Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Work includes excavating for a single freeze pit (test hole) 8x approximately, this is for the ongoing ddots south capitol street bridge relocation. Pepco 69kv relocation from t street to south capitol street. Work time 7am - 7pm monday - saturday required due to the type of work being performed. After hours permits will be gained with dcra. Work involves cable splicing, cable pulling, cable freezing. Date: March 3, 2016 Contractor: Wa Chester Inc Permit type: Excavation; boring test pit (single) | Permit status: Approved (pending payment | Expiration date: June 2, 2016 | |||||
SCORE 82 Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Clean tcps, as well as, previously approved tcp have been uploaded. Work has been delayed to accommodate nationals baseball schedule. Date: June 15, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Approved (pending payment | Expiration date: September 29, 2016 | |||||
SCORE 82 Work includes excavating for a single freeze pit (test hole) 8x approximately, this is for the ongoing ddots south capitol street bridge relocation. Pepco 69kv relocation from t street to south capitol street. Work time 7am - 7pm monday - saturday required due to the type of work being performed. After hours permits will be gained with dcra. Work involves cable splicing, cable pulling, cable freezing. Date: March 3, 2016 Contractor: Wa Chester Inc Permit type: Excavation; boring test pit (single) | Permit status: Approved (pending payment | Expiration date: June 2, 2016 | |||||
SCORE 82 Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Clean tcps, as well as, previously approved tcp have been uploaded. Work has been delayed to accommodate nationals baseball schedule. Date: June 15, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Issued | Expiration date: December 2, 2016 | Permit id: Pa179255 | |||||
SCORE 82 Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Clean tcps, as well as, previously approved tcp have been uploaded. Work has been delayed to accommodate nationals baseball schedule. Date: November 9, 2016 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Approved (pending payment | Expiration date: January 31, 2017 | |||||
SCORE 82 Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Clean tcps, as well as, previously approved tcp have been uploaded. Work has been delayed to accommodate nationals baseball schedule. Date: January 5, 2017 Contractor: Wa Chester Inc Permit type: Excavation; electric ml conduit (trench) | Permit status: Assigned | Expiration date: April 1, 2017 | |||||
SCORE 96 Construction staging area Date: April 1, 2014 Contractor: Potomac Electric Power Company Permit status: Expired | Expiration date: April 12, 2014 | Permit id: Pa10130010-R1 | |||||
SCORE 96 Excavation; boring test pit (single), excavation; electric ml conduit (trench) Contractor: Potomac Electric Power Company Permit status: 1 | Expiration date: September 25, 2017 | Permit id: 0 | |||||
SCORE 82 Excavation; boring test pit (single) Contractor: Wa Chester Inc Permit status: 1 | Expiration date: June 2, 2016 | Permit id: 0 | |||||
SCORE 82 Excavation; electric ml conduit (trench) Date: January 20, 2017 Contractor: Wa Chester Inc Permit status: 8 | Expiration date: April 1, 2017 | Permit id: Pa179255-R2 | |||||
SCORE 82 Excavation; electric ml conduit (trench) Contractor: Wa Chester Inc Permit status: 1 | Expiration date: July 30, 2017 | Permit id: 0 | |||||
SCORE 82 Excavation; electric ml conduit (trench) Date: September 30, 2016 Contractor: Wa Chester Inc Permit status: 8 | Expiration date: December 2, 2016 | Permit id: Pa179255 | |||||
SCORE 96 Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw and p street sw, under separate construction permits. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Clean tcps, as well as, previously approved tcp have been uploaded. Per previously approved tcps, work will require continuous 24 hour access to the manhole at times. Date: May 18, 2017 Contractor: Potomac Electric Power Company Permit type: Excavation; boring test pit (single), excavation; electric ml conduit (trench) | Permit status: Approved (pending payment | Expiration date: September 25, 2017 | Permit id: 0 | |||||
SCORE 96 Construction staging area Date: March 3, 2016 Contractor: Potomac Electric Power Company Permit status: Expired | Expiration date: March 30, 2016 | Permit id: Pa10231709 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: April 27, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Date: October 12, 2016 Contractor: Potomac Electric Power Company Permit status: Expired | Expiration date: November 16, 2016 | Permit id: Pa10315491 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: December 15, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Date: February 23, 2017 Contractor: Potomac Electric Power Company Permit status: Expired | Expiration date: March 28, 2017 | Permit id: Pa10373387 | |||||
SCORE 93 Steel plate- single location Date: February 27, 2017 Contractor: Matt Fry Cw And Sons Infrastructure, Inc Permit status: Expired | Expiration date: March 3, 2017 | Permit id: Pa10378425 | |||||
SCORE 96 Construction staging area Date: March 21, 2017 Contractor: Potomac Electric Power Company Permit status: Expired | Expiration date: April 28, 2017 | Permit id: Pa10379492 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Approved | Expiration date: June 29, 2017 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Approved | Expiration date: August 25, 2017 | Permit id: 0 | |||||
