Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Job number 10122 - shoebuy 101 arch street 16th floor - 16th floor renovation Client: Clpf-101 Arch Lp | Permit type: Fire alarm | Current use: Comm | Permit id: Efa131478 | Parcel: 304597000 | |||||
SCORE 95 Job number 10210 - cbre 101 arch street - 3rd and 6th floor - rework lighting in bathroom and lobby on 3rd and 6th floors Client: Clpf-101 Arch Lp | Permit type: Electrical | Current use: Comm | Permit id: E135650 | Parcel: 304597000 | |||||
To relocate 11 sprinkler heads. Date: July 29, 2013 Permit status: Na | Permit id: Sprk264947 | Parcel: 0304597000 | |||||
Remodel nexage 15th fl doc20121350 Date: December 24, 2012 Permit status: Na | Permit id: Bfdf202506 | Parcel: 0304597000 | |||||
Install speaker strobe to existing booster; ~; doc#20130887 Date: August 7, 2013 Permit status: Na | Permit id: Bfdf269469 | Parcel: 0304597000 | |||||
Cutting &; welding of leaking chilled water pipes bfd paid detail required Date: January 30, 2014 Permit status: Na | Permit id: Cbw322019 | Parcel: 0304597000 | |||||
Relocate (8) existing sprinklers on 18th floor. Date: June 28, 2011 Permit status: Na | Permit id: Sprk82845 | Parcel: 0304597000 | |||||
Relocate (30) sprinkler heads for new ceiling in common area &; tenant space Date: November 30, 2012 Permit status: Na | Permit id: Sprk201976 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors Date: May 27, 2015 Permit status: Na | Permit id: Bsd476563 | Parcel: 0304597000 | |||||
Cutting burning welding for repairs to leaking condenser water pipes Date: October 8, 2013 Permit status: Na | Permit id: Cbw292160 | Parcel: 0304597000 | |||||
Relocate (74) sprinklers on 21st floor.; work to be done per nfpa stands. One floor zone at a time. Date: July 18, 2011 Permit status: Na | Permit id: Sprk85884 | Parcel: 0304597000 | |||||
Remodel of common corridor on 15th floor; ~; doc# 20121351 Date: December 24, 2012 Permit status: Na | Permit id: Bfdf202091 | Parcel: 0304597000 | |||||
Relocate 38 sprinkler heads on 2nd &; 3rd floors Date: June 25, 2014 Permit status: Na | Permit id: Sprk370292 | Parcel: 0304597000 | |||||
Relocate two (2) existing sprinkler heads on the 18th floor to new ceiling grid Date: May 3, 2013 Permit status: Na | Permit id: Sprk237608 | Parcel: 0304597000 | |||||
Alteration;to portions of;existing system of the 10th floor; doc#20141711. Five devices. Work to be done per nfpa stands 7 cmr. 10th floor. Date: December 15, 2014 Permit status: Na | Permit id: Bfdf434254 | Parcel: 0304597000 | |||||
Install inergen fire suppression detector system; ~; doc# 20131110 Date: November 21, 2013 Permit status: Na | Permit id: Bfdf287711 | Parcel: 0304597000 | |||||
Install (1) new alarm relay to shut down the 2nd floor muzak machine; ~; doc# 20131190 Date: November 12, 2013 Permit status: Na | Permit id: Bfdf294820 | Parcel: 0304597000 | |||||
Installation of floo Date: April 29, 2015 Permit status: Na | Permit id: Chm463579 | Parcel: 0304597000 | |||||
Bagging of smoke detectors remove bags at end of work day Date: April 10, 2015 Permit status: Na | Permit id: Bsd460841 | Parcel: 0304597000 | |||||
Relocate 9 existing sprinkler heads. Work to be done per nfpa stands 7 cmr. One floor zone at a time. Date: November 3, 2014 Permit status: Na | Permit id: Sprk418656 | Parcel: 0304597000 | |||||
To install new fire alarm devices in tenant space. Doc#20141411 Date: November 13, 2014 Permit status: Na | Permit id: Bfdf414969 | Parcel: 0304597000 | |||||
Relocate #56 sprinkler heads to new ceiling grid. Work to be done per nfpa. Stands. 7 cmr 8th ed. Work to be done one floor zone at a time. Date: May 25, 2011 Permit status: Na | Permit id: Sprk77274 | Parcel: 0304597000 | |||||
Only one floor shall be impaired at any given time Date: February 4, 2013 Permit status: Na | Permit id: Sprk216908 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors for dust control during ongoing construction Date: May 14, 2014 Permit status: Na | Permit id: Bsd358476 | Parcel: 0304597000 | |||||
Installation of pane Date: March 27, 2014 Permit status: Na | Permit id: Chm322353 | Parcel: 0304597000 | |||||
Renovation of existing office space; ~; doc# 20140852 Date: August 5, 2014 Permit status: Na | Permit id: Bfdf378108 | Parcel: 0304597000 | |||||
Stand dumpster at curb 7pm to 6am Date: March 21, 2014 Permit type: Dumpsters | Permit status: Expired | Permit id: Occu-345945 | Parcel: 0304597000 | |||||
Relocate (4) existing sprinklers on ground floor.; work to be done one floor zone at a time. Per nfpa stands. 7 cmr 8th ed. ; Date: May 9, 2011 Permit status: Na | Permit id: Sprk75368 | Parcel: 0304597000 | |||||
Install inergen clean agent fire suppression system in the approx. 9 sf it server room on the 14th floor. Work to be done per nfpa stands. 7 cmr. System to be tied to building fire alarm system. Building sprinklers to remain. Date: October 3, 2013 Permit status: Na | Permit id: Sprk285055 | Parcel: 0304597000 | |||||
SCORE 82 Installing fire alarm device in tenant space because a new room was createdbuilt. Date: May 27, 2015 Contractor: Erica Burgos J And M Brown Company Permit type: Bfd other | Permit status: Na | Permit id: Bfdf466776 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors Date: October 20, 2014 Permit status: Na | Permit id: Bsd417824 | Parcel: 0304597000 | |||||
Coordinate impairment with building managment only one floor shall be impaired in the building at any given time Date: September 10, 2012 Permit status: Na | Permit id: Sprk178650 | Parcel: 0304597000 | |||||
Installing a 6 sprinkler heads pre-action system in a existing mdf room on the 4th floor. Work to be done per nfpa stands. 7 cmr. One floor zone at a time Date: October 9, 2013 Permit status: Na | Permit id: Sprk288935 | Parcel: 0304597000 | |||||
Alteration of existing fa system to include installing 5 new spkstrobes 1 strobe only 1 smoke detector &; co led rai doc20120355 Date: March 29, 2012 Permit status: Na | Permit id: Bfdf126974 | Parcel: 0304597000 | |||||
Impairment shall be limited to one zone at any given time within the building coordinate impairment with building management Date: May 12, 2015 Permit type: Bfd other | Permit status: Na | Permit id: Sprk467471 | Parcel: 0304597000 | |||||
Alteration of existing fire alarm system to include (6) new fa speaker strobe (5) strobe only; ~; doc# 20121041 ; tamper and duct detector - supervisory; short circuit ground fault open wire - trouble Date: October 3, 2012 Permit status: Na | Permit id: Bfdf180218 | Parcel: 0304597000 | |||||
General Date: August 15, 2012 Permit status: Expired | Permit id: Occu-173566 | Parcel: 0304597000 | |||||
Coordinate impairment with building management so that only one floor is impaired at any given time Date: May 30, 2013 Permit status: Na | Permit id: Sprk243035 | Parcel: 0304597000 | |||||
Renovation of space requiring device relocations &; additions; ~; doc# 20130114 Date: February 14, 2013 Permit status: Na | Permit id: Bfdf216064 | Parcel: 0304597000 | |||||
Only one floor shall be impaired at any given time Date: May 11, 2015 Permit type: Bfd other | Permit status: Na | Permit id: Sprk464527 | Parcel: 0304597000 | |||||
