Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Install of exterior lighting building a2 front entrance courtyard only Date: April 19, 2007 Contractor: Wesley Sunvison Permit type: Electrical permit | Permit status: Final | Completion date: September 11, 2007 | Expiration date: September 11, 2007 | Permit id: 2007-115312 Ep | |||||
SCORE 100 Install new 75kva transformer 225 amp panel in 1st floor admin building Date: May 24, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: August 1, 2007 | Expiration date: August 1, 2007 | Permit id: 2007-124381 Ep | |||||
SCORE 100 Completion of electrical on csf process eds and subclean for a2 fab phase 1 of mod 1only Date: August 23, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: February 19, 2008 | Expiration date: February 19, 2008 | Permit id: 2007-146206 Ep | |||||
SCORE 100 Install new 75kva transformer 225 amp panel in 1st floor admin building Date: May 24, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: August 1, 2007 | Expiration date: August 1, 2007 | Permit id: 2007-124381 Ep | |||||
SCORE 100 Installing a new 8 water line off the exst water line to exst cooling tower only Date: March 14, 2007 Contractor: Johnny Edwards Permit type: Plumbing permit | Permit status: Final | Completion date: August 23, 2007 | Expiration date: August 23, 2007 | Permit id: 2007-105894 Pp | |||||
SCORE 91 A2 mod 1 install electrical in make up air unit only Date: April 17, 2007 Contractor: Douglas W Filipek Permit type: Electrical permit | Permit status: Final | Completion date: August 1, 2007 | Expiration date: August 1, 2007 | Permit id: 2007-114468 Ep | |||||
SCORE 100 Install of exterior lighting building a2 front entrance courtyard only Date: April 19, 2007 Contractor: Wesley Sunvison Permit type: Electrical permit | Permit status: Final | Completion date: September 11, 2007 | Expiration date: September 11, 2007 | Permit id: 2007-115312 Ep | |||||
SCORE 100 Completion of electrical on csf process eds and subclean for a2 fab phase 1 of mod 1only Date: August 23, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: February 19, 2008 | Expiration date: February 19, 2008 | Permit id: 2007-146206 Ep | |||||
SCORE 100 Elec equipment hookup add vfds variable frequency drive to cooling tower per randy haydon Date: August 24, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 18, 2007 | Expiration date: September 18, 2007 | Permit id: 2007-146469 Ep | |||||
SCORE 100 A2 fab shell building Permit type: Mechanical permit | Permit status: Closed | Expiration date: October 14, 2007 | Permit id: 2006-0185 Mp | |||||
SCORE 83 Mod 1 mech piping in fab only a2 fab building interior finish out pmt06024809 Permit type: Mechanical permit | Permit status: Final | Completion date: August 22, 2007 | Expiration date: August 22, 2007 | Permit id: 2006-029296 Mp | |||||
SCORE 100 Rerouting underground fire main only Permit type: Plumbing permit | Permit status: Final | Completion date: October 21, 2006 | Expiration date: October 21, 2006 | Permit id: 2006-018869 Pp | |||||
SCORE 67 Mod 1 a2 fabinstall sanitary waste vent water only permit 06024809 Date: November 27, 2006 Contractor: Dale Friesenhahn Permit type: Plumbing permit | Permit status: Final | Completion date: August 22, 2007 | Expiration date: August 22, 2007 | Permit id: 2006-029518 Pp | |||||
SCORE 100 Install 6 new sewer line 2 water line to bulk gas plant only Permit type: Plumbing permit | Permit status: Final | Completion date: August 22, 2007 | Expiration date: August 22, 2007 | Permit id: 2007-005227 Pp | |||||
SCORE 67 A2 fabplumbinginstalling all roof drain leaders only permit 06024809 Date: November 27, 2006 Contractor: Dale Friesenhahn Permit type: Plumbing permit | Permit status: Final | Completion date: August 22, 2007 | Expiration date: August 22, 2007 | Permit id: 2006-029516 Pp | |||||
SCORE 59 Install elec for bus duct from cleanroom to main switchgear wire csf process ids subfab clean for fab refer06024809a2 fab rowid 739765 phase 1 of mod 1 only Permit type: Electrical permit | Permit status: Final | Completion date: August 24, 2007 | Expiration date: August 24, 2007 | Permit id: 2006-029164 Ep | |||||
SCORE 59 Temp lighting a2 fab shell building ref pmt 06023234 Permit type: Electrical permit | Permit status: Final | Completion date: August 24, 2007 | Expiration date: August 24, 2007 | Permit id: 2007-001597 Ep | |||||
SCORE 100 Mod a2 elect hookup for water purification syst eqpmnt refer to perm 06024809 Permit type: Electrical permit | Permit status: Final | Completion date: August 7, 2007 | Expiration date: February 3, 2008 | Permit id: 2007-002995 Ep | |||||
SCORE 100 A2 fab shell building Permit type: Building permit | Permit status: Final | Completion date: June 29, 2007 | Expiration date: October 14, 2007 | Permit id: 2006-0185 Bp | |||||
SCORE 59 Install elec for bus duct from cleanroom to main switchgear wire csf process ids subfab clean for fab refer06024809a2 fab Permit type: Building permit | Permit status: Cancelled | Completion date: April 3, 2007 | Expiration date: May 16, 2007 | Permit id: 2006-029164 Bp | |||||
Fab2 elect hookup for water purification syst eqpmnt refer to perm 06024809 Date: February 8, 2007 Value: $1,000,000 Permit type: Building permit | Permit status: Cancelled | Completion date: April 18, 2007 | Expiration date: August 7, 2007 | Permit id: 2007-002995 Bp | |||||
Mod 1mech piping in fab only a2 fab building interior finish out pmt06024809 Date: November 20, 2006 Value: $500 Permit type: Building permit | Permit status: Cancelled | Completion date: April 24, 2007 | Expiration date: May 19, 2007 | Permit id: 2006-029296 Bp | |||||
A2 fabplumbinginstalling all roof drain leaders only permit 06024809 Date: November 27, 2006 Permit type: Building permit | Permit status: Cancelled | Completion date: April 17, 2007 | Expiration date: May 26, 2007 | Permit id: 2006-029516 Bp | |||||
SCORE 100 Interior nonstructual demo Permit type: Building permit | Permit status: Final | Completion date: October 17, 2017 | Expiration date: October 17, 2017 | Permit id: 2017-122935 Bp | |||||
SCORE 100 Elec equipment hookup add vfds variable frequency drive to cooling tower per randy haydon Date: August 24, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 18, 2007 | Expiration date: September 18, 2007 | Permit id: 2007-146469 Ep | |||||
SCORE 100 Mod a2 elect hookup for water purification syst eqpmnt refer to perm 06024809 Permit type: Electrical permit | Permit status: Final | Completion date: August 7, 2007 | Expiration date: February 3, 2008 | Permit id: 2007-002995 Ep | |||||
SCORE 82 Interior remodel to existing office area and expand existing data center Date: October 31, 2017 Contractor: Russell Ferraro Permit type: Electrical permit | Permit status: Active | Expiration date: May 13, 2018 | Permit id: 2017-133142 Ep | |||||
SCORE 100 Interior remodel to existing office area and expand existing data center Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Active | Expiration date: May 13, 2018 | Permit id: 2017-133142 Bp | |||||
SCORE 96 Interior remodel to existing office area and expand existing data center Date: November 14, 2017 Contractor: Travis Everett Permit type: Mechanical permit | Permit status: Active | Expiration date: May 13, 2018 | Permit id: 2017-133142 Mp | |||||
SCORE 96 Interior remodel to existing office area and expand existing data center Date: November 14, 2017 Contractor: Chris Cosgrove Permit type: Plumbing permit | Permit status: Active | Expiration date: May 13, 2018 | Permit id: 2017-133142 Pp | |||||
SCORE 100 Interior nonstructual demo Permit type: Building permit | Permit status: Final | Completion date: October 17, 2017 | Expiration date: October 17, 2017 | Permit id: 2017-122935 Bp | |||||
SCORE 100 A2 fab shell building Permit type: Mechanical permit | Permit status: Closed | Expiration date: October 14, 2007 | Permit id: 2006-0185 Mp | |||||
SCORE 100 A2 fab shell building Permit type: Building permit | Permit status: Final | Completion date: June 29, 2007 | Expiration date: October 14, 2007 | Permit id: 2006-0185 Bp | |||||
SCORE 100 Interior remodel to existing office area and expand existing data center Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Active | Expiration date: June 4, 2018 | Permit id: 2017-133142 Bp | |||||
SCORE 100 Install compressor redundancy power in fab2 only Date: January 13, 2014 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 18, 2014 | Expiration date: December 18, 2014 | Permit id: 2014-003328 Ep | |||||
SCORE 100 Install compressor redundancy power in fab2 only Date: January 13, 2014 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 18, 2014 | Expiration date: December 18, 2014 | Permit id: 2014-003328 Ep | |||||
SCORE 99 Relocation of 2 sub panels to existing fab 2 bldg only Date: December 17, 2013 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: January 7, 2014 | Expiration date: January 7, 2014 | Permit id: 2013-130144 Ep | |||||
SCORE 100 Running new 2inch water line wastewater linefireline and storm drain outside utilities only factory operation building fob Date: November 20, 2012 Contractor: Sidney Ging Permit type: Plumbing permit | Permit status: Final | Completion date: May 6, 2013 | Expiration date: May 6, 2013 | Permit id: 2012-116939 Pp | |||||
SCORE 100 Reconnect lighting panels in ups in fab 2 only Date: December 6, 2013 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: February 28, 2014 | Expiration date: February 28, 2014 | Permit id: 2013-126533 Ep | |||||
SCORE 100 Reroute fireline extend some storm drains removing a piv fdc relocating a fdc install a backflow preventer Date: August 12, 2010 Contractor: Sidney Ging Permit type: Plumbing permit | Permit status: Final | Completion date: October 18, 2010 | Expiration date: October 18, 2010 | Permit id: 2010-0695 Pp | |||||
SCORE 100 Install 6 sewer and water line for control room install one rpz and tie in to exst sewer Date: October 20, 2011 Contractor: Sidney Ging Permit type: Plumbing permit | Permit status: Final | Completion date: November 18, 2011 | Expiration date: November 18, 2011 | Permit id: 2011-095378 Pp | |||||
SCORE 100 Install chiller makeup and redundant water to commercial bldg only samsung Date: June 15, 2012 Contractor: Sidney Ging Permit type: Plumbing permit | Permit status: Final | Completion date: January 23, 2013 | Expiration date: January 23, 2013 | Permit id: 2012-060075 Pp | |||||
SCORE 100 Relocation of a 48 storm sewer an 8 sanitary sewer and a wastewater manhole Date: August 24, 2012 Contractor: Sidney Ging Permit type: Plumbing permit | Permit status: Final | Completion date: February 28, 2013 | Expiration date: February 28, 2013 | Permit id: 2012-086326 Pp | |||||
