Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Date: July 10, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: March 14, 2008 | Expiration date: March 14, 2008 | Permit id: 2007-126906 Pp | |||||
SCORE 100 11111 Research Blvd Nb Austin Tx 78759 Renovation of exist ambulatorydaysurgery mechanical room addition Permit type: Plumbing permit | Permit status: Final | Completion date: March 6, 2002 | Expiration date: March 6, 2002 | Permit id: 2001-000067 Pp | |||||
SCORE 100 Date: July 29, 2009 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: November 5, 2009 | Expiration date: November 5, 2009 | Permit id: 2009-084094 Pp | |||||
SCORE 100 Date: August 7, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: February 22, 2008 | Expiration date: October 26, 2008 | Permit id: 2007-114794 Pp | |||||
SCORE 100 Date: November 2, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: November 15, 2007 | Expiration date: November 15, 2007 | Permit id: 2007-142307 Pp | |||||
SCORE 100 Date: August 21, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: September 13, 2007 | Expiration date: September 13, 2007 | Permit id: 2007-145228 Pp | |||||
SCORE 100 Date: October 10, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: November 15, 2007 | Expiration date: November 15, 2007 | Permit id: 2007-150773 Pp | |||||
SCORE 100 Date: November 30, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: March 20, 2008 | Expiration date: March 20, 2008 | Permit id: 2007-168736 Pp | |||||
SCORE 100 115 Metric Blvd Unit 1 Austin Tx 78758 Change out 2 rooftop units 1 split system to exsting comm bldg Date: November 30, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: January 8, 2008 | Expiration date: January 8, 2008 | Permit id: 2007-1687 Pp | |||||
SCORE 100 Date: December 31, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: January 7, 2008 | Expiration date: January 7, 2008 | Permit id: 2007-173778 Pp | |||||
SCORE 100 1337 Westbank Dr Austin Tx 78746 New tennissoftball bldg for existing public secondary educational facility Date: January 23, 2008 Contractor: Vernon Wattinger Applicant: Vernon Wattinger | Applicant Phone: (512) 282-0616 | Permit type: Plumbing permit | Permit status: Final | Completion date: August 1, 2008 | Expiration date: August 1, 2008 | Permit id: 2008-000927 Pp | |||||
SCORE 100 121 Samsung Blvd Bldg Ct Austin Tx 78754 Construction of one cell to cooling tower in mod 2 copper phase infrastructure at existing semiconductor facility Date: August 12, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: January 13, 2011 | Expiration date: January 13, 2011 | Permit id: 2008-065169 Pp | |||||
SCORE 100 121 Samsung Blvd Bldg Gen Austin Tx 78754 Installing new generator to support copper phase infrastructure of mod 2 project at existing semiconductor facility Date: November 9, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: December 29, 2010 | Expiration date: December 29, 2010 | Permit id: 2008-0651 Pp | |||||
SCORE 100 3001 S Congress Ave Austin Tx 78704 Change of use and remodel from university dormitory to university classroomoffice and new addition 8184 sqft Date: September 25, 2008 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: July 21, 2009 | Expiration date: July 21, 2009 | Permit id: 2008-072779 Pp | |||||
SCORE 100 Date: April 11, 2008 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: May 30, 2008 | Expiration date: May 30, 2008 | Permit id: 2008-024619 Pp | |||||
SCORE 100 8911 N Capital Of Texas Hwy Nb Austin Tx 78759 Add meters to exist cooling tower plbg mech onlyevaporative credits project Permit type: Plumbing permit | Permit status: Final | Completion date: January 9, 2003 | Expiration date: January 9, 2003 | Permit id: 2002-010497 Pp | |||||
SCORE 100 Date: April 13, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: June 20, 2007 | Expiration date: June 20, 2007 | Permit id: 2007-113616 Pp | |||||
SCORE 100 Date: August 7, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Void | Expiration date: November 7, 2007 | Permit id: 2007-120546 Pp | |||||
SCORE 100 Date: November 30, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: December 3, 2007 | Expiration date: December 3, 2007 | Permit id: 2007-168732 Pp | |||||
SCORE 100 121 Samsung Blvd Bldg Cub 2 Austin Tx 78754 Cub 2 infrastructure upgrade to support copper phase at existing semiconductor facility Date: September 3, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: December 13, 2010 | Expiration date: December 13, 2010 | Permit id: 2008-065171 Pp | |||||
SCORE 100 Date: November 2, 2009 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: March 10, 2010 | Expiration date: March 10, 2010 | Permit id: 2009-1038 Pp | |||||
SCORE 100 121 Samsung Blvd Bldg Fab1 Austin Tx 78754 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Date: February 5, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: March 29, 2010 | Expiration date: March 29, 2010 | Permit id: 2009-131896 Pp | |||||
