelton Construction Inc
SCORE
100
3633 21st St Boulder Co
Replace gas fireplace
Date:  June 22, 2015

Client: Mar Del | Applicant: Melton Construction, Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d
2015/06/2201003633 21st St Boulder CoMelton Construction Inc
SCORE
100
3572 Smuggler Wy Boulder Co
Master bathroom remodel ( s. F.) to include adding a new pocket door, relocating attic access, and remove bath tub and install new shower with poured pan.
Date:  June 22, 2015
Value:   $5,011

Client: Robert Colwell,Robin Chazdon | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Townhomes, remo
2015/06/2250111003572 Smuggler Wy Boulder CoMelton Construction Inc
SCORE
100
2795 Regis Dr Boulder Co
Bathroom remodel and reconfiguration of laundry room ( s. F.).
Date:  June 22, 2015
Value:   $20,000

Client: Khemarin Seng,Molly Ware | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/06/22200001002795 Regis Dr Boulder CoMelton Construction Inc
SCORE
100
1985 Vassar Cr Boulder Co
Kitchen remodel to sfd (138 sf). Scope includes new window, and a fully renovated kitchen, and a new gas fireplace. Includes associated meps. (no net plumbing fixture count change) - scope updated on 08 14 2015 to include main level master bed and bath remodel to relocated master bed closet, and fully renovate and expand master bath (one additional sink, and replace tub shower combo with steam shower).
Date:  June 26, 2015
Value:   $63,756

Client: Jonathan Rucker,Karen Regan | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/06/26637561001985 Vassar Cr Boulder CoMelton Construction Inc
SCORE
100
4052 Eleuthera Ct Boulder Co
Remodel (125 sf) to master bath located on second floor of sfd (removal of existing tub, replaced with new shower). Scope includes meps.
Date:  June 26, 2015
Value:   $40,300

Client: Living Haley | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/06/26403001004052 Eleuthera Ct Boulder CoMelton Construction Inc
SCORE
100
5148 2nd St Boulder Co
Temporary construction power for new sfdd under pmt2015-01785.
Date:  July 10, 2015

Client: Mirinda Carfrae | Applicant: Melton Construction, Inc | Permit type: Electrical | Permit status: Iss | Current use: Single family d
2015/07/1001005148 2nd St Boulder CoMelton Construction Inc
SCORE
100
878 Grant Pl Boulder Co
Master suite remodel for single family detached dwelling. Scope includes reconfiguration of closet and bath space, addition of one window and replacement of others. No net change in plumbing fixtures.
Date:  August 10, 2015
Value:   $31,409

Client: Bridget Carlin,Robert Kanick | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/08/1031409100878 Grant Pl Boulder CoMelton Construction Inc
SCORE
100
3855 Cloverleaf Dr Boulder Co
Addition (375 sf) and remodel (75 sf) to sfd, with new front porch (96 sf). Scope includes front-yard bump out to expand kitchen and entry-way, and small expansion of conditioned space into existing garage (maintaining one viable off-street parking space), as well as remodel to exiting kitchen to facilitate new layout. Meps included (new 2 amp electrical service).
Date:  August 14, 2015
Value:   $139,138

Client: James Martin,Linda Martin | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Act | Current use: Single family d
2015/08/141391381003855 Cloverleaf Dr Boulder CoMelton Construction Inc
SCORE
100
1986 Hardscrabble Dr Boulder Co
Remodel of master bath for single family detached dwelling. Remodel will result in decrease of one fixture (tub).
Date:  August 21, 2015
Value:   $23,000

Client: Leo Pedlow,Dorothy Pedlow | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d
2015/08/21230001001986 Hardscrabble Dr Boulder CoMelton Construction Inc
SCORE
100
14 Rockmont Cr Boulder Co
Remodel (2,758 sq. Ft.) and conditioned additions (422 sq. Ft.). Scope of work includes new front porch (65 sq. Ft.), new rear covered patio (84 sq. Ft.), and a new rooftop balcony over the existing garage (3 sq. Ft.). Scope of work includes associated meps.
Date:  August 31, 2015
Value:   $335,000

