SCORE

CAROL ARRIA

ABOUT CAROL ARRIA

Carol Arria specializes in:

Carol Arria offers services:

Based on the information received from , associated with Carol Arria over the past .

If you are considering hiring Carol Arria for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Carol Arria has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
82
1 Oliver St Boston Ma
Installation shall comply with the requirements of 7 cmr nfpa standard and isd approved shop drawings. Impairment shall be coordinated with the building listed impairment coordinator (required by ;nfpa 241) so that only one zone shall be impaired.
Date:  September 18, 2016
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk629234 | Parcel: 0304075000
2016/09/180821 Oliver St Boston MaCarol Arria
SCORE
82
38 Chauncy St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa 13. All impairments shall be coordinated with the buildings listed impairment coordinator (per nfpa 241) so that only one zone is impaired.
Date:  September 18, 2016
Contractor: Carol Arria

Client: Dwf Iv 38 Chauncy Llc | Permit type: Bfd sprinkler system | Permit id: Sprk628506 | Parcel: 0304557000
2016/09/1808238 Chauncy St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Installation shall comply with the requirements of 7 cmr nfpa standard and isd approved shop drawings. Impairment shall be coordinated with the building listed impairment coordinator (required by ;nfpa 241) so that only one zone shall be impaired.
Date:  September 18, 2016
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk627351 | Parcel: 0304410000
2016/09/180821 Federal St Boston MaCarol Arria
SCORE
82
99111 Seaport Bl Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa 13. All impairments shall be coordinated with the buildings listed impairment coordinator (per nfpa 241) so that only one zone is impaired.
Date:  September 18, 2016
Contractor: Carol Arria

Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk627551 | Parcel: 0602640030
2016/09/1808299111 Seaport Bl Boston MaCarol Arria
SCORE
82
5 Boylston St Boston Ma
Add and or relocate 1 sprinkler heads on the 19th floor
Date:  September 18, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk628450 | Parcel: 0401092000
2016/09/180825 Boylston St Boston MaCarol Arria
SCORE
82
101 Federal St Boston Ma
Add and or relocate 13 sprinkler heads on the 10th floor
Date:  September 20, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk629997 | Parcel: 0304199000
2016/09/20082101 Federal St Boston MaCarol Arria
SCORE
82
225 Franklin St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa 13. Only one zone shall be impaired at a time and shall be coordinated with the buildings impairment coordinator....;this project is being done under on alt building permit #599524
Date:  September 20, 2016
Contractor: Carol Arria

Client: Two25 Franklin Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk627263 | Parcel: 0304134000
2016/09/20082225 Franklin St Boston MaCarol Arria
SCORE
82
4 Atlantic Av Boston Ma
Coordinate sprinkler impairment with the building listed impairment coordinator (required by nfpa 241) so that only one zone shall be impaired.
Date:  September 22, 2016
Contractor: Carol Arria

Client: Csrefi Independence Wharf | Permit type: Bfd sprinkler system | Permit id: Sprk631452 | Parcel: 0302956000
2016/09/220824 Atlantic Av Boston MaCarol Arria
SCORE
82
159 Saint James Av Boston Ma
All impairments shall be coordinated with jeff dubiel the buildings impairment coordinator so that only one zone shall be impaired at any given time within the building.
Date:  September 15, 2016
Contractor: Carol Arria

Client: Authorized Agent | Permit type: Bfd sprinkler system | Permit id: Sprk636823 | Parcel: 0501156000
2016/09/15082159 Saint James Av Boston MaCarol Arria
SCORE
82
159 Saint James Av Boston Ma
Impairment shall be coordinated with the buildings impairment coordinator so that only one;zone is impaired at any given time.
Date:  September 23, 2016
Contractor: Carol Arria

Client: Authorized Agent | Permit type: Bfd sprinkler system | Permit id: Sprk640284 | Parcel: 0501156000
2016/09/23082159 Saint James Av Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Coordinate impairment with the building listed impairment coordinator (per nfpa 241) so that only one zone is impaired at any given time within the building.
Date:  October 4, 2016
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk640039 | Parcel: 0304075000
2016/10/040821 Oliver St Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Coordinate impairment with the buildings listed impairment coordinator (per nfpa 241) ;so that only one zone is impaired at any given time within the building.
Date:  October 11, 2016
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk635115 | Parcel: 0304075000
2016/10/110821 Oliver St Boston MaCarol Arria
SCORE
82
75 Arlington St Boston Ma
Turn up 1 sprinkler heads on the 3rd floor
Date:  October 13, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk642808
2016/10/1308275 Arlington St Boston MaCarol Arria
SCORE
82
125 Summer St Boston Ma
Only one zone shall be impaired at any given time within the building all impairments shall be coordinated with the buildings listed impairment coordinator (earl draper)
Date:  October 13, 2016
Contractor: Carol Arria

Client: Opg 125 Summer Owner (de)llc | Permit type: Bfd sprinkler system | Permit id: Sprk637591 | Parcel: 0304256000
2016/10/13082125 Summer St Boston MaCarol Arria
SCORE
82
125 Summer St Boston Ma
Add and or relocate 35 sprinkler heads on the 16th floor
Date:  October 13, 2016
Contractor: Carol Arria

Client: Opg 125 Summer Owner (de)llc | Permit type: Bfd sprinkler system | Permit id: Sprk642820 | Parcel: 0304256000
2016/10/13082125 Summer St Boston MaCarol Arria
SCORE
82
1 Summer St Boston Ma
Add and or relocate 18 sprinkler heads on the 28th floor
Date:  October 18, 2016
Contractor: Carol Arria

Client: One Hundred Summer St Llc | Permit type: Bfd sprinkler system | Permit id: Sprk641217 | Parcel: 0304220000
2016/10/180821 Summer St Boston MaCarol Arria
SCORE
82
275 Tremont St Boston Ma
This app is to extend sprk510128 to finish up relocating 334 sprinkler heads. Most of the work is done. Need permit to just finish up.
Date:  October 19, 2016
Contractor: Carol Arria

Client: Hh Fp Portfolio Llc | Permit type: Bfd sprinkler system | Permit id: Sprk638597 | Parcel: 0500065000
2016/10/19082275 Tremont St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Phase i: turn up sprinkler heads on the 1st floor phase ii: add relocate sprinkler heads on the 1st floor
Date:  October 19, 2016
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk638705 | Parcel: 0304410000
2016/10/190821 Federal St Boston MaCarol Arria
SCORE
82
1 Beacon St Boston Ma
No other sprinkler zone within the building shall be impaired during this scheduled impairment. Coordinated impairment with the building listed nfpa 241 impairment coordinator.
Date:  October 24, 2016
Contractor: Carol Arria

Client: Obs Reit Llc | Permit type: Bfd sprinkler system | Permit id: Sprk645093 | Parcel: 0302720000
2016/10/240821 Beacon St Boston MaCarol Arria
SCORE
82
5 Boylston St Boston Ma
During this scheduled impairment no other sprinkler zone or life safety system in the building shall be impaired. Coordinate impairment with the buildings listed nfpa 241 impairment coordinator.
Date:  October 24, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk644888 | Parcel: 0401092000
2016/10/240825 Boylston St Boston MaCarol Arria
SCORE
82
13 Center Pz Boston Ma
Add and or relocate 11 sprinkler heads on the 1st floor
Date:  October 24, 2016
Contractor: Carol Arria