Renovation of space requiring device relocations and additions. Doc#20130573 Date: May 31, 2013 Permit status: Na | Permit id: Bfdf243923 | Parcel: 0304597000 | |||||
Only one floor shall be impaired at any given time... Installation shall be inaccordance with 7 cmr and nfpa 13 Date: November 12, 2014 Permit status: Na | Permit id: Sprk420534 | Parcel: 0304597000 | |||||
Install smoke detector and speaker strobes doc20130144 Date: March 4, 2013 Permit status: Na | Permit id: Bfdf218054 | Parcel: 0304597000 | |||||
Note. There shall be no impact to;the smoke control system on the 11th floor due to the construction Date: November 28, 2011 Permit status: Na | Permit id: Bfdf102992 | Parcel: 0304597000 | |||||
Only one zone shall be impaired at any given time Date: August 3, 2015 Permit type: Bfd other | Permit status: Na | Permit id: Sprk497587 | Parcel: 0304597000 | |||||
Renovation to tenant fit-out space on 18th floor; ~; doc# 20121274 Date: November 13, 2012 Permit status: Na | Permit id: Bfdf196575 | Parcel: 0304597000 | |||||
Alter existing fa system for new renant build out doc20110736 Date: July 22, 2011 Permit status: Na | Permit id: Bfdf85097 | Parcel: 0304597000 | |||||
Relocate (8) existing sprinklers on floor 11 Date: November 18, 2011 Permit status: Na | Permit id: Sprk104088 | Parcel: 0304597000 | |||||
Installation of upho Date: December 19, 2012 Permit status: Na | Permit id: Chm191282 | Parcel: 0304597000 | |||||
Relocate 12 existing sprinkler heads to comform to new floor plan to meet state and local code Date: January 22, 2013 Permit status: Na | Permit id: Sprk214252 | Parcel: 0304597000 | |||||
Relocate 5 sprinklers for new ceiling work on 9th floor Date: August 30, 2013 Permit status: Na | Permit id: Sprk275603 | Parcel: 0304597000 | |||||
Relocate #18 existing sprinkler heads to new ceiling grid. Work to be done per nfpa stands. One floor zone at a time. Work to be done one floor zone at atime per nfpa stands. Date: May 24, 2011 Permit status: Na | Permit id: Sprk77276 | Parcel: 0304597000 | |||||
Relocate andor add a total of sixty one sprinkler heads on the first floor. Work to be done per nfpa stands 7 cmr one floor zone at a time. Date: April 4, 2014 Permit status: Na | Permit id: Sprk347653 | Parcel: 0304597000 | |||||
SCORE 100 Renovation of existing office; ~; doc# 20140654 Date: June 18, 2014 Contractor: John Omahony Permit status: Na | Permit id: Bfdf363811 | Parcel: 0304597000 | |||||
Relocate sprinkler heads. Work to be done per nfpa stands one floor zone at a time. Date: October 1, 2014 Permit status: Na | Permit id: Sprk408914 | Parcel: 0304597000 | |||||
SCORE 82 Installing new fire alarm devices for renovation project.; restroom not in scope of work Date: June 2, 2015 Contractor: Erica Burgos J And M Brown Company Permit type: Bfd other | Permit status: Na | Permit id: Bfdf466527 | Parcel: 0304597000 | |||||
SCORE 82 Only one zone shall be impaired at any given time Date: August 25, 2015 Contractor: Boston Fire Sprinkler Co. Inc Permit type: Bfd other | Permit status: Na | Permit id: Sprk505647 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors Date: August 28, 2015 Permit status: Na | Permit id: Bsd512973 | Parcel: 0304597000 | |||||
SCORE 82 Stand lift at curb erect and maintain pedestrian protective staging on sidewalk / 7am to 6pm Date: May 15, 2014 Permit type: Cranes | Permit status: Expired | Permit id: Occu-363223 | Parcel: 0304597000 | |||||
Relocate (112) sprinkler heads. Work to be done per nfpa stands 7 cmr. Work to be done one floor zone at a time. Date: September 9, 2015 Permit status: Na | Permit id: Sprk513696 | Parcel: 0304597000 | |||||
Minor interior renovations to include new non-load bearing drywall partitions new carpet paint and accoustical ceilings Date: October 26, 2011 Permit status: Na | Permit id: Fdc102102 | Parcel: 0304597000 | |||||
Installation of upho Date: December 4, 2012 Permit status: Na | Permit id: Chm203197 | Parcel: 0304597000 | |||||
Installation of pane Date: September 24, 2015 Permit status: Na | Permit id: Chm519264 | Parcel: 0304597000 | |||||
Demo floors walls ceiling. Build new offices; secure any floor openings Date: November 16, 2012 Permit type: Installation of upho | Permit status: Na | Current use: Comm | Permit id: Fdc199847 | Parcel: 0304597000 | |||||
Miscellaneous demolition to existing interior walls and repair / finish new opening Date: March 26, 2014 Permit status: Na | Permit id: Fdc338543 | Parcel: 0304597000 | |||||
Bagging of smoke detectors ; Date: August 20, 2012 Permit status: Na | Permit id: Bsd173415 | Parcel: 0304597000 | |||||
Installation of floo Date: June 23, 2014 Permit status: Na | Permit id: Chm374822 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors for dust control during renovation work Date: March 26, 2014 Permit status: Na | Permit id: Bsd345690 | Parcel: 0304597000 | |||||
Demolition of existing doors infill drywall partition removal of existing wall covering and paint Date: October 25, 2010 Permit status: Na | Permit id: Fdc47978 | Parcel: 0304597000 | |||||
Minor renovations to existing office to include demolition of gwb partitions and flooring Date: February 16, 2011 Permit status: Na | Permit id: Fdc63899 | Parcel: 0304597000 | |||||
Renovation to existing office space on 20th floor; -; doc 20110492 Date: May 25, 2011 Permit status: Na | Permit id: Bfdf75338 | Parcel: 0304597000 | |||||
Cutting burning &; welding to place steel decking for improved compactor access (dpl) bfd paid detail required Date: November 21, 2011 Permit status: Na | Permit id: Cbw106395 | Parcel: 0304597000 | |||||
Demo/renovations of office space to include drywall ceilings flooring &; paintings Date: March 2, 2012 Permit status: Na | Permit id: Fdc121888 | Parcel: 0304597000 | |||||
SCORE 82 Stand lift at curb erect and maintain pedestrian protective staging on sidewalk / 7pm to 1159pm Date: June 11, 2014 Permit type: Cranes | Permit status: Expired | Permit id: Occu-363222 | Parcel: 0304597000 | |||||
Installation of upho Date: September 3, 2013 Permit status: Na | Permit id: Chm282263 | Parcel: 0304597000 | |||||
Bagging of smoke detectors Date: August 2, 2010 Permit status: Na | Permit id: Bsd36313 | Parcel: 0304597000 | |||||
Demolition/build out of new ada restroom and corridor to include drywall ceiling paint flooring Date: May 14, 2014 Permit status: Na | Permit id: Fdc358472 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors for dust constrol during construction Date: July 5, 2011 Permit status: Na | Permit id: Bsd83995 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors for dust control during ongoing construction work Date: June 18, 2014 Permit status: Na | Permit id: Bsd367937 | Parcel: 0304597000 | |||||
Demo install 1 speaker strobe. Doc#20140972 Date: August 12, 2014 Permit status: Na | Permit id: Bfdf384967 | Parcel: 0304597000 | |||||
Construction of new drywall partations act ceilings paint tile &; new light fixtures Date: April 7, 2015 Permit status: Na | Permit id: Fdc459339 | Parcel: 0304597000 | |||||