SCORE 100 Reconnect lighting panels in ups in fab 2 only Date: December 6, 2013 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: February 28, 2014 | Expiration date: February 28, 2014 | Permit id: 2013-126533 Ep | |||||
SCORE 100 Installing new generator to support copper phase infrastructure of mod 2 project at existing semiconductor facility Date: October 15, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: January 12, 2011 | Expiration date: January 12, 2011 | Permit id: 2008-0651 Ep | |||||
SCORE 100 Installing new generator to support copper phase infrastructure of mod 2 project at existing semiconductor facility Date: August 12, 2010 Contractor: V R Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: December 29, 2010 | Expiration date: December 29, 2010 | Permit id: 2008-0651 Mp | |||||
SCORE 100 Installing new generator to support copper phase infrastructure of mod 2 project at existing semiconductor facility Date: November 9, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: December 29, 2010 | Expiration date: December 29, 2010 | Permit id: 2008-0651 Pp | |||||
SCORE 100 Installing new generators to support copper phase infrastructure of mod 2 project at existing semiconductor facilitysamsung austin semiconductor Permit type: Building permit | Permit status: Final | Completion date: May 27, 2011 | Expiration date: May 27, 2011 | Permit id: 2008-0651 Bp | |||||
SCORE 100 Fire riser room addition to existing generator bldg for officesemiconductor manufacturing Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: May 21, 2015 | Expiration date: May 21, 2015 | Permit id: 2015-0239 Bp | |||||
SCORE 100 Fire riser room addition to existing generator bldg for officesemiconductor manufacturing Date: March 26, 2015 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: May 11, 2015 | Expiration date: May 11, 2015 | Permit id: 2015-0239 Ep | |||||
SCORE 99 Fire riser room addition to existing generator bldg for officesemiconductor manufacturing Date: March 25, 2015 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: April 24, 2015 | Expiration date: April 24, 2015 | Permit id: 2015-0239 Mp | |||||
SCORE 100 Fire riser room addition to existing generator bldg for officesemiconductor manufacturing Date: March 26, 2015 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: May 11, 2015 | Expiration date: May 11, 2015 | Permit id: 2015-0239 Ep | |||||
SCORE 100 Installing new generator to support copper phase infrastructure of mod 2 project at existing semiconductor facility Date: October 15, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: January 12, 2011 | Expiration date: January 12, 2011 | Permit id: 2008-0651 Ep | |||||
SCORE 100 Fire riser room addition to existing generator bldg for officesemiconductor manufacturing Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: May 21, 2015 | Expiration date: May 21, 2015 | Permit id: 2015-0239 Bp | |||||
SCORE 100 Installing new generators to support copper phase infrastructure of mod 2 project at existing semiconductor facilitysamsung austin semiconductor Permit type: Building permit | Permit status: Final | Completion date: May 27, 2011 | Expiration date: May 27, 2011 | Permit id: 2008-0651 Bp | |||||
SCORE 100 Relocate existing power for diesel tanks golf cart chargers only Date: August 12, 2015 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: March 2, 2016 | Expiration date: March 2, 2016 | Permit id: 2015-097585 Ep | |||||
SCORE 100 New construction shell structure for cub1 addition Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: November 5, 2010 | Expiration date: November 5, 2010 | Permit id: 2010-057465 Bp | |||||
SCORE 99 Conduit site lighting only 2010056001sc Date: July 21, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: August 25, 2010 | Expiration date: August 25, 2010 | Permit id: 2010-062726 Ep | |||||
SCORE 100 Finishout of sas central utility building including scope in mechelec rooms hvac process piping etcincluding office and corridor area Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: December 28, 2010 | Expiration date: December 28, 2010 | Permit id: 2010-065655 Bp | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 17, 2010 | Expiration date: June 17, 2010 | Permit id: 2009-131895 Bp | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Date: January 13, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 3, 2010 | Expiration date: March 3, 2010 | Permit id: 2009-131895 Ep | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Date: January 4, 2010 Contractor: V R Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: March 22, 2010 | Expiration date: March 22, 2010 | Permit id: 2009-131895 Mp | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Date: January 4, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: March 22, 2010 | Expiration date: March 22, 2010 | Permit id: 2009-131895 Pp | |||||
SCORE 99 Fmcs 120v branch circuit tie in t1 project Date: February 10, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: March 23, 2010 | Expiration date: March 23, 2010 | Permit id: 2010-0109 Ep | |||||
SCORE 99 Finishout of sas central utility building including scope in mechelec rooms hvac process piping etc Date: August 6, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: December 15, 2010 | Expiration date: December 15, 2010 | Permit id: 2010-065655 Ep | |||||
SCORE 100 Finishout of sas central utility building including scope in mechelec rooms hvac process piping etc Date: August 6, 2010 Contractor: V R Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: December 18, 2010 | Expiration date: December 18, 2010 | Permit id: 2010-065655 Mp | |||||
SCORE 100 Finishout of sas central utility building including scope in mechelec rooms hvac process piping etc Date: August 6, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: December 13, 2010 | Expiration date: December 13, 2010 | Permit id: 2010-065655 Pp | |||||
SCORE 59 Install electrical service to bacnet controller and run conduit to power panel additional circuits Date: September 8, 2010 Contractor: Bobby Cuvelier Permit type: Electrical permit | Permit status: Final | Completion date: November 4, 2010 | Expiration date: November 4, 2010 | Permit id: 2010-077773 Ep | |||||
SCORE 99 Install 3 roof drains and reroute existing overflow drains only Date: October 11, 2010 Contractor: Alfred Botello Permit type: Plumbing permit | Permit status: Final | Completion date: December 14, 2010 | Expiration date: December 14, 2010 | Permit id: 2010-087862 Pp | |||||
SCORE 100 Install ductwork fan coil unit and exhaust fans only Date: October 11, 2010 Contractor: Thomas Emmett Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: December 14, 2010 | Expiration date: December 14, 2010 | Permit id: 2010-087864 Mp | |||||
SCORE 100 Install 2 rainwater drains only Date: July 16, 2010 Contractor: Sidney Ging Permit type: Plumbing permit | Permit status: Final | Completion date: October 19, 2010 | Expiration date: October 19, 2010 | Permit id: 2010-061409 Pp | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Date: January 13, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 3, 2010 | Expiration date: March 3, 2010 | Permit id: 2009-131895 Ep | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 17, 2010 | Expiration date: June 17, 2010 | Permit id: 2009-131895 Bp | |||||
SCORE 100 New construction shell structure for cub1 addition Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: November 5, 2010 | Expiration date: November 5, 2010 | Permit id: 2010-057465 Bp | |||||
SCORE 100 Finishout of sas central utility building including scope in mechelec rooms hvac process piping etcincluding office and corridor area Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: December 28, 2010 | Expiration date: December 28, 2010 | Permit id: 2010-065655 Bp | |||||
SCORE 100 Hook up two chillers in cub 2 for atlas 50k only Date: February 14, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: June 27, 2012 | Expiration date: June 27, 2012 | Permit id: 2012-014739 Ep | |||||
SCORE 100 Elect equipment hookup Date: March 8, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: August 7, 2007 | Expiration date: August 7, 2007 | Permit id: 2007-104654 Ep | |||||
SCORE 100 Reolocating 6 wastewater line from manhole to cut bldg only Date: March 21, 2007 Contractor: Johnny Edwards Permit type: Plumbing permit | Permit status: Final | Completion date: May 9, 2007 | Expiration date: May 9, 2007 | Permit id: 2007-1076 Pp | |||||
SCORE 100 Install valve into 12 domestic water line exsting cap off for future use only Date: April 3, 2007 Contractor: Johnny Edwards Permit type: Plumbing permit | Permit status: Final | Completion date: May 9, 2007 | Expiration date: May 9, 2007 | Permit id: 2007-110914 Pp | |||||
SCORE 82 Mod 1 install elec for utility support equipment for the central utilities bldg upwiwt and bulk gas plant areas utility areas cub2 Date: April 9, 2007 Contractor: Wynn Scruggs Permit type: Electrical permit | Permit status: Final | Completion date: August 21, 2007 | Expiration date: August 21, 2007 | Permit id: 2007-112348 Ep | |||||
SCORE 100 Cub 2 infrastructure upgrades to support copper phase at existing semiconductor facility samsung austin semiconductor Permit type: Building permit | Permit status: Final | Completion date: April 11, 2011 | Expiration date: April 11, 2011 | Permit id: 2008-065171 Bp | |||||
SCORE 100 Cub 2 infrastructure upgrades to support copper phase at existing semiconductor facility Date: October 15, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: January 21, 2011 | Expiration date: January 21, 2011 | Permit id: 2008-065171 Ep | |||||
SCORE 100 Cub 2 infrastructure upgrade to support copper phase at existing semiconductor facility Date: August 12, 2010 Contractor: V R Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: December 13, 2010 | Expiration date: December 13, 2010 | Permit id: 2008-065171 Mp | |||||
SCORE 100 Install fireline and domestic water to exsting tap only Date: August 25, 2008 Contractor: Eliseo Leal Permit type: Plumbing permit | Permit status: Final | Completion date: February 18, 2009 | Expiration date: February 18, 2009 | Permit id: 2008-067173 Pp | |||||
SCORE 100 Cub 2 infrastructure upgrade to support copper phase at existing semiconductor facility Date: September 3, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: December 13, 2010 | Expiration date: December 13, 2010 | Permit id: 2008-065171 Pp | |||||
SCORE 99 Installation of instrumentation power circuits only Date: September 21, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: December 17, 2010 | Expiration date: December 17, 2010 | Permit id: 2010-081494 Ep | |||||