Client: Sri Ten Center Plaza Llc | Permit type: Bfd sprinkler system | Permit id: Sprk645616 | Parcel: 0302717000
2016/10/2408213 Center Pz Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Phase i: turn up 22 sprinkler heads on the 12th floor phase ii: add relocate 17 sprinkler heads on the 12th floor. Work to be done in accordance with nfpa 13 and cmr 780. One floor zone at a time.
Date:  October 24, 2016
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk645187 | Parcel: 0304410000
2016/10/240821 Federal St Boston MaCarol Arria
SCORE
82
13211341 Boylston S Boston Ma
Add and or relocate 131 sprinkler heads on the 4th floor.
Date:  October 25, 2016
Contractor: Carol Arria

Client: Van Ness Fe Llc | Permit type: Bfd sprinkler system | Permit id: Sprk646364 | Parcel: 0504325000
2016/10/2508213211341 Boylston S Boston MaCarol Arria
SCORE
82
8 Boylston St Boston Ma
Add and or relocate 31 sprinkler heads on the 25th floor
Date:  October 25, 2016
Contractor: Carol Arria

Client: Bp Prucenter Acquisition Llc | Permit type: Bfd sprinkler system | Permit id: Sprk646642 | Parcel: 0401037100
2016/10/250828 Boylston St Boston MaCarol Arria
SCORE
82
8 Boylston St Boston Ma
Add and or relocate 64 sprinkler heads on the 32nd and 33rd floors. Impairment company and fire alarm company are the same.
Date:  October 25, 2016
Contractor: Carol Arria

Client: Bp Prucenter Acquisition Llc | Permit type: Bfd sprinkler system | Permit id: Sprk646646 | Parcel: 0401037100
2016/10/250828 Boylston St Boston MaCarol Arria
SCORE
82
13211341 Boylston S Boston Ma
Add and or relocate 131 sprinkler heads on the 6th floor.
Date:  October 26, 2016
Contractor: Carol Arria

Client: Van Ness Fe Llc | Permit type: Bfd sprinkler system | Permit id: Sprk646353 | Parcel: 0504325000
2016/10/2608213211341 Boylston S Boston MaCarol Arria
SCORE
82
101 Federal St Boston Ma
Relocate sprinkler heads on the 7th floor
Date:  October 26, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk647505 | Parcel: 0304199000
2016/10/26082101 Federal St Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
No other sprinkler zone within the building shall be impaired during this scheduled impairment. All impairments shall be coordinated with the buildings nfpa 241 impairment coordinator.
Date:  October 26, 2016
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk647499 | Parcel: 0304075000
2016/10/260821 Oliver St Boston MaCarol Arria
SCORE
82
245 Summer St Boston Ma
No other sprinkler zone within the building shall be impaired during this scheduled impairment. Coordinate impairment with the buildings listed nfpa 241 impairment coordinator
Date:  October 26, 2016
Contractor: Carol Arria

Client: Bdc Summer St 121a Lp | Permit type: Bfd sprinkler system | Permit id: Sprk644697 | Parcel: 0305364005
2016/10/26082245 Summer St Boston MaCarol Arria
SCORE
82
545 Boylston St Boston Ma
Add and or relocate 29 sprinkler heads on the 6th floor
Date:  October 27, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk650475
2016/10/27082545 Boylston St Boston MaCarol Arria
SCORE
82
73 Tremont St Boston Ma
Phase i: turn up 1 sprinkler heads phase ii: relocate 134 sprinkler heads
Date:  October 27, 2016
Contractor: Carol Arria

Client: Seventy-3 Tremont St Realty | Permit type: Bfd sprinkler system | Permit id: Sprk644203 | Parcel: 0304675000
2016/10/2708273 Tremont St Boston MaCarol Arria
SCORE
82
9599 Kneeland St Boston Ma
Add and or relocate 35 sprinkler heads on the 2nd floor
Date:  November 2, 2016
Contractor: Carol Arria

Client: Mass Dept Of Transportation | Permit type: Bfd sprinkler system | Permit id: Sprk650555 | Parcel: 0304980000
2016/11/020829599 Kneeland St Boston MaCarol Arria
SCORE
82
2 State St Boston Ma
Phase 1: turn up 23 sprinkler heads on the 3rd floor phase ii: relocate 23 sprinkler heads on the 3rd floor
Date:  November 2, 2016
Contractor: Carol Arria

Client: Two Hundred State Condo Tr | Permit type: Bfd sprinkler system | Permit id: Sprk651035 | Parcel: 0303790000
2016/11/020822 State St Boston MaCarol Arria
SCORE
82
1962 Stuart St Boston Ma
Phase i: turn up sprinkler heads on ground level. Phase ii: add and or relocate sprinkler heads. Relocate pre-action cabinet. All work on ground level.
Date:  November 2, 2016
Contractor: Carol Arria

Client: Nkotb Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk649167 | Parcel: 0500135000
2016/11/020821962 Stuart St Boston MaCarol Arria
SCORE
82
31 Saint James Av Boston Ma
Remove one 2 1 2 inch hose valve on the 4th floor remove two 2 1 2 inch hose valves on the 5th floor remove two 2 1 2 inch hose valves on the 6th floor there is a separate standpipe feeling these hose valves; building sprinkler system will not be impaired during removal.
Date:  November 2, 2016
Contractor: Carol Arria

Client: Authorized Agent | Permit type: Bfd sprinkler system | Permit id: Sprk652078 | Parcel: 0501156000
2016/11/0208231 Saint James Av Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Relocate 12 sprinkler heads on the 26th floor
Date:  November 2, 2016
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk650798 | Parcel: 0304075000
2016/11/020821 Oliver St Boston MaCarol Arria
SCORE
82
Post Office Sq Boston Ma
Coordinate impairment with listed building impairment coordinator so that only one zone is impaired at any given time within the building.
Date:  July 7, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk608929
2016/07/07082Post Office Sq Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Phase 1: turn up six sprinkler heads on the 12 floor; phase ii: change uprights to pendant heads for new ceiling.
Date:  July 27, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk613072
2016/07/270821 Federal St Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Coordinate impairment with the buildings impairment coordinator so that only one zone is impaired at any given time within the building.
Date:  August 3, 2016
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk615857 | Parcel: 0304075000
2016/08/030821 Oliver St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Coordinate impairment with buildings listed impairment coordinator so that only one zone is impaired at any given time within the building
Date:  August 1, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk613986 | Parcel: 0304406018
2016/08/010821 Federal St Boston MaCarol Arria
SCORE
82
8d Allstate Rd Dorchester Ma
Phase i: turn up sprinkler heads. Phase ii: relocate sprinkler heads
Date:  September 9, 2016
Contractor: Carol Arria

Client: E&a Northeast Lp | Permit type: Bfd sprinkler system | Permit id: Sprk625336 | Parcel: 0703501045
2016/09/090828d Allstate Rd Dorchester MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Coordinate impairment with the buildings listed nfpa 241;program;manager;so that only one zone shall be impaired at any time within the building
Date:  September 13, 2016
Contractor: Carol Arria

