Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 42 4226 Block Of Wisconsin Avenue Nw Washington Dc Excavate to make (1) 179 ft x 4ft trench from the 43 block of wisconsin avenue nw between 39th st nw and van ness st nw, and from the 39 block of van ness st nw between wisconsin avenue nw and 40th place nw for a 138kv transmission line. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines at van ness substation in nw dc. Attached plan and conditions are part of this permit. Extended restoration shall be set by a ddot public space inspector, because the work is located in the roadway. All work shall be completed to dc standards. Work hours are between 9:30am to 3: pm monday through saturday. Date: January 12, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: April 28, 2016 | Permit id: Pa121649 | |||||
SCORE 82 38 3899 Block Of Van Ness Street Nw Washington Dc Excavate to make (1) 195 ft x 4 ft trench from the 42 block of wisconsin avenue nw between 39th st nw and van ness st nw, and from the 38 block of van ness st nw between wisconsin ave nw and 38th st nw for a 138kv transmission line at van ness substation in nw dc. Attached plan and conditions are part of this permit. All work shall be completed to dc standards. Extended restoration waiver has been approved. Work hours are between 9: am to 3: pm monday through saturday. Date: January 12, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Cancel/withdrawn | Expiration date: April 28, 2016 | |||||
SCORE 82 2 71 Block Of T Street Sw Washington Dc Work includes excavating for a single freeze pit (test hole) 8x approximately, this is for the ongoing ddots south capitol street bridge relocation. Pepco 69kv relocation from t street to south capitol street. Work time 7am - 7pm monday - saturday required due to the type of work being performed. After hours permits will be gained with dcra. Work involves cable splicing, cable pulling, cable freezing. Date: March 3, 2016 Contractor: Wa Chester Inc Permit type: Excavation; boring test pit (single) | Permit status: Approved (pending payment | Expiration date: June 2, 2016 | |||||
SCORE 82 13 1399 Block Of South Capitol Street Washington Dc Work includes excavating for a single area 8ft x 10ft for (freezing operation) on the existing electric transmission line. Work requires 7am - 7pm monday thru saturday. Per discussion with ddot pepco will minimize impact and condense work zone when possible. Work is in conjunction with south capitol street bridge work and tied to work on t street sw, under separate construction permit. Freezing, splicing, cable pulling operation, inspection will be involved. Date: March 3, 2016 Contractor: Wa Chester Inc Permit type: Excavation; boring test pit (single) | Permit status: Assigned | Expiration date: June 9, 2016 | |||||
SCORE 82 Wisconsin Avenue Nw And Fessenden Street Nw Washington Dc Pepcos 138kv transmission line that runs from harrison substation to van ness substation. Work includes installation of 138kv transmission line on wisconsin ave from approximately 4932 wisconsin ave nw to van ness substation on van ness st nw. Work will start at station 15+ and end on van ness st. Please route to awtar floura. Date: March 17, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench), excavation; manhole installation | Permit status: Cancel/withdrawn | Expiration date: July 2, 2016 | |||||
SCORE 82 42 4226 Block Of Wisconsin Avenue Nw Washington Dc Excavate to make (1) 179 ft x 4ft trench from the 43 block of wisconsin avenue nw between 39th st nw and van ness st nw, and from the 39 block of van ness st nw between wisconsin avenue nw and 40th place nw for a 138kv transmission line. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines at van ness substation in nw dc. Attached plan and conditions are part of this permit. Extended restoration shall be set by a ddot public space inspector, because the work is located in the roadway. All work shall be completed to dc standards. Work hours are between 9:30am to 3: pm monday through saturday. Date: March 29, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: June 29, 2016 | Permit id: Pa121649-R1 | |||||
SCORE 82 13 1399 Block Of South Capitol Street Washington Dc Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on south capitol street sw, between n street and p street. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on t street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Previously approved, as well as, clean tcps have been uploaded. Per previously approved tcps, 1 lane of south capitol street will require closure. Work has been delayed to accommodate nationals baseball schedule. Date: June 15, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench), excavation; boring test pit (single) | Permit status: Resubmitted | Expiration date: December 1, 2016 | |||||
SCORE 82 2 71 Block Of T Street Sw Washington Dc Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Clean tcps, as well as, previously approved tcp have been uploaded. Work has been delayed to accommodate nationals baseball schedule. Date: June 15, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Approved (pending payment | Expiration date: September 29, 2016 | |||||