Demo and construction Date: March 31, 2014 Permit status: Na | Permit id: Fdc347044 | Parcel: 0304597000 | |||||
Cutting &; welding of steel plates under the existing compactor to retrofit for improved access &; use (dpl) bfd paid detail required Date: August 16, 2011 Permit status: Na | Permit id: Cbw86817 | Parcel: 0304597000 | |||||
Stand boom truck at curb / pedestrian staging required / boston police detail area a; 343-4239 Date: July 9, 2014 Permit type: Cranes | Permit status: Expired | Permit id: Occu-249085 | Parcel: 0304597000 | |||||
Demo to include drywall millwork flooring ceilings &; painting Date: October 20, 2014 Permit status: Na | Permit id: Fdc417820 | Parcel: 0304597000 | |||||
Burning / welding for demolition of stairs (dpl) bfd paid detail required Date: February 24, 2010 Permit status: Na | Permit id: Cbw15627 | Parcel: 0304597000 | |||||
Bagging of smoke detectors maintain security Date: November 16, 2012 Permit status: Na | Permit id: Bsd199856 | Parcel: 0304597000 | |||||
Bagging of smoke detectors Date: April 25, 2011 Permit status: Na | Permit id: Bsd73425 | Parcel: 0304597000 | |||||
Demo/renovations of office space to include drywall paint flooring &;ceiling; Date: April 25, 2011 Permit status: Na | Permit id: Fdc73422 | Parcel: 0304597000 | |||||
Renovations to existing space to include new walls ceiling paint &; flooring Date: August 20, 2012 Permit status: Na | Permit id: Fdc173411 | Parcel: 0304597000 | |||||
Select demo - minor office renovation Date: February 16, 2011 Permit status: Na | Permit id: Bsd63877 | Parcel: 0304597000 | |||||
Demo;&; renovations to include floors walls ceiling paint &; carpet secure any floor openings Date: October 1, 2012 Permit status: Na | Permit id: Fdc186833 | Parcel: 0304597000 | |||||
SCORE 100 Demo and renovations of space to build out office space for tenant to include drywall painting ceiling flooring Date: April 10, 2015 Contractor: Garland Building Company Permit type: Bfd other | Permit status: Na | Permit id: Fdc460717 | Parcel: 0304597000 | |||||
Demo - new fire alarm - smokes - pull stations - a/vs - and strobe devices; ~; doc# 20140397 ; audible visual devices to be speaker strobes programmed for selective evacuation.; Date: May 15, 2014 Permit status: Na | Permit id: Bfdf348085 | Parcel: 0304597000 | |||||
Selective demolition and removal to include ceilings drywall millwork and carpet; Date: March 27, 2014 Permit status: Na | Permit id: Fdc345678 | Parcel: 0304597000 | |||||
Demo/renovations of office space to include drywall paint flooring &; ceilings Date: April 25, 2011 Permit status: Na | Permit id: Fdc73414 | Parcel: 0304597000 | |||||
Burning;for stair dismantling (dpl) bfd paid detail required Date: February 23, 2010 Permit status: Na | Permit id: Cbw15162 | Parcel: 0304597000 | |||||
Minor renovations to the 17th floor fire alarm system; -; doc 20110496 Date: May 18, 2011 Permit status: Na | Permit id: Bfdf75303 | Parcel: 0304597000 | |||||
Demolition / renovation of existing space to include drywall ceiling paint and flooring Date: June 12, 2014 Permit status: Na | Permit id: Fdc367939 | Parcel: 0304597000 | |||||
Minor renovations to include upgrades of paint &; millwork Date: August 4, 2010 Permit status: Na | Permit id: Fdc36310 | Parcel: 0304597000 | |||||
Minor renovations to existing office to include demolition of gwb partitions paint;and flooring Date: February 16, 2011 Permit status: Na | Permit id: Fdc63901 | Parcel: 0304597000 | |||||
Partial tenant fitout 6th floor doc#20100705 Date: August 31, 2010 Permit status: Na | Permit id: Bfdf38628 | Parcel: 0304597000 | |||||
Bagging of smoke detectors Date: March 2, 2012 Permit status: Na | Permit id: Bsd121889 | Parcel: 0304597000 | |||||
Temporary place of assembly for;325 persons 2nd floor lobby and restaurant 355 persons first floor lobby;on october 26 2013 from 8pm to 2am fire detail of 2 uniform staff requied.; no live entertainment. Contact name is ricardo soto 617-737-1777 bfd paid detail required Date: October 25, 2013 Permit status: Na | Permit id: Tpla296382 | Parcel: 0304597000 | |||||
Downtown crossing vendors; tabares r. Quassaidi azzedine boudraa &; flor aguirre Date: August 20, 2012 Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-173817 | Parcel: 0304597000 | |||||
Demolition / renovation to existing space to include drywall paint ceiling flooring and millwork Date: July 5, 2011 Permit status: Na | Permit id: Fdc83916 | Parcel: 0304597000 | |||||
6th &; 7th floors Date: September 5, 2012 Permit type: Installation of floo | Permit status: Na | Permit id: Chm174827 | Parcel: 0304597000 | |||||
On-going construction on 13th &; 14 th floors Date: October 25, 2010 Permit status: Na | Permit id: Bsd47422 | Parcel: 0304597000 | |||||
Relocate (32) sprinkler heads. Work to be done per nfpa stands 7 cmr one floor zone at a time. Date: June 23, 2014 Permit status: Na | Permit id: Sprk374291 | Parcel: 0304597000 | |||||
SCORE 95 Job number 102 - cbre 101 arch street - 3rd and 6th floor - rework lighting in bathroom and lobby on 3rd and 6th floors Client: Clpf-101 Arch Lp | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E135650 | Parcel: 0304597000 | |||||
SCORE 95 Job number 10122 - shoebuy 101 arch street 16th floor - 16th floor renovation Client: Clpf-101 Arch Lp | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa131478 | Parcel: 0304597000 | |||||
SCORE 100 Install wiring within office cubicles on 16th floor for shoebuy. Com Client: Clpf-101 Arch Lp | Permit type: Electrical | Current use: Comm | Permit id: E137392 | Parcel: 304597000 | |||||
To relocate 11 sprinkler heads. Date: July 29, 2013 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk264947 | Parcel: 0304597000 | |||||
Remodel nexage 15th fl doc20121350 Date: December 24, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf202506 | Parcel: 0304597000 | |||||
Install speaker strobe to existing booster; ~; doc#20130887 Date: August 7, 2013 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf269469 | Parcel: 0304597000 | |||||
Cutting &; welding of leaking chilled water pipes bfd paid detail required Date: January 30, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw322019 | Parcel: 0304597000 | |||||
Relocate (8) existing sprinklers on 18th floor. Date: June 28, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk82845 | Parcel: 0304597000 | |||||
Relocate (30) sprinkler heads for new ceiling in common area &; tenant space Date: November 30, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk201976 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors Date: May 27, 2015 Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd476563 | Parcel: 0304597000 | |||||
Cutting / burning / welding for repairs to leaking condenser water pipes Date: October 8, 2013 Client: Clpf-101 Arch L | Permit type: Bfd cutting-burning-welding | Permit id: Cbw292160 | Parcel: 0304597000 | |||||
Relocate (74) sprinklers on 21st floor.; work to be done per nfpa stands. One floor zone at a time. Date: July 18, 2011 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk85884 | Parcel: 0304597000 | |||||