SCORE 100 121 Samsung Blvd Bldg Fab2 Austin Tx 78754 Finishout for cleanroom over bridge for existing officeseminconductor manufacturing facility Date: January 4, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: March 29, 2010 | Expiration date: March 29, 2010 | Permit id: 2009-133756 Pp | |||||
SCORE 100 76 Metropolis Dr Bldg 1 Austin Tx 78744 Tenant finishout for admnbusprof offices and new guardhouse structure Date: February 24, 2009 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: June 25, 2009 | Expiration date: June 25, 2009 | Permit id: 2008-093856 Pp | |||||
SCORE 100 Date: March 27, 2009 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: April 1, 2009 | Expiration date: April 1, 2009 | Permit id: 2009-0236 Pp | |||||
SCORE 100 3001 S Congress Ave Austin Tx 78704 Change of use and interior remodel from classroom to accessory use food service within existing private college facility Date: July 16, 2009 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: July 20, 2009 | Expiration date: July 20, 2009 | Permit id: 2009-024566 Pp | |||||
SCORE 100 3001 S Congress Ave Austin Tx 78704 Interior remodel to existing university arts bldg photo lab remodel Date: June 29, 2009 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: July 20, 2009 | Expiration date: July 20, 2009 | Permit id: 2009-067314 Pp | |||||
SCORE 100 Date: November 2, 2009 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Expired | Expiration date: May 4, 2010 | Permit id: 2009-1210 Pp | |||||
SCORE 100 Date: November 3, 2009 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: November 10, 2009 | Expiration date: November 10, 2009 | Permit id: 2009-122525 Pp | |||||
SCORE 100 121 Samsung Blvd Bldg Cub1 Austin Tx 78754 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Date: January 4, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: March 22, 2010 | Expiration date: March 22, 2010 | Permit id: 2009-131895 Pp | |||||
SCORE 100 Date: November 30, 2009 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: December 1, 2009 | Expiration date: December 1, 2009 | Permit id: 2009-131914 Pp | |||||
SCORE 100 121 Samsung Blvd Austin Tx 78754 Finishout for cleanroom over bridge for existing officeseminconductor manufacturing facility Date: January 4, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: March 29, 2010 | Expiration date: March 29, 2010 | Permit id: 2009-133674 Pp | |||||
SCORE 100 814 Airport Blvd Bldg A Austin Tx 78702 New construction 220 sf to create trade school offices and classrooms new construction 8045 sf trade school shop Date: March 10, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: October 29, 2010 | Expiration date: October 29, 2010 | Permit id: 2009-136452 Pp | |||||
SCORE 100 814 Airport Blvd Bldg B Austin Tx 78702 New construction 220 sf to create trade school offices and classrooms new construction 8045 sf trade school shop Date: March 10, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: October 29, 2010 | Expiration date: October 29, 2010 | Permit id: 2009-136453 Pp | |||||
SCORE 100 Date: February 2, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: April 12, 2010 | Expiration date: April 12, 2010 | Permit id: 2010-008931 Pp | |||||
SCORE 100 Date: February 2, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: April 12, 2010 | Expiration date: April 12, 2010 | Permit id: 2010-008932 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: October 19, 2000 | Expiration date: October 19, 2000 | Permit id: 1998-009002 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: March 13, 2000 | Expiration date: March 13, 2000 | Permit id: 1999-003963 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: August 29, 2001 | Expiration date: August 29, 2001 | Permit id: 2001-000068 Pp | |||||
SCORE 100 1221 S Mopac Expy Nb Bldg 3 Unit 4 Austin Tx 78746 Interior finishout 3rd floor lobby 4th floor offices for graycary Permit type: Plumbing permit | Permit status: Final | Completion date: May 11, 2001 | Expiration date: May 11, 2001 | Permit id: 2001-002851 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: January 25, 2002 | Expiration date: January 25, 2002 | Permit id: 2002-017158 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: March 20, 2002 | Expiration date: March 20, 2002 | Permit id: 2002-004846 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: July 22, 2002 | Expiration date: July 22, 2002 | Permit id: 2002-011762 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Expiration date: November 11, 2002 | Permit id: 2002-017887 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: December 9, 2003 | Expiration date: December 9, 2003 | Permit id: 2003-019552 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: February 5, 2002 | Expiration date: February 5, 2002 | Permit id: 2000-004799 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: October 23, 2000 | Expiration date: December 1, 2000 | Permit id: 2000-019873 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: October 27, 2000 | Expiration date: December 1, 2000 | Permit id: 2000-010003 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: October 20, 2000 | Expiration date: October 20, 2000 | Permit id: 2000-010676 Pp | |||||