SCORE 100 New pad mep for cub air receiver tanks Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 4, 2013 | Expiration date: June 4, 2013 | Permit id: 2012-094693 Bp | |||||
SCORE 100 A2 finishout cub2 Permit type: Mechanical permit | Permit status: Final | Completion date: June 22, 2007 | Expiration date: January 26, 2008 | Permit id: 2006-0137 Mp | |||||
SCORE 100 Install outside underground www lines only refer to pmt06020517 Permit type: Plumbing permit | Permit status: Final | Completion date: November 13, 2006 | Expiration date: November 13, 2006 | Permit id: 2006-024561 Pp | |||||
SCORE 100 New shell central utility buildingcub 2 Permit type: Mechanical permit | Permit status: Final | Completion date: February 13, 2007 | Expiration date: February 13, 2007 | Permit id: 2006-016748 Mp | |||||
SCORE 100 A2 finishout cub2 mod 1 portion only Permit type: Electrical permit | Permit status: Final | Completion date: August 7, 2007 | Expiration date: August 7, 2007 | Permit id: 2006-0137 Ep | |||||
SCORE 100 Cub 2elect hookup for water purification syst eqpmnt refer to permit 06024659 no such permit number kpl Permit type: Electrical permit | Permit status: Final | Completion date: August 1, 2007 | Expiration date: August 1, 2007 | Permit id: 2007-002997 Ep | |||||
Cub2elect hookup for water purification syst eqpmnt refer to permit 06024659 Date: February 8, 2007 Value: $2,000,000 Permit type: Building permit | Permit status: Cancelled | Completion date: April 18, 2007 | Expiration date: August 7, 2007 | Permit id: 2007-002997 Bp | |||||
SCORE 95 Install 5 ft underground fireline at new cub building Permit type: Building permit | Permit status: Final | Completion date: August 29, 2007 | Expiration date: August 29, 2007 | Permit id: 2007-002894 Bp | |||||
SCORE 94 Add temp panels in cub 2 to existing commercial building Date: July 5, 2011 Contractor: Larry Hall Permit type: Electrical permit | Permit status: Final | Completion date: July 26, 2011 | Expiration date: July 26, 2011 | Permit id: 2011-058732 Ep | |||||
SCORE 100 Equipment feeders and connection to cub 2 chiller pump only Date: August 4, 2011 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 1, 2011 | Expiration date: December 1, 2011 | Permit id: 2011-069214 Ep | |||||
SCORE 100 Hook up two chillers in cub 2 for atlas 50k only Date: February 14, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: June 27, 2012 | Expiration date: June 27, 2012 | Permit id: 2012-014739 Ep | |||||
SCORE 100 Cub boiler replacement Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: March 8, 2013 | Expiration date: March 8, 2013 | Permit id: 2012-094692 Bp | |||||
SCORE 100 Cub boiler replacement Date: October 3, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: January 25, 2013 | Expiration date: January 25, 2013 | Permit id: 2012-094692 Ep | |||||
SCORE 99 Cub boiler replacement Date: October 3, 2012 Contractor: Julian Lopez Permit type: Plumbing permit | Permit status: Final | Completion date: January 4, 2013 | Expiration date: January 4, 2013 | Permit id: 2012-094692 Pp | |||||
SCORE 100 New pad mep for cub air receiver tanks Date: October 3, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 17, 2013 | Expiration date: April 17, 2013 | Permit id: 2012-094693 Ep | |||||
SCORE 99 New pad mep for cub air receiver tanks Date: October 3, 2012 Contractor: Julian Lopez Permit type: Plumbing permit | Permit status: Final | Completion date: April 4, 2013 | Expiration date: April 4, 2013 | Permit id: 2012-094693 Pp | |||||
SCORE 100 Cub boiler replacement Date: October 3, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: January 25, 2013 | Expiration date: January 25, 2013 | Permit id: 2012-094692 Ep | |||||
SCORE 100 New pad mep for cub air receiver tanks Date: October 3, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 17, 2013 | Expiration date: April 17, 2013 | Permit id: 2012-094693 Ep | |||||
SCORE 100 Equipment feeders and connection to cub 2 chiller pump only Date: August 4, 2011 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 1, 2011 | Expiration date: December 1, 2011 | Permit id: 2011-069214 Ep | |||||
SCORE 100 Cub 2 infrastructure upgrades to support copper phase at existing semiconductor facility Date: October 15, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: January 21, 2011 | Expiration date: January 21, 2011 | Permit id: 2008-065171 Ep | |||||
SCORE 100 Elect equipment hookup Date: March 8, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: August 7, 2007 | Expiration date: August 7, 2007 | Permit id: 2007-104654 Ep | |||||
SCORE 100 Cub 2elect hookup for water purification syst eqpmnt refer to permit 06024659 no such permit number kpl Permit type: Electrical permit | Permit status: Final | Completion date: August 1, 2007 | Expiration date: August 1, 2007 | Permit id: 2007-002997 Ep | |||||
SCORE 95 Install 5 ft underground fireline at new cub building Permit type: Building permit | Permit status: Final | Completion date: August 29, 2007 | Expiration date: August 29, 2007 | Permit id: 2007-002894 Bp | |||||
SCORE 100 Cub boiler replacement Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: March 8, 2013 | Expiration date: March 8, 2013 | Permit id: 2012-094692 Bp | |||||
SCORE 100 New pad mep for cub air receiver tanks Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 4, 2013 | Expiration date: June 4, 2013 | Permit id: 2012-094693 Bp | |||||
SCORE 100 Cub 2 infrastructure upgrades to support copper phase at existing semiconductor facility samsung austin semiconductor Permit type: Building permit | Permit status: Final | Completion date: April 11, 2011 | Expiration date: April 11, 2011 | Permit id: 2008-065171 Bp | |||||
SCORE 100 New shell central utility buildingcub 2 Permit type: Mechanical permit | Permit status: Final | Completion date: February 13, 2007 | Expiration date: February 13, 2007 | Permit id: 2006-016748 Mp | |||||
SCORE 100 A2 finishout cub2 Permit type: Mechanical permit | Permit status: Final | Completion date: June 22, 2007 | Expiration date: January 26, 2008 | Permit id: 2006-0137 Mp | |||||
SCORE 100 A2 finishout cub2 mod 1 portion only Permit type: Electrical permit | Permit status: Final | Completion date: August 7, 2007 | Expiration date: August 7, 2007 | Permit id: 2006-0137 Ep | |||||
SCORE 99 Two story expansion of existing upw building Permit type: Mechanical permit | Permit status: Final | Completion date: December 16, 2005 | Expiration date: December 16, 2005 | Permit id: 2004-0058 Mp | |||||
SCORE 100 Install voc emission control disc acid on roof top refer 04015790 Permit type: Mechanical permit | Permit status: Final | Completion date: April 1, 2005 | Expiration date: April 1, 2005 | Permit id: 2005-022663 Mp | |||||
SCORE 100 Install voc emission control disc acid on roof top refer 04015790 Permit type: Plumbing permit | Permit status: Final | Completion date: April 1, 2005 | Expiration date: April 1, 2005 | Permit id: 2005-022663 Pp | |||||
SCORE 99 Two story expansion of existing upw building Permit type: Electrical permit | Permit status: Final | Completion date: June 14, 2005 | Expiration date: June 14, 2005 | Permit id: 2004-0058 Ep | |||||
SCORE 100 Provide and install electrical wiring to iwt panels motor control center pumps instruments equipment and tanks Date: January 28, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 5, 2010 | Expiration date: March 5, 2010 | Permit id: 2010-0078 Ep | |||||
SCORE 100 Upgrade existing circuits to electrical pump only Date: March 7, 2014 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: September 8, 2014 | Expiration date: September 8, 2014 | Permit id: 2014-023197 Ep | |||||
SCORE 100 New iwt canopy over existing equipment Date: May 2, 2013 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: November 20, 2013 | Expiration date: November 20, 2013 | Permit id: 2013-0351 Ep | |||||
SCORE 94 Modify city water system and install safety showers to iwt1 only Date: January 21, 2010 Contractor: David Moats Permit type: Plumbing permit | Permit status: Final | Completion date: March 1, 2010 | Expiration date: March 1, 2010 | Permit id: 2010-005408 Pp | |||||
SCORE 100 Provide and install electrical wiring to iwt panels motor control center pumps instruments equipment and tanks Date: January 28, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 5, 2010 | Expiration date: March 5, 2010 | Permit id: 2010-0078 Ep | |||||
SCORE 100 Mep finish out for expansion of copper and awwfww wastewater treatment facilities for existing officesemiconductor manufacturing facility samsung austin semiconductor saturn iwt expansion mep finish Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: April 28, 2011 | Expiration date: April 28, 2011 | Permit id: 2010-0825 Bp | |||||
SCORE 87 Mep finish out for expansion of copper and awwfww wastewater treatment facilities for existing officesemiconductor manufacturing facility Date: October 1, 2010 Contractor: Carl E. Spangler Permit type: Electrical permit | Permit status: Final | Completion date: December 15, 2010 | Expiration date: December 15, 2010 | Permit id: 2010-0825 Ep | |||||
SCORE 68 Mep finish out for expansion of copper and awwfww wastewater treatment facilities for existing officesemiconductor manufacturing facility Date: November 4, 2010 Contractor: Donald A Potosky Permit type: Mechanical permit | Permit status: Final | Completion date: December 9, 2010 | Expiration date: December 9, 2010 | Permit id: 2010-0825 Mp | |||||
SCORE 94 Mep finish out for expansion of copper and awwfww wastewater treatment facilities for existing officesemiconductor manufacturing facility Date: September 27, 2010 Contractor: David Moats Permit type: Plumbing permit | Permit status: Final | Completion date: December 30, 2010 | Expiration date: December 30, 2010 | Permit id: 2010-0825 Pp | |||||
SCORE 87 Equipment permit includes relocate lighting and heat trace panels equipment addition of level switch and level transmitters Date: December 15, 2010 Contractor: Carl E. Spangler Permit type: Electrical permit | Permit status: Final | Completion date: January 25, 2011 | Expiration date: January 25, 2011 | Permit id: 2010-107083 Ep | |||||
SCORE 100 New iwt canopy over existing equipment Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: November 22, 2013 | Expiration date: November 22, 2013 | Permit id: 2013-0351 Bp | |||||
SCORE 100 New iwt canopy over existing equipment Date: May 2, 2013 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: November 20, 2013 | Expiration date: November 20, 2013 | Permit id: 2013-0351 Ep | |||||