Client: The Landmark Condo Assn | Permit type: Bfd sprinkler system | Permit id: Sprk620674 | Parcel: 0304406000
2016/09/130821 Federal St Boston MaCarol Arria
SCORE
82
State St Boston Ma
All impairments shall be coordinated with the building listed impairment coordinator per nfpa 241 and only one zone shall be impairment within the building at any given time.
Date:  September 8, 2016
Contractor: Carol Arria

Client: Anbeca Llc | Permit type: Bfd sprinkler system | Permit id: Sprk631160 | Parcel: 0303685000
2016/09/08082State St Boston MaCarol Arria
SCORE
82
175 Federal St Boston Ma
Coordinate sprinkler impairment with buildings impairment coordinator so that only one zone can be impaired at any given time within the building.
Date:  August 12, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk615997
2016/08/12082175 Federal St Boston MaCarol Arria
SCORE
82
2 Clarendon St Boston Ma
Add and or relocate 1 sprinkler heads on the 48th floor
Date:  September 8, 2016
Contractor: Carol Arria

Client: Bp Hancock Llc | Permit type: Bfd sprinkler system | Permit id: Sprk621831 | Parcel: 0401134000
2016/09/080822 Clarendon St Boston MaCarol Arria
SCORE
82
501 Boylston St Boston Ma
Relocate 7 sprinkler heads
Date:  September 9, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk625353
2016/09/09082501 Boylston St Boston MaCarol Arria
SCORE
82
3 A St Boston Ma
Conditions of approval: coordinate impairment with the buildings impairment coordinator so that only one zone is impaired within the building during this scheduled impairment......... Installation shall be in-accordance with the requirements of 7 cmr and nfpa 13.
Date:  September 12, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk625959
2016/09/120823 A St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Work to be done per nfpa stands 7 cmr. One floor zone at a time.
Date:  September 1, 2016
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk626982 | Parcel: 0304410000
2016/09/010821 Federal St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Coordinate sprinkler impairment with the building impairment coordinator so that only one zone is impaired at any given time within the building.
Date:  August 12, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk615994 | Parcel: 0304406032
2016/08/120821 Federal St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Installation shall be in accordance;with 7 cmr and nfpa 13. Only one floor shall be impaired at any given time within the building.
Date:  August 12, 2016
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk617256 | Parcel: 0304410000
2016/08/120821 Federal St Boston MaCarol Arria
SCORE
82
23 Dry Dock Av Boston Ma
Add 13 new sprinkler heads on the 5th floor
Date:  September 9, 2016
Contractor: Carol Arria

Client: Jamestown 21-23-25 Drydock | Permit type: Bfd sprinkler system | Permit id: Sprk625075 | Parcel: 0602674013
2016/09/0908223 Dry Dock Av Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Installation per 7 cmr and nfpa 13. All impairments shall be coordinated building;impairment coordinator so that only one zone is impaired at any given time within the building.
Date:  August 23, 2016
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk620614 | Parcel: 0304410000
2016/08/230821 Federal St Boston MaCarol Arria
SCORE
82
101 Federal St Boston Ma
Only one zone shall be impaired at any given time in the building coordinate impairment with the buildings listed impairment coordinator.
Date:  August 19, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk619424 | Parcel: 0304199000
2016/08/19082101 Federal St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Phase 1: turn up 52 sprinkler heads. Phase ii; add relocate 96 sprinkler heads on the 9th floor
Date:  September 8, 2016
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk620604 | Parcel: 0304410000
2016/09/080821 Federal St Boston MaCarol Arria
SCORE
82
21 Dry Dock Av Boston Ma
Add 41 new sprinkler heads on the 5th 6th and 8th floors (no more than one floor off at a time)
Date:  September 9, 2016
Contractor: Carol Arria

Client: Jamestown 21-23-25 Drydock | Permit type: Bfd sprinkler system | Permit id: Sprk625069 | Parcel: 0602674013
2016/09/0908221 Dry Dock Av Boston MaCarol Arria
SCORE
82
111 Huntington Av Boston Ma
Phase 1: turn up 41 sprinkler heads on the 18th floor phase ii: add relocate 47 sprinkler heads on the 18th floor
Date:  September 15, 2016
Contractor: Carol Arria

Client: Bp 111 Huntington Av Lessee | Permit type: Bfd sprinkler system | Permit id: Sprk628568 | Parcel: 0401037500
2016/09/15082111 Huntington Av Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Coordinate with building management so that only one zone within the building shall be impaired at any given time within the building
Date:  July 27, 2016
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk613442 | Parcel: 0304410000
2016/07/270821 Federal St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Phase i: turn up 52 sprinkler heads on the 9th floor during construction;phase ii: add relocate 96 sprinkler heads on the 9th floor for tenant fit out.; work to be done per nfpa stands 7 cmr. One floor zone at a time.
Date:  September 1, 2016
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk627364 | Parcel: 0304410000
2016/09/010821 Federal St Boston MaCarol Arria
SCORE
82
State St Boston Ma
Relocate 28 sprinkler heads on the 10th floor. Work to be done one floor zone at a time per nfpa stands.
Date:  September 8, 2016
Contractor: Carol Arria

Client: Anbeca Llc | Permit type: Bfd sprinkler system | Permit id: Sprk625622 | Parcel: 0303685000
2016/09/08082State St Boston MaCarol Arria
SCORE
82
19 Dry Dock Av Boston Ma
Add 28 sprinkler heads on the 6th floor
Date:  March 31, 2017
Contractor: Carol Arria

Client: Jamestown 21-23-25 Drydock | Permit type: Bfd sprinkler system | Permit id: Sprk687694 | Parcel: 0602674013
2017/03/3108219 Dry Dock Av Boston MaCarol Arria
SCORE
82
545 Boylston St Boston Ma
Installation shall be in accordance with the isd approved shop drawings 7 cmr and nfpa 13. Coordinate impairment with the building owners listed;nfpa 241 impairment coordinator so that no more than one sprinkler zone is impairment at any given time.
Date:  April 3, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk684175
2017/04/03082545 Boylston St Boston MaCarol Arria
SCORE
82
8 Boylston St Boston Ma
Impairment shall be coordinated with the buildings nfpa 241 impairment coordinator so that no;only one sprinkler zones;is impaired at a time in the entire building.
Date:  April 3, 2017
Contractor: Carol Arria

Client: Bp Prucenter Acquisition Llc | Permit type: Bfd sprinkler system | Permit id: Sprk685604 | Parcel: 0401037100
2017/04/030828 Boylston St Boston MaCarol Arria
SCORE
82
13211341 Boylston S Boston Ma
Impairment shall be coordinated with the buildings nfpa 241 impairment coordinator so that no other sprinkler zones are impaired during this scheduled impairment
Date:  April 3, 2017
Contractor: Carol Arria

Client: Van Ness Fe Llc | Permit type: Bfd sprinkler system | Permit id: Sprk685926 | Parcel: 0504325000
2017/04/0308213211341 Boylston S Boston MaCarol Arria
SCORE
82
19 Dry Dock Av Boston Ma
No other sprinkler zone in the building shall be impaired during this scheduled impairment coordinate impairment with the buildings listed nfpa 241 impairment coordinator.
Date:  April 4, 2017
Contractor: Carol Arria