Remodel of common corridor on 15th floor; ~; doc# 20121351 Date: December 24, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf202091 | Parcel: 0304597000 | |||||
Relocate 38 sprinkler heads on 2nd &; 3rd floors Date: June 25, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk370292 | Parcel: 0304597000 | |||||
Relocate two (2) existing sprinkler heads on the 18th floor to new ceiling grid Date: May 3, 2013 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk237608 | Parcel: 0304597000 | |||||
Alteration;to portions of;existing system of the 10th floor; doc#20141711. Five devices. Work to be done per nfpa stands 7 cmr. 10th floor. Date: December 15, 2014 Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf434254 | Parcel: 0304597000 | |||||
Install inergen fire suppression / detector system; ~; doc# 20131110 Date: November 21, 2013 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf287711 | Parcel: 0304597000 | |||||
Install (1) new alarm relay to shut down the 2nd floor muzak machine; ~; doc# 20131190 Date: November 12, 2013 Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf294820 | Parcel: 0304597000 | |||||
Bfd chemist certificate proces Date: April 29, 2015 Client: Clpf-101 Arch L | Permit id: Chm463579 | Parcel: 0304597000 | |||||
Bagging of smoke detectors remove bags at end of work day Date: April 10, 2015 Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd460841 | Parcel: 0304597000 | |||||
Relocate 9 existing sprinkler heads. Work to be done per nfpa stands 7 cmr. One floor zone at a time. Date: November 3, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk418656 | Parcel: 0304597000 | |||||
To install new fire alarm devices in tenant space. Doc#20141411 Date: November 13, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf414969 | Parcel: 0304597000 | |||||
Relocate #56 sprinkler heads to new ceiling grid. Work to be done per nfpa. Stands. 7 cmr 8th ed. Work to be done one floor zone at a time. Date: May 25, 2011 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk77274 | Parcel: 0304597000 | |||||
Only one floor shall be impaired at any given time Date: February 4, 2013 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk216908 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors for dust control during ongoing construction Date: May 14, 2014 Client: Clpf-101 Arch L | Permit type: Bfd bag smoke detectors | Permit id: Bsd358476 | Parcel: 0304597000 | |||||
Bfd chemist certificate proces Date: March 27, 2014 Client: Clpf-101 Arch Lp | Permit id: Chm322353 | Parcel: 0304597000 | |||||
Renovation of existing office space; ~; doc# 20140852 Date: August 5, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf378108 | Parcel: 0304597000 | |||||
Stand dumpster at curb / 7pm to 6am Date: March 21, 2014 Client: Clpf-101 Arch L | Permit type: Street occupancy permit | Expiration date: March 26, 2014 | Permit id: Occu-345945 | Parcel: 0304597000 | |||||
Relocate (4) existing sprinklers on ground floor.; work to be done one floor zone at a time. Per nfpa stands. 7 cmr 8th ed. ; Date: May 9, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk75368 | Parcel: 0304597000 | |||||
Install inergen clean agent fire suppression system in the approx. 9 sf it server room on the 14th floor. Work to be done per nfpa stands. 7 cmr. System to be tied to building fire alarm system. Building sprinklers to remain. Date: October 3, 2013 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk285055 | Parcel: 0304597000 | |||||
SCORE 82 Installing fire alarm device in tenant space because a new room was created/built. Date: May 27, 2015 Contractor: Erica Burgos J And M Brown Company Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf466776 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors Date: October 20, 2014 Client: Clpf-101 Arch L | Permit type: Bfd bag smoke detectors | Permit id: Bsd417824 | Parcel: 0304597000 | |||||
Coordinate impairment with building managment only one floor shall be impaired in the building at any given time Date: September 10, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk178650 | Parcel: 0304597000 | |||||
Installing a 6 sprinkler heads pre-action system in a existing mdf room on the 4th floor. Work to be done per nfpa stands. 7 cmr. One floor zone at a time Date: October 9, 2013 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk288935 | Parcel: 0304597000 | |||||
Alteration of existing f/a system to include installing 5 new spk/strobes 1 strobe only 1 smoke detector &; co led rai doc20120355 Date: March 29, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf126974 | Parcel: 0304597000 | |||||
Impairment shall be limited to one zone at any given time within the building coordinate impairment with building management Date: May 12, 2015 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk467471 | Parcel: 0304597000 | |||||
Alteration of existing fire alarm system to include (6) new fa speaker strobe (5) strobe only; ~; doc# 20121041 ; tamper and duct detector - supervisory; short circuit ground fault open wire - trouble Date: October 3, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf180218 | Parcel: 0304597000 | |||||
Street occupancy permit Date: August 15, 2012 Client: Clpf-101 Arch L | Expiration date: March 31, 2013 | Permit id: Occu-173566 | Parcel: 0304597000 | |||||
Coordinate impairment with building management so that only one floor is impaired at any given time Date: May 30, 2013 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk243035 | Parcel: 0304597000 | |||||
Renovation of space requiring device relocations &; additions; ~; doc# 20130114 Date: February 14, 2013 Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf216064 | Parcel: 0304597000 | |||||
Only one floor shall be impaired at any given time Date: May 11, 2015 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk464527 | Parcel: 0304597000 | |||||
Renovation of space requiring device relocations and additions. Doc#20130573 Date: May 31, 2013 Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf243923 | Parcel: 0304597000 | |||||
Only one floor shall be impaired at any given time... Installation shall be inaccordance with 7 cmr and nfpa 13 Date: November 12, 2014 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk420534 | Parcel: 0304597000 | |||||
Install smoke detector and speaker strobes doc20130144 Date: March 4, 2013 Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf218054 | Parcel: 0304597000 | |||||
Note. There shall be no impact to;the smoke control system on the 11th floor due to the construction Date: November 28, 2011 Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf102992 | Parcel: 0304597000 | |||||
Only one zone shall be impaired at any given time Date: August 3, 2015 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk497587 | Parcel: 0304597000 | |||||
Renovation to tenant fit-out space on 18th floor; ~; doc# 20121274 Date: November 13, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf196575 | Parcel: 0304597000 | |||||
