Building Permits at 736 Cambridge St Brighton MA 02135


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 736 Cambridge St Brighton MA 02135 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Low voltage wiring to install apc light in room 2043 and install lock power supply. Install card reader package on room 2010.
Date:  February 10, 2011
Value:   $5,000

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv63541 | Parcel: 2101835100
2011/02/10500095736 Cambridge St Brighton Ma 02135
SCORE
100
House officers quaters. Existing building demo jfs job # 4932
Date:  March 21, 2012
Value:   $5,000
Contractor: Derek Shine

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl124717 | Parcel: 2101835100
2012/03/215000100736 Cambridge St Brighton Ma 02135Derek Shine
SCORE
96
Low voltage wiring to install card reader setan medical staff lounge #4127.
Date:  February 7, 2013
Value:   $3,000
Contractor: Arthur Bourque

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv219346 | Parcel: 2101835100
2013/02/07300096736 Cambridge St Brighton Ma 02135Arthur Bourque
Install conduit; 150 sq ft; in sdwk;
Date:  August 9, 2013

Client: St Elizabeths Hosp Of Bos | Permit type: Service | Permit id: Exca-27292 | Parcel: 2101835100
2013/08/09095736 Cambridge St Brighton Ma 02135
SCORE
100
Renovations to existing patient rooms and support spaces on the 3rd floor to include new paint vct patching ceiling tile electrical relocating of lights in existing grid new doors frames. No sprinkler or fire alarm. Egress not affected.
Date:  February 12, 2014
Value:   $300,000

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interio | Current use: Other | Permit id: Sf326084 | Parcel: 2101835100
2014/02/12300000100736 Cambridge St Brighton Ma 02135Christina Guarnotta
SCORE
100
Fit out of 3 new patient rooms and support spaces at st. Elizabeths medical center icu on the 5th floor . Scope includes new paint wallcovering vct ceiling tile millwork sprinkler plumbing medical gas hvac electrical lighting tel com nurse call and fire alarm.
Date:  March 26, 2014
Value:   $355,000

Client: St Elizabeths Hosp Of Bos | Permit type: Fast track applicati | Current use: Other | Permit id: Alt343524 | Parcel: 2101835100
2014/03/26355000100736 Cambridge St Brighton Ma 02135Christina Guarnotta
SCORE
100
Renovations to 5th floor pharmacy space at st. Elizabeths hospital. Work to include hvac modification flooring millwork installing glass in door and hardware electrical add outlets tel data new lighting. No sprinkler or fire alarm egress not affected.
Date:  April 14, 2014
Value:   $90,000

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interio | Current use: Other | Permit id: Sf352008 | Parcel: 2101835100
2014/04/1490000100736 Cambridge St Brighton Ma 02135Christina Guarnotta
SCORE
100
Renovations to existing patient rooms operating rooms and support spaces on the 3rd floor for st. Elizabeths medical center to include new paint vct patching ceiling tile electrical relocating of lights in existing grid new doors frames sprinkler and fire alarm work.
Date:  July 1, 2014
Value:   $3,495,000

Client: St Elizabeths Hosp Of Bos | Permit type: Fast track applicati | Current use: Other | Permit id: Alt374022 | Parcel: 2101835100
2014/07/013495000100736 Cambridge St Brighton Ma 02135Christina Guarnotta
SCORE
100
Convert existing restroom into work room for st. Elizabeths on the 8th floor for the hearing aid center. Work to include selective demo new finishes no fire alarm or sprinkler work.
Date:  July 28, 2014
Value:   $45,000

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interio | Current use: Other | Permit id: Sf388588 | Parcel: 2101835100
2014/07/2845000100736 Cambridge St Brighton Ma 02135Christina Guarnotta
SCORE
100
Erect 40x100 tent on 9 10 14. Removal on 910 14
Date:  August 29, 2014
Value:   $4,100
Contractor: Mark Traina

Client: St Elizabeths Hosp Of Bos | Permit type: Other | Current use: Other | Permit id: Sf402572 | Parcel: 2101835100
2014/08/294100100736 Cambridge St Brighton Ma 02135Mark Traina
SCORE
96
Low voltage wiringt to install mini dome camera on exterior of st margarets loading dock.
Date:  September 19, 2014
Value:   $2,000
Contractor: Arthur Bourque

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv408936 | Parcel: 2101835100
2014/09/19200096736 Cambridge St Brighton Ma 02135Arthur Bourque
SCORE
96
Low voltage wiring to replace existing camera housing with new on the exterior of seton 4.
Date:  September 19, 2014
Value:   $1,001
Contractor: Arthur Bourque

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv408940 | Parcel: 2101835100
2014/09/19100196736 Cambridge St Brighton Ma 02135Arthur Bourque
Low voltage wiring to install apc light in room 2043 and install lock power supply. Install card reader package on room 2010.
Date:  February 10, 2011
Value:   $5,000

Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: Elv63541 | Parcel: 2101835100
2011/02/10500095736 Cambridge St Brighton Ma 02135
Gas leak repair; 5 x 4 rdwy; work started under emer-463926; all work 9:30am-3:30pm; mon thru sat
Date:  May 28, 2015

Permit type: Maintenance | Permit status: Expired | Permit id: Exca-477566
2015/05/28095736 Cambridge St Brighton Ma 02135
Renovation to existing space into a dunkin donuts; ~; doc#20141181 ; all manual fire alarm boxes to initiate smoke control system.
Date:  September 24, 2014

Permit status: Na | Permit id: Bfdf399827 | Parcel: 2101835100
2014/09/24095736 Cambridge St Brighton Ma 02135
Bagging of smoke detectors @ st. Josephs hall &; st. Margarets
Date:  March 15, 2012

Permit status: Na | Permit id: Bsd124113 | Parcel: 2101835100
2012/03/15095736 Cambridge St Brighton Ma 02135
Convert a wet standpipe to a dry standpipe fed by the fdc in preparation for demo of the building out ladys hall at st elizabeths medical center
Date:  March 6, 2012

Permit status: Na | Permit id: Sprk121124 | Parcel: 2101835100
2012/03/06095736 Cambridge St Brighton Ma 02135
Bagging of smoke detectors
Date:  March 21, 2014

Permit status: Na | Permit id: Bsd343642 | Parcel: 2101835100
2014/03/21095736 Cambridge St Brighton Ma 02135
Burning &; welding for installation of 2-14" chilled water valves &; 2-2" chemical feed valves bfd paid detail required
Date:  December 28, 2010

Permit status: Na | Permit id: Cbw56705 | Parcel: 2101835100
2010/12/28095736 Cambridge St Brighton Ma 02135
Only one zone shall be impaired at any given time...... Installation shall comply with the requirements of 7 cmr and nfpa 13
Date:  November 12, 2014

Permit status: Na | Permit id: Sprk421637 | Parcel: 2101835100
2014/11/12095736 Cambridge St Brighton Ma 02135
Work to be done per nfpa stands. 7 cmr. Fire watch required. No patient occupancy in impaired floor zone.
Date:  October 16, 2014

Permit status: Na | Permit id: Sprk412730 | Parcel: 2101835100
2014/10/16095736 Cambridge St Brighton Ma 02135
Installation of floo
Date:  September 19, 2012

Permit status: Na | Permit id: Chm184600 | Parcel: 2101835100
2012/09/19095736 Cambridge St Brighton Ma 02135
To remove asbestos
Date:  February 6, 2012

Permit status: Na | Permit id: Asb118005
2012/02/06095736 Cambridge St Brighton Ma 02135
Welding of plate steel i-beam &; tube steel @ william connell;pavilion bfd paid detail required
Date:  July 1, 2010

Permit status: Na | Permit id: Cbw31844 | Parcel: 2101835100
2010/07/01095736 Cambridge St Brighton Ma 02135
During demo a temp fs line was installed around the building being demo; ~; bfd fire detail required - 1 officer &; 4 firefighters without a pump to monitor the buildings that will be without a water supply bfd paid detail required
Date:  May 25, 2012

Permit status: Na | Permit id: Sprk141888 | Parcel: 2101835100
2012/05/25095736 Cambridge St Brighton Ma 02135
Burning &; welding for installation of handicap ramp rails (dpl) bfd paid detail required
Date:  January 19, 2011

Permit status: Na | Permit id: Cbw58555 | Parcel: 2101835100
2011/01/19095736 Cambridge St Brighton Ma 02135
Complete demo of entire structure @;house officers quarters (hoq) bldg
Date:  March 20, 2012

Permit status: Na | Permit id: Fdc124740 | Parcel: 2101835100
2012/03/20095736 Cambridge St Brighton Ma 02135
Relocation of (7) sprinkler heads on 4th floor. Work to be done per nfpa stands. One floor zone at a time. No patient occupancy in impaired zone.
Date:  January 30, 2012

Permit status: Na | Permit id: Sprk115187 | Parcel: 2101835100
2012/01/30095736 Cambridge St Brighton Ma 02135
Soldering &; brazing of copper pipe to provide water to new fixtures &; medical gas to new outlets (dpl) bfd paid detail required
Date:  April 10, 2012

Permit status: Na | Permit id: Cbw130051 | Parcel: 2101835100
2012/04/10095736 Cambridge St Brighton Ma 02135
Connecting new 6" supply line to the existing bulk service main on level-3.; work to be done per nfpa 13 stands. 7 cmr work to be done one floor zone at a time.; based on contractor information building system is duel fed no impairment of fire suppression system is required.;any system impairment will require fire detail.
Date:  March 1, 2011

Permit status: Na | Permit id: Sprk65354 | Parcel: 2101835100
2011/03/01095736 Cambridge St Brighton Ma 02135
Alteration of existing fire alarm system; doc#20130681. Building addition. Fire alarm work to be done per nfpa stands 7 cmr. No impairment of building fire alarm operation for building occupants patients.
Date:  August 27, 2013

Permit status: Na | Permit id: Bfdf251367 | Parcel: 2101835100
2013/08/27095736 Cambridge St Brighton Ma 02135
Welding for handles on kitchen steamers (dpl) bfd paid detail required
Date:  May 13, 2010

Permit status: Na | Permit id: Cbw24774 | Parcel: 2101835100
2010/05/13095736 Cambridge St Brighton Ma 02135
Installation inaccordance with nfpa 13 and 7 cmr. Coordinate impairment with building managment so that only one zone is impaired at any given time
Date:  May 19, 2014

Permit status: Na | Permit id: Sprk355390 | Parcel: 2101835100
2014/05/19095736 Cambridge St Brighton Ma 02135
Interior renovation of existing;patient rooms to include drywall ceiling paint and flooring;
Date:  March 3, 2014

Permit status: Na | Permit id: Fdc326419 | Parcel: 2101835100
2014/03/03095736 Cambridge St Brighton Ma 02135
Cutting burning welding for complete demolition of existing structure (dpl) bfd paid detail required
Date:  March 26, 2012

Permit status: Na | Permit id: Cbw125869 | Parcel: 2101835100
2012/03/26095736 Cambridge St Brighton Ma 02135
Installation/evaluat
Date:  November 4, 2013

Permit status: Na | Permit id: Chm301533 | Parcel: 2101835100
2013/11/04095736 Cambridge St Brighton Ma 02135
Relocate 1 sprinkler heads on the 5th floor. Work to be done per nfpa stands.; work to be done one floor zone at a time. No patient occupancy in impaired zone.
Date:  March 6, 2012

Permit status: Na | Permit id: Sprk121113 | Parcel: 2101835100
2012/03/06095736 Cambridge St Brighton Ma 02135
Burning welding for installation of mini-piles in william connell pavilion (dpl) bfd paid detail required
Date:  March 11, 2011