SCORE 87 Equipment permit includes relocate lighting and heat trace panels equipment addition of level switch and level transmitters Date: December 15, 2010 Contractor: Carl E. Spangler Permit type: Electrical permit | Permit status: Final | Completion date: January 25, 2011 | Expiration date: January 25, 2011 | Permit id: 2010-107083 Ep | |||||
SCORE 87 Mep finish out for expansion of copper and awwfww wastewater treatment facilities for existing officesemiconductor manufacturing facility Date: October 1, 2010 Contractor: Carl E. Spangler Permit type: Electrical permit | Permit status: Final | Completion date: December 15, 2010 | Expiration date: December 15, 2010 | Permit id: 2010-0825 Ep | |||||
SCORE 100 New iwt canopy over existing equipment Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: November 22, 2013 | Expiration date: November 22, 2013 | Permit id: 2013-0351 Bp | |||||
SCORE 100 Mep finish out for expansion of copper and awwfww wastewater treatment facilities for existing officesemiconductor manufacturing facility samsung austin semiconductor saturn iwt expansion mep finish Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: April 28, 2011 | Expiration date: April 28, 2011 | Permit id: 2010-0825 Bp | |||||
SCORE 59 Elec srv for symax room electircal finish out room02177 Date: March 30, 2007 Contractor: Roderick Cossman Permit type: Electrical permit | Permit status: Final | Completion date: August 17, 2007 | Expiration date: August 17, 2007 | Permit id: 2007-110097 Ep | |||||
SCORE 100 A2 finishout office bldg ofc 2 includes a cafeteria Permit type: Plumbing permit | Permit status: Final | Completion date: July 20, 2007 | Expiration date: July 20, 2007 | Permit id: 2006-013716 Pp | |||||
SCORE 99 Install elec for site lighting only Permit type: Electrical permit | Permit status: Final | Completion date: August 24, 2007 | Expiration date: August 24, 2007 | Permit id: 2006-028767 Ep | |||||
SCORE 100 New shell office building Permit type: Building permit | Permit status: Final | Completion date: August 10, 2007 | Expiration date: June 5, 2007 | Permit id: 2006-016752 Bp | |||||
SCORE 100 A2 finishout office bldg ofc 2 includes a cafeteria Permit type: Mechanical permit | Permit status: Final | Completion date: July 13, 2007 | Expiration date: July 13, 2007 | Permit id: 2006-013716 Mp | |||||
SCORE 100 New shell office building Permit type: Building permit | Permit status: Final | Completion date: August 10, 2007 | Expiration date: June 5, 2007 | Permit id: 2006-016752 Bp | |||||
SCORE 100 Construction of one cell to cooling tower in mod 2 copper phase infrastructure at existing semiconductor facility samsung austin semiconductor Permit type: Building permit | Permit status: Final | Completion date: April 28, 2011 | Expiration date: April 28, 2011 | Permit id: 2008-065169 Bp | |||||
SCORE 100 Construction of one cell to cooling tower in mod 2 copper phase infrastructure at existing semiconductor facility Date: October 15, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: January 6, 2011 | Expiration date: January 6, 2011 | Permit id: 2008-065169 Ep | |||||
SCORE 100 Addition and remodel to existing semiconductor facility Date: August 12, 2010 Contractor: V R Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: January 13, 2011 | Expiration date: January 13, 2011 | Permit id: 2008-065169 Mp | |||||
SCORE 100 Construction of one cell to cooling tower in mod 2 copper phase infrastructure at existing semiconductor facility Date: August 12, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: January 13, 2011 | Expiration date: January 13, 2011 | Permit id: 2008-065169 Pp | |||||
SCORE 100 Install outside underground waterwastewater fireline only Date: June 11, 2010 Contractor: Sidney Ging Permit type: Plumbing permit | Permit status: Final | Completion date: October 19, 2010 | Expiration date: October 19, 2010 | Permit id: 2010-050935 Pp | |||||
SCORE 99 Installation of instrumentation power circuits cooling towers Date: September 21, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: December 21, 2010 | Expiration date: December 21, 2010 | Permit id: 2010-081497 Ep | |||||
SCORE 100 Remodel to existing officesemiconductor manufacturing increased quantity of cooling tower cells 1 cooling tower basin installed during saturn project Permit type: Building permit | Permit status: Final | Completion date: December 22, 2011 | Expiration date: December 22, 2011 | Permit id: 2011-056359 Bp | |||||
SCORE 100 Remodel to existing officesemiconductor manufacturing increased quantity of cooling tower cells 1 cooling tower basin installed during saturn project Date: August 3, 2011 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 15, 2011 | Expiration date: December 15, 2011 | Permit id: 2011-056359 Ep | |||||
SCORE 99 Remodel to existing officesemiconductor manufacturing increased quantity of cooling tower cells 1 cooling tower basin installed during saturn project Date: August 9, 2011 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: December 14, 2011 | Expiration date: December 14, 2011 | Permit id: 2011-056359 Mp | |||||
SCORE 100 Remodel to existing officesemiconductor manufacturing increased quantity of cooling tower cells 1 cooling tower basin installed during saturn project Date: August 3, 2011 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 15, 2011 | Expiration date: December 15, 2011 | Permit id: 2011-056359 Ep | |||||
SCORE 100 Construction of one cell to cooling tower in mod 2 copper phase infrastructure at existing semiconductor facility Date: October 15, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: January 6, 2011 | Expiration date: January 6, 2011 | Permit id: 2008-065169 Ep | |||||
SCORE 100 Construction of one cell to cooling tower in mod 2 copper phase infrastructure at existing semiconductor facility samsung austin semiconductor Permit type: Building permit | Permit status: Final | Completion date: April 28, 2011 | Expiration date: April 28, 2011 | Permit id: 2008-065169 Bp | |||||
SCORE 100 Remodel to existing officesemiconductor manufacturing increased quantity of cooling tower cells 1 cooling tower basin installed during saturn project Permit type: Building permit | Permit status: Final | Completion date: December 22, 2011 | Expiration date: December 22, 2011 | Permit id: 2011-056359 Bp | |||||
SCORE 100 Install elec for security building pt1 only Date: August 5, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 9, 2010 | Expiration date: September 9, 2010 | Permit id: 2010-067271 Ep | |||||
SCORE 100 Install elec for security building pt1 only Date: August 5, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 9, 2010 | Expiration date: September 9, 2010 | Permit id: 2010-067271 Ep | |||||
SCORE 100 Installing 18 sewer line only Date: October 20, 2010 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Final | Completion date: November 3, 2010 | Expiration date: November 3, 2010 | Permit id: 2010-091072 Pp | |||||
SCORE 100 Installing 18 sewer line only Date: October 20, 2010 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Final | Completion date: November 3, 2010 | Expiration date: November 3, 2010 | Permit id: 2010-091072 Pp | |||||
SCORE 99 Install 2 100a subpanels on 2 existing 100a panels for plc and emergency panels Date: September 29, 2017 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: October 24, 2017 | Expiration date: October 24, 2017 | Permit id: 2017-123459 Ep | |||||
SCORE 95 Install elec for temp transformer pad cp2 only Permit type: Electrical permit | Permit status: Final | Completion date: October 31, 2006 | Expiration date: October 31, 2006 | Permit id: 2006-001369 Ep | |||||
SCORE 95 Install elec for temp transformer pad cp3 only Permit type: Electrical permit | Permit status: Final | Completion date: December 15, 2006 | Expiration date: December 15, 2006 | Permit id: 2006-0013 Ep | |||||
SCORE 95 Install elec for temp transformer pad cp4 only Permit type: Electrical permit | Permit status: Final | Completion date: June 27, 2006 | Expiration date: June 27, 2006 | Permit id: 2006-001372 Ep | |||||
SCORE 95 Install elec for temp transformer pad cp5 only Permit type: Electrical permit | Permit status: Final | Completion date: July 18, 2006 | Expiration date: May 19, 2007 | Permit id: 2006-001373 Ep | |||||
Install elec for temp transformer pad cp5 only Date: May 31, 2006 Value: $6,062 Permit type: Building permit | Permit status: Final | Completion date: July 18, 2006 | Expiration date: May 19, 2007 | Permit id: 2006-001373 Bp | |||||
SCORE 95 Install elec for temp transformer pad cp6 only Permit type: Electrical permit | Permit status: Final | Completion date: July 18, 2006 | Expiration date: July 18, 2006 | Permit id: 2006-001374 Ep | |||||
SCORE 95 Install elec for temp transformer pad cp7 only Permit type: Electrical permit | Permit status: Final | Completion date: July 18, 2006 | Expiration date: July 18, 2006 | Permit id: 2006-001375 Ep | |||||
SCORE 95 Install elec for temp transformer pad cp1 only Permit type: Electrical permit | Permit status: Final | Completion date: June 28, 2006 | Expiration date: June 28, 2006 | Permit id: 2006-001366 Ep | |||||
SCORE 99 Install elec for a2cp9 temp transformer only Permit type: Electrical permit | Permit status: Final | Completion date: November 20, 2006 | Expiration date: November 20, 2006 | Permit id: 2006-024489 Ep | |||||
SCORE 100 Install main temp power for office const trailers only Permit type: Electrical permit | Permit status: Final | Completion date: February 22, 2007 | Expiration date: February 22, 2007 | Permit id: 2007-000999 Ep | |||||
SCORE 100 New shell secondary substation Permit type: Mechanical permit | Permit status: Final | Completion date: February 14, 2007 | Expiration date: February 14, 2007 | Permit id: 2006-016753 Mp | |||||
SCORE 100 A2 finishout secondary substation Permit type: Building permit | Permit status: Final | Completion date: August 17, 2007 | Expiration date: August 17, 2007 | Permit id: 2006-013704 Bp | |||||
SCORE 100 New shell secondary substation Permit type: Mechanical permit | Permit status: Final | Completion date: February 14, 2007 | Expiration date: February 14, 2007 | Permit id: 2006-016753 Mp | |||||
SCORE 100 A2 finishout secondary substation Permit type: Building permit | Permit status: Final | Completion date: August 17, 2007 | Expiration date: August 17, 2007 | Permit id: 2006-013704 Bp | |||||
SCORE 100 New construction substation building for officesemiconductor manufacturing Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 7, 2012 | Expiration date: June 7, 2012 | Permit id: 2011-087023 Bp | |||||