SCORE 100 9 E 30th St Unit 303 Austin Tx 78705 Interior remodel to existing medical office for drs gunter gasal Permit type: Plumbing permit | Permit status: Void | Completion date: January 2, 2001 | Expiration date: January 5, 2001 | Permit id: 2000-021211 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Expiration date: February 5, 2008 | Permit id: 2006-013543 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: November 19, 2008 | Expiration date: November 19, 2008 | Permit id: 2007-001224 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: February 15, 2007 | Expiration date: February 15, 2007 | Permit id: 2007-003693 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Completion date: May 11, 2004 | Expiration date: May 11, 2004 | Permit id: 2004-007686 Pp | |||||
SCORE 100 2501 Anken Dr Austin Tx 78741 Gas test for 2exst gas meters to exst office bldg for laundry room dhw heater room Permit type: Plumbing permit | Permit status: Final | Completion date: August 31, 2004 | Expiration date: August 31, 2004 | Permit id: 2004-007904 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: October 25, 2004 | Expiration date: October 25, 2004 | Permit id: 2004-008138 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: August 19, 2004 | Expiration date: March 8, 2005 | Permit id: 2004-011733 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Expiration date: August 29, 2007 | Permit id: 2004-011939 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: August 20, 2004 | Expiration date: August 20, 2004 | Permit id: 2004-019772 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: September 7, 2004 | Expiration date: September 7, 2004 | Permit id: 2004-002144 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Expired | Expiration date: March 2, 2005 | Permit id: 2004-002374 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Expired | Expiration date: March 2, 2005 | Permit id: 2004-002378 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: September 3, 2004 | Expiration date: March 6, 2005 | Permit id: 2004-002423 Pp | |||||
SCORE 100 21 Kramer Ln Bldg 1 Unit 2 Austin Tx 78758 Replace 17 12 ton package unit to exsting comm bldg only unit 34 Permit type: Plumbing permit | Permit status: Final | Completion date: November 7, 2005 | Expiration date: November 7, 2005 | Permit id: 2005-025367 Pp | |||||
SCORE 100 4613 Tannehill Ln Austin Tx 78721 Remove and replace exist 175 gallon hot water storage tank only the salvation army shelter for women and children Permit type: Plumbing permit | Permit status: Final | Completion date: November 7, 2005 | Expiration date: November 7, 2005 | Permit id: 2005-025577 Pp | |||||
SCORE 100 1908 Kramer Ln Bldg B Austin Tx 78758 Changeout exsting 3 roof top units 1 condensing unit to exsting comm bldg only Permit type: Plumbing permit | Permit status: Final | Completion date: December 15, 2005 | Expiration date: June 14, 2006 | Permit id: 2005-008726 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: April 7, 2006 | Expiration date: April 7, 2006 | Permit id: 2006-015302 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: February 13, 2006 | Expiration date: February 13, 2006 | Permit id: 2006-019806 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: February 23, 2006 | Expiration date: August 22, 2006 | Permit id: 2006-025905 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: August 9, 2006 | Expiration date: April 10, 2007 | Permit id: 2006-007453 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: August 23, 2006 | Expiration date: August 23, 2006 | Permit id: 2006-027772 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: November 16, 2007 | Expiration date: October 26, 2008 | Permit id: 2006-0031 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Expired | Expiration date: March 2, 2005 | Permit id: 2004-002377 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Expiration date: August 29, 2007 | Permit id: 2003-016186 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: September 3, 2004 | Expiration date: March 6, 2005 | Permit id: 2004-002421 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Expiration date: June 26, 2002 | Permit id: 2001-018968 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: May 20, 2002 | Expiration date: November 16, 2002 | Permit id: 2002-014616 Pp | |||||
SCORE 100 121 Samsung Blvd Unit Upw Austin Tx 78754 Install voc emission control disc acid on roof top refer 04015790 Permit type: Plumbing permit | Permit status: Final | Completion date: April 1, 2005 | Expiration date: April 1, 2005 | Permit id: 2005-022663 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: February 13, 2006 | Expiration date: September 5, 2006 | Permit id: 2006-019951 Pp | |||||
SCORE 100 Date: May 10, 2006 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: January 29, 2007 | Expiration date: September 25, 2007 | Permit id: 2006-021673 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: February 1, 2000 | Expiration date: February 1, 2000 | Permit id: 1999-014557 Pp | |||||
