Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 736 Cambridge St Brighton Ma 02135 St. Elizabeths hospital - cbr lab renovations - 2nd &; 3rd floors;-; construction includes selective demolition of existing architecturals and meps. Providing replacement hvac equipment and extending/relocating/reusing existing meps to accommodate new layout modifications to existing fire alarm and sprinkler system. Providing minor interior finishes where specified. Use square footage and egress are unchanged. Client: St Elizabeths Hosp Of Bos | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt404240 | Parcel: 2101835100 | |||||
SCORE 59 736 Cambridge St Brighton Ma St. Elizabeths hospital - cbr lab renovations - 2nd &; 3rd floors;-; construction includes selective demolition of existing architecturals and meps. Providing replacement hvac equipment and extending/relocating/reusing existing meps to accommodate new layout modifications to existing fire alarm and sprinkler system. Providing minor interior finishes where specified. Use square footage and egress are unchanged. Client: St Elizabeths Hosp Of Bos | Permit type: Long form/alteration permit | Expiration date: March 8, 2015 | Current use: Comm | Permit id: Alt404240 | Parcel: 2101835100 |