Client: Real Integrated | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Act | Current use: Single family d
2015/08/3133500010014 Rockmont Cr Boulder CoMelton Construction Inc
SCORE
100
1406 Sunshine Canyon Dr Mountains Co
Addition / interior remodel /new furnace-hw heater/ decks /reroof /reinsulate exterior walls/reside
Date:  June 3, 2009
Value:   $170,000

Permit type: Residential remodel | Permit status: Close | Completion date: December 22, 2009 | Permit id: Bp-09-0685
2009/06/031700001001406 Sunshine Canyon Dr Mountains CoMelton Construction Inc
SCORE
100
7229 Mount Meeker Road Boulder Co
Remodel of two bathrooms in the 1st floor
Date:  November 9, 2009
Value:   $25,000

Permit type: Residential remodel | Permit status: Close | Completion date: February 10, 2010 | Permit id: Bp-09-1689
2009/11/09250001007229 Mount Meeker Road Boulder CoMelton Construction Inc
SCORE
100
Date:  December 22, 2009
Value:   $16,252

Permit type: Residential remodel | Permit status: Close | Completion date: February 5, 2010 | Permit id: Bp-09-1930
2009/12/22162521006822 Camelia Court Niwot CoMelton Construction Inc
SCORE
100
891 Columbia Place Boulder Co
Existing deck converted to covered porch & add sunshade / pergola
Date:  March 3, 2010
Value:   $11,700

Permit type: Residential remodel | Permit status: Permit closed | Completion date: June 10, 2010 | Permit id: Bp-10-0279
2010/03/0311700100891 Columbia Place Boulder CoMelton Construction Inc
SCORE
100
6744 Golf Club Drive Boulder Co
Addition/remodel, reroof, basement finish bwop
Date:  June 8, 2010
Value:   $180,000

Permit type: Residential addition | Permit status: Permit closed | Completion date: October 12, 2010 | Permit id: Bp-10-0864
2010/06/081800001006744 Golf Club Drive Boulder CoMelton Construction Inc
SCORE
100
2 Cactus Court Boulder Co
Remodel kitchen & bath and add gable roof to south elevation
Date:  July 19, 2010
Value:   $215,000

Permit type: Residential remodel | Permit status: Permit closed | Completion date: March 30, 2011 | Permit id: Bp-10-1166
2010/07/192150001002 Cactus Court Boulder CoMelton Construction Inc
SCORE
100
2 Cactus Court Boulder Co
Deconstruction for remodel in bp-10-1166
Date:  July 30, 2010
Value:   $15,000

Permit type: Residential demolition | Permit status: Permit closed | Completion date: November 17, 2010 | Permit id: Bp-10-1274
2010/07/30150001002 Cactus Court Boulder CoMelton Construction Inc
SCORE
100
568 Rembrandt Road Mountains Co
Roof over framing, platform for installation of new a/c unit, new ductwork
Date:  August 2, 2010
Value:   $28,000

Permit type: Residential remodel | Permit status: Permit closed | Completion date: September 23, 2010 | Permit id: Bp-10-1279
2010/08/0228000100568 Rembrandt Road Mountains CoMelton Construction Inc
SCORE
100
5881 Sunshine Canyon Drive Boulder Co
Rebuild detached garage destroyed in four mile canyon fire (fmf-10-0189)
Date:  October 14, 2010
Value:   $70,000

Permit type: New residence | Permit status: Permit closed | Completion date: December 23, 2010 | Permit id: Bp-10-1867
2010/10/14700001005881 Sunshine Canyon Drive Boulder CoMelton Construction Inc
SCORE
100
7826 Arlington Drive Boulder Co
Renovation/addition, new attached garage
Date:  November 9, 2010
Value:   $107,007