SCORE 96 Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Clean tcps, as well as, previously approved tcp have been uploaded. Work has been delayed to accommodate nationals baseball schedule. Date: January 20, 2017 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: April 1, 2017 | Permit id: Pa179255-R2 | |||||
SCORE 96 Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw and p street sw, under separate construction permits. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Clean tcps, as well as, previously approved tcp have been uploaded. Per previously approved tcps, work will require continuous 24 hour access to the manhole at times. Contractor: Potomac Electric Power Company Permit status: Approved (pending payment | Expiration date: September 25, 2017 | Permit id: 0 | |||||
SCORE 96 Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Clean tcps, as well as, previously approved tcp have been uploaded. Work has been delayed to accommodate nationals baseball schedule. Contractor: Potomac Electric Power Company Permit status: Approved (pending payment | Expiration date: July 30, 2017 | Permit id: 0 | |||||
SCORE 96 Construction staging area Date: March 13, 2014 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: April 2, 2014 | Permit id: Pa10130010 | |||||
SCORE 96 Construction staging area Date: January 6, 2016 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: February 4, 2016 | Permit id: Pa10224412 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: April 27, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: December 15, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Date: April 19, 2017 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: May 29, 2017 | Permit id: Pa10379492-R1 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Approved (pending payment | Expiration date: June 29, 2017 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Approved (pending payment | Expiration date: September 13, 2017 | Permit id: 0 | |||||
SCORE 96 Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw and p street sw, under separate construction permits. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Clean tcps, as well as, previously approved tcp have been uploaded. Per previously approved tcps, work will require continuous 24 hour access to the manhole at times. Date: September 1, 2017 Contractor: Potomac Electric Power Company Permit type: Excavation; boring test pit (single), excavation; electric ml conduit (trench) | Permit status: Issued | Expiration date: November 24, 2017 | Permit id: Pa205487-R1 | |||||
SCORE 82 Excavation; boring test pit (single) Contractor: Wa Chester Inc Permit status: 1 | Expiration date: June 2, 2016 | Permit id: 0 | |||||
SCORE 82 Excavation; electric ml conduit (trench) Contractor: Wa Chester Inc Permit status: 1 | Expiration date: July 30, 2017 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: April 27, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: December 15, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: June 29, 2017 | Permit id: 0 | |||||
SCORE 99 Construction staging area Contractor: Davis Construction Permit status: Assigned | Expiration date: April 29, 2018 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Assigned | Expiration date: November 25, 2017 | Permit id: 0 | |||||
SCORE 96 Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw, under separate construction permit. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Work will require continuous 24 hour access to the manhole at times. Clean tcps, as well as, previously approved tcp have been uploaded. Work has been delayed to accommodate nationals baseball schedule. Contractor: Potomac Electric Power Company Permit status: Approved (pending payment | Expiration date: July 30, 2017 | Permit id: 0 | |||||
SCORE 96 Work includes the following: excavating, backfill, compaction, repaving, pulling cable, splicing, and vacuuming on t street sw, between water street and the potomac river. This work is to tie-in to existing 69kv underground transmission line. Work is in conjunction with south capitol street bridge work and tied to work on south capitol street sw and p street sw, under separate construction permits. Work includes excavating for a single area, approximately 8ft x 10ft for freezing operation on the existing electric transmission line. Clean tcps, as well as, previously approved tcp have been uploaded. Per previously approved tcps, work will require continuous 24 hour access to the manhole at times. Date: June 28, 2017 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: September 25, 2017 | Permit id: Pa205487 | |||||
SCORE 96 Construction staging area Date: March 3, 2016 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa10231510 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: April 27, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: December 15, 2016 | Permit id: 0 | |||||
SCORE 99 Construction staging area Contractor: Davis Construction Permit status: Assigned | Expiration date: April 29, 2018 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: June 29, 2017 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Assigned | Expiration date: November 25, 2017 | Permit id: 0 |