Permit status: Na | Permit id: Cbw67124 | Parcel: 2101835100
2011/03/11095736 Cambridge St Brighton Ma 02135
Renovation work to (8) patient rooms on 7th floor in cardinal medeiros pavillion.; ~; doc# 20111069
Date:  October 27, 2011

Permit status: Na | Permit id: Bfdf99258 | Parcel: 2101835100
2011/10/27095736 Cambridge St Brighton Ma 02135
Welding only;of steel ductwork &; stainless steel humidifier section of supply air duct (dpl) bfd paid detail required
Date:  January 24, 2012

Permit status: Na | Permit id: Cbw114868 | Parcel: 2101835100
2012/01/24095736 Cambridge St Brighton Ma 02135
Seton bldg. :; replace leaking valve &; add new drain connection.; our lady hall bldg: take existing fire pump off line in anticipation of bldg. Being demolished.; all work to tak place at same time during (1) shut-down.; st. Margarets bldg. : replace existing rpbp with straight spool piece. Per br a e p calculations. Bfd paid detail required ; paid fire detail required: 1 officer &; 4 firefighters to monitor thr four bldgs. That will be without water supply.
Date:  April 11, 2012

Permit status: Na | Permit id: Sprk129572 | Parcel: 2101835100
2012/04/11095736 Cambridge St Brighton Ma 02135
Removal of 1 12" hose racks throughout the facility(hose valve off risers to remain) and removal of the restricting pin on pressure restricting valves to allow valves to open fully.; pressure restriction is no longer needed.
Date:  September 5, 2013

Permit status: Na | Permit id: Sprk280508 | Parcel: 2101835100
2013/09/05095736 Cambridge St Brighton Ma 02135
Complete demolition of "mmr" bldg
Date:  February 9, 2012

Permit status: Na | Permit id: Fdc117351 | Parcel: 2101835100
2012/02/09095736 Cambridge St Brighton Ma 02135
Installation of upho
Date:  August 15, 2013

Permit status: Na | Permit id: Chm275344 | Parcel: 2101835100
2013/08/15095736 Cambridge St Brighton Ma 02135
Scaffolding
Date:  April 30, 2013

Permit status: Expired | Permit id: Occu-202036 | Parcel: 2101835100
2013/04/30095736 Cambridge St Brighton Ma 02135
Temporary placement of (2) dumpsters for removal of debris
Date:  May 17, 2010

Permit status: Na | Permit id: Td25787 | Parcel: 2101835100
2010/05/17095736 Cambridge St Brighton Ma 02135
Pv ir room renovation relocating existing devices and installing smokes for reconfigured areas doc20111377 work to be done per nfpa stands. 780cmr. No occupancy in impaired fa zone.
Date:  January 20, 2012

Permit status: Na | Permit id: Bfdf111569 | Parcel: 2101835100
2012/01/20095736 Cambridge St Brighton Ma 02135
Stand truck at curb in 3 spaces; ; 7 am to 4 pm
Date:  August 26, 2014

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-400847 | Parcel: 2101835100
2014/08/26095736 Cambridge St Brighton Ma 02135
Complete demolition of "olh" bldg
Date:  February 9, 2012

Permit status: Na | Permit id: Fdc117345 | Parcel: 2101835100
2012/02/09095736 Cambridge St Brighton Ma 02135
Bagging of smoke detectors
Date:  September 23, 2013

Permit status: Na | Permit id: Bsd287631 | Parcel: 2101835100
2013/09/23095736 Cambridge St Brighton Ma 02135
Complete demo of entire structure @;our lady of health (olh);bldg
Date:  March 20, 2012

Permit status: Na | Permit id: Fdc124739 | Parcel: 2101835100
2012/03/20095736 Cambridge St Brighton Ma 02135
Welding of 2 new flanges and a degree elbow to a short section of pipe; on steam line bfd paid detail required
Date:  June 16, 2015

Permit status: Na | Permit id: Cbw479035 | Parcel: 2101835100
2015/06/16095736 Cambridge St Brighton Ma 02135
Remove existing fire alarm system for building demo - and remove master box; ~; doc# 20120259
Date:  March 5, 2012

Permit status: Na | Permit id: Bfdf122326 | Parcel: 2101835100
2012/03/05095736 Cambridge St Brighton Ma 02135
Complete demo of entire structure @ mother mary rose (mmr) pavillion
Date:  March 20, 2012

Permit status: Na | Permit id: Fdc124736 | Parcel: 2101835100
2012/03/20095736 Cambridge St Brighton Ma 02135
Cutting of steel casings on the mini piles ;(dpl); paid detail required ;
Date:  December 3, 2010

Permit status: Na | Permit id: Cbw53069 | Parcel: 2101835100
2010/12/03095736 Cambridge St Brighton Ma 02135
Add relocate a total of 129 sprinkler heads. Work to be done one floor zone at at a time per nfpa stands. 7 cmr.
Date:  August 1, 2014

Permit status: Na | Permit id: Sprk384578 | Parcel: 2101835100
2014/08/01095736 Cambridge St Brighton Ma 02135
Only one floor shall be impaired at any given time........... Installation shall comply with the requirements of 7 cmr and nfpa 13
Date:  January 8, 2015

Permit status: Na | Permit id: Sprk435579
2015/01/08095736 Cambridge St Brighton Ma 02135
Relocation of approximately 15 of 2" sprinkler pipe to make room for new duct work installation on 3rd floor work to be done one floor zone at a time. Per nfpa 13 stand
Date:  August 20, 2010

Permit status: Na | Permit id: Sprk38898 | Parcel: 2101835100
2010/08/20095736 Cambridge St Brighton Ma 02135
Cutting welding &; soldering for installation of new mechanical equipment air handlers &; associated;ductwork piping (dpl) bfd paid detail required
Date:  April 27, 2012

Permit status: Na | Permit id: Cbw133752 | Parcel: 2101835100
2012/04/27095736 Cambridge St Brighton Ma 02135
Modify existing 4" main to be fed by the fdc in preparation for demolition of building mother mary rose at st elizabeths medical center
Date:  March 5, 2012

Permit status: Na | Permit id: Sprk121121 | Parcel: 2101835100
2012/03/05095736 Cambridge St Brighton Ma 02135
Temporary bagging of smoke detectors for dust control
Date:  October 15, 2012

Permit status: Na | Permit id: Bsd189286 | Parcel: 2101835100
2012/10/15095736 Cambridge St Brighton Ma 02135
Install new sprinkler system per engineered plans submitted with the building permit this is an addition to existing building new addition will have new sprinkler system with minor modifications to the entire system; ~; paid detail required by dfc j neimann ~ 1 officer; 6 firefighters; and 1 pumper
Date:  January 4, 2013

Permit status: Na | Permit id: Sprk210900
2013/01/04095736 Cambridge St Brighton Ma 02135
Temporary bagging of smoke detectors for dust control during construction
Date:  April 16, 2014

Permit status: Na | Permit id: Bsd352093 | Parcel: 2101835100
2014/04/16095736 Cambridge St Brighton Ma 02135
Remove existing fire alarm system; and remove master box; for bldg demo; ~; doc# 20120261
Date:  March 5, 2012

Permit status: Na | Permit id: Bfdf122344 | Parcel: 2101835100
2012/03/05095736 Cambridge St Brighton Ma 02135
Stand truck &; trailer at curb 4 spaces no work marathon monday
Date:  April 3, 2013

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-232453 | Parcel: 2101835100
2013/04/03095736 Cambridge St Brighton Ma 02135
Complete demolition of "hoq" bldg
Date:  February 9, 2012

Permit status: Na | Permit id: Fdc117350 | Parcel: 2101835100
2012/02/09095736 Cambridge St Brighton Ma 02135
Cutting welding;for demolition of;black iron piping servicing steam condensate piping of various sizes bfd paid detail required
Date:  March 19, 2012

Permit status: Na | Permit id: Cbw124352 | Parcel: 2101835100
2012/03/19095736 Cambridge St Brighton Ma 02135
Grinding welding &; burning to install the new angle brace on the existing dunnage steel to install the new light boom steel supports to renovate the surgery suites. Bfd paid detail required
Date:  September 22, 2014

Permit status: Na | Permit id: Cbw406843 | Parcel: 2101835100
2014/09/22095736 Cambridge St Brighton Ma 02135
Installation of inte
Date:  July 9, 2013

Permit status: Na | Permit id: Chm261917 | Parcel: 2101835100
2013/07/09095736 Cambridge St Brighton Ma 02135
Cone off area for window replacement peds detoured onto walkway on hospital property 6pm to 9pm 450ft?
Date:  September 2, 2014

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-403643 | Parcel: 2101835100
2014/09/02095736 Cambridge St Brighton Ma 02135
Installation of inte
Date:  June 10, 2014

Permit status: Na | Permit id: Chm365700 | Parcel: 2101835100
2014/06/10095736 Cambridge St Brighton Ma 02135
Remove existing fire alarm system for building demo - and remove master box; ~; doc# 20120260
Date:  March 5, 2012

Permit status: Na | Permit id: Bfdf122343 | Parcel: 2101835100
2012/03/05095736 Cambridge St Brighton Ma 02135
SCORE
91
St. Elizabeths 8th floor vasc lab renovation
Date:  February 26, 2015
Contractor: Gregory Babikian

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf436851 | Parcel: 2101835100
2015/02/26091736 Cambridge St Brighton Ma 02135Gregory Babikian
Renovation of lab second &; third floors. Doc#20141353
Date:  November 10, 2014

Permit status: Na | Permit id: Bfdf412856 | Parcel: 2101835100
2014/11/10095736 Cambridge St Brighton Ma 02135
Cutting welding grinding;for removal of existing dock levelers and bumpersto accommodate the installation of new levelers and bumpers in;existing steel;embedded in concrete to facilitate replacement of (3) dock levelers bfd paid detail required
Date:  August 28, 2015

Permit status: Na | Permit id: Cbw511392 | Parcel: 2101835100
2015/08/28095736 Cambridge St Brighton Ma 02135
Welding burning cutting;&; grinding of;pipe &; condensate return piping (dpl) bfd paid detail required
Date:  October 6, 2014

Permit status: Na | Permit id: Cbw413960 | Parcel: 2101835100
2014/10/06095736 Cambridge St Brighton Ma 02135
Construction work to include building of three story addition to existing three story building
Date:  August 29, 2012

Permit status: Na | Permit id: Fdc178027 | Parcel: 2101835100
2012/08/29095736 Cambridge St Brighton Ma 02135
Cutting &; welding for installation of steam isolation valve in service bldg bfd paid detail required
Date:  October 16, 2012

Permit status: Na | Permit id: Cbw190692 | Parcel: 2101835100
2012/10/16095736 Cambridge St Brighton Ma 02135
Installation of upho
Date:  June 11, 2014

Permit status: Na | Permit id: Chm372346 | Parcel: 2101835100
2014/06/11095736 Cambridge St Brighton Ma 02135
Installation of upho
Date:  October 3, 2012

Permit status: Na | Permit id: Chm187142 | Parcel: 2101835100
2012/10/03095736 Cambridge St Brighton Ma 02135
To remove asbestos
Date:  August 16, 2011

Permit status: Na | Permit id: Asb91035 | Parcel: 2101835100
2011/08/16095736 Cambridge St Brighton Ma 02135
Roof drain fittings
Date:  September 10, 2015

Permit status: Na | Permit id: Asb517645 | Parcel: 2101835100
2015/09/10095736 Cambridge St Brighton Ma 02135
Temporary bagging of smoke detectors for dust control during;construction work
Date:  August 29, 2012