Client: Jamestown 21-23-25 Drydock | Permit type: Bfd sprinkler system | Permit id: Sprk687699 | Parcel: 0602674013
2017/04/0408219 Dry Dock Av Boston MaCarol Arria
SCORE
82
25 Dry Dock Av Boston Ma
Turn up 16 sprinkler heads on the 4th floor
Date:  April 5, 2017
Contractor: Carol Arria

Client: Jamestown 21-23-25 Drydock | Permit type: Bfd sprinkler system | Permit id: Sprk687708 | Parcel: 0602674013
2017/04/0508225 Dry Dock Av Boston MaCarol Arria
SCORE
82
25 Dry Dock Av Boston Ma
Coordinator impairment with the buildings nfpa 241 impairment coordinator so that no other sprinkler zone in the building is impaired during this scheduled impairment.
Date:  April 5, 2017
Contractor: Carol Arria

Client: Jamestown 21-23-25 Drydock | Permit type: Bfd sprinkler system | Permit id: Sprk687706 | Parcel: 0602674013
2017/04/0508225 Dry Dock Av Boston MaCarol Arria
SCORE
82
21 Dry Dock Av Boston Ma
Coordinator impairment with the buildings nfpa 241 impairment coordinator so that no other sprinkler zone in the building is impaired during this scheduled impairment.
Date:  April 5, 2017
Contractor: Carol Arria

Client: Jamestown 21-23-25 Drydock | Permit type: Bfd sprinkler system | Permit id: Sprk687687 | Parcel: 0602674013
2017/04/0508221 Dry Dock Av Boston MaCarol Arria
SCORE
82
21 Dry Dock Av Boston Ma
Add 72 sprinkler heads on the 3rd floor. Per nfpa stands 7 cmr. ;one floor zone at a time.
Date:  April 7, 2017
Contractor: Carol Arria

Client: Jamestown 21-23-25 Drydock | Permit type: Bfd sprinkler system | Permit id: Sprk687685 | Parcel: 0602674013
2017/04/0708221 Dry Dock Av Boston MaCarol Arria
SCORE
82
5 Boylston St Boston Ma
Phase i: turn up 117 sprinkler heads on the 4th floor phase ii: add relocate 113 sprinkler heads on the 4th floor and 2 heads on the 3rd floor. One floor to be done at a time.
Date:  April 11, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk695522 | Parcel: 0401092000
2017/04/110825 Boylston St Boston MaCarol Arria
SCORE
82
1 Beacon St Boston Ma
One standpipes shall be operational at all times during the impairment
Date:  April 13, 2017
Contractor: Carol Arria

Client: Obs Reit Llc | Permit type: Bfd sprinkler system | Permit id: Sprk689351 | Parcel: 0302720000
2017/04/130821 Beacon St Boston MaCarol Arria
SCORE
82
179 Lincoln St Boston Ma
Impairments shall be coordinated with the buildings nfpa 241 impairment coordinator so that no more that one zone is impaired at any time within the building.;
Date:  April 14, 2017
Contractor: Carol Arria

Client: Invesco If Iv U S 3 Llc | Permit type: Bfd sprinkler system | Permit id: Sprk690512 | Parcel: 0305332000
2017/04/14082179 Lincoln St Boston MaCarol Arria
SCORE
82
99 Summer St Boston Ma
Installation shall be ;accordance with the requirements of 7 cmr and nfpa 13. Impairments shall be coordinated with the buildings nfpa 241 impairment coordinator so that no more that one zone is impaired at any time within the building.;
Date:  April 14, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk694362 | Parcel: 0304576000
2017/04/1408299 Summer St Boston MaCarol Arria
SCORE
82
665 Huntington Av Boston Ma
Add and or relocate 7 sprinkler heads and turn up 3 on the ground floor. Add one sprinkler head on the 3rd floor.
Date:  April 18, 2017
Contractor: Carol Arria

Client: President & Fellows | Permit type: Bfd sprinkler system | Permit id: Sprk691843 | Parcel: 0401880000
2017/04/18082665 Huntington Av Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Coordinate impairment with the buildings listed nfpa 241 impairment coordinator so that no other sprinkler zone in the building shall be impaired during this scheduled impairment
Date:  April 24, 2017
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk693058 | Parcel: 0304410000
2017/04/240821 Federal St Boston MaCarol Arria
SCORE
82
23 Dry Dock Av Boston Ma
Turn up sprinkler heads on the 5thfloor
Date:  April 25, 2017
Contractor: Carol Arria

Client: Jamestown 21-23-25 Drydock | Permit type: Bfd sprinkler system | Permit id: Sprk695327 | Parcel: 0602674013
2017/04/2508223 Dry Dock Av Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Add and or relocate seven (7) sprinkler heads on the 3rd floor
Date:  April 25, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk696744 | Parcel: 0304075000
2017/04/250821 Oliver St Boston MaCarol Arria
SCORE
82
416 W Broadway Boston Ma
Add relocate sprinkler heads in basement add relocate 5 sprinkler heads on the 1st floor one floor to be done at a time
Date:  April 25, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk697243
2017/04/25082416 W Broadway Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Add and or relocate 103 sprinkler heads on the 28th floor
Date:  April 25, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk696904 | Parcel: 0304075000
2017/04/250821 Oliver St Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Relocate nine (9) sprinkler heads on the 46th floor
Date:  April 25, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk696743 | Parcel: 0304075000
2017/04/250821 Oliver St Boston MaCarol Arria
SCORE
82
8809 Boylston St Boston Ma
Add and or relocate 3 sprinkler heads on the 12th floor add and or relocate 318 sprinkler heads on the 13th floor one floor to be done at a time
Date:  April 25, 2017
Contractor: Carol Arria

Client: Massachusetts Convention | Permit type: Bfd sprinkler system | Permit id: Sprk696435 | Parcel: 0401039000
2017/04/250828809 Boylston St Boston MaCarol Arria
SCORE
82
225 Franklin St Boston Ma
Add and or relocate 14 sprinkler heads on the 1st floor
Date:  April 25, 2017
Contractor: Carol Arria

Client: Two25 Franklin Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk698809 | Parcel: 0304134000
2017/04/25082225 Franklin St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Add and or relocate three (3) sprinkler heads on the first floor
Date:  April 25, 2017
Contractor: Carol Arria

Client: The Landmark Condo Assn | Permit type: Bfd sprinkler system | Permit id: Sprk696951 | Parcel: 0304406000
2017/04/250821 Federal St Boston MaCarol Arria
SCORE
82
155 Federal St Boston Ma
Impairment shall be coordinated with the buildings listed nfpa 241 impairment coordinate so that no other sprinkler zone is impaired within the building during this scheduled impairment.
Date:  May 8, 2017
Contractor: Carol Arria

Client: Power John F | Permit type: Bfd sprinkler system | Permit id: Sprk694737 | Parcel: 0304210000
2017/05/08082155 Federal St Boston MaCarol Arria
SCORE
82
225 Franklin St Boston Ma
No other sprinkler zone in the building shall be impaired during this scheduled impairment. Coordinate impairment with the buildings nfpa 241 impairment coordinator.
Date:  May 10, 2017
Contractor: Carol Arria