Alter existing fa system for new renant build out doc20110736 Date: July 22, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf85097 | Parcel: 0304597000 | |||||
Relocate (8) existing sprinklers on floor 11 Date: November 18, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk104088 | Parcel: 0304597000 | |||||
Bfd chemist certificate proces Date: October 22, 2015 Client: Clpf-101 Arch L | Permit id: Chm527228 | Parcel: 0304597000 | |||||
SCORE 82 Installing and relocating fire alarm devices. Date: October 26, 2015 Contractor: Erica Burgos J And M Brown Company Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf514858 | Parcel: 0304597000 | |||||
SCORE 82 Installing new and relocating existing fire alarm devices in tenant space. Date: October 26, 2015 Contractor: Erica Burgos J And M Brown Company Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf514580 | Parcel: 0304597000 | |||||
Stand boom truck at curb/ erect pedestrian staging on sidewalk Date: October 29, 2015 Client: Clpf-101 Arch L | Permit type: Street occupancy permit | Expiration date: October 31, 2015 | Permit id: Occu-240167 | Parcel: 0304597000 | |||||
SCORE 86 Interior office renovations on the 18th floor to include select demo of drywall partitions &; flooring new cabinets; new architectural finishes - carpet flooring paint Date: May 27, 2015 Contractor: James Tully Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Permit id: Fdc476368 | Parcel: 0304597000 | |||||
Demo &; reno work to inlcude finishes carpet walls ceilings Date: July 30, 2015 Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Permit id: Fdc499106 | Parcel: 0304597000 | |||||
Repair leak on main sprinkler line. Bfd (1) firefighter for paid detail. Date: December 9, 2015 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk540267 | Parcel: 0304597000 | |||||
Bfd chemist certificate proces Date: December 19, 2012 Client: Clpf-101 Arch Lp | Permit id: Chm191282 | Parcel: 0304597000 | |||||
SCORE 95 Job number 102 - cbre 101 arch street - 3rd and 6th floor - rework lighting in bathroom and lobby on 3rd and 6th floors Client: Clpf-101 Arch Lp | Permit type: Electrical permit | Expiration date: October 27, 2012 | Current use: Comm | Permit id: E135650 | Parcel: 0304597000 | |||||
Relocate 12 existing sprinkler heads to comform to new floor plan to meet state and local code Date: January 22, 2013 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk214252 | Parcel: 0304597000 | |||||
Relocate 5 sprinklers for new ceiling work on 9th floor Date: August 30, 2013 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk275603 | Parcel: 0304597000 | |||||
SCORE 95 Job number 10122 - shoebuy 101 arch street 16th floor - 16th floor renovation Client: Clpf-101 Arch L | Permit type: Electrical fire alarms | Expiration date: October 12, 2012 | Current use: Comm | Permit id: Efa131478 | Parcel: 0304597000 | |||||
Relocate #18 existing sprinkler heads to new ceiling grid. Work to be done per nfpa stands. One floor zone at a time. Work to be done one floor zone at atime per nfpa stands. Date: May 24, 2011 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk77276 | Parcel: 0304597000 | |||||
Relocate and/or add a total of sixty one sprinkler heads on the first floor. Work to be done per nfpa stands 7 cmr one floor zone at a time. Date: April 4, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk347653 | Parcel: 0304597000 | |||||
SCORE 100 Renovation of existing office; ~; doc# 20140654 Date: June 18, 2014 Contractor: John Omahony Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf363811 | Parcel: 0304597000 | |||||
Relocate sprinkler heads. Work to be done per nfpa stands one floor zone at a time. Date: October 1, 2014 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk408914 | Parcel: 0304597000 | |||||
SCORE 82 Installing new fire alarm devices for renovation project.; restroom not in scope of work Date: June 2, 2015 Contractor: Erica Burgos J And M Brown Company Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf466527 | Parcel: 0304597000 | |||||
SCORE 82 Only one zone shall be impaired at any given time Date: August 25, 2015 Contractor: Boston Fire Sprinkler Co. Inc Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk505647 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors Date: August 28, 2015 Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd512973 | Parcel: 0304597000 | |||||
SCORE 82 Stand lift at curb erect and maintain pedestrian protective staging on sidewalk / 7am to 6pm Date: May 15, 2014 Client: Clpf-101 Arch Lp | Permit type: Street occupancy permit | Expiration date: May 18, 2014 | Permit id: Occu-363223 | Parcel: 0304597000 | |||||
Relocate (112) sprinkler heads. Work to be done per nfpa stands 7 cmr. Work to be done one floor zone at a time. Date: September 9, 2015 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk513696 | Parcel: 0304597000 | |||||
Minor interior renovations to include new non-load bearing drywall partitions new carpet paint and accoustical ceilings Date: October 26, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc102102 | Parcel: 0304597000 | |||||
Bfd chemist certificate proces Date: December 4, 2012 Client: Clpf-101 Arch Lp | Permit id: Chm203197 | Parcel: 0304597000 | |||||
Demo floors walls ceiling. Build new offices; secure any floor openings Date: November 16, 2012 Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Current use: Comm | Permit id: Fdc199847 | Parcel: 0304597000 | |||||
Miscellaneous demolition to existing interior walls and repair / finish new opening Date: March 26, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc338543 | Parcel: 0304597000 | |||||
Bagging of smoke detectors ; Date: August 20, 2012 Client: Clpf-101 Arch L | Permit type: Bfd bag smoke detectors | Permit id: Bsd173415 | Parcel: 0304597000 | |||||
Bfd chemist certificate proces Date: June 23, 2014 Client: Clpf-101 Arch L | Permit id: Chm374822 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors for dust control during renovation work Date: March 26, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd345690 | Parcel: 0304597000 | |||||
Demolition of existing doors infill drywall partition removal of existing wall covering and paint Date: October 25, 2010 Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Permit id: Fdc47978 | Parcel: 0304597000 | |||||
Minor renovations to existing office to include demolition of gwb partitions and flooring Date: February 16, 2011 Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Permit id: Fdc63899 | Parcel: 0304597000 | |||||
Renovation to existing office space on 20th floor; -; doc 20110492 Date: May 25, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf75338 | Parcel: 0304597000 | |||||
Cutting burning &; welding to place steel decking for improved compactor access (dpl) bfd paid detail required Date: November 21, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw106395 | Parcel: 0304597000 | |||||
Demo/renovations of office space to include drywall ceilings flooring &; paintings Date: March 2, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc121888 | Parcel: 0304597000 | |||||