Permit status: Na | Permit id: Bsd178029 | Parcel: 2101835100
2012/08/29095736 Cambridge St Brighton Ma 02135
To remove asbestos from the 1st and 3rd floors
Date:  July 26, 2010

Permit status: Na | Permit id: Asb35558 | Parcel: 2101835100
2010/07/26095736 Cambridge St Brighton Ma 02135
Renovations;of (3) offices to include drywall painting &; ceilings
Date:  November 14, 2014

Permit status: Na | Permit id: Fdc424169 | Parcel: 2101835100
2014/11/14095736 Cambridge St Brighton Ma 02135
Temporary bagging of smoke detectors for dust control during renovation work
Date:  March 3, 2014

Permit status: Na | Permit id: Bsd326422 | Parcel: 2101835100
2014/03/03095736 Cambridge St Brighton Ma 02135
Welding / cutting of black iron pipe servicing steam condensate piping for 3-story addition on existing 3-story building to include connections to existing infrastructure feeding new hvac mechanical equipment bfd paid detail required
Date:  February 15, 2013

Permit status: Na | Permit id: Cbw220046 | Parcel: 2101835100
2013/02/15095736 Cambridge St Brighton Ma 02135
Cutting / welding for removal replacement and; repairs of low pressure steam piping system (dpl) bfd paid detail required
Date:  July 8, 2011

Permit status: Na | Permit id: Cbw85142 | Parcel: 2101835100
2011/07/08095736 Cambridge St Brighton Ma 02135
Removal of asbestos
Date:  July 24, 2012

Permit status: Na | Permit id: Asb165395 | Parcel: 2101835100
2012/07/24095736 Cambridge St Brighton Ma 02135
Remodel of surgery suite and support areas. Doc#20141356
Date:  November 17, 2014

Permit status: Na | Permit id: Bfdf413158 | Parcel: 2101835100
2014/11/17095736 Cambridge St Brighton Ma 02135
Install conduit; 1 sq ft; in sdwk;
Date:  August 9, 2013

Permit type: Service | Permit status: Expired | Permit id: Exca-272925 | Parcel: 2101835100
2013/08/09095736 Cambridge St Brighton Ma 02135
Burning for the removal of metal canopy structure bfd paid detail required
Date:  July 20, 2010

Permit status: Na | Permit id: Cbw34053 | Parcel: 2101835100
2010/07/20095736 Cambridge St Brighton Ma 02135
To remove asbestos
Date:  August 9, 2012

Permit status: Na | Permit id: Asb170698
2012/08/09095736 Cambridge St Brighton Ma 02135
Burning &; welding of carbon steel piping for steam/chiller water lines (dpl); bfd paid detail required
Date:  November 2, 2010

Permit status: Na | Permit id: Cbw48891 | Parcel: 2101835100
2010/11/02095736 Cambridge St Brighton Ma 02135
General permit for the storage of oxygen 5-75lbs / acetylene 3-75lbs 2-25lbs.
Date:  June 6, 2013

Permit type: Bfd other | Permit status: Na | Permit id: Gp246228 | Parcel: 2101835100
2013/06/06095736 Cambridge St Brighton Ma 02135
Bagging of smoke detector
Date:  November 29, 2010

Permit status: Na | Permit id: Bsd53224 | Parcel: 2101835100
2010/11/29095736 Cambridge St Brighton Ma 02135
To remove asbestos our ladys hall room 62
Date:  February 17, 2010

Permit status: Na | Permit id: Asb15075 | Parcel: 2101835100
2010/02/17095736 Cambridge St Brighton Ma 02135
St elizabeths hospital. 5sf of vat/mastic from floor in room 4020
Date:  November 7, 2014

Permit status: Na | Permit id: Asb424150 | Parcel: 2101835100
2014/11/07095736 Cambridge St Brighton Ma 02135
Install 4 weld-o-lets to existing hot water and chilled water piping mains in 5 level mech room this piping is required to supply hot/chilled water for a new air handler. Installing a sm amt of new steam piping in the 3rd level mech. Room and new operating room and to repair one steam line in 3rd fl operating &; 5th mech rm. Bfd paid detail required
Date:  September 29, 2014

Permit status: Na | Permit id: Cbw407840 | Parcel: 2101835100
2014/09/29095736 Cambridge St Brighton Ma 02135
To remove asbestos from the 2nd and 3rd floors
Date:  June 22, 2010

Permit status: Na | Permit id: Asb30796 | Parcel: 2101835100
2010/06/22095736 Cambridge St Brighton Ma 02135
Cutting &; welding for installation of valves for water system bfd paid detail required
Date:  March 24, 2010

Permit status: Na | Permit id: Cbw17706 | Parcel: 2101835100
2010/03/24095736 Cambridge St Brighton Ma 02135
St. Elizabeths medical ctr. 25lf pipe insulation above ceiling elevator lobby in quinn building.; ;elevator lobby on 2nd floor
Date:  December 29, 2014

Permit status: Na | Permit id: Asb437935 | Parcel: 2101835100
2014/12/29095736 Cambridge St Brighton Ma 02135
Burning / welding on carbon steel piping for steam and chilled water lines (dpl) bfd paid detail required
Date:  June 15, 2010

Permit status: Na | Permit id: Cbw28916 | Parcel: 2101835100
2010/06/15095736 Cambridge St Brighton Ma 02135
Company picnic/bbq to take place in one of our parking lots. Will have outdoor grilling a large tent and a dj.
Date:  August 12, 2015

Permit type: Special event | Permit status: Expired | Permit id: Pub503114 | Parcel: 2101835100
2015/08/12095736 Cambridge St Brighton Ma 02135
Installation of upho
Date:  August 15, 2013

Permit status: Na | Permit id: Chm275329 | Parcel: 2101835100
2013/08/15095736 Cambridge St Brighton Ma 02135
Demolition of 3" mud slabs and interior walls
Date:  April 30, 2010

Permit status: Na | Permit id: Fdc23252 | Parcel: 2101835100
2010/04/30095736 Cambridge St Brighton Ma 02135
St. Elizabeth medical center. Phase one:3000sf of floor tile 2 sinks at 55sf 70sf of window glazing 3 interior/1exterior all from pacu room-on cmp wing
Date:  September 9, 2014

Permit status: Na | Permit id: Asb405830 | Parcel: 2101835100
2014/09/09095736 Cambridge St Brighton Ma 02135
Cookout for hospital employees
Date:  August 19, 2014

Permit type: Special event | Permit status: Expired | Permit id: Pub389555 | Parcel: 2101835100
2014/08/19095736 Cambridge St Brighton Ma 02135
Cutting / welding / grinding of existing duct work for installation of lead sheilding at linac vault (dpl) bfd paid detail required
Date:  March 31, 2011

Permit status: Na | Permit id: Cbw69661 | Parcel: 2101835100
2011/03/31095736 Cambridge St Brighton Ma 02135
To conduct the following: use of two 40# propane tanks for cooking location : st. Elizabeths hospital event: ;employee luncheon ;: proper fire extinguishers required : one b/c extinguisher with each cooking unit ;: no refueling on site : ;no changing cylinders on site
Date:  September 2, 2014

Permit type: Open burning & cooki | Permit status: Na | Permit id: Gp402639 | Parcel: 2101835100
2014/09/02095736 Cambridge St Brighton Ma 02135
To remove asbestos from the corridor o/s room 42
Date:  January 25, 2010

Permit status: Na | Permit id: Asb12293 | Parcel: 2101835100
2010/01/25095736 Cambridge St Brighton Ma 02135
To remove asbestos from 736 cambridge street boston
Date:  August 1, 2011

Permit status: Na | Permit id: Asb88564 | Parcel: 2101835100
2011/08/01095736 Cambridge St Brighton Ma 02135
Bagging of smoke detectors
Date:  December 3, 2010

Permit status: Na | Permit id: Bsd53582 | Parcel: 2101835100
2010/12/03095736 Cambridge St Brighton Ma 02135
Cutting / burning / soldering &; braising of hot / cold water supply and return lines (dpl); bfd paid detail required
Date:  August 11, 2011

Permit status: Na | Permit id: Cbw89758 | Parcel: 2101835100
2011/08/11095736 Cambridge St Brighton Ma 02135
Welding only to remove &; replace pipe @ seton pavilion bldg bfd paid detail required
Date:  October 24, 2011

Permit status: Na | Permit id: Cbw101606 | Parcel: 2101835100
2011/10/24095736 Cambridge St Brighton Ma 02135
To conduct the following: tent for employee luncheon -no sidewall- total cubic feet of project: 40000
Date:  September 2, 2014

Permit status: Na | Permit id: Ta402648 | Parcel: 2101835100
2014/09/02095736 Cambridge St Brighton Ma 02135
Bagging of smoke detectors @ our lady shall bldg
Date:  April 5, 2010

Permit status: Na | Permit id: Bsd20270 | Parcel: 2101835100
2010/04/05095736 Cambridge St Brighton Ma 02135
To conduct the following: propane for grills 2-40# propane tanks; one lbs b/c extinguisher required: k-extinguisher required if deep fryer or frylator is used : only enough propane per cooking station is allowed: cylinders must be secured from falling over: milk crates work well.
Date:  September 11, 2015

Permit type: Open burning & cooki | Permit status: Na | Permit id: Gp516277 | Parcel: 2101835100
2015/09/11095736 Cambridge St Brighton Ma 02135
To remove asbestos
Date:  December 3, 2010

Permit status: Na | Permit id: Asb54302 | Parcel: 2101835100
2010/12/03095736 Cambridge St Brighton Ma 02135
Temporary bagging of smoke detectors for dust control during construction
Date:  February 9, 2012

Permit status: Na | Permit id: Bsd117411 | Parcel: 2101835100
2012/02/09095736 Cambridge St Brighton Ma 02135
Ceiling in room b-03 and hallway ceiling outside of room b-03
Date:  May 8, 2015

Permit status: Na | Permit id: Asb470000 | Parcel: 2101835100
2015/05/08095736 Cambridge St Brighton Ma 02135
Install co detectors in our ladies hall basement and 1st floor
Date:  December 1, 2010

Permit status: Na | Permit id: Bfdf52295 | Parcel: 2101835100
2010/12/01095736 Cambridge St Brighton Ma 02135
Welding 2" fitting into 10" pipe for a new drain convection off fire main emergency
Date:  April 17, 2012

Permit status: Na | Permit id: Cbw131387 | Parcel: 2101835100
2012/04/17095736 Cambridge St Brighton Ma 02135
Replace existing fire alarm panel with new simplex 4100u and replace all existing smoke detectors with new. Work to be done in parallel or during non business hours.; work to be done per nfpa 72 and 7 cmr 7th ed. Doc#20100893
Date:  November 1, 2010

Permit status: Na | Permit id: Bfdf45743 | Parcel: 2101835100
2010/11/01095736 Cambridge St Brighton Ma 02135
Burning &; welding of small steel parts;for drilling operations (dpl 2-25-2011) bfd paid detail required
Date:  November 18, 2010

Permit status: Na | Permit id: Cbw51935 | Parcel: 2101835100
2010/11/18095736 Cambridge St Brighton Ma 02135
Cutting / burning / welding for repair of rear entry landing to include welding new angle to existing stair landing supports and new metal pan to angle (dpl) bfd paid detail required
Date:  October 18, 2013

Permit status: Na | Permit id: Cbw295843 | Parcel: 2101835100
2013/10/18095736 Cambridge St Brighton Ma 02135
Burning / welding for installation of mini-piles in unoccupied space of pavilion (dpl ;2/25/11) bfd paid detail required
Date:  February 11, 2011