SCORE 100 701 Congress Ave Austin Tx 78701 Install grease trap install utility gas extension from star canyon grease trap and water tie in ref 9808047 Permit type: Plumbing permit | Permit status: Final | Completion date: February 12, 2001 | Expiration date: February 12, 2001 | Permit id: 2001-010132 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Expiration date: August 29, 2007 | Permit id: 2003-016185 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Expiration date: February 16, 2005 | Permit id: 2004-020182 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: September 3, 2004 | Expiration date: March 6, 2005 | Permit id: 2004-002371 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: September 3, 2004 | Expiration date: March 6, 2005 | Permit id: 2004-002373 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: September 3, 2004 | Expiration date: March 6, 2005 | Permit id: 2004-002422 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: October 8, 2004 | Expiration date: October 8, 2004 | Permit id: 2004-0095 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: December 22, 2004 | Expiration date: December 22, 2004 | Permit id: 2004-013795 Pp | |||||
SCORE 100 6505 N Ih 35 Svrd Nb Austin Tx 78752 Interior remodel to existing hotel common area restaurantbar meeting rooms fitness center Permit type: Plumbing permit | Permit status: Final | Completion date: April 5, 2005 | Expiration date: April 5, 2005 | Permit id: 2005-022373 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: December 21, 2005 | Expiration date: December 21, 2005 | Permit id: 2005-0135 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: January 23, 2006 | Expiration date: July 22, 2006 | Permit id: 2005-018353 Pp | |||||
SCORE 100 11101 Metric Blvd Unit 1 Austin Tx 78758 Replacing roof 18 top units 3 condensing units to exist comm bldg only Permit type: Plumbing permit | Permit status: Final | Completion date: March 15, 2006 | Expiration date: March 15, 2006 | Permit id: 2006-019954 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Expiration date: June 9, 2007 | Permit id: 2006-028719 Pp | |||||
SCORE 100 Date: June 4, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: June 15, 2010 | Expiration date: June 15, 2010 | Permit id: 2010-048531 Pp | |||||
SCORE 100 121 Samsung Blvd Bldg Cub1 Austin Tx 78754 Finishout of sas central utility building including scope in mechelec rooms hvac process piping etc Date: August 6, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: December 13, 2010 | Expiration date: December 13, 2010 | Permit id: 2010-065655 Pp | |||||
SCORE 100 Date: August 12, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: August 17, 2010 | Expiration date: August 17, 2010 | Permit id: 2010-069466 Pp | |||||
SCORE 100 Date: August 26, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: September 14, 2010 | Expiration date: September 14, 2010 | Permit id: 2010-074199 Pp | |||||
SCORE 100 Date: July 9, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: July 15, 2010 | Expiration date: July 15, 2010 | Permit id: 2010-059439 Pp | |||||
SCORE 100 505 Barton Springs Rd Unit 3fl Austin Tx 78704 Change out ice machine like for like with new rpz located on 3rd floor breakroom Date: June 8, 2011 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: June 13, 2011 | Expiration date: June 13, 2011 | Permit id: 2011-046404 Pp | |||||
SCORE 100 Permit type: Mechanical permit | Permit status: Final | Completion date: February 29, 2000 | Expiration date: February 29, 2000 | Permit id: 1999-015483 Mp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Completion date: July 17, 2001 | Expiration date: January 30, 2002 | Permit id: 2001-006467 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: April 26, 2001 | Expiration date: April 26, 2001 | Permit id: 2001-013855 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Expired | Expiration date: December 8, 2001 | Permit id: 2001-010538 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: December 10, 2001 | Expiration date: December 10, 2001 | Permit id: 2001-012579 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: December 14, 2001 | Expiration date: December 14, 2001 | Permit id: 2001-015569 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: November 20, 2002 | Expiration date: November 20, 2002 | Permit id: 2002-006909 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Expiration date: July 29, 2003 | Permit id: 2003-012736 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Expired | Expiration date: January 5, 2005 | Permit id: 2004-012516 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: May 23, 2005 | Expiration date: May 23, 2005 | Permit id: 2005-007129 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Final | Completion date: November 20, 2002 | Expiration date: November 20, 2002 | Permit id: 2002-006907 Pp | |||||
SCORE 100 Permit type: Plumbing permit | Permit status: Void | Expiration date: February 16, 2005 | Permit id: 2004-020182 Pp |