SCORE 100 New construction substation building for officesemiconductor manufacturing Date: December 6, 2011 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: May 9, 2012 | Expiration date: May 9, 2012 | Permit id: 2011-087023 Ep | |||||
SCORE 99 New construction substation building for officesemiconductor manufacturing Date: December 20, 2011 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: April 23, 2012 | Expiration date: April 23, 2012 | Permit id: 2011-087023 Mp | |||||
SCORE 100 New foundation and structural only bldg for officesemiconductor manufacturing fab x elevator bldg structure Date: September 4, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: January 25, 2013 | Expiration date: January 25, 2013 | Permit id: 2012-082399 Ep | |||||
SCORE 100 New foundation and structural only bldg for officesemiconductor manufacturing fab x elevator bldg structure Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: February 22, 2013 | Expiration date: February 22, 2013 | Permit id: 2012-082399 Bp | |||||
SCORE 100 New foundation and structural only bldg for officesemiconductor manufacturing fab x elevator bldg structure Date: September 4, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: January 25, 2013 | Expiration date: January 25, 2013 | Permit id: 2012-082399 Ep | |||||
SCORE 96 Mep finish for fab 1 ut bldgprocess exhaust 2nd mech permit for dsi work Date: January 30, 2013 Contractor: Travis Everett Permit type: Mechanical permit | Permit status: Final | Completion date: February 15, 2013 | Expiration date: February 15, 2013 | Permit id: 2013-004099 Mp | |||||
SCORE 100 Remodel existing fab x shell bldg converstion low fab area tco phased approved gvilla11813no chemicalsonly tool set up Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 4, 2013 | Expiration date: June 4, 2013 | Permit id: 2012-094134 Bp | |||||
SCORE 100 New pads and mep finishouts for fab 1 tanks waste tank fab1 ln2 and cu ww tank Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 4, 2013 | Expiration date: June 4, 2013 | Permit id: 2012-094135 Bp | |||||
SCORE 100 Fab x elevator bldg mep finish out Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: March 8, 2013 | Expiration date: March 8, 2013 | Permit id: 2012-094136 Bp | |||||
SCORE 89 Remodel existing fab x area fab x elevator bldg mep finish out fab x shell bldg converstion fab 1 tanks waste tank tstar 2 3 4 Date: October 3, 2012 Contractor: Charles F Benge Permit type: Electrical permit | Permit status: Final | Completion date: January 9, 2013 | Expiration date: January 9, 2013 | Permit id: 2012-094134 Ep | |||||
SCORE 99 Remodel existing fab x area fab x elevator bldg mep finish out fab x shell bldg converstion fab 1 tanks waste tank tstar 2 3 4 Date: October 3, 2012 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: February 19, 2013 | Expiration date: February 19, 2013 | Permit id: 2012-094134 Mp | |||||
SCORE 94 Remodel existing fab x area fab x elevator bldg mep finish out fab x shell bldg converstion fab 1 tanks waste tank tstar 2 3 4 Date: October 4, 2012 Contractor: David Moats Permit type: Plumbing permit | Permit status: Final | Completion date: February 19, 2013 | Expiration date: February 19, 2013 | Permit id: 2012-094134 Pp | |||||
SCORE 89 New pads and mep finishouts for fab 1 tanks waste tank fab1 ln2 and cu ww tank Date: October 3, 2012 Contractor: Charles F Benge Permit type: Electrical permit | Permit status: Final | Completion date: March 27, 2013 | Expiration date: March 27, 2013 | Permit id: 2012-094135 Ep | |||||
SCORE 100 New pads and mep finishouts for fab 1 tanks waste tank fab1 ln2 and cu ww tank Date: October 9, 2012 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: April 2, 2013 | Expiration date: April 2, 2013 | Permit id: 2012-094135 Mp | |||||
SCORE 94 New pads and mep finishouts for fab 1 tanks waste tank fab1 ln2 and cu ww tank Date: October 4, 2012 Contractor: David Moats Permit type: Plumbing permit | Permit status: Final | Completion date: April 9, 2013 | Expiration date: April 9, 2013 | Permit id: 2012-094135 Pp | |||||
SCORE 89 Fab x elevator bldg mep finish out Date: October 3, 2012 Contractor: Charles F Benge Permit type: Electrical permit | Permit status: Final | Completion date: January 16, 2013 | Expiration date: January 16, 2013 | Permit id: 2012-094136 Ep | |||||
SCORE 99 Fab x elevator bldg mep finish out Date: October 3, 2012 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: February 15, 2013 | Expiration date: February 15, 2013 | Permit id: 2012-094136 Mp | |||||
SCORE 100 Fab 1 ut building mep finishout Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: March 8, 2013 | Expiration date: March 8, 2013 | Permit id: 2012-094146 Bp | |||||
SCORE 89 Fab 1 ut building mep finishout Date: October 3, 2012 Contractor: Charles F Benge Permit type: Electrical permit | Permit status: Final | Completion date: January 31, 2013 | Expiration date: January 31, 2013 | Permit id: 2012-094147 Ep | |||||
SCORE 99 Fab 1 ut building mep finishout Date: October 3, 2012 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: February 15, 2013 | Expiration date: February 15, 2013 | Permit id: 2012-094149 Mp | |||||
SCORE 100 New foundation and structural only bldg for officesemiconductor manufacturing fab x elevator bldg structure Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: February 22, 2013 | Expiration date: February 22, 2013 | Permit id: 2012-082399 Bp | |||||
SCORE 100 Remodel existing fab x shell bldg converstion low fab area tco phased approved gvilla11813no chemicalsonly tool set up Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 4, 2013 | Expiration date: June 4, 2013 | Permit id: 2012-094134 Bp | |||||
SCORE 100 New pads and mep finishouts for fab 1 tanks waste tank fab1 ln2 and cu ww tank Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 4, 2013 | Expiration date: June 4, 2013 | Permit id: 2012-094135 Bp | |||||
SCORE 100 Fab x elevator bldg mep finish out Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: March 8, 2013 | Expiration date: March 8, 2013 | Permit id: 2012-094136 Bp | |||||
SCORE 100 Fab 1 ut building mep finishout Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: March 8, 2013 | Expiration date: March 8, 2013 | Permit id: 2012-094146 Bp | |||||
SCORE 100 Install of and wiring to md2 pp panel busplug at samsung fab 1 2 tool pad grounding Date: August 4, 2011 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 15, 2011 | Expiration date: December 15, 2011 | Permit id: 2011-069203 Ep | |||||
SCORE 100 Samsung fab 1 busway panels switchgear hook up motors only permit has been paid for will fax in request Date: October 1, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 23, 2013 | Expiration date: April 23, 2013 | Permit id: 2012-0979 Ep | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing install redundant voc unit and associated mep Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 26, 2015 | Expiration date: June 26, 2015 | Permit id: 2015-007869 Bp | |||||
SCORE 99 Interior remodel to existing officesemiconductor manufacturing install redundant voc unit and associated mep Date: March 18, 2015 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: June 5, 2015 | Expiration date: June 5, 2015 | Permit id: 2015-007869 Ep | |||||
SCORE 96 Interior remodel to existing officesemiconductor manufacturing install redundant voc unit and associated mep Date: March 5, 2015 Contractor: Travis Everett Permit type: Mechanical permit | Permit status: Final | Completion date: June 24, 2015 | Expiration date: June 24, 2015 | Permit id: 2015-007869 Mp | |||||
SCORE 96 Interior remodel to existing officesemiconductor manufacturing install redundant voc unit and associated mep Date: March 6, 2015 Contractor: Chris Cosgrove Permit type: Plumbing permit | Permit status: Final | Completion date: June 26, 2015 | Expiration date: June 26, 2015 | Permit id: 2015-007869 Pp | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Date: February 5, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: March 29, 2010 | Expiration date: March 29, 2010 | Permit id: 2009-131896 Pp | |||||
SCORE 94 Relocate and reinstall and add new power panels and transformers connect fan filter unitssub duct and lighting and power cable tray in process level and sub fab only Date: January 6, 2010 Contractor: Larry Hall Permit type: Electrical permit | Permit status: Final | Completion date: March 17, 2010 | Expiration date: March 17, 2010 | Permit id: 2010-001127 Ep | |||||
SCORE 94 Install power and grounding for networking main racks etos racks only Date: January 7, 2010 Contractor: Larry Hall Permit type: Electrical permit | Permit status: Final | Completion date: March 30, 2010 | Expiration date: March 30, 2010 | Permit id: 2010-001373 Ep | |||||
SCORE 94 Modify natural gas distribution system and add saftey showers to all fab areas with city water Date: January 21, 2010 Contractor: David Moats Permit type: Plumbing permit | Permit status: Final | Completion date: March 18, 2010 | Expiration date: March 18, 2010 | Permit id: 2010-005398 Pp | |||||
SCORE 100 New shell construction electrical distribution addition to fab1 for semiconductor manufacturing Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: November 24, 2010 | Expiration date: November 24, 2010 | Permit id: 2010-057454 Bp | |||||
SCORE 100 Delievering temp service to temp contruction trailer only Date: August 24, 2010 Contractor: Doyle Baird Permit type: Electrical permit | Permit status: Final | Completion date: September 30, 2010 | Expiration date: September 30, 2010 | Permit id: 2010-073152 Ep | |||||
SCORE 99 Install floor drains sector 17 Date: October 11, 2010 Contractor: Alfred Botello Permit type: Plumbing permit | Permit status: Final | Completion date: December 22, 2010 | Expiration date: December 22, 2010 | Permit id: 2010-087867 Pp | |||||
SCORE 94 Add transformer and panel in fab 1only Date: June 17, 2011 Contractor: Larry Hall Permit type: Electrical permit | Permit status: Final | Completion date: June 29, 2011 | Expiration date: June 29, 2011 | Permit id: 2011-053404 Ep | |||||
SCORE 100 Power to pv pumps in existing structure Date: August 30, 2011 Contractor: Doyle Baird Permit type: Electrical permit | Permit status: Final | Completion date: January 23, 2012 | Expiration date: January 23, 2012 | Permit id: 2011-077842 Ep | |||||
SCORE 99 New h2s04 h202 building fab1 Date: October 3, 2012 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: June 17, 2013 | Expiration date: June 17, 2013 | Permit id: 2012-094047 Mp | |||||