Permit status: Na | Permit id: Cbw63421 | Parcel: 2101835100
2011/02/11095736 Cambridge St Brighton Ma 02135
Date:  January 20, 2015

Permit status: Na | Permit id: Bfdmus442093 | Parcel: 2101835100
2015/01/20095736 Cambridge St Brighton Ma 02135
Burning / welding of 2" hot water heating piping bfd paid detail required
Date:  April 7, 2010

Permit status: Na | Permit id: Cbw20559 | Parcel: 2101835100
2010/04/07095736 Cambridge St Brighton Ma 02135
Ceiling outside room 7800
Date:  May 8, 2015

Permit status: Na | Permit id: Asb470061 | Parcel: 2101835100
2015/05/08095736 Cambridge St Brighton Ma 02135
Demo-convert restroom into workroom to include drywall ceiling paint flooring
Date:  August 15, 2014

Permit status: Na | Permit id: Fdc390245 | Parcel: 2101835100
2014/08/15095736 Cambridge St Brighton Ma 02135
SCORE
89
Construction support for new philips equipment in ep lab. Patch existing flooring reuse drop ceiling move duct as required relocate lights as required. Installation of unistrut supports for new philips equipment and skytron light. No hot work permitted without paid detail
Date:  August 4, 2015
Contractor: Alexander Main

Permit type: Bfd other | Permit status: Na | Permit id: Fdc500447 | Parcel: 2101835100
2015/08/04089736 Cambridge St Brighton Ma 02135Alexander Main
St. Elizabeth medical ctr. 100lf pipe insulation inside pipe chase and 1200sf of gwb caulking/sink undercoat in walls in labe rooms 2016 &; 2021
Date:  December 29, 2014

Permit status: Na | Permit id: Asb437937 | Parcel: 2101835100
2014/12/29095736 Cambridge St Brighton Ma 02135
Stand;boom truck at curb / 9: am to 3: pm; / boston police area d; 343-4210; / pedestrian staging is required
Date:  December 10, 2014

Permit type: Cranes | Permit status: Expired | Permit id: Occu-432560
2014/12/10095736 Cambridge St Brighton Ma 02135
Electrical fire alarm for 2nd floor radiation oncology department per nfpa-72 780cmr 7th ed doc#20100438
Date:  September 13, 2010

Permit status: Na | Permit id: Bfdf42261 | Parcel: 2101835100
2010/09/13095736 Cambridge St Brighton Ma 02135
Demo/renovations of existing space for new patient rooms to include drywall ceiling paint &; flooring
Date:  March 21, 2014

Permit status: Na | Permit id: Fdc343644 | Parcel: 2101835100
2014/03/21095736 Cambridge St Brighton Ma 02135
Welding only to the drain pan attached to the mud drum of boiler bfd paid detail required
Date:  November 30, 2011

Permit status: Na | Permit id: Cbw107010 | Parcel: 2101835100
2011/11/30095736 Cambridge St Brighton Ma 02135
Renovation of part of 5th floor; ~; doc# 20120669
Date:  July 2, 2012

Permit status: Na | Permit id: Bfdf147260 | Parcel: 2101835100
2012/07/02095736 Cambridge St Brighton Ma 02135
Date:  November 4, 2014

Permit status: Na | Permit id: Aspce422499 | Parcel: 2101835100
2014/11/04095736 Cambridge St Brighton Ma 02135
St. Elizabeth medical center
Date:  March 21, 2014

Permit status: Na | Permit id: Asb345639 | Parcel: 2101835100
2014/03/21095736 Cambridge St Brighton Ma 02135
St. Elizabeths medical center/seton; hall-operating room/100sq ft of duct sealant.
Date:  May 28, 2014

Permit status: Na | Permit id: Asb367029 | Parcel: 2101835100
2014/05/28095736 Cambridge St Brighton Ma 02135
Cranes
Date:  November 26, 2012

Permit status: Expired | Permit id: Occu-202606 | Parcel: 2101835100
2012/11/26095736 Cambridge St Brighton Ma 02135
St. Elizabeths medical center. 3lf of pipe insulation from hallway roof and drain
Date:  October 30, 2014

Permit status: Na | Permit id: Asb421912 | Parcel: 2101835100
2014/10/30095736 Cambridge St Brighton Ma 02135
Demo/renovations of existing space to include drywall ceiling paint flooring.
Date:  April 16, 2014

Permit status: Na | Permit id: Fdc352091 | Parcel: 2101835100
2014/04/16095736 Cambridge St Brighton Ma 02135
Cutting / burning / welding of structural steel metal deck and sheer studs for erection of new addition to existing building (dpl 10/1/13) bfd paid detail required
Date:  October 1, 2012

Permit status: Na | Permit id: Cbw186323 | Parcel: 2101835100
2012/10/01095736 Cambridge St Brighton Ma 02135
To remove asbestos from 736 cambridge street brighton
Date:  August 1, 2011

Permit status: Na | Permit id: Asb88509 | Parcel: 2101835100
2011/08/01095736 Cambridge St Brighton Ma 02135
Bagging of smoke detectors; bagging during day only remove bag after work is completed
Date:  November 14, 2014

Permit status: Na | Permit id: Bsd424173 | Parcel: 2101835100
2014/11/14095736 Cambridge St Brighton Ma 02135
Install c/o detectors to basement 1st 3rd 4th and 5th
Date:  November 30, 2010

Permit status: Na | Permit id: Bfdf48855 | Parcel: 2101835100
2010/11/30095736 Cambridge St Brighton Ma 02135
Cutting / burning / welding for repair;of condensor water baffle plate; and brackets at the central heating and cooling plant (dpl) bfd paid detail required
Date:  April 7, 2014

Permit status: Na | Permit id: Cbw348877 | Parcel: 2101835100
2014/04/07095736 Cambridge St Brighton Ma 02135
Temporary placement of (3) dumpsters for debris during construction
Date:  February 9, 2012

Permit status: Na | Permit id: Td117430 | Parcel: 2101835100
2012/02/09095736 Cambridge St Brighton Ma 02135
Cutting burning &; welding to include structural steel metal deck &; sheer studs (dpl); for each separate location bfd paid detail required
Date:  April 17, 2013

Permit status: Na | Permit id: Cbw232193 | Parcel: 2101835100
2013/04/17095736 Cambridge St Brighton Ma 02135
Tents----fire extinguishers are required in each tent permitted on site.; permit is for fire apparatus access; flame certification is for the tent material only; occupant load approval is required from the inspectional services department.
Date:  September 11, 2015

Permit status: Na | Permit id: Ta516283 | Parcel: 2101835100
2015/09/11095736 Cambridge St Brighton Ma 02135
Cutting burning &; welding to make connections to the existing infrastructure that will feed new hvac;mechanical system &; black iron piping to service steam/condensate piping @ william f. Connell bldg ; bfd paid detail required
Date:  December 3, 2012

Permit status: Na | Permit id: Cbw200946 | Parcel: 2101835100
2012/12/03095736 Cambridge St Brighton Ma 02135
St. Elizabeth medical center. 1500sf of floor tile. Mastic from rm 4020
Date:  October 30, 2014

Permit status: Na | Permit id: Asb421945 | Parcel: 2101835100
2014/10/30095736 Cambridge St Brighton Ma 02135
Electrical low voltage
Date:  February 10, 2011
Value:   $5,000

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv63541
2011/02/10500095736 Cambridge St Brighton Ma 02135
Excavation permit
Date:  May 28, 2015

Permit type: Maintenance | Permit id: Exca-477566
2015/05/28095736 Cambridge St Brighton Ma 02135
SCORE
82
Semc. Installation of low voltage cabling for telecommunication devices.
Date:  February 8, 2017
Value:   $7,500
Contractor: Kimberly Rennie

Client: Steward St Elizabeths | Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv679625 | Parcel: 2101835100
2017/02/08750082736 Cambridge St Brighton Ma 02135Kimberly Rennie
SCORE
100
Erect 40x1 tent on 6 22 17. Removal on 6 22 17.
Date:  June 14, 2017
Value:   $5,000
Contractor: Mark Traina

Client: Steward St Elizabeths | Permit type: Other | Permit status: Open | Current use: Other | Permit id: Sf720068 | Parcel: 2101835100
2017/06/145000100736 Cambridge St Brighton Ma 02135Mark Traina
SCORE
100
St. Elizabeths heat exchanger misc. Low voltage hvac control wiring - npb 174371
Date:  March 13, 2017
Value:   $2,500
Contractor: Paul Guarracino

Client: Steward St Elizabeths | Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv688264 | Parcel: 2101835100
2017/03/132500100736 Cambridge St Brighton Ma 02135Paul Guarracino
SCORE
82
3 hand sinks
Date:  April 7, 2017
Value:   $3,000
Contractor: Joe Ponticelli

Client: Steward St Elizabeths | Permit type: Plumbing | Permit status: Open | Current use: Comm | Permit id: Pl662283 | Parcel: 2101835100
2017/04/07300082736 Cambridge St Brighton Ma 02135Joe Ponticelli
SCORE
100
Plumbing permit
Date:  November 20, 2014
Value:   $21,240
Contractor: Michael Petrilli

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl425993 | Parcel: 2101835100
2014/11/2021240100736 Cambridge St Brighton Ma 02135Michael Petrilli
SCORE
96
Low voltage wiring to install new amber strobe light in emergency department security office.
Date:  April 19, 2016
Value:   $3,000
Contractor: Arthur Bourque

Client: Steward St Elizabeths | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv581404 | Parcel: 2101835100
2016/04/19300096736 Cambridge St Brighton Ma 02135Arthur Bourque
SCORE
100
Erect 40x1 tent on 5 12 16. Removal on 5 12 16.
Date:  April 21, 2016
Value:   $6,000
Contractor: Mark Traina

Client: Steward St Elizabeths | Permit type: Other | Permit status: Expired | Current use: Other | Permit id: Sf580702 | Parcel: 2101835100
2016/04/216000100736 Cambridge St Brighton Ma 02135Mark Traina
SCORE
99
Add 1 amp sub-panel and circuits for new radio equipment
Date:  October 21, 2016
Value:   $5,000
Contractor: Paul Hanson

Client: Steward St Elizabeths | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E642663 | Parcel: 2101835100
2016/10/21500099736 Cambridge St Brighton Ma 02135Paul Hanson
SCORE
65
Renovations to the 3rd floor usp-797 pharmacy at st. Elizabeths hospital.
Date:  October 24, 2016
Value:   $115,642
Contractor: John J. Sparks Jr

Client: Steward St Elizabeths | Permit type: Electrical | Permit status: Open | Current use: Other | Permit id: E649659 | Parcel: 2101835100
2016/10/2411564265736 Cambridge St Brighton Ma 02135John J. Sparks Jr
SCORE
99
Replace one existing fire alarm panel on first floor.
Date:  October 27, 2016
Value:   $17,000
Contractor: Michael Fisher

Client: Steward St Elizabeths | Permit type: Fire alarm | Permit status: Open | Current use: Comm | Permit id: Alt641642 | Parcel: 2101835100
2016/10/271700099736 Cambridge St Brighton Ma 02135Michael Fisher
SCORE
82
St. Elizabeths usp 797 pharmacy work: phase 1 - 221 sf renovation of an existing conference room into office space.; phase 2 - 442 sf renovation of existing office space into a new sterile compounding area to meet the usp 797 standards. 1 &; 2 prior to starting phase 3. Phase 3 - 4 sf convert the existing pharmacy compounding space into offices and equipment alcove:
Date:  November 1, 2016
Value:   $667,893
Contractor: Andrew Previdi