Client: Two25 Franklin Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk703488 | Parcel: 0304134000
2017/05/10082225 Franklin St Boston MaCarol Arria
SCORE
82
31 Saint James Av Boston Ma
Coordinate impairment with the buildings impairment coordinator.
Date:  May 11, 2017
Contractor: Carol Arria

Client: Authorized Agent | Permit type: Bfd sprinkler system | Permit id: Sprk694461 | Parcel: 0501156000
2017/05/1108231 Saint James Av Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Coordinate impairment with the buildings nfpa 241 impairment coordinator so that no other sprinkler zone is impairment within the building during this scheduled impairment.
Date:  May 23, 2017
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk702579 | Parcel: 0304410000
2017/05/230821 Federal St Boston MaCarol Arria
SCORE
82
75101 Federal St Boston Ma
Coordinate sprinkler;impairment with the buildings listed nfpa 241 impairment coordinator so that no other sprinkler zone within the building is impaired during this scheduled impairment.
Date:  May 23, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk703097 | Parcel: 0304198000
2017/05/2308275101 Federal St Boston MaCarol Arria
SCORE
82
53 State St Boston Ma
Coordinate sprinkler impairment;with the buildings nfpa 241 impairment coordinator.....;so that no other;sprinkler zone;will be;impaired during this scheduled impairment.
Date:  May 25, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk706389
2017/05/2508253 State St Boston MaCarol Arria
SCORE
82
8809 Boylston St Boston Ma
Coordinate impairment with the buildings nfpa 241;impairment coordinator so that no other sprinkler zone within the building is impaired during this scheduled impairment. Impaired sprinkler zone shall be fully restored within 8 hours.
Date:  May 25, 2017
Contractor: Carol Arria

Client: Massachusetts Convention | Permit type: Bfd sprinkler system | Permit id: Sprk706608 | Parcel: 0401039000
2017/05/250828809 Boylston St Boston MaCarol Arria
SCORE
82
1 High St Boston Ma
Coordinate sprinkler impairment;with the buildings nfpa 241 impairment coordinator.....;so that no other;sprinkler zone;will be;impaired during this scheduled impairment.
Date:  May 25, 2017
Contractor: Carol Arria

Client: Spus7 High St Lp | Permit type: Bfd sprinkler system | Permit id: Sprk706317 | Parcel: 0304408000
2017/05/250821 High St Boston MaCarol Arria
SCORE
82
Milk St Boston Ma
Impairments shall be coordinated with the buildings impairment coordinator.
Date:  June 13, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk685500
2017/06/13082Milk St Boston MaCarol Arria
SCORE
82
21 Custom House St Boston Ma
Coordinate impairment with the buildings nfpa 241 impairment coordinator so that no other sprinkler zone within the building ;is impaired during this scheduled impairment.
Date:  May 30, 2017
Contractor: Carol Arria

Client: Aman Inc | Permit type: Bfd sprinkler system | Permit id: Sprk708139 | Parcel: 0303988000
2017/05/3008221 Custom House St Boston MaCarol Arria
SCORE
82
313 Congress St Boston Ma
Add and or relocate 19 sprinkler heads on the 4th floor
Date:  June 5, 2017
Contractor: Carol Arria

Client: Mept Fort Point Creative | Permit type: Bfd sprinkler system | Permit id: Sprk712525 | Parcel: 0602692000
2017/06/05082313 Congress St Boston MaCarol Arria
SCORE
82
179 Lincoln St Boston Ma
Add and or relocate 15 sprinkler heads on the 5th floor
Date:  June 2, 2017
Contractor: Carol Arria

Client: Invesco If Iv U S 3 Llc | Permit type: Bfd sprinkler system | Permit id: Sprk711091 | Parcel: 0305332000
2017/06/02082179 Lincoln St Boston MaCarol Arria
SCORE
82
1 Summer St Boston Ma
Add relocate 25 sprinkler heads on the 19th floor
Date:  June 2, 2017
Contractor: Carol Arria

Client: One Hundred Summer St Llc | Permit type: Bfd sprinkler system | Permit id: Sprk710868 | Parcel: 0304220000
2017/06/020821 Summer St Boston MaCarol Arria
SCORE
82
225 Franklin St Boston Ma
Removal of two 2 1 2" hose valves per the attached letter from wb engineers. Work will be done on a saturday when building occupancy is limited. Only one standpipe will be worked on at one time leaving the floors with sprinkler coverage.
Date:  June 2, 2017
Contractor: Carol Arria

Client: Two25 Franklin Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk709687 | Parcel: 0304134000
2017/06/02082225 Franklin St Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Add and or relocate 15 sprinkler heads on the 7th floor
Date:  June 2, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk710169 | Parcel: 0304075000
2017/06/020821 Oliver St Boston MaCarol Arria
SCORE
82
Oliver St Boston Ma
Add and or relocate 9 sprinkler heads on the 24th floor
Date:  June 5, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 2 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk712513 | Parcel: 0304071000
2017/06/05082Oliver St Boston MaCarol Arria
SCORE
82
Milk St Boston Ma
Please see attached narrative that was attached under sprinkler plans. Work to be done off hours. See attached from fire pump testing co.
Date:  June 13, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk685461
2017/06/13082Milk St Boston MaCarol Arria
SCORE
82
State St Boston Ma
Turn up 117 sprinkler heads on the 9th floor
Date:  June 21, 2017
Contractor: Carol Arria

Client: Anbeca Llc | Permit type: Bfd sprinkler system | Permit id: Sprk717219 | Parcel: 0303685000
2017/06/21082State St Boston MaCarol Arria
SCORE
82
1 Northern Av Boston Ma
Impairment shall be coordinated with the buildings nfpa 241 impairment coordinator so that no other sprinkler zone is impaired during this scheduled impairment.
Date:  June 23, 2017
Contractor: Carol Arria

Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk714375 | Parcel: 0602671025
2017/06/230821 Northern Av Boston MaCarol Arria
SCORE
82
13461352 Boylston S Boston Ma
Add relocate 29 sprinkler heads on level 1
Date:  June 28, 2017
Contractor: Carol Arria

Client: Skpr 13 Boylston Lp | Permit type: Bfd sprinkler system | Permit id: Sprk722521 | Parcel: 0504313000
2017/06/2808213461352 Boylston S Boston MaCarol Arria
SCORE
82
1 Tremont St Boston Ma
Relocate six (6) sprinkler heads in the basement
Date:  June 28, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk722538
2017/06/280821 Tremont St Boston MaCarol Arria
SCORE
82
2 State St Boston Ma
Phase 1: turn up 18 sprinkler heads on the 4th floor phase ii: add relocate 67 sprinkler heads on the 4th floor
Date:  June 29, 2017
Contractor: Carol Arria

Client: Two Hundred State Condo Tr | Permit type: Bfd sprinkler system | Permit id: Sprk724460 | Parcel: 0303790000
2017/06/290822 State St Boston MaCarol Arria
SCORE
82
Milk St Boston Ma
Coordinated impairment with the buildings nfpa 241 impairment coordinator so that only one zone is impaired at any given time.
Date:  March 10, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk682897
2017/03/10082Milk St Boston MaCarol Arria
SCORE
82
2355 Northern Av Boston Ma
Relocate sprinkler heads on the 1st floor in tower "c." this is a brand new building and has not accepted by the city.
Date:  June 29, 2017
Contractor: Carol Arria

Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk706630 | Parcel: 0602640020
2017/06/290822355 Northern Av Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Add and or relocate 23 sprinkler heads on the 8th floor
Date:  June 30, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk724632 | Parcel: 0304075000
2017/06/300821 Oliver St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Add and or relocate sprinkler heads on the 23rd floor
Date:  July 5, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk726702
2017/07/050821 Federal St Boston MaCarol Arria
SCORE
82
State St Boston Ma
Add 24 new sprinkler heads on the 1st floor
Date:  July 5, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk726694
2017/07/05082State St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Installing;in accordance with 7 cmr nfpa 13; and isd approved shop drawings... No other sprinkler zone shall be impaired in this building during this scheduled impairment ...... Coordinate impairment with the buildings; listed;nfpa 241 impairment coordinator.
Date:  January 25, 2017
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk669340 | Parcel: 0304410000
2017/01/250821 Federal St Boston MaCarol Arria
SCORE
82
225 Franklin St Boston Ma
Relocate seven (7) sprinkler heads on the 32nd floor (no more than one floor off at a time - comply with the requirements of nfpa 13 n(2013) and 7 cmr)
Date:  March 21, 2017
Contractor: Carol Arria

Client: Two25 Franklin Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk683028 | Parcel: 0304134000
2017/03/21082225 Franklin St Boston MaCarol Arria
SCORE
82
116116 Huntington A Boston Ma
Relocate two (2) sprinkler heads on the 9th floor
Date:  February 1, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk673142
2017/02/01082116116 Huntington A Boston MaCarol Arria
SCORE
82
2 Boylston St Boston Ma
Add 2 sprinkler heads on the 3rd flr; 2 heads on 4th; 2 heads on 5th; 7 heads on 6th; 7 heads on 7th; 2 heads on 8th
Date:  November 30, 2016
Contractor: Carol Arria

Client: Four Seasons Place | Permit type: Bfd sprinkler system | Permit id: Sprk658292 | Parcel: 0501185000
2016/11/300822 Boylston St Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Add and or relocate 17 sprinkler heads on the 46th floor
Date:  March 6, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk680642 | Parcel: 0304075000
2017/03/060821 Oliver St Boston MaCarol Arria
SCORE
82
1 Summer St Boston Ma
No other sprinkler zone within the building shall be impaired during this scheduled impairment. Coordinate impairment with the buildings nfpa 241;impairment coordinator.
Date:  January 23, 2017
Contractor: Carol Arria

Client: One Hundred Summer St Llc | Permit type: Bfd sprinkler system | Permit id: Sprk668018 | Parcel: 0304220000
2017/01/230821 Summer St Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
No other sprinkler zone within the building shall be impaired during this scheduled impairment. Coordinate impairment with the buildings nfpa 241;impairment coordinator.
Date:  January 23, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk667968 | Parcel: 0304075000
2017/01/230821 Oliver St Boston MaCarol Arria
SCORE
82
8 Boylston St Boston Ma
Turn up 184 sprinkler heads on the 5th flr; 171 on the 33rd flr; 239 on the 34th flr. One floor done at a time. Remove four 4 1 2" hose valves on 5th floor. There is a separate standpipe feeding these hose valves; building sprinkler system will not be impaired during removal
Date:  November 22, 2016
Contractor: Carol Arria

Client: Bp Prucenter Acquisition Llc | Permit type: Bfd sprinkler system | Permit id: Sprk655786 | Parcel: 0401037100
2016/11/220828 Boylston St Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Coordinate sprinkler impairment with the buildings listed nfpa 241 impairment coordinator so that no other sprinkler zone is impaired in the building during this scheduled impairment.
Date:  March 15, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk686489 | Parcel: 0304075000
2017/03/150821 Oliver St Boston MaCarol Arria
SCORE
82
5 Boylston St Boston Ma
Phase i: turn up 15 sprinkler heads on the 13th floor phase ii: add and or relocate 25 sprinkler heads on the 13th floor
Date:  March 8, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk676704 | Parcel: 0401092000
2017/03/080825 Boylston St Boston MaCarol Arria
SCORE
82
Saint James Av Boston Ma
Add and or relocate sprinkler heads on the 10th floor
Date:  January 18, 2017
Contractor: Carol Arria

Client: St James Arlington Real | Permit type: Bfd sprinkler system | Permit id: Sprk666064 | Parcel: 0501152000
2017/01/18082Saint James Av Boston MaCarol Arria
SCORE
82
1 Beacon St Boston Ma
Removal of hose valve on the 29th floor that is located in tenant space.
Date:  February 15, 2017
Contractor: Carol Arria

Client: Obs Reit Llc | Permit type: Bfd sprinkler system | Permit id: Sprk651520 | Parcel: 0302720000
2017/02/150821 Beacon St Boston MaCarol Arria
SCORE
82
8 Boylston St Boston Ma
No other sprinkler zone in the building shall be impaired during this scheduled impairment coordinate; impairment with the buildings listed nfpa 241 impairment coordinator.
Date:  November 14, 2016
Contractor: Carol Arria

Client: Bp Prucenter Acquisition Llc | Permit type: Bfd sprinkler system | Permit id: Sprk650561 | Parcel: 0401037100
2016/11/140828 Boylston St Boston MaCarol Arria
SCORE
82
1 Summer St Boston Ma
Add relocate four (4) sprinkler heads on the 10th floor
Date:  December 5, 2016
Contractor: Carol Arria

Client: One Hundred Summer St Llc | Permit type: Bfd sprinkler system | Permit id: Sprk661200 | Parcel: 0304220000
2016/12/050821 Summer St Boston MaCarol Arria
SCORE
82
8809 Boylston St Boston Ma
Add and or relocate 17 sprinkler heads on the 14th floor
Date:  March 3, 2017
Contractor: Carol Arria

Client: Massachusetts Convention | Permit type: Bfd sprinkler system | Permit id: Sprk677762 | Parcel: 0401039000
2017/03/030828809 Boylston St Boston MaCarol Arria
SCORE
82
Hallet St Dorchester Ma
Add relocate three (3) sprinkler heads. Work to be done per nfpa stands. 7 cmr. One zone at a time. Contractor to remain as fire watch during any impairment.
Date:  December 16, 2016
Contractor: Carol Arria

Client: Boston Firefighters Cred Un | Permit type: Bfd sprinkler system | Permit id: Sprk665220 | Parcel: 1604204000
2016/12/16082Hallet St Dorchester MaCarol Arria
SCORE
82
225 Franklin St Boston Ma
Add relocate 7 sprinkler heads on the 8th floor
Date:  December 16, 2016
Contractor: Carol Arria

Client: Two25 Franklin Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk664638 | Parcel: 0304134000
2016/12/16082225 Franklin St Boston MaCarol Arria
SCORE
82
88 Ashburton Pl Boston Ma
Turn up 47 heads-add relo on flr turn up 53; add relo 58 on flr turn up 7; add relo 62 flr 5 turn up 40; add relo 66 flr 6 turn up 40; add relo 72 flr 10
Date:  December 16, 2016
Contractor: Carol Arria