SCORE 94 New h2s04 h202 building fab1 Date: October 4, 2012 Contractor: David Moats Permit type: Plumbing permit | Permit status: Final | Completion date: June 24, 2013 | Expiration date: June 24, 2013 | Permit id: 2012-094047 Pp | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: August 27, 2010 | Expiration date: August 27, 2010 | Permit id: 2009-131896 Bp | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Date: January 13, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 26, 2010 | Expiration date: March 26, 2010 | Permit id: 2009-131896 Ep | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Date: January 4, 2010 Contractor: V R Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: March 29, 2010 | Expiration date: March 29, 2010 | Permit id: 2009-131896 Mp | |||||
SCORE 94 Install power panels install lighting install fan filter units and install power cable trayexpansion area 1st and 2nd floor only Date: January 25, 2010 Contractor: Larry Hall Permit type: Electrical permit | Permit status: Final | Completion date: March 23, 2010 | Expiration date: March 23, 2010 | Permit id: 2010-006276 Ep | |||||
SCORE 94 Polymide areainstall power panels install fan filter units and install power cable tray only Date: January 25, 2010 Contractor: Larry Hall Permit type: Electrical permit | Permit status: Final | Completion date: March 30, 2010 | Expiration date: March 30, 2010 | Permit id: 2010-006281 Ep | |||||
SCORE 100 Installing process duct work Date: February 9, 2010 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: April 5, 2010 | Expiration date: April 5, 2010 | Permit id: 2010-009743 Mp | |||||
SCORE 99 Fms 120v branch circuit tie in only t1 project Date: February 10, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: March 30, 2010 | Expiration date: March 30, 2010 | Permit id: 2010-010965 Ep | |||||
SCORE 99 Fmcs 120v branch circuit tie in Date: February 10, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: March 23, 2010 | Expiration date: March 23, 2010 | Permit id: 2010-010971 Ep | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing facility construct temporary emergency exit corridor on first floor of fab1expansion bldg Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: August 27, 2010 | Expiration date: August 27, 2010 | Permit id: 2010-050262 Bp | |||||
SCORE 99 Interior remodel to existing officesemiconductor manufacturing facility construct temporary emergency exit corridor on first floor of fab1expansion bldg Date: June 28, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: July 9, 2010 | Expiration date: July 9, 2010 | Permit id: 2010-050262 Ep | |||||
SCORE 100 Finishout meps of sas fab1 building including scope in connected mechanical rooms electrical rooms and ccss architectural cleanroom hvac process piping plumbing electrical lsstco for occupancy fab 1 all floors approved 120610gvillaapproval including utility bldg122810includes tool move in and hook up Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 20, 2011 | Expiration date: June 20, 2011 | Permit id: 2010-065806 Bp | |||||
SCORE 99 Finishout meps of sas fab1 building including scope in connected mechanical rooms electrical rooms and ccss architectural cleanroom hvac process piping plumbing electrical lss Date: August 6, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: December 21, 2010 | Expiration date: December 21, 2010 | Permit id: 2010-065806 Ep | |||||
SCORE 100 Finishout meps of sas fab1 building including scope in connected mechanical rooms electrical rooms and ccss architectural cleanroom hvac process piping plumbing electrical lss Date: August 10, 2010 Contractor: David Richards Permit type: Mechanical permit | Permit status: Final | Completion date: December 21, 2010 | Expiration date: December 21, 2010 | Permit id: 2010-065806 Mp | |||||
SCORE 98 Finishout meps of sas fab1 building including scope in connected mechanical rooms electrical rooms and ccss architectural cleanroom hvac process piping plumbing electrical lss Date: August 10, 2010 Contractor: John Ward Permit type: Plumbing permit | Permit status: Final | Completion date: December 21, 2010 | Expiration date: December 21, 2010 | Permit id: 2010-065806 Pp | |||||
SCORE 99 Constrcuation trailer for fab1 nomura Date: August 2, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: October 20, 2010 | Expiration date: October 20, 2010 | Permit id: 2010-066025 Ep | |||||
SCORE 100 Plumbing connection for construction trailer only Date: August 3, 2010 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: October 20, 2010 | Expiration date: October 20, 2010 | Permit id: 2010-066436 Pp | |||||
SCORE 99 Electrical for dsi electrical construction trailer 2 only Date: August 17, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: August 18, 2010 | Expiration date: August 18, 2010 | Permit id: 2010-070812 Ep | |||||
SCORE 59 Install electrical service to emergency exaust dampers and run conduit to power panel only Date: September 8, 2010 Contractor: Bobby Cuvelier Permit type: Electrical permit | Permit status: Final | Completion date: November 17, 2010 | Expiration date: November 17, 2010 | Permit id: 2010-077772 Ep | |||||
SCORE 100 Equipments hook up only fab 1 Date: October 6, 2010 Contractor: Doyle Baird Permit type: Electrical permit | Permit status: Final | Completion date: November 10, 2010 | Expiration date: November 10, 2010 | Permit id: 2010-0858 Ep | |||||
SCORE 100 Install outside underground waterwastewater and fireline only Date: July 2, 2010 Contractor: Sidney Ging Permit type: Plumbing permit | Permit status: Final | Completion date: November 8, 2010 | Expiration date: November 8, 2010 | Permit id: 2010-057265 Pp | |||||
SCORE 100 Install of and wiring to md2 pp panel busplug at samsung fab 1 2 tool pad grounding Date: August 4, 2011 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 15, 2011 | Expiration date: December 15, 2011 | Permit id: 2011-069203 Ep | |||||
SCORE 100 New canopy for fab1 outdoor gas cylinder staging Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: July 25, 2012 | Expiration date: July 25, 2012 | Permit id: 2012-029441 Bp | |||||
SCORE 89 New canopy for fab1 outdoor gas cylinder staging Date: April 23, 2012 Contractor: Charles F Benge Permit type: Electrical permit | Permit status: Final | Completion date: July 10, 2012 | Expiration date: July 10, 2012 | Permit id: 2012-029441 Ep | |||||
SCORE 100 New compressor building for semiconductor manufacturing facility Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: July 30, 2013 | Expiration date: July 30, 2013 | Permit id: 2013-017712 Bp | |||||
SCORE 99 New compressor building for semiconductor manufacturing facility Date: March 20, 2013 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: July 29, 2013 | Expiration date: July 29, 2013 | Permit id: 2013-017712 Ep | |||||
SCORE 99 New compressor building for semiconductor manufacturing facility gc paid for pmt will send in trade contractor Date: March 8, 2013 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: July 29, 2013 | Expiration date: July 29, 2013 | Permit id: 2013-017712 Mp | |||||
SCORE 89 Connect construction power skid in fab 1 only Date: August 1, 2012 Contractor: Charles F Benge Permit type: Electrical permit | Permit status: Final | Completion date: January 8, 2013 | Expiration date: January 8, 2013 | Permit id: 2012-077422 Ep | |||||
SCORE 100 New h2s04 h202 building fab1 Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: November 18, 2013 | Expiration date: November 18, 2013 | Permit id: 2012-094047 Bp | |||||
SCORE 100 New h2s04 h202 building fab1 Date: October 3, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: June 6, 2013 | Expiration date: June 6, 2013 | Permit id: 2012-094047 Ep | |||||
SCORE 100 Samsung fab 1 busway panels switchgear hook up motors only permit has been paid for will fax in request Date: October 1, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 23, 2013 | Expiration date: April 23, 2013 | Permit id: 2012-0979 Ep | |||||
SCORE 100 Finishout meps of sas fab1 building including scope in connected mechanical rooms electrical rooms and ccss architectural cleanroom hvac process piping plumbing electrical lssinstalling 59 dry cooling coils Date: August 16, 2010 Contractor: Thomas Emmett Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: December 30, 2010 | Expiration date: December 30, 2010 | Permit id: 2010-070158 Mp | |||||
SCORE 99 Install electrical for fsg electrical construction trailers 3 Date: August 17, 2010 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: August 18, 2010 | Expiration date: August 18, 2010 | Permit id: 2010-070817 Ep | |||||
SCORE 82 Interior remodel to existing semiconductor manufacturing facility to increase the area of the cylinder storage canopy Date: June 8, 2017 Contractor: Russell Ferraro Permit type: Electrical permit | Permit status: Final | Completion date: August 10, 2017 | Expiration date: August 10, 2017 | Permit id: 2017-064395 Ep | |||||
SCORE 86 Remove 4 mcc panels and install 2 new mcc panels to existing commercial only 1 new 800amp panel Date: September 15, 2017 Contractor: Juan R Saucedo Permit type: Electrical permit | Permit status: Active | Expiration date: April 1, 2018 | Permit id: 2017-116131 Ep | |||||
SCORE 100 New h2s04 h202 building fab1 Date: October 3, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: June 6, 2013 | Expiration date: June 6, 2013 | Permit id: 2012-094047 Ep | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Date: January 13, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 26, 2010 | Expiration date: March 26, 2010 | Permit id: 2009-131896 Ep | |||||
SCORE 100 Interior remodel to existing semiconductor manufacturing facility to increase the area of the cylinder storage canopy Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: August 11, 2017 | Expiration date: August 11, 2017 | Permit id: 2017-064395 Bp | |||||
SCORE 99 Demo cable from existing panel and install a new 8 amp panel and cable tray at existing switchgear Date: November 22, 2016 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: December 15, 2016 | Expiration date: December 15, 2016 | Permit id: 2016-143538 Ep | |||||
SCORE 100 New h2s04 h202 building fab1 Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: November 18, 2013 | Expiration date: November 18, 2013 | Permit id: 2012-094047 Bp | |||||
SCORE 100 New compressor building for semiconductor manufacturing facility Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: July 30, 2013 | Expiration date: July 30, 2013 | Permit id: 2013-017712 Bp | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing install redundant voc unit and associated mep Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 26, 2015 | Expiration date: June 26, 2015 | Permit id: 2015-007869 Bp | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing cub1 upgrade package fab1 upgrade package Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: August 27, 2010 | Expiration date: August 27, 2010 | Permit id: 2009-131896 Bp | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing facility construct temporary emergency exit corridor on first floor of fab1expansion bldg Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: August 27, 2010 | Expiration date: August 27, 2010 | Permit id: 2010-050262 Bp | |||||