Permit type: Residential addition | Permit status: Permit complete | Completion date: April 6, 2011 | Permit id: Bp-10-2060
2010/11/091070071007826 Arlington Drive Boulder CoMelton Construction Inc
SCORE
100
568 Rembrandt Road Mountains Co
Install air conditioner on roof
Date:  August 2, 2010
Value:   $28,000

Permit type: Air conditioning | Permit status: Withdrawn | Permit id: Bp-10-1278
2010/08/0228000100568 Rembrandt Road Mountains CoMelton Construction Inc
SCORE
100
Date:  February 3, 2011
Value:   $41,000

Permit type: Residential remodel | Permit status: Permit closed | Completion date: May 3, 2011 | Permit id: Bp-11-0139
2011/02/03410001004957 Sundance Square Boulder CoMelton Construction Inc
SCORE
100
7352 Meadow Court Boulder Co
Basement finish includes bathroom, wetbar area and update interior lighting & furnace
Date:  February 10, 2011
Value:   $32,560

Permit type: Residential remodel | Permit status: Permit closed | Completion date: April 27, 2011 | Permit id: Bp-11-0167
2011/02/10325601007352 Meadow Court Boulder CoMelton Construction Inc
SCORE
100
4957 Sundance Square Boulder Co
Relocate laundry to unfinished basement (ref: bp-11-0139)
Date:  March 25, 2011
Value:   $750

Permit type: Residential remodel | Permit status: Permit closed | Completion date: May 3, 2011 | Permit id: Bp-11-0378
2011/03/257501004957 Sundance Square Boulder CoMelton Construction Inc
SCORE
100
79 Esussex Court Longmont Co
Remodel master bathroom, electrical, plumbing
Date:  August 2, 2011
Value:   $42,000

Permit type: Residential remodel | Permit status: Permit issued | Expiration date: February 6, 2012 | Permit id: Bp-11-1278
2011/08/024200010079 Esussex Court Longmont CoMelton Construction Inc
SCORE
100
6949 Roaring Fork Trail Boulder Co
Master bedroom, garage & deck addition
Date:  August 12, 2011
Value:   $210,000

Permit type: Residential addition | Permit status: Permit closed | Completion date: April 20, 2012 | Permit id: Bp-11-1359
2011/08/122100001006949 Roaring Fork Trail Boulder CoMelton Construction Inc
SCORE
100
5865 Olde Stage Road Boulder Co
Kitchen remodel & add gas line
Date:  August 24, 2011
Value:   $19,000

Permit type: Residential remodel | Permit status: Permit complete | Completion date: February 6, 2011 | Permit id: Bp-11-1423
2011/08/24190001005865 Olde Stage Road Boulder CoMelton Construction Inc
SCORE
100
5186 Buckingham Road Boulder Co
Install interior access door between 2 units (5184 and 5186 buckingham rd)
Date:  September 19, 2011
Value:   $1,000

Permit type: Residential remodel | Permit status: Permit closed | Completion date: March 15, 2012 | Permit id: Bp-11-1554
2011/09/1910001005186 Buckingham Road Boulder CoMelton Construction Inc
SCORE
100
5184 Buckingham Road Boulder Co
Install interior access door between 2 units (5184 and 5186 buckingham rd)
Date:  September 19, 2011
Value:   $2,000

Permit type: Residential remodel | Permit status: Permit closed | Completion date: March 15, 2012 | Permit id: Bp-11-1555
2011/09/1920001005184 Buckingham Road Boulder CoMelton Construction Inc
SCORE
100
4643 Greylock Street Boulder Co
Concrete slab repair
Date:  October 25, 2011
Value:   $12,000

Permit type: Residential remodel | Permit status: Permit closed | Completion date: December 20, 2011 | Permit id: Bp-11-1803
2011/10/25120001004643 Greylock Street Boulder CoMelton Construction Inc
SCORE
100
4434 Mast Road Boulder Co
Sunroom addition - and replace deck mbh 1. 4. 12
Date:  December 16, 2011
Value:   $16,000