SCORE 82 42 4226 Block Of Wisconsin Avenue Nw Washington Dc Excavate to make (1) 179 ft x 4ft trench from the 43 block of wisconsin avenue nw between 39th st nw and van ness st nw, and from the 39 block of van ness st nw between wisconsin avenue nw and 40th place nw for a 138kv transmission line. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines at van ness substation in nw dc. Attached plan and conditions are part of this permit. Extended restoration shall be set by a ddot public space inspector, because the work is located in the roadway. All work shall be completed to dc standards. Work hours are between 9:30am to 3: pm monday through saturday. Date: January 12, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: April 28, 2016 | Permit id: Pa121649 | |||||
SCORE 82 38 3899 Block Of Van Ness Street Nw Washington Dc Excavate to make (1) 195 ft x 4 ft trench from the 42 block of wisconsin avenue nw between 39th st nw and van ness st nw, and from the 38 block of van ness st nw between wisconsin ave nw and 38th st nw for a 138kv transmission line at van ness substation in nw dc. Attached plan and conditions are part of this permit. All work shall be completed to dc standards. Extended restoration waiver has been approved. Work hours are between 9: am to 3: pm monday through saturday. Date: January 12, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Cancel/withdrawn | Expiration date: April 28, 2016 | |||||
SCORE 82 2 71 Block Of T Street Sw Washington Dc Work includes excavating for a single freeze pit (test hole) 8x approximately, this is for the ongoing ddots south capitol street bridge relocation. Pepco 69kv relocation from t street to south capitol street. Work time 7am - 7pm monday - saturday required due to the type of work being performed. After hours permits will be gained with dcra. Work involves cable splicing, cable pulling, cable freezing. Date: March 3, 2016 Contractor: Wa Chester Inc Permit type: Excavation; boring test pit (single) | Permit status: Approved (pending payment | Expiration date: June 2, 2016 | |||||
SCORE 82 13 1399 Block Of South Capitol Street Washington Dc Work includes excavating for a single area 8ft x 10ft for (freezing operation) on the existing electric transmission line. Work requires 7am - 7pm monday thru saturday. Per discussion with ddot pepco will minimize impact and condense work zone when possible. Work is in conjunction with south capitol street bridge work and tied to work on t street sw, under separate construction permit. Freezing, splicing, cable pulling operation, inspection will be involved. Date: March 3, 2016 Contractor: Wa Chester Inc Permit type: Excavation; boring test pit (single) | Permit status: Approved (pending payment | Expiration date: October 27, 2016 | |||||
SCORE 82 42 4226 Block Of Wisconsin Avenue Nw Washington Dc Excavate to make (1) 179 ft x 4ft trench from the 43 block of wisconsin avenue nw between 39th st nw and van ness st nw, and from the 39 block of van ness st nw between wisconsin avenue nw and 40th place nw for a 138kv transmission line. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines at van ness substation in nw dc. Attached plan and conditions are part of this permit. Extended restoration shall be set by a ddot public space inspector, because the work is located in the roadway. All work shall be completed to dc standards. Work hours are between 9:30am to 3: pm monday through saturday. Date: March 29, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: June 29, 2016 | Permit id: Pa121649-R1 | |||||
SCORE 82 13 1399 Block Of South Capitol Street Washington Dc Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on south capitol street sw, between n street and p street. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on t street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Previously approved, as well as, clean tcps have been uploaded. Per previously approved tcps, 1 lane of south capitol street will require closure. Work has been delayed to accommodate nationals baseball schedule. Date: June 15, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench), excavation; boring test pit (single) | Permit status: Issued | Expiration date: December 1, 2016 | Permit id: Pa179246 | |||||
SCORE 82 2 71 Block Of T Street Sw Washington Dc Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Clean tcps, as well as, previously approved tcp have been uploaded. Work has been delayed to accommodate nationals baseball schedule. Date: June 15, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Issued | Expiration date: December 2, 2016 | Permit id: Pa179255 | |||||
SCORE 82 42 4226 Block Of Wisconsin Avenue Nw Washington Dc Excavate to make (1) 179 ft x 4ft trench from the 43 block of wisconsin avenue nw between 39th st nw and van ness st nw, and from the 39 block of van ness st nw between wisconsin avenue nw and 40th place nw for a 138kv transmission line. This phase is part of pepcos active and ongoing project to upgrade 138kv transmission lines at van ness substation in nw dc. Attached plan and conditions are part of this permit. Extended restoration shall be set by a ddot public space inspector, because the work is located in the roadway. All work shall be completed to dc standards. Work hours are between 10: am to 4: pm monday through saturday. Date: September 29, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Issued | Expiration date: December 30, 2016 | Permit id: Pa121649-R4 | |||||