SCORE 100 New shell construction electrical distribution addition to fab1 for semiconductor manufacturing Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: November 24, 2010 | Expiration date: November 24, 2010 | Permit id: 2010-057454 Bp | |||||
SCORE 100 Finishout meps of sas fab1 building including scope in connected mechanical rooms electrical rooms and ccss architectural cleanroom hvac process piping plumbing electrical lsstco for occupancy fab 1 all floors approved 120610gvillaapproval including utility bldg122810includes tool move in and hook up Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 20, 2011 | Expiration date: June 20, 2011 | Permit id: 2010-065806 Bp | |||||
SCORE 100 Interior remodel to existing semiconductor manufacturing facility to increase the area of the cylinder storage canopy Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: August 11, 2017 | Expiration date: August 11, 2017 | Permit id: 2017-064395 Bp | |||||
SCORE 100 New canopy for fab1 outdoor gas cylinder staging Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: July 25, 2012 | Expiration date: July 25, 2012 | Permit id: 2012-029441 Bp | |||||
SCORE 100 Replace existing chiller with new chillers for existing officesemiconductor manufacturing Date: December 3, 2014 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 2, 2015 | Expiration date: September 2, 2015 | Permit id: 2014-112363 Ep | |||||
SCORE 100 Upgrade electric panel only for commercial Date: July 15, 2015 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: July 27, 2015 | Expiration date: July 27, 2015 | Permit id: 2015-0857 Ep | |||||
SCORE 100 Onstall dysc ups at 121 samsung blvd this is a capacitor ups does not use batteries modification of the fire alarm system requires the approval of the austin fire department which includes the review of the fire alarm shop drawing required voltage drop and battery load calculations and an inspection of the system per scott stookeyi Date: April 15, 2016 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: June 27, 2016 | Expiration date: June 27, 2016 | Permit id: 2016-027891 Ep | |||||
SCORE 71 Acid exhaust for wet device lab Permit type: Mechanical permit | Permit status: Final | Completion date: April 7, 2005 | Expiration date: April 7, 2005 | Permit id: 2005-005573 Mp | |||||
SCORE 82 Add capacitor correction factor system Date: December 20, 2016 Contractor: Russell Ferraro Permit type: Electrical permit | Permit status: Final | Completion date: June 15, 2017 | Expiration date: June 15, 2017 | Permit id: 2016-1541 Ep | |||||
SCORE 100 Add two truck scales to existing commercial only Date: August 11, 2015 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 2, 2016 | Expiration date: March 2, 2016 | Permit id: 2015-097026 Ep | |||||
SCORE 100 Connect 5kv feeder only Date: June 7, 2011 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: July 28, 2011 | Expiration date: July 28, 2011 | Permit id: 2011-049779 Ep | |||||
SCORE 99 Installing plumbing to job trailer only tei 2 Date: November 20, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: December 8, 2009 | Expiration date: December 8, 2009 | Permit id: 2009-128765 Pp | |||||
SCORE 100 Installinf electrical to commercial job trailer onlly simplex Date: January 4, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: January 13, 2010 | Expiration date: January 13, 2010 | Permit id: 2010-000345 Ep | |||||
SCORE 100 Finishout for cleanroom over bridge for existing officeseminconductor manufacturing facility Date: January 13, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 25, 2010 | Expiration date: March 25, 2010 | Permit id: 2009-133674 Ep | |||||
SCORE 100 Installation of 8 and 6 fire line to the inert gas canopy Date: June 4, 2013 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Final | Completion date: June 21, 2013 | Expiration date: June 21, 2013 | Permit id: 2013-057722 Pp | |||||
SCORE 100 New cuww building for existing officesemiconductor manufacturing Date: January 11, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 19, 2012 | Expiration date: April 19, 2012 | Permit id: 2011-112033 Ep | |||||
SCORE 100 Install new 100a 208v feed to east security bldg and install lights and receptacles only Date: June 28, 2011 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: July 26, 2011 | Expiration date: July 26, 2011 | Permit id: 2011-056833 Ep | |||||
SCORE 98 Installation of new tanks and vaporizers and associated piping for the construction of liquid nitrogen backup capability to be added to previously reviewed permitted bulk gas generation plant 5 Date: April 14, 2011 Contractor: Richard Harkins Permit type: Mechanical permit | Permit status: Final | Completion date: August 12, 2011 | Expiration date: August 12, 2011 | Permit id: 2011-011644 Mp | |||||
SCORE 100 Extend existing canopy for officesemiconductor manufacturing Date: March 13, 2014 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 12, 2014 | Expiration date: September 12, 2014 | Permit id: 2014-009305 Ep | |||||
SCORE 95 Replace the existing cooling tower on the existing basin Date: February 24, 2017 Contractor: Michael Daniel Sweat Permit type: Plumbing permit | Permit status: Final | Completion date: June 13, 2017 | Expiration date: June 13, 2017 | Permit id: 2016-156448 Pp | |||||
SCORE 100 Installing electrical service to comm job trailer only lasko Date: December 11, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 18, 2009 | Expiration date: December 18, 2009 | Permit id: 2009-136269 Ep | |||||
SCORE 100 Install new scrubbers on roof to existing utility building Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: March 28, 2017 | Expiration date: March 28, 2017 | Permit id: 2016-156466 Bp | |||||
SCORE 100 Install electric to comm job trailer only chasco Date: July 14, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: July 19, 2010 | Expiration date: July 19, 2010 | Permit id: 2010-059748 Ep | |||||
SCORE 100 Install electrical for job trailer for beard mechanical only Date: September 1, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 2, 2010 | Expiration date: September 2, 2010 | Permit id: 2010-075958 Ep | |||||
SCORE 100 Install electrical for commercial job trailer for jmeg 2 only Date: September 1, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 2, 2010 | Expiration date: September 2, 2010 | Permit id: 2010-0759 Ep | |||||
SCORE 100 Install electric to comm job trailer only nomura Date: July 23, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 9, 2010 | Expiration date: September 9, 2010 | Permit id: 2010-063815 Ep | |||||
SCORE 100 Install elec to job trailer stci Date: June 7, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: June 9, 2010 | Expiration date: June 9, 2010 | Permit id: 2010-049069 Ep | |||||
SCORE 100 Installing electrical service to comm job trailer only teitech 2 Date: December 11, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 18, 2009 | Expiration date: December 18, 2009 | Permit id: 2009-136267 Ep | |||||
SCORE 100 Relocatereplace existing 8 sewer line relocate 36 storm drain add 24 storm drain with grate inlet box and connect existing roof drains to grate inlet box only Date: November 8, 2012 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Final | Completion date: April 24, 2013 | Expiration date: April 24, 2013 | Permit id: 2012-113482 Pp | |||||
SCORE 100 Install electrical to comm job trailer brandt Date: August 4, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: October 26, 2010 | Expiration date: October 26, 2010 | Permit id: 2010-067058 Ep | |||||
SCORE 100 Install outside underground water line only Date: August 31, 2012 Contractor: Travis S Cox Applicant: Travis S Cox | Applicant Phone: (512) 842-1301 | Permit type: Plumbing permit | Permit status: Final | Completion date: November 20, 2012 | Expiration date: November 20, 2012 | Permit id: 2012-088626 Pp | |||||
SCORE 100 Install electrical to comm job trailer nurse trailer Date: July 9, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: July 14, 2010 | Expiration date: July 14, 2010 | Permit id: 2010-059542 Ep | |||||
SCORE 100 Install a temporary egress path required for the utility excavation Date: April 19, 2016 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: May 31, 2016 | Expiration date: May 31, 2016 | Permit id: 2016-043313 Ep | |||||
SCORE 100 Rerouting fire hydrant lead piping for the fab1 east cylinder staging are expansion refer sp20070495c sheet c260 Date: April 27, 2017 Contractor: Sidney Ging Permit type: Plumbing permit | Permit status: Final | Completion date: July 28, 2017 | Expiration date: July 28, 2017 | Permit id: 2017-0500 Pp | |||||
SCORE 100 Installing electrical plumbing to job trailer only daw tech 1 Date: November 16, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: November 18, 2009 | Expiration date: November 18, 2009 | Permit id: 2009-1270 Ep | |||||
SCORE 100 Instll electric to south parking lot security mangate only Date: August 27, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 29, 2010 | Expiration date: September 29, 2010 | Permit id: 2010-074967 Ep | |||||
SCORE 87 Install elec for office trailer only fab 2 Date: October 8, 2010 Contractor: Carl E. Spangler Permit type: Electrical permit | Permit status: Final | Completion date: December 7, 2010 | Expiration date: December 7, 2010 | Permit id: 2010-087528 Ep | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility installation of mechanical process electrical equipment to support additional tools Date: March 26, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: May 22, 2008 | Expiration date: May 22, 2008 | Permit id: 2008-014631 Ep | |||||
SCORE 100 Dysc 7 and ups panel relocation Date: May 19, 2011 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: May 27, 2011 | Expiration date: May 27, 2011 | Permit id: 2011-043697 Ep | |||||
SCORE 100 Installing electrical service to comm job trailer Date: November 4, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 18, 2009 | Expiration date: December 18, 2009 | Permit id: 2009-122857 Ep | |||||
SCORE 99 Installing plumbing to job trailer only tei 1 Date: November 20, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: December 8, 2009 | Expiration date: December 8, 2009 | Permit id: 2009-128764 Pp | |||||