SCORE 82 Stand lift at curb erect and maintain pedestrian protective staging on sidewalk / 7pm to 1159pm Date: June 11, 2014 Client: Clpf-101 Arch L | Permit type: Street occupancy permit | Expiration date: June 15, 2014 | Permit id: Occu-363222 | Parcel: 0304597000 | |||||
Bfd chemist certificate proces Date: September 3, 2013 Client: Clpf-101 Arch L | Permit id: Chm282263 | Parcel: 0304597000 | |||||
Bagging of smoke detectors Date: August 2, 2010 Client: Clpf-101 Arch L | Permit type: Bfd bag smoke detectors | Permit id: Bsd36313 | Parcel: 0304597000 | |||||
Demolition/build out of new ada restroom and corridor to include drywall ceiling paint flooring Date: May 14, 2014 Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Permit id: Fdc358472 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors for dust constrol during construction Date: July 5, 2011 Client: Clpf-101 Arch L | Permit type: Bfd bag smoke detectors | Permit id: Bsd83995 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors for dust control during ongoing construction work Date: June 18, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd367937 | Parcel: 0304597000 | |||||
Demo install 1 speaker strobe. Doc#20140972 Date: August 12, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf384967 | Parcel: 0304597000 | |||||
Construction of new drywall partations act ceilings paint tile &; new light fixtures Date: April 7, 2015 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc459339 | Parcel: 0304597000 | |||||
Demo and construction Date: March 31, 2014 Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Permit id: Fdc347044 | Parcel: 0304597000 | |||||
Cutting &; welding of steel plates under the existing compactor to retrofit for improved access &; use (dpl) bfd paid detail required Date: August 16, 2011 Client: Clpf-101 Arch L | Permit type: Bfd cutting-burning-welding | Permit id: Cbw86817 | Parcel: 0304597000 | |||||
Stand boom truck at curb / pedestrian staging required / boston police detail area a; 343-4239 Date: July 9, 2014 Client: Clpf-101 Arch Lp | Permit type: Street occupancy permit | Expiration date: July 12, 2014 | Permit id: Occu-249085 | Parcel: 0304597000 | |||||
Demo to include drywall millwork flooring ceilings &; painting Date: October 20, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc417820 | Parcel: 0304597000 | |||||
Burning / welding for demolition of stairs (dpl) bfd paid detail required Date: February 24, 2010 Client: Clpf-101 Arch Lp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw15627 | Parcel: 0304597000 | |||||
Bagging of smoke detectors maintain security Date: November 16, 2012 Client: Clpf-101 Arch L | Permit type: Bfd bag smoke detectors | Permit id: Bsd199856 | Parcel: 0304597000 | |||||
Bagging of smoke detectors Date: April 25, 2011 Client: Clpf-101 Arch L | Permit type: Bfd bag smoke detectors | Permit id: Bsd73425 | Parcel: 0304597000 | |||||
Demo/renovations of office space to include drywall paint flooring &;ceiling; Date: April 25, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc73422 | Parcel: 0304597000 | |||||
Renovations to existing space to include new walls ceiling paint &; flooring Date: August 20, 2012 Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Permit id: Fdc173411 | Parcel: 0304597000 | |||||
Select demo - minor office renovation Date: February 16, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd63877 | Parcel: 0304597000 | |||||
Demo;&; renovations to include floors walls ceiling paint &; carpet secure any floor openings Date: October 1, 2012 Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Permit id: Fdc186833 | Parcel: 0304597000 | |||||
SCORE 100 Demo and renovations of space to build out office space for tenant to include drywall painting ceiling flooring Date: April 10, 2015 Contractor: Garland Building Company Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc460717 | Parcel: 0304597000 | |||||
Demo - new fire alarm - smokes - pull stations - a/vs - and strobe devices; ~; doc# 20140397 ; audible visual devices to be speaker strobes programmed for selective evacuation.; Date: May 15, 2014 Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf348085 | Parcel: 0304597000 | |||||
Selective demolition and removal to include ceilings drywall millwork and carpet; Date: March 27, 2014 Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Permit id: Fdc345678 | Parcel: 0304597000 | |||||
Demo/renovations of office space to include drywall paint flooring &; ceilings Date: April 25, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc73414 | Parcel: 0304597000 | |||||
Burning;for stair dismantling (dpl) bfd paid detail required Date: February 23, 2010 Client: Clpf-101 Arch Lp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw15162 | Parcel: 0304597000 | |||||
Minor renovations to the 17th floor fire alarm system; -; doc 20110496 Date: May 18, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf75303 | Parcel: 0304597000 | |||||
Demolition / renovation of existing space to include drywall ceiling paint and flooring Date: June 12, 2014 Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Permit id: Fdc367939 | Parcel: 0304597000 | |||||
Minor renovations to include upgrades of paint &; millwork Date: August 4, 2010 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc36310 | Parcel: 0304597000 | |||||
Minor renovations to existing office to include demolition of gwb partitions paint;and flooring Date: February 16, 2011 Client: Clpf-101 Arch L | Permit type: Bfd construction demo reno | Permit id: Fdc63901 | Parcel: 0304597000 | |||||
Partial tenant fitout 6th floor doc#20100705 Date: August 31, 2010 Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf38628 | Parcel: 0304597000 | |||||
Bagging of smoke detectors Date: March 2, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd121889 | Parcel: 0304597000 | |||||
SCORE 100 Install wiring within office cubicles on 16th floor for shoebuy. Com Client: Clpf-101 Arch L | Permit type: Electrical permit | Expiration date: November 1, 2012 | Current use: Comm | Permit id: E137392 | Parcel: 0304597000 | |||||
Temporary place of assembly for;325 persons 2nd floor lobby and restaurant 355 persons first floor lobby;on october 26 2013 from 8pm to 2am fire detail of 2 uniform staff requied.; no live entertainment. Contact name is ricardo soto 617-737-1777 bfd paid detail required Date: October 25, 2013 Client: Clpf-101 Arch L | Permit type: Bfdtemporary place of assembly | Permit id: Tpla296382 | Parcel: 0304597000 | |||||
Downtown crossing vendors; tabares r. Quassaidi azzedine boudraa &; flor aguirre Date: August 20, 2012 Client: Clpf-101 Arch L | Permit type: Street occupancy permit | Expiration date: March 31, 2013 | Permit id: Occu-173817 | Parcel: 0304597000 | |||||
Demolition / renovation to existing space to include drywall paint ceiling flooring and millwork Date: July 5, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc83916 | Parcel: 0304597000 | |||||
6th &; 7th floors Date: September 5, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd chemist certificate proces | Permit id: Chm174827 | Parcel: 0304597000 | |||||