SCORE 82 13 1399 Block Of South Capitol Street Washington Dc Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on south capitol street sw, between n street and p street. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on t street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Previously approved, as well as, clean tcps have been uploaded. Per previously approved tcps, 1 lane of south capitol street will require closure. Work has been delayed to accommodate nationals baseball schedule. Date: November 9, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench), excavation; boring test pit (single) | Permit status: Approved (pending payment | Expiration date: January 30, 2017 | |||||
SCORE 82 2 71 Block Of T Street Sw Washington Dc Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Clean tcps, as well as, previously approved tcp have been uploaded. Work has been delayed to accommodate nationals baseball schedule. Date: November 9, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Approved (pending payment | Expiration date: January 31, 2017 | |||||
SCORE 82 13 1399 Block Of South Capitol Street Washington Dc Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on south capitol street sw, between n street and p street. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on t street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Previously approved, as well as, clean tcps have been uploaded. Per previously approved tcps, 1 lane of south capitol street will require closure. Work has been delayed to accommodate nationals baseball schedule. Date: January 5, 2017 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench), excavation; boring test pit (single) | Permit status: Assigned | Expiration date: March 31, 2017 | |||||
SCORE 82 2 71 Block Of T Street Sw Washington Dc Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Clean tcps, as well as, previously approved tcp have been uploaded. Work has been delayed to accommodate nationals baseball schedule. Date: January 5, 2017 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Assigned | Expiration date: April 1, 2017 | |||||
SCORE 82 Contractor: Wa Chester Inc Permit status: 1 | Expiration date: October 27, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Wa Chester Inc Permit status: 1 | Expiration date: June 2, 2016 | Permit id: 0 | |||||
SCORE 82 Date: February 22, 2016 Contractor: Wa Chester Inc Permit status: 8 | Expiration date: April 28, 2016 | Permit id: Pa121649 | |||||
SCORE 82 Contractor: Wa Chester Inc Permit status: 3 | Expiration date: April 28, 2016 | Permit id: 0 | |||||
SCORE 82 13 1399 Block Of South Capitol Street Washington Dc Excavation; electric ml conduit (trench), excavation; boring test pit (single) Date: January 20, 2017 Contractor: Wa Chester Inc Permit status: 8 | Expiration date: March 31, 2017 | Permit id: Pa179246-R2 | |||||
SCORE 82 Date: January 20, 2017 Contractor: Wa Chester Inc Permit status: 8 | Expiration date: April 1, 2017 | Permit id: Pa179255-R2 | |||||
SCORE 82 Wisconsin Avenue Nw And Fessenden Street Nw Washington Dc Excavation; electric ml conduit (trench), excavation; manhole installation Contractor: Wa Chester Inc Permit status: 3 | Expiration date: July 2, 2016 | Permit id: 0 | |||||
SCORE 82 13 1399 Block Of South Capitol Street Washington Dc Excavation; electric ml conduit (trench), excavation; boring test pit (single) Contractor: Wa Chester Inc Permit status: 1 | Expiration date: July 29, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Wa Chester Inc Permit status: 1 | Expiration date: July 30, 2017 | Permit id: 0 | |||||
SCORE 82 13 1399 Block Of South Capitol Street Washington Dc Excavation; electric ml conduit (trench), excavation; boring test pit (single) Date: September 30, 2016 Contractor: Wa Chester Inc Permit status: 8 | Expiration date: December 1, 2016 | Permit id: Pa179246 | |||||
SCORE 82 Date: September 30, 2016 Contractor: Wa Chester Inc Permit status: 8 | Expiration date: December 2, 2016 | Permit id: Pa179255 | |||||
SCORE 82 Contractor: Wa Chester Inc Permit status: 3 | Expiration date: April 28, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Wa Chester Inc Permit status: 1 | Expiration date: June 2, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Wa Chester Inc Permit status: 1 | Expiration date: October 27, 2016 | Permit id: 0 | |||||
SCORE 82 Wisconsin Avenue Nw And Fessenden Street Nw Washington Dc Excavation; electric ml conduit (trench), excavation; manhole installation Contractor: Wa Chester Inc Permit status: 3 | Expiration date: July 2, 2016 | Permit id: 0 | |||||
SCORE 82 13 1399 Block Of South Capitol Street Washington Dc Excavation; electric ml conduit (trench), excavation; boring test pit (single) Contractor: Wa Chester Inc Permit status: 1 | Expiration date: July 29, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Wa Chester Inc Permit status: 1 | Expiration date: July 30, 2017 | Permit id: 0 |