Client: Two Fifty Five State St Llc | Permit type: Bfd sprinkler system | Permit id: Sprk665192 | Parcel: 0303820000
2016/12/1608288 Ashburton Pl Boston MaCarol Arria
SCORE
82
Park Pz Boston Ma
Add and or relocate 45 sprinkler heads on the 1st floor
Date:  March 8, 2017
Contractor: Carol Arria

Client: Park Plaza Condo Trust | Permit type: Bfd sprinkler system | Permit id: Sprk681075 | Parcel: 0500810000
2017/03/08082Park Pz Boston MaCarol Arria
SCORE
82
8809 Boylston St Boston Ma
No other sprinkler zone in the building shall be impaired during this scheduled impairment..... Coordinate impairment with the buildings listed nfpa 241 impairment coordinator.
Date:  February 27, 2017
Contractor: Carol Arria

Client: Massachusetts Convention | Permit type: Bfd sprinkler system | Permit id: Sprk675650 | Parcel: 0401039000
2017/02/270828809 Boylston St Boston MaCarol Arria
SCORE
82
Oliver St Boston Ma
No other floor shall be impaired during this scheduled impairment.... This;impairment;shall be coordinated with;buildings impairment ;coordinator
Date:  December 6, 2016
Contractor: Carol Arria

Client: Fort Hill Sq 2 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk660034 | Parcel: 0304071000
2016/12/06082Oliver St Boston MaCarol Arria
SCORE
82
204216 Massachusett Boston Ma
Installation shall be in accordance with 7 cmr nfpa 13 and isd approved shop drawings. No other sprinkler zone in the building shall be impairment during this scheduled impairment. Coordinate impairment with the building listed nfpa 241 impairment coordinator.
Date:  February 8, 2017
Contractor: Carol Arria

Client: First Church Of Christian | Permit type: Bfd sprinkler system | Permit id: Sprk679388 | Parcel: 0401185000
2017/02/08082204216 Massachusett Boston MaCarol Arria
SCORE
82
304 Western Av Brighton Ma
Add six (6) new sprinkler heads on the 1st floor in the spring restaurant. Petco is on a different zone. Only restaurant area will be zoned out during work.
Date:  March 10, 2017
Contractor: Carol Arria

Client: Harvard Re Allston Inc | Permit type: Bfd sprinkler system | Permit id: Sprk681646 | Parcel: 2200863070
2017/03/10082304 Western Av Brighton MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Turn up 1 sprinkler heads on the 28th floor
Date:  December 2, 2016
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk660032 | Parcel: 0304075000
2016/12/020821 Oliver St Boston MaCarol Arria
SCORE
82
1 Tremont St Boston Ma
No other sprinkler zone in the building shall be impaired during this scheduled impairment..... Coordinator the impairment with the buildings nfpa 241 impairment coordinator. Installation shall be in accordance with the requirements of 7 cmr and nfpa standards.
Date:  February 13, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk674121
2017/02/130821 Tremont St Boston MaCarol Arria
SCORE
82
1 Oliver St Boston Ma
Coordinate impairment with the buildings nfpa 241;impairment coordinator so that only one zone is impaired any given time within the building.
Date:  March 8, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 1 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk672923 | Parcel: 0304075000
2017/03/080821 Oliver St Boston MaCarol Arria
SCORE
82
1 Beacon St Boston Ma
Schedule impairments with the building listed nfpa 241 impairment coordinator so that only one sprinkler zone is impaired at any given time.
Date:  February 21, 2017
Contractor: Carol Arria

Client: Obs Reit Llc | Permit type: Bfd sprinkler system | Permit id: Sprk675223 | Parcel: 0302720000
2017/02/210821 Beacon St Boston MaCarol Arria
SCORE
82
245 Summer St Boston Ma
No other zone shall be impaired in the building during this scheduled impairment coordinate impairment with the buildings impairment coordinator. Installation shall be in accordance with 7 cmr nfpa 13 and isd approved shop drawings.
Date:  December 5, 2016
Contractor: Carol Arria

Client: Bdc Summer St 121a Lp | Permit type: Bfd sprinkler system | Permit id: Sprk659204 | Parcel: 0305364005
2016/12/05082245 Summer St Boston MaCarol Arria
SCORE
82
Oliver St Boston Ma
Turn up 8 sprinkler heads in tower 2 area where bridge will be connected. Add 6 new sprinkler heads in new bridge area. Turn heads back down at end of job. This is a bridge connecting 1 ip and 2 ip at the 4th floor. All pipe being run from 2 ip
Date:  February 1, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 2 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk673600 | Parcel: 0304071000
2017/02/01082Oliver St Boston MaCarol Arria
SCORE
82
Milk St Boston Ma
Coordinate impairment with the buildings nfpa 241 impairment coordinator so that there is no hot work or other impairments in the building during this scheduled impairment.
Date:  March 17, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk685449
2017/03/17082Milk St Boston MaCarol Arria
SCORE
82
222 Berkeley St Boston Ma
Add and or relocate 94 sprinkler heads on the 2nd floor
Date:  November 18, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk655051 | Parcel: 0401096000
2016/11/18082222 Berkeley St Boston MaCarol Arria
SCORE
82
2 Avenue De Lafayet Boston Ma
Turn up sprinkler heads on the 1st floor
Date:  November 30, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk655793
2016/11/300822 Avenue De Lafayet Boston MaCarol Arria
SCORE
82
222 Berkeley St Boston Ma
No other zone shall be impaired during this scheduled impairment.......... Impairment shall be scheduled with the building nfpa 241 impairment coordinator.
Date:  November 14, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk644896 | Parcel: 0401096000
2016/11/14082222 Berkeley St Boston MaCarol Arria
SCORE
82
25 Battery Wh Boston Ma
Installing;in accordance with 7 cmr nfpa 13; and isd approved shop drawings... No other sprinkler zone shall be impaired in this building during this scheduled impairment ...... Coordinate impairment with the buildings; listed;nfpa 241 impairment coordinator.
Date:  January 24, 2017
Contractor: Carol Arria

Client: Battery Wharf Master Condo | Permit type: Bfd sprinkler system | Permit id: Sprk669328 | Parcel: 0303041000
2017/01/2408225 Battery Wh Boston MaCarol Arria
SCORE
82
2438 Channel Center Boston Ma
Add and or relocate 18 sprinkler heads on the 6th floor.
Date:  January 30, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk671321 | Parcel: 0602757045
2017/01/300822438 Channel Center Boston MaCarol Arria
SCORE
82
8809 Boylston St Boston Ma
No other sprinkler zone shall be impaired in the building during this scheduled impairment... Coordinate impairment with the buildings listed nfpa 241 impairment coordinator.... Installation shall comply with the requirements of 7 cmr nfpa 13 and isd approved shop drawings.;
Date:  January 30, 2017
Contractor: Carol Arria

Client: Massachusetts Convention | Permit type: Bfd sprinkler system | Permit id: Sprk668014 | Parcel: 0401039000
2017/01/300828809 Boylston St Boston MaCarol Arria
SCORE
82
1 Beacon St Boston Ma
No other sprinkler zone shall be impaired within the building during this scheduled impairment. All impairments shall be coordinated with the buildings listed impairment coordinator. Installation shall be in accordance with the requirements of;7 cmr and nfpa 13.
Date:  January 5, 2017
Contractor: Carol Arria