On-going construction on 13th &; 14 th floors Date: October 25, 2010 Client: Clpf-101 Arch L | Permit type: Bfd bag smoke detectors | Permit id: Bsd47422 | Parcel: 0304597000 | |||||
Relocate (32) sprinkler heads. Work to be done per nfpa stands 7 cmr one floor zone at a time. Date: June 23, 2014 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk374291 | Parcel: 0304597000 | |||||
Stand lift at curb / 40x8; / 7 am to 4 pm; /boston police area a; 343-4239; / must beremoved from city street at the close of each workday.; Date: October 5, 2015 Client: Clpf-101 Arch L | Permit type: Street occupancy permit | Expiration date: October 11, 2015 | Permit id: Occu-526085 | Parcel: 0304597000 | |||||
Coordinate impairment with the buildings impairment manager so that only one zone is impaired at any given time within the building. Date: October 10, 2015 Client: Clpf-101 Arch L | Permit type: Bfd sprinkler system | Permit id: Sprk524093 | Parcel: 0304597000 | |||||
SCORE 82 Installing; fire alarm devices in 9th floor renovation tenant space per nfpa stands 7 cmr. Date: October 16, 2015 Contractor: Erica Burgos J And M Brown Company Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf516148 | Parcel: 0304597000 | |||||
SCORE 82 Installing new fire alarm devices in tenant space 19th floor per nfpa stands 7 cmr. Date: October 16, 2015 Contractor: Erica Burgos J And M Brown Company Client: Clpf-101 Arch L | Permit type: Bfd fire alarm installations | Permit id: Bfdf516101 | Parcel: 0304597000 | |||||
Bfd chemist certificate proces Date: June 16, 2016 Client: Clpf-101 Arch Lp | Permit id: Chm597376 | Parcel: 0304597000 | |||||
Scoep?; preaction system under separate permit.; postive alarm sequence not permitted.; Date: June 22, 2016 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf587643 | Parcel: 0304597000 | |||||
Stand truck at curb 7:00am to 4:00pm Date: October 5, 2016 Client: Clpf-101 Arch Lp | Permit type: Street occupancy permit | Expiration date: October 10, 2016 | Permit id: Occu-644067 | Parcel: 0304597000 | |||||
Stand lift at curb ; 40x8; ; 7 am to 4 pm; ;boston police area a; 343-4239; ; must beremoved from city street at the close of each workday.; Date: October 5, 2015 Client: Clpf-101 Arch Lp | Permit type: Street occupancy permit | Expiration date: October 11, 2015 | Permit id: Occu-526085 | Parcel: 0304597000 | |||||
Install inergen fire suppression detector system; ~; doc# 20131110 Date: November 21, 2013 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf287711 | Parcel: 0304597000 | |||||
Miscellaneous demolition to existing interior walls and repair finish new opening Date: March 26, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc338543 | Parcel: 0304597000 | |||||
SCORE 86 Installing new fire alarm devices in tenant space. Date: June 20, 2016 Contractor: Erica Burgos Permit type: Bfd fire alarm installations | Permit id: Bfdf601232 | |||||
SCORE 86 Installing fire alarm device in tenant space because a new room was created built. Date: May 27, 2015 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf466776 | Parcel: 0304597000 | |||||
SCORE 86 Installing new fire alarm devices for renovation project.; restroom not in scope of work Date: June 2, 2015 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf466527 | Parcel: 0304597000 | |||||
SCORE 86 Installing; fire alarm devices in 9th floor renovation tenant space per nfpa stands 7 cmr. Date: October 16, 2015 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf516148 | Parcel: 0304597000 | |||||
SCORE 86 Installing new fire alarm devices in tenant space 19th floor per nfpa stands 7 cmr. Date: October 16, 2015 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf516101 | Parcel: 0304597000 | |||||
SCORE 86 Installing and relocating fire alarm devices. Date: October 26, 2015 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf514858 | Parcel: 0304597000 | |||||
SCORE 86 Installing new fire alarm devices in existing tenant space Date: June 17, 2016 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf603413 | Parcel: 0304597000 | |||||
SCORE 86 Installing new and relocating existing fire alarm devices in tenant space. Date: October 26, 2015 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf514580 | Parcel: 0304597000 | |||||
Bfd chemist certificate proces Date: June 27, 2016 Client: Clpf-101 Arch Lp | Permit id: Chm605478 | Parcel: 0304597000 | |||||
Bfd chemist certificate proces Date: November 4, 2016 Permit id: Chm651518 | |||||
Alteration of existing f a system to include installing 5 new spk strobes 1 strobe only 1 smoke detector &; co led rai doc20120355 Date: March 29, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf126974 | Parcel: 0304597000 | |||||
Demo renovations of office space to include drywall ceilings flooring &; paintings Date: March 2, 2012 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc121888 | Parcel: 0304597000 | |||||
Stand lift at curb erect and maintain pedestrian protective staging on sidewalk 7am to 6pm Date: May 15, 2014 Client: Clpf-101 Arch Lp | Permit type: Street occupancy permit | Expiration date: May 18, 2014 | Permit id: Occu-363223 | Parcel: 0304597000 | |||||
Stand lift at curb erect and maintain pedestrian protective staging on sidewalk 7pm to 1159pm Date: June 11, 2014 Client: Clpf-101 Arch Lp | Permit type: Street occupancy permit | Expiration date: June 15, 2014 | Permit id: Occu-363222 | Parcel: 0304597000 | |||||
Cutting burning welding for repairs to leaking condenser water pipes Date: October 8, 2013 Client: Clpf-101 Arch Lp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw292160 | Parcel: 0304597000 | |||||
SCORE 100 Demo of finishes renovations to office space on the 3rd floor Date: July 15, 2016 Contractor: Garland Building Company Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc611309 | Parcel: 0304597000 | |||||
Bagging of smoke detectors Date: July 15, 2016 Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd611867 | Parcel: 0304597000 | |||||
SCORE 100 Demo renovations to office space on the 4th floor to include drywall painting ceiling flooring Date: March 25, 2016 Contractor: Garland Building Company Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc573931 | Parcel: 0304597000 | |||||
SCORE 92 Only one zone shall be impaired at any given time Date: August 3, 2015 Contractor: Ronald O And #39;Connor Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk497587 | Parcel: 0304597000 | |||||
SCORE 97 Interior renovation of existing office space includes new walls finishes (ceilings flooring and paint) minor modidcatipons to hvac system to accommodate new layout. New lighting. Relocation of fire protection heads Date: July 18, 2016 Contractor: Brian Ford Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc609982 | Parcel: 0304597000 | |||||
Relocate and or add a total of sixty one sprinkler heads on the first floor. Work to be done per nfpa stands 7 cmr one floor zone at a time. Date: April 4, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk347653 | Parcel: 0304597000 | |||||