Permit type: Residential addition | Permit status: Permit complete | Completion date: March 27, 2013 | Permit id: Bp-11-2050
2011/12/16160001004434 Mast Road Boulder CoMelton Construction Inc
SCORE
100
69 Roaring Fork Trail Boulder Co
Tear off & reroof w/ tamko heritage 30yr fiberglass dimensional shingles
Date:  August 26, 2011
Value:   $11,143

Permit type: Reroofing | Permit status: Permit closed | Completion date: January 23, 2012 | Permit id: Bp-11-1435
2011/08/261114310069 Roaring Fork Trail Boulder CoMelton Construction Inc
SCORE
100
1323 Swallow Court Boulder Co
Final inspection for deck (bp-04-0285 expired)
Date:  January 25, 2012
Value:   $3,000

Permit type: Residential remodel | Permit status: Permit closed | Completion date: February 15, 2012 | Permit id: Bp-12-0115
2012/01/2530001001323 Swallow Court Boulder CoMelton Construction Inc
SCORE
100
419 Majestic View Drive Boulder Co
Addition of 2-car garage w/ carport, master suite, office & remodel (sprw-11-0070)
Date:  March 14, 2012
Value:   $311,490

Permit type: Residential addition | Permit status: Permit issued | Expiration date: March 22, 2014 | Permit id: Bp-12-0372
2012/03/14311490100419 Majestic View Drive Boulder CoMelton Construction Inc
SCORE
100
Date:  June 13, 2012
Value:   $75,000

Permit type: Residential addition | Permit status: Permit closed | Completion date: November 16, 2012 | Permit id: Bp-12-1004
2012/06/13750001007221 Four Rivers Road Boulder CoMelton Construction Inc
SCORE
100
7351 Panorama Drive Boulder Co
Remodel of bathroom & kitchen and addition of front porch cover
Date:  June 13, 2012
Value:   $148,000

Permit type: Residential remodel | Permit status: Permit closed | Completion date: November 29, 2012 | Permit id: Bp-12-1015
2012/06/131480001007351 Panorama Drive Boulder CoMelton Construction Inc
SCORE
100
153 Poorman Road Boulder Co
Interior & exterior remodel w/ additions
Date:  September 13, 2012
Value:   $300,000

Permit type: Residential addition | Permit status: Permit complete | Completion date: February 13, 2014 | Permit id: Bp-12-1629
2012/09/13300000100153 Poorman Road Boulder CoMelton Construction Inc
SCORE
100
1311 Songbird Court Boulder Co
Kitchen remodel & basement finish
Date:  November 15, 2012
Value:   $37,946

Permit type: Residential remodel | Permit status: Permit complete | Completion date: March 15, 2013 | Permit id: Bp-12-2023
2012/11/15379461001311 Songbird Court Boulder CoMelton Construction Inc
SCORE
100
7126 Four Rivers Road Boulder Co
Gas fireplace insert - new cabinets
Date:  April 18, 2013
Value:   $9,200

Permit type: Residential remodel | Permit status: Permit complete | Completion date: June 11, 2013 | Permit id: Bp-13-0483
2013/04/1892001007126 Four Rivers Road Boulder CoMelton Construction Inc
SCORE
100
153 Poorman Road Boulder Co
Access deck addition
Date:  May 10, 2013
Value:   $600

Permit type: Residential addition | Permit status: Permit complete | Completion date: February 13, 2014 | Permit id: Bp-13-0641
2013/05/10600100153 Poorman Road Boulder CoMelton Construction Inc
SCORE
100
4567 Tanglewood Trail Boulder Co
Master bed & bath remodel
Date:  June 3, 2013
Value:   $55,288