Client: Steward St Elizabeths | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Other | Permit id: Alt636083 | Parcel: 2101835100
2016/11/0166789382736 Cambridge St Brighton Ma 02135Andrew Previdi
SCORE
84
Romoval and replacement of existing gas fired water heater
Date:  May 9, 2016
Value:   $40,000
Contractor: Chris Oconnor

Client: Steward St Elizabeths | Permit type: Gas | Permit status: Expired | Current use: Comm | Permit id: G588509 | Parcel: 2101835100
2016/05/094000084736 Cambridge St Brighton Ma 02135Chris Oconnor
SCORE
84
Removal and replacement of existing gas fired water heater
Date:  May 9, 2016
Value:   $40,000
Contractor: Chris Oconnor

Client: Steward St Elizabeths | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl588507 | Parcel: 2101835100
2016/05/094000084736 Cambridge St Brighton Ma 02135Chris Oconnor
SCORE
82
Repair replace an existing exterior entrance door that is failing with a new door to match the existing door. Also move an interior door to facilitate the activities of the cardiology department.
Date:  May 9, 2016
Value:   $14,300
Contractor: Bob Gendron

Client: Steward St Elizabeths | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf588702 | Parcel: 2101835100
2016/05/091430082736 Cambridge St Brighton Ma 02135Bob Gendron
SCORE
100
Installation of new fire alarm panel interior on 1st floor fire command center.
Date:  November 17, 2016
Value:   $5,000
Contractor: William Weber

Client: Steward St Elizabeths | Permit type: Fire alarm | Permit status: Open | Current use: Comm | Permit id: Efa657321 | Parcel: 2101835100
2016/11/175000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
59
Replacement of casework and foodservice equipment painting
Date:  June 11, 2014
Value:   $140,000
Contractor: Lisa May

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf358835 | Parcel: 2101835100
2014/06/1114000059736 Cambridge St Brighton Ma 02135Lisa May
SCORE
100
Erect 40x1 tent on 9/17/15. Removal on 9/17/15.
Date:  August 25, 2015
Value:   $4,400
Contractor: Mark Traina

Client: St Elizabeths Hosp Of Bos | Permit type: Other | Permit status: Expired | Current use: Other | Permit id: Sf510221 | Parcel: 2101835100
2015/08/254400100736 Cambridge St Brighton Ma 02135Mark Traina
SCORE
99
Adding new sprinkler piping for audio booth
Date:  April 7, 2010
Value:   $10,000
Contractor: Peter Linton

Client: St Elizabeths Hosp Of Bos | Permit type: Fire protection/sprinkler | Current use: Comm | Permit id: Alt12713 | Parcel: 2101835100
2010/04/071000099736 Cambridge St Brighton Ma 02135Peter Linton
SCORE
70
Hospital alt117027 issued 2 2 2012 temp coo for 5th floor oncology exam rooms (ccp5) only. Tco expires 11 23 2012 pending completion per plans.
Date:  September 24, 2012
Contractor: Ron Benham

Client: St Elizabeths Hosp Of Bos | Permit status: Expired | Current use: Comm | Permit id: Coo184642 | Parcel: 2101835100
2012/09/24070736 Cambridge St Brighton Ma 02135Ron Benham
SCORE
91
Install and wire five(5)fire alarm strobe only 8th floor vasc. All work was old work on existing drywall walls
Date:  April 17, 2015
Value:   $1,500
Contractor: Gregory Babikian

Client: St Elizabeths Hosp Of Bos | Permit type: Fire alarm | Permit status: Expired | Current use: Other | Permit id: Efa460189 | Parcel: 2101835100
2015/04/17150091736 Cambridge St Brighton Ma 02135Gregory Babikian
SCORE
59
Would like to pull fast track permit while the long form permit is being reviewed (see alt19135). All fees/plans/specs/documentation have been paid and;turned in;already. We are looking to perform mud slab demo and some selective architectural demo of interior walls and act ceilings. Cost reflected on alt 19135
Date:  April 28, 2010
Contractor: Ronald J Benham

Client: St Elizabeths Hosp Of Bos | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Sf23573 | Parcel: 2101835100
2010/04/28059736 Cambridge St Brighton Ma 02135Ronald J Benham
SCORE
96
Low voltage wiring to install (1) card reader on inside of the ccp #5 trash removal door.
Date:  November 8, 2012
Value:   $2,000
Contractor: Arthur Bourque

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv198690 | Parcel: 2101835100
2012/11/08200096736 Cambridge St Brighton Ma 02135Arthur Bourque
SCORE
100
New sinks and floor drains
Date:  September 30, 2014
Value:   $59,000
Contractor: Kevin Almeida

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl410010 | Parcel: 2101835100
2014/09/3059000100736 Cambridge St Brighton Ma 02135Kevin Almeida
SCORE
100
3rd floor remodel of existing patient rooms at 736 cambridge st. (gec#14029)
Date:  April 16, 2014
Value:   $65,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E352893 | Parcel: 2101835100
2014/04/1665000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
99
Empty conduits x-ray rm 4 downlights 2 layin
Date:  June 14, 2010
Value:   $12,000
Contractor: Angela Noenickx

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Other | Permit id: E29695 | Parcel: 2101835100
2010/06/141200099736 Cambridge St Brighton Ma 02135Angela Noenickx
SCORE
100
Lab renovation 2nd & 3rd floors at 736 cambridge st. (gec #s14444).
Date:  September 16, 2014
Value:   $35,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E406815 | Parcel: 2101835100
2014/09/1635000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
99
Renovation of existing cardiac catheterization suite. Work includes replacing existing equipment and electrical infrastructure and upgrading the finishs for the space.
Date:  May 3, 2010
Value:   $296,500
Contractor: Peter Linton

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf22594 | Parcel: 2101835100
2010/05/0329650099736 Cambridge St Brighton Ma 02135Peter Linton
SCORE
82
Suite 407-new tenant interior fit-up including new flooring painting casework handicap bathroom
Date:  October 3, 2014
Value:   $55,000
Contractor: Brent Heinzer

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf413778 | Parcel: 2101835100
2014/10/035500082736 Cambridge St Brighton Ma 02135Brent Heinzer
SCORE
99
Renovate offices into hearing aid center
Date:  March 26, 2010
Value:   $20,000
Contractor: Angela Noenickx

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E19562 | Parcel: 2101835100
2010/03/262000099736 Cambridge St Brighton Ma 02135Angela Noenickx
SCORE
96
Low voltage wiring to replace lock hardware on dumpster door with delayed egress maglock and electrified lever set.
Date:  August 27, 2013
Value:   $3,000
Contractor: Arthur Bourque

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv279705 | Parcel: 2101835100
2013/08/27300096736 Cambridge St Brighton Ma 02135Arthur Bourque
SCORE
70
Legal occuapancy:; st. Elizabeths hospital renovations to existing space. Alt117027 issued: 2 2 12 coo for 5th floor oncology.
Date:  October 9, 2012
Value:   $1,293,265
Contractor: Ron Benham

Client: St Elizabeths Hosp Of Bos | Permit type: Fast track application | Permit status: Expired | Current use: Other | Permit id: Coo180296 | Parcel: 2101835100
2012/10/09129326570736 Cambridge St Brighton Ma 02135Ron Benham
SCORE
96
St. Elizabeths medical center -; installation of new;signage;per bra approved plans
Date:  February 6, 2013
Value:   $36,735
Contractor: Dennis Prifti

Client: St Elizabeths Hosp Of Bos | Permit type: Signs | Current use: Other | Permit id: Alt199006 | Parcel: 2101835100
2013/02/063673596736 Cambridge St Brighton Ma 02135Dennis Prifti
SCORE
100
Replace concrete landing and metal pan at stairwell and install new aluminum glass entry work to be done at 11 nevins
Date:  October 4, 2013
Value:   $30,856
Contractor: Ralph Dantonio

Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf292279
2013/10/0430856100736 Cambridge St Brighton Ma 02135Ralph Dantonio
SCORE
89
Construct a new 3 story addition onto the existing 3 story william f. Connell building with an addition for a new stair and elevator.; excavate for new stair / elevator addition and install a new poured concrete foundation on mini piles.; ;lpr;
Date:  October 9, 2012
Value:   $20,954,365
Contractor: Ronald Benham

Client: St Elizabeths Hosp Of Bos | Permit type: Addition | Permit status: Expired | Current use: Other | Permit id: Alt146092 | Parcel: 2101835100
2012/10/092095436589736 Cambridge St Brighton Ma 02135Ronald Benham
SCORE
100
Install of 750 kw generator at 736 cambridge st. (gec #14060).
Date:  October 31, 2014
Value:   $10,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E420722 | Parcel: 2101835100
2014/10/3110000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
59
St. Elizabeths hospital - cbr lab renovations - 2nd &; 3rd floors;-; construction includes selective demolition of existing architecturals and meps. Providing replacement hvac equipment and extending/relocating/reusing existing meps to accommodate new layout modifications to existing fire alarm and sprinkler system. Providing minor interior finishes where specified. Use square footage and egress are unchanged.
Date:  September 8, 2014
Value:   $652,119
Contractor: Wayne Curley

Client: St Elizabeths Hosp Of Bos | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt404240 | Parcel: 2101835100
2014/09/0865211959736 Cambridge St Brighton Ma 02135Wayne Curley
SCORE
99
Empty conduits for x-ray room new lights
Date:  June 14, 2010
Value:   $25,000
Contractor: Angela Noenickx

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Other | Permit id: E29691 | Parcel: 2101835100
2010/06/142500099736 Cambridge St Brighton Ma 02135Angela Noenickx
SCORE
100
Splicing existing data cables to a new closet location 50 from existing.
Date:  May 7, 2012
Value:   $30,000
Contractor: Michael Lydon

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv138997 | Parcel: 2101835100
2012/05/0730000100736 Cambridge St Brighton Ma 02135Michael Lydon
SCORE
100
St. Elizabeths-4th floor cardinal cushing pavilion - add 7 fa devices
Date:  November 22, 2011
Value:   $9,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Efa106869 | Parcel: 2101835100
2011/11/229000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
100
Installing one sink on the 8th floor of st elizabeths
Date:  August 12, 2014
Value:   $5,000
Contractor: Thomas Hannon

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl390432 | Parcel: 2101835100
2014/08/125000100736 Cambridge St Brighton Ma 02135Thomas Hannon
SCORE
61
Removal and disposal of the existing roof system and installation of new 3. 5" insulation and a fully-adhered tpo roof system.
Date:  June 29, 2010
Value:   $61,380
Contractor: Mark J Mckernan

Client: St Elizabeths Hosp Of Bos | Permit type: Roofing | Permit status: Expired | Current use: Other | Permit id: Sf31809 | Parcel: 2101835100
2010/06/296138061736 Cambridge St Brighton Ma 02135Mark J Mckernan
SCORE
100
Install 18 carbon monoxide detectors
Date:  February 15, 2011
Value:   $16,000
Contractor: Brian Souza

Client: St Elizabeths Hosp Of Bos | Permit type: Fire alarm | Current use: Comm | Permit id: Sf64132 | Parcel: 2101835100
2011/02/1516000100736 Cambridge St Brighton Ma 02135Brian Souza
SCORE
91
8th floor vasc renovation. Demo 4 receptacles. Add 1 recessed light 3 under cabinet light install 1 receptacle and 3 gfi receptacles. Rooms 8033 8030 8042b 8040 8025
Date:  December 22, 2014
Value:   $6,000
Contractor: Gregory Babikian