Upon completion of fire pump work the pump;shall be witness tested by bfd. Call lt curry 617-343-3034 to schedule bfd witness test. Bfd paid; fire detail required Date: July 29, 2016 Permit type: Bfd sprinkler system | Permit id: Sprk594950 | |||||
Temporary bagging of smoke detectors Date: March 28, 2016 Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd572979 | Parcel: 0304597000 | |||||
Alter existing system to accomodate new tenant layout Date: March 31, 2016 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf575568 | Parcel: 0304597000 | |||||
Stand dumpster at curb 7pm to 6am Date: March 21, 2014 Client: Clpf-101 Arch Lp | Permit type: Street occupancy permit | Expiration date: March 26, 2014 | Permit id: Occu-345945 | Parcel: 0304597000 | |||||
Stand boom truck at curb ; pedestrian staging required ; boston police detail area a; 343-4239 Date: July 9, 2014 Client: Clpf-101 Arch Lp | Permit type: Street occupancy permit | Expiration date: July 12, 2014 | Permit id: Occu-249085 | Parcel: 0304597000 | |||||
Burning welding for demolition of stairs (dpl) bfd paid detail required Date: February 24, 2010 Client: Clpf-101 Arch Lp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw15627 | Parcel: 0304597000 | |||||
Demolition build out of new ada restroom and corridor to include drywall ceiling paint flooring Date: May 14, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc358472 | Parcel: 0304597000 | |||||
Demo renovations of office space to include drywall paint flooring &;ceiling; Date: April 25, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc73422 | Parcel: 0304597000 | |||||
Demo renovations of office space to include drywall paint flooring &; ceilings Date: April 25, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc73414 | Parcel: 0304597000 | |||||
Demolition renovation of existing space to include drywall ceiling paint and flooring Date: June 12, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc367939 | Parcel: 0304597000 | |||||
Demolition renovation to existing space to include drywall paint ceiling flooring and millwork Date: July 5, 2011 Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc83916 | Parcel: 0304597000 | |||||
Demo - new fire alarm - smokes - pull stations - a vs - and strobe devices; ~; doc# 20140397 ; audible visual devices to be speaker strobes programmed for selective evacuation.; Date: May 15, 2014 Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf348085 | Parcel: 0304597000 | |||||
Temporary bagging of smoke detectors Date: June 6, 2016 Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd598682 | Parcel: 0304597000 | |||||
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building Date: June 8, 2016 Permit type: Bfd sprinkler system | Permit id: Sprk589069 | |||||
Temporary bagging of smoke detctors Date: June 10, 2016 Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd600950 | Parcel: 0304597000 | |||||
Stand boom truck at curb erect pedestrian staging on sidewalk Date: August 17, 2016 Client: Clpf-101 Arch Lp | Permit type: Street occupancy permit | Expiration date: August 20, 2016 | Permit id: Occu-240167 | Parcel: 0304597000 | |||||
SCORE 86 Installing new fire alarm devices in tenant space (4th floor) Date: August 24, 2016 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf607667 | Parcel: 0304597000 | |||||
SCORE 86 Installing fire alarm devices in existing tenant space. Date: April 10, 2017 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf682911 | Parcel: 0304597000 | |||||
Bfd chemist certificate proces Date: April 10, 2017 Client: Clpf-101 Arch Lp | Permit id: Chm693116 | Parcel: 0304597000 | |||||
SCORE 86 Installing new fire alarm devices in tenant space. Date: April 20, 2017 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf679911 | Parcel: 0304597000 | |||||
SCORE 82 Relocate 65 sprinklers on the 8th fl. Date: June 20, 2017 Contractor: Anne Hayes Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk716733 | Parcel: 0304597000 | |||||
SCORE 86 Installing new fire alarm devices in tenant space. Date: March 30, 2017 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf679902 | Parcel: 0304597000 | |||||
SCORE 82 The work will consist of the relocation of existing sprinkler heads to suit the remodel of an existing tenant space Date: March 3, 2017 Contractor: Christopher Fletcher Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk676794 | Parcel: 0304597000 | |||||
SCORE 82 Relocate 52 sprinklers in the basement and 1st floor. Date: January 27, 2017 Contractor: Anne Hayes Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk671948 | Parcel: 0304597000 | |||||
SCORE 82 Relocate sprinklers on the 17th floor. (no more than one floor off at a time - comply with requirements of nfpa 13 (2013)) Date: March 20, 2017 Contractor: Anne Hayes Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Permit id: Sprk682569 | Parcel: 0304597000 | |||||
Stand bucket truck at curb 7pm-6am Date: February 15, 2017 Client: Clpf-101 Arch Lp | Permit type: Street occupancy permit | Expiration date: February 17, 2017 | Permit id: Occu-681158 | Parcel: 0304597000 | |||||
SCORE 86 Installing new fire alarm devices in tenant space. Date: March 1, 2017 Contractor: Erica Burgos Client: Clpf-101 Arch Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf682886 | Parcel: 0304597000 | |||||
Stand lift at curb ; 40x8; ; 7 am to 4 pm; ;boston police area a; 343-4239; ; must beremoved from city street at the close of each workday.; Date: December 6, 2016 Client: Clpf-101 Arch Lp | Permit type: Street occupancy permit | Expiration date: December 10, 2016 | Permit id: Occu-526085 | Parcel: 0304597000 | |||||
SCORE 82 Select demolition of existing non load bearing partitions construction of new office space;to accomodate new layout Date: February 28, 2017 Contractor: Tremont Interiors Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc671963 | Parcel: 0304597000 | |||||
SCORE 82 Interior renovation of existing office space consisting of carpet ceilings (acoustic ceiling tile) walls (gypsum wall board &; metal stud framing); Date: March 24, 2017 Contractor: Tremont Interiors Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc691562 | Parcel: 0304597000 | |||||
SCORE 82 Temporary bagging of smoke detectors Date: February 28, 2017 Contractor: Tremont Interiors Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd671962 | Parcel: 0304597000 | |||||
SCORE 100 Temporary bagging of smoke detectors Date: July 13, 2017 Contractor: Ralph Dantonio Client: Clpf-101 Arch Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd718610 | Parcel: 0304597000 | |||||
SCORE 100 Demolish partition walls and install new walls for office space improvements. Install new carpet flooring paint doors and frames within work space. Date: July 13, 2017 Contractor: Ralph Dantonio Client: Clpf-101 Arch Lp | Permit type: Bfd construction demo reno | Permit id: Fdc718609 | Parcel: 0304597000 | |||||
SCORE 82 Phase i: turn up 26 heads phase ii: relocate 26 sprinkler heads and add 2 new sprinkler heads Date: July 20, 2017 Contractor: Carol Arria Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Expiration date: July 20, 2018 | Permit id: Sprk733823 | Parcel: 0304597000 |