Client: Obs Reit Llc | Permit type: Bfd sprinkler system | Permit id: Sprk662361 | Parcel: 0302720000
2017/01/050821 Beacon St Boston MaCarol Arria
SCORE
82
Oliver St Boston Ma
No other sprinkler zone within the building shall be impaired during this scheduled impairment. Coordinate impairment with the buildings nfpa 241;impairment coordinator.
Date:  January 23, 2017
Contractor: Carol Arria

Client: Fort Hill Sq 2 Owner Llc | Permit type: Bfd sprinkler system | Permit id: Sprk667987 | Parcel: 0304071000
2017/01/23082Oliver St Boston MaCarol Arria
SCORE
82
111 Huntington Av Boston Ma
No other zone shall be impaired in the building during this scheduled impairment coordinate impairment with the buildings impairment coordinator. Installation shall be in accordance with 7 cmr nfpa 13 and isd approved shop drawings.
Date:  December 5, 2016
Contractor: Carol Arria

Client: Bp 111 Huntington Av Lessee | Permit type: Bfd sprinkler system | Permit id: Sprk655456 | Parcel: 0401037500
2016/12/05082111 Huntington Av Boston MaCarol Arria
SCORE
82
2355 Northern Av Boston Ma
No other sprinkler;zone shall be impaired during this scheduled impairment. Installation shall be in-accordance with the requirements of 7 cmr nfpa standards and isd approved shop drawings. Impairment of buildings sprinkler system by licensed personnel only
Date:  January 4, 2017
Contractor: Carol Arria

Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk660607 | Parcel: 0602640020
2017/01/040822355 Northern Av Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
Coordinate impairment with the buildings nfpa 241;impairment coordinator so that no other sprinkler zone in the building is impaired during this scheduled impairment.
Date:  January 19, 2017
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk670475 | Parcel: 0304410000
2017/01/190821 Federal St Boston MaCarol Arria
SCORE
82
101 Federal St Boston Ma
No other sprinkler zone in the building shall be impaired during this scheduled impairment..... Coordinator the impairment with the buildings nfpa 241 impairment coordinator. Installation shall be in accordance with the requirements of 7 cmr and nfpa standards.
Date:  February 13, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk674288 | Parcel: 0304199000
2017/02/13082101 Federal St Boston MaCarol Arria
SCORE
82
179 Lincoln St Boston Ma
Add relocate sprinkler heads on the 4th floor. Work to be done one floor zone at a time per nfpa stands 7 cmr. 8hrs per day.
Date:  January 3, 2017
Contractor: Carol Arria

Client: Invesco If Iv U S 3 Llc | Permit type: Bfd sprinkler system | Permit id: Sprk664641 | Parcel: 0305332000
2017/01/03082179 Lincoln St Boston MaCarol Arria
SCORE
82
222 Berkeley St Boston Ma
Turn up sprinkler heads on the 13th floor
Date:  November 30, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk655862 | Parcel: 0401096000
2016/11/30082222 Berkeley St Boston MaCarol Arria
SCORE
82
1 Federal St Boston Ma
No other sprinkler;zone in the building shall be impaired during this scheduled impairment coordinate impairment with the buildings listed nfpa 241 impairment coordinator. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and isd approved shop drawings.
Date:  February 23, 2017
Contractor: Carol Arria

Client: Bp Federal Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk674992 | Parcel: 0304410000
2017/02/230821 Federal St Boston MaCarol Arria
SCORE
82
53 State St Boston Ma
Relocate seven (7) existing sprinkler heads on the 14th floor
Date:  November 30, 2016
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk658258
2016/11/3008253 State St Boston MaCarol Arria
SCORE
82
2 Franklin St Boston Ma
Relocate four (4) sprinkler heads on the 21st floor
Date:  January 31, 2017
Contractor: Carol Arria

Client: Two Sixty Franklin Inc | Permit type: Bfd sprinkler system | Permit id: Sprk672912 | Parcel: 0304023000
2017/01/310822 Franklin St Boston MaCarol Arria
SCORE
82
245 Summer St Boston Ma
Add relocate a total of 2 sprinkler heads on the 13th floor
Date:  November 18, 2016
Contractor: Carol Arria

Client: Bdc Summer St 121a Lp | Permit type: Bfd sprinkler system | Permit id: Sprk654466 | Parcel: 0305364005
2016/11/18082245 Summer St Boston MaCarol Arria
SCORE
82
State St Boston Ma
Add and or relocate sprinkler heads on the 8th floor
Date:  July 12, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Permit id: Sprk728310
2017/07/12082State St Boston MaCarol Arria
SCORE
82
1256 Thomson Pl Boston Ma
Relocate one (1) sprinkler head on the 3rd floor. Per the building management company there is a shut off valve on each floor.
Date:  July 11, 2017
Contractor: Carol Arria

Client: Fort Point Channel Investors | Permit type: Bfd sprinkler system | Permit id: Sprk727535 | Parcel: 0602654010
2017/07/110821256 Thomson Pl Boston MaCarol Arria
SCORE
82
2 Boylston St Boston Ma
Add and or relocate 26 sprinkler heads in the basement
Date:  July 19, 2017
Contractor: Carol Arria

Client: Fourteen School Street Corp | Permit type: Bfd sprinkler system | Expiration date: July 19, 2018 | Permit id: Sprk731842 | Parcel: 0304908000
2017/07/190822 Boylston St Boston MaCarol Arria
SCORE
82
2 Portland St Boston Ma
Add relocate six (6) sprinkler heads on the 3rd floor
Date:  July 20, 2017
Contractor: Carol Arria

Permit type: Bfd sprinkler system | Expiration date: July 20, 2018 | Permit id: Sprk733727
2017/07/200822 Portland St Boston MaCarol Arria
SCORE
82
101 Arch St Boston Ma
Phase i: turn up 26 heads phase ii: relocate 26 sprinkler heads and add 2 new sprinkler heads
Date:  July 20, 2017
Contractor: Carol Arria

Client: Clpf-101 Arch Lp | Permit type: Bfd sprinkler system | Expiration date: July 20, 2018 | Permit id: Sprk733823 | Parcel: 0304597000
2017/07/20082101 Arch St Boston MaCarol Arria
SCORE
82
1 Beacon St Boston Ma
Phase i: turn up 37 sprinkler heads on 3rd floor phase ii: add relocate 33 sprinkler heads on 3rd floor
Date:  July 20, 2017
Contractor: Carol Arria

Client: Obs Reit Llc | Permit type: Bfd sprinkler system | Expiration date: July 19, 2018 | Permit id: Sprk732050 | Parcel: 0302720000
2017/07/200821 Beacon St Boston MaCarol Arria
SCORE
82
8 Boylston St Boston Ma
Phase i: turn up 44 heads on 4th flr; 29 heads on 6th flr; heads on 7th flr phase ii: add relocate 44 heads on 4th flr; 42 heads on 6th flr; 46 heads on 7th flr. Work being done in main tower of prudential where top of the hub is
Date:  July 20, 2017
Contractor: Carol Arria

Client: Bp Prucenter Acquisition Llc | Permit type: Bfd sprinkler system | Expiration date: July 19, 2018 | Permit id: Sprk731167 | Parcel: 0401037100
2017/07/200828 Boylston St Boston MaCarol Arria
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.