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Permit status: Expired | Current use: Mixed | Permit id: E436417 | Parcel: 2101835100
2014/12/22600091736 Cambridge St Brighton Ma 02135Gregory Babikian
SCORE
100
Demo and add data cabling for 2nd and 3rd floor renovation space.
Date:  October 24, 2014
Value:   $5,000
Contractor: Michael Lydon

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Mixed | Permit id: Elv418836 | Parcel: 2101835100
2014/10/245000100736 Cambridge St Brighton Ma 02135Michael Lydon
SCORE
79
Install and wire hvac temperature controls at st. Elizabeths hospital.
Date:  December 16, 2010
Value:   $22,721
Contractor: Patrick Guyot

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv55005 | Parcel: 2101835100
2010/12/162272179736 Cambridge St Brighton Ma 02135Patrick Guyot
SCORE
96
Low voltage wiring to install mini dome camera outside of seton 4 cafeteria.
Date:  September 19, 2014
Value:   $1,001
Contractor: Arthur Bourque

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv408946 | Parcel: 2101835100
2014/09/19100196736 Cambridge St Brighton Ma 02135Arthur Bourque
SCORE
100
St. Elizabeths medical center icu 3rd floor addition. (gec #12117)
Date:  January 23, 2013
Value:   $2,000,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Other | Permit id: E215364 | Parcel: 2101835100
2013/01/232000000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
100
Controls wiring for ahu and vav.
Date:  November 10, 2014
Value:   $6,500
Contractor: Julie Keefe

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv425269 | Parcel: 2101835100
2014/11/106500100736 Cambridge St Brighton Ma 02135Julie Keefe
SCORE
59
Interior renovations for new linac proceedure room exam rooms staff and support areas. Work involves metal stud framing drywall hvac electrical fire protection fire alarm plumbing and architectural wall ceiling floor finishes.; ;
Date:  June 24, 2010
Value:   $4,861,053
Contractor: Jason Harding

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Alt19135 | Parcel: 2101835100
2010/06/24486105359736 Cambridge St Brighton Ma 02135Jason Harding
SCORE
96
Low voltage wiring to install new interlock panel in 5th floor panel room.
Date:  August 5, 2014
Value:   $2,000
Contractor: Arthur Bourque

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv391324 | Parcel: 2101835100
2014/08/05200096736 Cambridge St Brighton Ma 02135Arthur Bourque
SCORE
100
Install cable for cash registers
Date:  September 23, 2014
Value:   $3,000
Contractor: Jeffrey Catalano

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv410173 | Parcel: 2101835100
2014/09/233000100736 Cambridge St Brighton Ma 02135Jeffrey Catalano
SCORE
100
Icu rooms fitout at 736 cambridge st. (gec #14030)
Date:  April 22, 2014
Value:   $100,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E354227 | Parcel: 2101835100
2014/04/22100000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
64
Constrcut new office and restroom in cmp-5 high pressure boiler mechanical space.
Date:  May 20, 2014
Value:   $30,000
Contractor: Scott Nicum

Client: St Elizabeths Hosp Of Bos | Permit type: Other | Current use: Other | Permit id: Sf354719 | Parcel: 2101835100
2014/05/203000064736 Cambridge St Brighton Ma 02135Scott Nicum
SCORE
91
Renovating of interior space with new in-wall utilities. Re-finishing the space and changing out window system
Date:  August 22, 2011
Value:   $500,000
Contractor: Greg Walsh

Client: St Elizabeths Hosp Of Bos | Permit type: Interior/exterior work | Current use: Other | Permit id: Sf90824 | Parcel: 2101835100
2011/08/2250000091736 Cambridge St Brighton Ma 02135Greg Walsh
SCORE
100
Outlets for patient rm monitors
Date:  July 21, 2011
Value:   $30,000
Contractor: James Milley

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Other | Permit id: E86841 | Parcel: 2101835100
2011/07/2130000100736 Cambridge St Brighton Ma 02135James Milley
SCORE
100
Installing fixtures and med gas piping on the 7th floor.
Date:  September 19, 2011
Value:   $40,000
Contractor: Thomas Hannon

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl95316 | Parcel: 2101835100
2011/09/1940000100736 Cambridge St Brighton Ma 02135Thomas Hannon
SCORE
100
Adding data cables on the 4th floor of seton building.
Date:  May 28, 2014
Value:   $2,000
Contractor: Michael Lydon

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Mixed | Permit id: Elv352414 | Parcel: 2101835100
2014/05/282000100736 Cambridge St Brighton Ma 02135Michael Lydon
SCORE
100
Installing plumbing fixtures and associated piping on the 5th floor of st es oncology center.
Date:  April 25, 2012
Value:   $194,000
Contractor: Thomas Hannon

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl123251 | Parcel: 2101835100
2012/04/25194000100736 Cambridge St Brighton Ma 02135Thomas Hannon
SCORE
100
Install 18 carbon monoxide detectors
Date:  October 26, 2010
Value:   $23,000
Contractor: Brian Souza

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E48676 | Parcel: 2101835100
2010/10/2623000100736 Cambridge St Brighton Ma 02135Brian Souza
SCORE
100
Low voltage at 736 cambridge st icu rooms. (gec#14030)
Date:  April 22, 2014
Value:   $10,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv354235 | Parcel: 2101835100
2014/04/2210000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
100
Install 13 fiber cables
Date:  October 5, 2011
Value:   $45,000
Contractor: Michael Lydon

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Other | Permit id: Elv99155 | Parcel: 2101835100
2011/10/0545000100736 Cambridge St Brighton Ma 02135Michael Lydon
SCORE
100
Tel data wiring for the 5th floor oncology department
Date:  May 16, 2012
Value:   $50,000
Contractor: Michael Lydon

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv142074 | Parcel: 2101835100
2012/05/1650000100736 Cambridge St Brighton Ma 02135Michael Lydon
SCORE
80
Demolition of existing mud slab and interior walls estimated approx. 40 linear feet(not a complete gut) 2nd flr only.
Date:  April 28, 2010
Value:   $30,000
Contractor: Mike Minichillo

Client: St Elizabeths Hosp Of Bos | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf23584 | Parcel: 2101835100
2010/04/283000080736 Cambridge St Brighton Ma 02135Mike Minichillo
SCORE
93
We propose to do the following work: demo a 12 wide non-structural interior partition subdividing two rooms. Demo will not impact ceiling including existing lighting and sprinklers. Abutting walls impacted by demo will be cosmetically repaired. Demo will convert two offices to one. We will demo and close in one door. We will install one new door and replace an existing door to change the swing. We will demo a transaction window and close it in with light gauge metal studs and gwb. No sprinkler work.
Date:  February 16, 2016
Value:   $7,222
Contractor: Robert Gendron

Client: Steward St Elizabeths | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf562594 | Parcel: 2101835100
2016/02/16722293736 Cambridge St Brighton Ma 02135Robert Gendron
SCORE
89
Three buildings are being completely demoed razed including the foundations with new hardscape finishes being done per contract drawings. See breakdown below: 1. Our ladys hall - olh building (65 500 sf) 2. Mother mary rose - mmr building (79 000 sf) 3. House office quarters - hoq building (25 30
Date:  April 18, 2012
Value:   $1,222,000
Contractor: Ronald Benham

Client: St Elizabeths Hosp Of Bos | Permit type: Removal of structure | Permit status: Expired | Current use: Mixed | Permit id: Sf119340 | Parcel: 2101835100
2012/04/18122200089736 Cambridge St Brighton Ma 02135Ronald Benham
SCORE
100
Jme job #14-1262 ~ npb low voltage control system st. Elizabeths icu and pharmacy.
Date:  May 23, 2014
Value:   $2,500
Contractor: Paul Guarracino

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv362735 | Parcel: 2101835100
2014/05/232500100736 Cambridge St Brighton Ma 02135Paul Guarracino
SCORE
100
New ep lab equipment replacement (x-ray machine) with new 125a feeder
Date:  August 5, 2015
Value:   $84,000
Contractor: Michael Mcdonald

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Permit status: Open | Current use: Comm | Permit id: E502581 | Parcel: 2101835100
2015/08/0584000100736 Cambridge St Brighton Ma 02135Michael Mcdonald
SCORE
100
Ccp-4th floor. Renovation of an existing medical treatment area jfs job # 4907
Date:  December 30, 2011
Value:   $18,000
Contractor: Derek Shine

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl108057 | Parcel: 2101835100
2011/12/3018000100736 Cambridge St Brighton Ma 02135Derek Shine
SCORE
96
Low voltage wiring to install card readers dble door 3241a single door 3425a single door st6-3a dbl door 3152a dbl door 332a and install access control panel electric room.
Date:  January 26, 2015
Value:   $38,000
Contractor: Arthur Bourque

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: Elv444130 | Parcel: 2101835100
2015/01/263800096736 Cambridge St Brighton Ma 02135Arthur Bourque
SCORE
89
Removing existing windows by abatement contractor and temporarily securing them back in each day until main building permit(sf119340) is approved for complete demo of 3 buildings.
Date:  February 27, 2012
Value:   $35,000
Contractor: Ronald Benham

Client: St Elizabeths Hosp Of Bos | Permit type: Demolition - exterior | Current use: Mixed | Permit id: Sf121554 | Parcel: 2101835100
2012/02/273500089736 Cambridge St Brighton Ma 02135Ronald Benham
SCORE
100
8 patient room renovation
Date:  September 20, 2011
Value:   $10,000
Contractor: James Milley

Client: St Elizabeths Hosp Of Bos | Permit type: Fire alarm | Current use: Other | Permit id: Efa96297 | Parcel: 2101835100
2011/09/2010000100736 Cambridge St Brighton Ma 02135James Milley
SCORE
100
5th floor hospital renovation
Date:  March 30, 2012
Value:   $20,000
Contractor: James Milley

Client: St Elizabeths Hosp Of Bos | Permit type: Fire alarm | Current use: Other | Permit id: Efa127620 | Parcel: 2101835100
2012/03/3020000100736 Cambridge St Brighton Ma 02135James Milley
SCORE
96
Low voltage wiring to install (6) cameras &; terminate card reader packages and associated devices ( panics @ nurses station).
Date:  June 17, 2013
Value:   $100,000
Contractor: Arthur Bourque

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv253449 | Parcel: 2101835100
2013/06/1710000096736 Cambridge St Brighton Ma 02135Arthur Bourque
SCORE
100
St. Elizabeths hospital inverventional imaging room (pv room) renovation micellaneous hvac control wiring jme job# 119255
Date:  February 14, 2012
Value:   $4,000
Contractor: Paul Guarracino

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv118274 | Parcel: 2101835100
2012/02/144000100736 Cambridge St Brighton Ma 02135Paul Guarracino
SCORE
89
Interior demo of 3 buildings: olh hoq & mmr. Interior demo will take place until full building demo permit is finalize to completely raze them. (reference permit sf119340)
Date:  March 15, 2012
Value:   $20,000
Contractor: Ronald Benham

Client: St Elizabeths Hosp Of Bos | Permit type: Demolition - interior | Current use: Comm | Permit id: Sf125089 | Parcel: 2101835100
2012/03/152000089736 Cambridge St Brighton Ma 02135Ronald Benham
SCORE
100
Lab renovation on 2nd and 3rd floors at 736 cambridge st. (gec #s14444)
Date:  September 16, 2014
Value:   $15,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Efa406810 | Parcel: 2101835100
2014/09/1615000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
100
Dcfi pharmacy renovation 5th floor
Date:  May 7, 2014
Value:   $40,000
Contractor: Michael Mckinnon