Permit type: Residential remodel | Permit status: Final inspection complete | Completion date: July 30, 2013 | Permit id: Bp-13-0776
2013/06/03552881004567 Tanglewood Trail Boulder CoMelton Construction Inc
SCORE
100
508 Hummer Drive Nederland Co
Interior remodel - add bedroom & bathroom to 1st floor
Date:  July 3, 2013
Value:   $92,625

Permit type: Residential remodel | Permit status: Permit complete | Completion date: April 10, 2014 | Permit id: Bp-13-0986
2013/07/0392625100508 Hummer Drive Nederland CoMelton Construction Inc
SCORE
100
Date:  July 12, 2013
Value:   $66,772

Permit type: Residential remodel | Permit status: Permit complete | Completion date: October 29, 2013 | Permit id: Bp-13-1044
2013/07/12667721008361 Greenwood Drive Longmont CoMelton Construction Inc
SCORE
100
269 Anemone Drive Boulder Co
Master bathroom remodel
Date:  August 21, 2013
Value:   $65,000

Permit type: Residential remodel | Permit status: Permit complete | Completion date: January 6, 2014 | Permit id: Bp-13-1324
2013/08/2165000100269 Anemone Drive Boulder CoMelton Construction Inc
SCORE
100
419 Majestic View Drive Boulder Co
Porte cochere addition to front of house (sprw-11-0070)
Date:  August 28, 2013
Value:   $5,000

Permit type: Residential remodel | Permit status: Permit complete | Completion date: April 29, 2014 | Permit id: Bp-13-1348
2013/08/285000100419 Majestic View Drive Boulder CoMelton Construction Inc
SCORE
100
7214 Spring Court Boulder Co
Resurface existing 1st level deck & 2nd level deck addition & exterior door
Date:  September 4, 2013
Value:   $16,000

Permit type: Residential addition | Permit status: Permit complete | Completion date: December 20, 2013 | Permit id: Bp-13-1394
2013/09/04160001007214 Spring Court Boulder CoMelton Construction Inc
SCORE
100
Date:  October 7, 2013
Value:   $13,813

Permit type: Residential remodel | Permit status: Permit complete | Completion date: May 8, 2014 | Permit id: Bp-13-1585
2013/10/07138131009006 Jason Court Boulder CoMelton Construction Inc
SCORE
100
245 Deer Trail Road Boulder Co
Detached garage/workshop (sprw-13-0013)
Date:  October 9, 2013
Value:   $85,090

Permit type: Residential accessory building | Permit status: Permit complete | Completion date: September 22, 2014 | Permit id: Bp-13-1615
2013/10/0985090100245 Deer Trail Road Boulder CoMelton Construction Inc
SCORE
100
245 Deer Trail Road Boulder Co
Deconstruct detached garage (bp-66-9398)
Date:  October 15, 2013
Value:   $10,000

Permit type: Residential deconstruction | Permit status: Permit complete | Completion date: January 3, 2014 | Permit id: Bp-13-1658
2013/10/1510000100245 Deer Trail Road Boulder CoMelton Construction Inc
SCORE
100
Date:  January 10, 2014
Value:   $45,000

Permit type: Residential remodel | Permit status: Permit complete | Completion date: June 10, 2014 | Permit id: Bp-14-0049
2014/01/10450001006029 Indian Road Boulder CoMelton Construction Inc
SCORE
100
8354 Thunderhead Drive Boulder Co
Expand deck / replace 6 doors & windows
Date:  June 20, 2014
Value:   $55,000

Permit type: Residential remodel | Permit status: Permit complete | Completion date: September 18, 2014 | Permit id: Bp-14-1102
2014/06/20550001008354 Thunderhead Drive Boulder CoMelton Construction Inc
SCORE
100
8418 Greenwood Drive Longmont Co
Kitchen & bathroom renovation
Date:  June 30, 2014
Value:   $36,253

Permit type: Residential remodel | Permit status: Permit complete | Completion date: September 9, 2014 | Permit id: Bp-14-1159
2014/06/30362531008418 Greenwood Drive Longmont CoMelton Construction Inc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.