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E357625 | Parcel: 2101835100
2014/05/0740000100736 Cambridge St Brighton Ma 02135Michael Mckinnon
SCORE
96
St elizabeths medical center: low voltage wiring to add card rerader on new door inside geriatric psych space.
Date:  July 1, 2014
Value:   $9,000
Contractor: Arthur Bourque

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv379671 | Parcel: 2101835100
2014/07/01900096736 Cambridge St Brighton Ma 02135Arthur Bourque
SCORE
99
Reno existing patient rooms to exam and offices
Date:  December 24, 2009
Value:   $58,000
Contractor: Angela Noenickx

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E2469 | Parcel: 2101835100
2009/12/245800099736 Cambridge St Brighton Ma 02135Angela Noenickx
SCORE
100
Hospital cafe renovation at 736 cambridge street. (gec #s14388).
Date:  May 29, 2014
Value:   $7,500
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E367182 | Parcel: 2101835100
2014/05/297500100736 Cambridge St Brighton Ma 02135William Weber
SCORE
100
Erect 40x1 tent on 9/10/14. Removal on 910/14
Date:  August 29, 2014
Value:   $4,100
Contractor: Mark Traina

Client: St Elizabeths Hosp Of Bos | Permit type: Other | Permit status: Expired | Current use: Other | Permit id: Sf402572 | Parcel: 2101835100
2014/08/294100100736 Cambridge St Brighton Ma 02135Mark Traina
SCORE
100
Our lady hall. Demo existing building on site. Jfs job # 4923
Date:  March 21, 2012
Value:   $5,000
Contractor: Derek Shine

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl124713 | Parcel: 2101835100
2012/03/215000100736 Cambridge St Brighton Ma 02135Derek Shine
SCORE
100
Replace fire alarm panel at our ladies hall st. Elizabeths hospital replace existing smoke detectors with new.
Date:  October 5, 2010
Value:   $9,000
Contractor: Brian Souza

Client: St Elizabeths Hosp Of Bos | Permit type: Fire alarm | Current use: Comm | Permit id: Efa45628 | Parcel: 2101835100
2010/10/059000100736 Cambridge St Brighton Ma 02135Brian Souza
SCORE
100
5th floor hospital space renovation
Date:  May 11, 2012
Value:   $380,000
Contractor: James Milley

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Other | Permit id: E127618 | Parcel: 2101835100
2012/05/11380000100736 Cambridge St Brighton Ma 02135James Milley
SCORE
99
Renovation to existing space to create an imaging room mep fire protection and fa per plans
Date:  November 21, 2011
Value:   $777,837
Contractor: Timothy Clinton

Client: St Elizabeths Hosp Of Bos | Permit type: Fast track application | Current use: Other | Permit id: Alt104186 | Parcel: 2101835100
2011/11/2177783799736 Cambridge St Brighton Ma 02135Timothy Clinton
SCORE
100
Low voltage wiring - st elizabeths medical center
Date:  May 1, 2013
Value:   $50,000
Contractor: Christine Mckeown

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv237397 | Parcel: 2101835100
2013/05/0150000100736 Cambridge St Brighton Ma 02135Christine Mckeown
SCORE
98
Change out of 250 kw generator.
Date:  May 31, 2013
Value:   $10,000
Contractor: John Penney

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E249516 | Parcel: 2101835100
2013/05/311000098736 Cambridge St Brighton Ma 02135John Penney
SCORE
100
Renovation to existing tenant space to a dunkin donuts
Date:  August 13, 2014
Value:   $3,000
Contractor: Jeffrey Catalano

Client: St Elizabeths Hosp Of Bos | Permit type: Fire alarm | Current use: Comm | Permit id: Efa392936 | Parcel: 2101835100
2014/08/133000100736 Cambridge St Brighton Ma 02135Jeffrey Catalano
SCORE
99
Relocated existing and 2 new fa speaker strobe 1 strobe 2 smoke det
Date:  March 26, 2010
Value:   $4,000
Contractor: Angela Noenickx

Client: St Elizabeths Hosp Of Bos | Permit type: Fire alarm | Current use: Comm | Permit id: Efa19564 | Parcel: 2101835100
2010/03/26400099736 Cambridge St Brighton Ma 02135Angela Noenickx
SCORE
100
St. Elizabeths cardinal cushing pavilion-interventional imaging room renovations
Date:  November 22, 2011
Value:   $40,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E106870 | Parcel: 2101835100
2011/11/2240000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
100
Installing fixtures and associated plumbing for the 5th floor icu addition in st elizabeths.
Date:  January 28, 2013
Value:   $1,200,000
Contractor: Thomas Hannon

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl216252 | Parcel: 2101835100
2013/01/281200000100736 Cambridge St Brighton Ma 02135Thomas Hannon
SCORE
99
St. Elizabeths hospital - cardinal cushing pavillion - hematology / oncology outpatient center ( 5th floor ) -; renovations to existing space new meps dywall ceilings and flooring finishes.; modifications to existing fire alarm and;fire sprinkler system.;
Date:  February 2, 2012
Value:   $2,615,977
Contractor: Timothy Clinton

Client: St Elizabeths Hosp Of Bos | Permit type: Fast track application | Permit status: Expired | Current use: Other | Permit id: Alt117027 | Parcel: 2101835100
2012/02/02261597799736 Cambridge St Brighton Ma 02135Timothy Clinton
SCORE
100
Convert existing restroom into work room for st. Elizabeths on the 8th floor for the hearing aid center. Work to include selective demo new finishes no fire alarm or sprinkler work.
Date:  July 28, 2014
Value:   $45,000

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf388588 | Parcel: 2101835100
2014/07/2845000100736 Cambridge St Brighton Ma 02135Garland Building Company
SCORE
83
Fire alarm new encology department 2nd floor of hospital
Date:  May 10, 2010
Value:   $25,000
Contractor: Glenn Duquette

Client: St Elizabeths Hosp Of Bos | Permit type: Fire alarm | Current use: Other | Permit id: Efa25105 | Parcel: 2101835100
2010/05/102500083736 Cambridge St Brighton Ma 02135Glenn Duquette
SCORE
100
Installing plumbing fixtures and associated piping on the 3rd floor of st es.
Date:  August 12, 2014
Value:   $255,000
Contractor: Thomas Hannon

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl386520 | Parcel: 2101835100
2014/08/12255000100736 Cambridge St Brighton Ma 02135Thomas Hannon
SCORE
100
Installing plumbing and associated piping on the 5th floor of st elizabeths.
Date:  March 12, 2014
Value:   $64,600
Contractor: Thomas Hannon

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl342480 | Parcel: 2101835100
2014/03/1264600100736 Cambridge St Brighton Ma 02135Thomas Hannon
SCORE
64
Installed new set of cross corridor doors. Required relocation of existing room to adjacent to new location.
Date:  May 20, 2014
Value:   $5,000
Contractor: Scott Nicum

Client: St Elizabeths Hosp Of Bos | Permit type: Other | Current use: Other | Permit id: Sf354716 | Parcel: 2101835100
2014/05/20500064736 Cambridge St Brighton Ma 02135Scott Nicum
SCORE
59
Replace existing millwork
Date:  April 9, 2010
Value:   $24,809
Contractor: Michael E Howell

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Current use: Other | Permit id: Sf20191 | Parcel: 2101835100
2010/04/092480959736 Cambridge St Brighton Ma 02135Michael E Howell
SCORE
100
Fitout of new surgery rooms and install of new generator at 736 cambridge st. (gec #14060).
Date:  August 14, 2014
Value:   $10,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Efa395349 | Parcel: 2101835100
2014/08/1410000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
99
Replace 2 smoke detectors
Date:  June 14, 2010
Value:   $400
Contractor: Angela Noenickx

Client: St Elizabeths Hosp Of Bos | Permit type: Fire alarm | Current use: Other | Permit id: Efa29694 | Parcel: 2101835100
2010/06/1440099736 Cambridge St Brighton Ma 02135Angela Noenickx
SCORE
99
Hospital c o-for imaging room- 4th. Fl.-only alt 104186 issued 11 21 2011
Date:  March 26, 2012
Value:   $777,837
Contractor: Timothy Clinton

Client: St Elizabeths Hosp Of Bos | Permit status: Expired | Permit id: Coo123409 | Parcel: 2101835100
2012/03/2677783799736 Cambridge St Brighton Ma 02135Timothy Clinton
SCORE
100
Renovations to 5th floor pharmacy space at st. Elizabeths hospital. Work to include hvac modification flooring millwork installing glass in door and hardware electrical add outlets tel/data new lighting. No sprinkler or fire alarm egress not affected.
Date:  April 14, 2014
Value:   $90,000

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf352008 | Parcel: 2101835100
2014/04/1490000100736 Cambridge St Brighton Ma 02135Garland Building Company
SCORE
96
Hospital c o-for new linac proceedure room exam; rooms staff and support areas -2nd. Fl. -only alt 19135 issued 6 24 2010
Date:  May 5, 2011
Contractor: Jason Nadeau

Client: St Elizabeths Hosp Of Bos | Permit status: Expired | Current use: Comm | Permit id: Coo74977 | Parcel: 2101835100
2011/05/05096736 Cambridge St Brighton Ma 02135Jason Nadeau
SCORE
96
Installation of 5 temporary banners to the outside walls of the st. Elizabeths hospital per;bra design review.; banners approved until december 31 2011
Date:  February 6, 2013
Value:   $1,900
Contractor: Dennis Prifti

Client: St Elizabeths Hosp Of Bos | Permit type: Signs | Current use: Comm | Permit id: Alt86769 | Parcel: 2101835100
2013/02/06190096736 Cambridge St Brighton Ma 02135Dennis Prifti
SCORE
100
Fit out of 3 new patient rooms and support spaces at st. Elizabeths medical center icu on the 5th floor . Scope includes new paint/wallcovering vct ceiling tile millwork sprinkler plumbing medical gas hvac electrical lighting tel/com/nurse call and fire alarm.
Date:  March 26, 2014
Value:   $355,000

Client: St Elizabeths Hosp Of Bos | Permit type: Fast track application | Permit status: Expired | Current use: Other | Permit id: Alt343524 | Parcel: 2101835100
2014/03/26355000100736 Cambridge St Brighton Ma 02135Garland Building Company
SCORE
100
St. Elizabeths medical center icu 3rd floor addition. Fire alarm devices (gec#12117)
Date:  January 23, 2013
Value:   $200,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Other | Permit id: Efa215360 | Parcel: 2101835100
2013/01/23200000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
100
Saint elizabeths hospital - surgery expansion project. Control wiring for air handling units terminal boxes and heat exchanger
Date:  October 22, 2014
Value:   $45,000
Contractor: Paul Guarracino

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv410754 | Parcel: 2101835100
2014/10/2245000100736 Cambridge St Brighton Ma 02135Paul Guarracino
SCORE
100
Furnish and install the required power and control wiring associated with (2) new split system ac units to be located in the st. Josephs building data center.
Date:  September 3, 2013
Value:   $5,000
Contractor: Christopher Sidoti

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E278546 | Parcel: 2101835100
2013/09/035000100736 Cambridge St Brighton Ma 02135Christopher Sidoti
SCORE
100
Pulling cabling required for new mri @ st. Elizabeths hospital.
Date:  October 16, 2015
Value:   $5,000
Contractor: Michael Mcdonald

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Permit status: Open | Current use: Other | Permit id: Elv530152 | Parcel: 2101835100
2015/10/165000100736 Cambridge St Brighton Ma 02135Michael Mcdonald
SCORE
59
Install lights outlets and switches for office renovation
Date:  June 10, 2014
Value:   $500
Contractor: Dean Crosby

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Other | Permit id: E362606 | Parcel: 2101835100
2014/06/1050059736 Cambridge St Brighton Ma 02135Dean Crosby
SCORE
89
Legal occupancy:; hospital doc#alt117027 coo for the 3 story addition onto the existing 3 story william f. Connell building alt146092 issued: 10 9 12; ;
Date:  September 30, 2013
Value:   $20,954,365
Contractor: Ronald Benham

Client: St Elizabeths Hosp Of Bos | Permit type: Addition | Permit status: Expired | Current use: Other | Permit id: Coo283840 | Parcel: 2101835100
2013/09/302095436589736 Cambridge St Brighton Ma 02135Ronald Benham
SCORE
100
8 patient rooms renovation 7th floor
Date:  September 20, 2011
Value:   $93,000
Contractor: James Milley

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Other | Permit id: E96293 | Parcel: 2101835100
2011/09/2093000100736 Cambridge St Brighton Ma 02135James Milley
SCORE
99
Renovation of existing office space into new hearing testing suite minor demolition of the space with new drywall partions ceilings and new lighting. 2 sets of stamped plans 2 sets of stamped architectural drawings as well as 2 sets of stamped fire protection documents hydrolic calculations. Letter of intent/control affidavits and fire protection from engineer.
Date:  March 31, 2010
Value:   $150,000
Contractor: Peter Linton

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Alt15184 | Parcel: 2101835100
2010/03/3115000099736 Cambridge St Brighton Ma 02135Peter Linton
SCORE
100
St. Es 736 cambridge st.-branch circuit feeds for new signage at 3 locations.(gec#s13302)
Date:  August 23, 2013
Value:   $3,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E278410 | Parcel: 2101835100
2013/08/233000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
100
Install new bathrooms and sinks
Date:  May 25, 2010
Value:   $100,000
Contractor: Kevin Almeida

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl27042 | Parcel: 2101835100
2010/05/25100000100736 Cambridge St Brighton Ma 02135Kevin Almeida
SCORE
100
St elizabeths medical center cardinal cushing pavilion 5th floor; hvac control wiring jme job#129470
Date:  April 11, 2012
Value:   $10,100
Contractor: Paul Guarracino

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: Elv129688 | Parcel: 2101835100
2012/04/1110100100736 Cambridge St Brighton Ma 02135Paul Guarracino
SCORE
100
Furnish and install plumbing
Date:  August 27, 2014
Contractor: Michael Petrilli

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl399995 | Parcel: 2101835100
2014/08/270100736 Cambridge St Brighton Ma 02135Michael Petrilli
SCORE
84
Install ge nursecall system
Date:  October 21, 2011
Value:   $21,000
Contractor: Paul Massicotte

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv101970 | Parcel: 2101835100
2011/10/212100084736 Cambridge St Brighton Ma 02135Paul Massicotte
SCORE
100
Install three lavatories on 8th floor.
Date:  December 7, 2010
Contractor: Joseph Valante

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl54609 | Parcel: 2101835100
2010/12/070100736 Cambridge St Brighton Ma 02135Joseph Valante
SCORE
82
Low voltage wiring to replace (4) cameras in pharmacy with new mini dome cameras.
Date:  June 14, 2016
Value:   $5,000
Contractor: Marc Desjardins

Client: Steward St Elizabeths | Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv602177 | Parcel: 2101835100
2016/06/14500082736 Cambridge St Brighton Ma 02135Marc Desjardins
SCORE
100
Renovation of existing tenant space to a dunkin donuts
Date:  August 13, 2014
Value:   $35,000
Contractor: Jeffrey Catalano

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E392931 | Parcel: 2101835100
2014/08/1335000100736 Cambridge St Brighton Ma 02135Jeffrey Catalano
SCORE
59
Instalation of nurse call system.
Date:  August 17, 2012
Value:   $64,000
Contractor: Tim Trychon

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv174491 | Parcel: 2101835100
2012/08/176400059736 Cambridge St Brighton Ma 02135Tim Trychon
SCORE
89
Renovation to existing 8 sf ep lab to prepare the space for new philips equipment. Includes relocation of plumbing hvac and electrical systems and patching existing finishes.
Date:  July 14, 2015
Value:   $164,500
Contractor: Alexander Main

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf494218 | Parcel: 2101835100
2015/07/1416450089736 Cambridge St Brighton Ma 02135Alexander Main
SCORE
96
Furnish and install 2 receptacles in seton bldg. 4th floor tel data closet.
Date:  April 4, 2013
Value:   $1,000
Contractor: Michael Lawlor

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Permit status: Expired | Current use: Other | Permit id: E232428 | Parcel: 2101835100
2013/04/04100096736 Cambridge St Brighton Ma 02135Michael Lawlor
SCORE
100
Renovations to existing patient rooms and support spaces on the 3rd floor to include new paint vct patching ceiling tile electrical relocating of lights in existing grid new doors/frames. No sprinkler or fire alarm. Egress not affected.
Date:  February 12, 2014
Value:   $300,000

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Other | Permit id: Sf326084 | Parcel: 2101835100
2014/02/12300000100736 Cambridge St Brighton Ma 02135Garland Building Company
SCORE
100
Replace kitchen sink.
Date:  April 23, 2010
Contractor: Joseph Valante

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl21804 | Parcel: 2101835100
2010/04/230100736 Cambridge St Brighton Ma 02135Joseph Valante
SCORE
100
Dfci pharmacy renovation 5th floor
Date:  May 7, 2014
Value:   $20,000
Contractor: Michael Mckinnon

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv357637 | Parcel: 2101835100
2014/05/0720000100736 Cambridge St Brighton Ma 02135Michael Mckinnon
SCORE
100
Renovating plumbing on the 3rd floor of st elizabeths
Date:  April 9, 2014
Value:   $108,000
Contractor: Thomas Hannon

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl350305 | Parcel: 2101835100
2014/04/09108000100736 Cambridge St Brighton Ma 02135Thomas Hannon
SCORE
82
St elizabeths hospital - nevins building 4th floor - interior renovation of single tenant space demo existing walls flooring ceiling and add new walls hc bathroom electrical plumbing sprinkler head relocation and new heads new flooring ceiling and wall coverings
Date:  September 1, 2015
Value:   $125,000
Contractor: Brent Heinzer

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Alt421766 | Parcel: 2101835100
2015/09/0112500082736 Cambridge St Brighton Ma 02135Brent Heinzer
SCORE
100
Data wiring for patient monitors
Date:  July 21, 2011
Value:   $20,000
Contractor: James Milley

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Other | Permit id: Elv86842 | Parcel: 2101835100
2011/07/2120000100736 Cambridge St Brighton Ma 02135James Milley
SCORE
96
Interior renovation of tenant space. Build non structural walls install and acoustical ceiling wall and floor tile finishes.
Date:  September 2, 2014
Value:   $300,000
Contractor: Edward Ribeiro

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf399607 | Parcel: 2101835100
2014/09/0230000096736 Cambridge St Brighton Ma 02135Edward Ribeiro
SCORE
100
Hvac control wiring cmp-7 project. Jme job#11-9133
Date:  November 2, 2011
Value:   $2,000
Contractor: Paul Guarracino

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv103650 | Parcel: 2101835100
2011/11/022000100736 Cambridge St Brighton Ma 02135Paul Guarracino
SCORE
83
Electrical service work and fit up on new encology space
Date:  May 10, 2010
Value:   $350,000
Contractor: Glenn Duquette

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Other | Permit id: E25116 | Parcel: 2101835100
2010/05/1035000083736 Cambridge St Brighton Ma 02135Glenn Duquette
SCORE
99
Renovation of an existing space for st elizabeths for thier new ent area. Minor demolition of walls and ceilings to expand the area for the new fit-out.
Date:  December 22, 2009
Value:   $395,343
Contractor: Peter Linton

Client: St Elizabeths Hosp Of Bos | Permit type: Renovations -interior nsc | Current use: Comm | Permit id: Sf2267 | Parcel: 2101835100
2009/12/2239534399736 Cambridge St Brighton Ma 02135Peter Linton
SCORE
59
Hospital c/o-for (3) small ;medical offices-8th. Fl.-only alt 423975 issued 11/14/14
Date:  April 13, 2015
Value:   $115,000
Contractor: Jim Howarth

Client: St Elizabeths Hosp Of Bos | Permit type: Fast track application | Permit status: Expired | Current use: Other | Permit id: Coo459963 | Parcel: 2101835100
2015/04/1311500059736 Cambridge St Brighton Ma 02135Jim Howarth
SCORE
100
Installation of rough cabling for card access and nurse call on the 5th floor ccp building. Terminations and system by others.
Date:  June 14, 2012
Value:   $4,000
Contractor: Michael Lydon

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv151281 | Parcel: 2101835100
2012/06/144000100736 Cambridge St Brighton Ma 02135Michael Lydon
SCORE
100
St. Elizabeths hospital icu addition low voltage control wiring for new mechanical equipment. Jme job#130240
Date:  May 15, 2013
Value:   $80,000
Contractor: Paul Guarracino

Client: St Elizabeths Hosp Of Bos | Permit type: Low voltage | Current use: Comm | Permit id: Elv236946 | Parcel: 2101835100
2013/05/1580000100736 Cambridge St Brighton Ma 02135Paul Guarracino
SCORE
100
Fitout of new surgery rooms and install of new generator at 736 cambridge st. (gec #14060).
Date:  August 14, 2014
Value:   $1,750,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E395338 | Parcel: 2101835100
2014/08/141750000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
100
Semc - 736 cambridge st - provide feed for monument signs at pavillion side walk -gec#s13302 internal photo eyes & maintenance switches.
Date:  September 18, 2013
Value:   $5,000
Contractor: William Weber

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Current use: Comm | Permit id: E263825 | Parcel: 2101835100
2013/09/185000100736 Cambridge St Brighton Ma 02135William Weber
SCORE
100
Installing and renovating plumbing on the 3rd floor of st es
Date:  June 24, 2014
Value:   $19,000
Contractor: Thomas Hannon

Client: St Elizabeths Hosp Of Bos | Permit type: Plumbing | Current use: Comm | Permit id: Pl360155 | Parcel: 2101835100
2014/06/2419000100736 Cambridge St Brighton Ma 02135Thomas Hannon
SCORE
96
Low voltage wiring to install card readers in cmp clean space and soiled elevators.
Date:  January 26, 2015
Value:   $10,000
Contractor: Arthur Bourque

Client: St Elizabeths Hosp Of Bos | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: Elv444133 | Parcel: 2101835100
2015/01/261000096736 Cambridge St Brighton Ma 02135Arthur Bourque
SCORE
100
Renovations to existing patient rooms operating rooms and support spaces on the 3rd floor for st. Elizabeths medical center to include new paint vct patching ceiling tile electrical relocating of lights in existing grid new doors/frames sprinkler and fire alarm work.
Date:  July 1, 2014
Value:   $3,495,000

Client: St Elizabeths Hosp Of Bos | Permit type: Fast track application | Permit status: Expired | Current use: Other | Permit id: Alt374022 | Parcel: 2101835100
2014/07/013495000100736 Cambridge St Brighton Ma 02135Garland Building Company
SCORE
100
St. Elizabeth medical center -; 8th floor -; renovation of three small medical offices to include drywall finishes painting acoustical and minor mep &; fire alarm - relocating;sprinkler heads
Date:  November 14, 2014
Value:   $115,000
Contractor: Michele Engber

Client: St Elizabeths Hosp Of Bos | Permit type: Fast track application | Permit status: Expired | Current use: Other | Permit id: Alt423975 | Parcel: 2101835100
2014/11/14115000100736 Cambridge St Brighton Ma 02135Michele Engber
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.