SCORE 100 Installing electrical to job trailer only Date: November 9, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: November 16, 2009 | Expiration date: November 16, 2009 | Permit id: 2009-125105 Ep | |||||
SCORE 99 Installing plumbing to job trailer only daw tech 1 Date: November 20, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: December 8, 2009 | Expiration date: December 8, 2009 | Permit id: 2009-1287 Pp | |||||
SCORE 100 Install electrical to comm job trailer restroom trailer Date: July 9, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: July 14, 2010 | Expiration date: July 14, 2010 | Permit id: 2010-059543 Ep | |||||
SCORE 100 Install elec srv to job trailer samoo Date: June 7, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: June 9, 2010 | Expiration date: June 9, 2010 | Permit id: 2010-049074 Ep | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing iwt upgrade package Date: March 30, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 2, 2010 | Expiration date: April 2, 2010 | Permit id: 2009-136613 Ep | |||||
SCORE 99 Install plumbing for job trailer tei tech 3 Date: December 14, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: February 9, 2010 | Expiration date: February 9, 2010 | Permit id: 2009-136491 Pp | |||||
SCORE 100 Installing electrical to job trailer only ssr Date: November 18, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 18, 2009 | Expiration date: December 18, 2009 | Permit id: 2009-127922 Ep | |||||
SCORE 99 Installing plumbing to job trailer only daw tech 2 Date: November 20, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: December 8, 2009 | Expiration date: December 8, 2009 | Permit id: 2009-128763 Pp | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility addition of two cells to existing cooling tower and associated ppumps and electrical equipment Date: March 26, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 17, 2008 | Expiration date: April 17, 2008 | Permit id: 2008-014628 Ep | |||||
SCORE 100 Install 1 new boiler for existing officesemiconductor manufacturing Date: December 3, 2014 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 29, 2014 | Expiration date: December 29, 2014 | Permit id: 2014-113712 Ep | |||||
SCORE 100 Relocation of a fire line Date: June 4, 2013 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Final | Completion date: June 18, 2013 | Expiration date: June 18, 2013 | Permit id: 2013-057718 Pp | |||||
SCORE 100 Install light poles outside new cub boiler backup propane tanks Date: January 3, 2013 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: June 5, 2013 | Expiration date: June 5, 2013 | Permit id: 2013-000452 Ep | |||||
SCORE 82 New constructioninstallation of nitrogen processing plant 4 semiconductor processing with assosiated structural and foundation elements Date: June 14, 2017 Contractor: Russell Ferraro Permit type: Electrical permit | Permit status: Final | Completion date: September 22, 2017 | Expiration date: September 22, 2017 | Permit id: 2017-068859 Ep | |||||
SCORE 100 Install electrical equipment in slurry utility bldg only Date: October 25, 2013 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: October 28, 2013 | Expiration date: October 28, 2013 | Permit id: 2013-112065 Ep | |||||
SCORE 100 A2 fab installing process exhaust duct work Date: March 13, 2007 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: May 31, 2007 | Expiration date: February 3, 2008 | Permit id: 2007-105818 Mp | |||||
SCORE 100 Mod 1 electrical equipment hookup fab a2 west utility deck penthouse Date: March 14, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: August 7, 2007 | Expiration date: August 7, 2007 | Permit id: 2007-106117 Ep | |||||
SCORE 100 A mod 1 installing concrete trench Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: April 23, 2008 | Expiration date: April 23, 2008 | Permit id: 2007-109025 Bp | |||||
SCORE 100 Installing concrete trench Date: August 17, 2007 Contractor: Samsung Texas Construction Permit type: Electrical permit | Permit status: Final | Completion date: August 20, 2007 | Expiration date: August 20, 2007 | Permit id: 2007-109025 Ep | |||||
SCORE 97 New meter vault for samsung Permit type: Building permit | Permit status: Final | Completion date: December 28, 2007 | Expiration date: December 28, 2007 | Permit id: 2007-135762 Bp | |||||
SCORE 100 New waste water meter vault for samsung Date: December 12, 2007 Contractor: Randy Eldridge Permit type: Electrical permit | Permit status: Final | Completion date: December 28, 2007 | Expiration date: December 28, 2007 | Permit id: 2007-1357 Ep | |||||
SCORE 99 New meter vault for samsung Date: December 20, 2007 Contractor: James L. Brown Permit type: Mechanical permit | Permit status: Final | Completion date: December 28, 2007 | Expiration date: December 28, 2007 | Permit id: 2007-135772 Mp | |||||
SCORE 100 Installing mod1 a2 trap primers only Date: August 21, 2007 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: September 13, 2007 | Expiration date: September 13, 2007 | Permit id: 2007-145228 Pp | |||||
SCORE 99 Install grounding box for samsung a2 mod 1 project Date: August 24, 2007 Contractor: Elliot House Permit type: Electrical permit | Permit status: Final | Completion date: May 22, 2008 | Expiration date: May 22, 2008 | Permit id: 2007-146493 Ep | |||||
SCORE 99 Install cable tray and cable for distribution panels only Date: October 22, 2007 Contractor: Kenneth Tumlinson Permit type: Electrical permit | Permit status: Final | Completion date: November 14, 2007 | Expiration date: November 14, 2007 | Permit id: 2007-160288 Ep | |||||
SCORE 100 Temp wastewater water line to new fit up employees caffeteria Date: November 9, 2007 Contractor: Johnny Edwards Permit type: Plumbing permit | Permit status: Final | Completion date: November 14, 2007 | Expiration date: November 14, 2007 | Permit id: 2007-164909 Pp | |||||
SCORE 56 New breakroom trailer no plan review reqd per ron menard Permit type: Building permit | Permit status: Final | Completion date: December 28, 2007 | Expiration date: December 28, 2007 | Permit id: 2007-166396 Bp | |||||
SCORE 99 Install cable tray and cable for distribution panels only phase iidollar value increased from 500000 to 5000000 Date: December 4, 2007 Contractor: Kenneth Tumlinson Permit type: Electrical permit | Permit status: Final | Completion date: March 13, 2008 | Expiration date: March 13, 2008 | Permit id: 2007-169365 Ep | |||||
SCORE 100 A2 mod 1 relocateinstall approx 18 exit fixtures on csf eds sub level process fab level Date: June 27, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: August 1, 2007 | Expiration date: February 3, 2008 | Permit id: 2007-132255 Ep | |||||
SCORE 60 New concrete pads wassociated plumbingelectrical for future n2 generation equipment Applicant Phone: (512) 672-1646 | Permit type: Building permit | Permit status: Withdrawn | Completion date: October 5, 2009 | Expiration date: May 3, 2009 | Permit id: 2008-072222 Bp | |||||
SCORE 100 New concrete pads wassociated plumbingelectrical for future n2 generation equipment Date: September 18, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Withdrawn | Completion date: October 5, 2009 | Expiration date: May 3, 2009 | Permit id: 2008-073898 Ep | |||||
SCORE 100 Install approx 1 ft of 6 sch pvc of underground piping Date: September 19, 2008 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: September 24, 2008 | Expiration date: September 24, 2008 | Permit id: 2008-074356 Pp | |||||
SCORE 72 Relocate fire line and 6 water line only Date: October 1, 2008 Contractor: Charles Cunningham Permit type: Plumbing permit | Permit status: Final | Completion date: February 6, 2009 | Expiration date: February 6, 2009 | Permit id: 2008-077407 Pp | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility addition of two cells to existing cooling tower and associated ppumps and electrical equipment Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: April 23, 2008 | Expiration date: April 23, 2008 | Permit id: 2008-014628 Bp | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility installation of emergency generator generator bldg Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: August 1, 2008 | Expiration date: August 1, 2008 | Permit id: 2008-014629 Bp | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility cub2 mechanical infrastructure upgrades to support additional tools electric permit separate Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: July 1, 2008 | Expiration date: July 1, 2008 | Permit id: 2008-0146 Bp | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility installation of mechanical process electrical equipment to support additional tools Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: July 1, 2008 | Expiration date: July 1, 2008 | Permit id: 2008-014631 Bp | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility addition of two cells to existing cooling tower and associated ppumps and electrical equipment Date: March 26, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 17, 2008 | Expiration date: April 17, 2008 | Permit id: 2008-014628 Ep | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility addition of two cells to existing cooling tower and associated ppumps and electrical equipment Date: March 27, 2008 Contractor: V R Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: April 1, 2008 | Expiration date: April 1, 2008 | Permit id: 2008-014628 Mp | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility installation of emergency generator generator bldg Date: April 23, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: July 7, 2008 | Expiration date: July 7, 2008 | Permit id: 2008-014629 Ep | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility installation of emergency generator generator bldg Date: July 24, 2008 Contractor: V R Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: July 30, 2008 | Expiration date: July 30, 2008 | Permit id: 2008-014629 Mp | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility installation of mechanical process electrical equipment to support additional tools Date: March 26, 2008 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: May 22, 2008 | Expiration date: May 22, 2008 | Permit id: 2008-014631 Ep | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility installation of mechanical process electrical equipment to support additional tools Date: March 27, 2008 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: April 1, 2008 | Expiration date: April 1, 2008 | Permit id: 2008-014631 Mp | |||||
SCORE 59 Interior remodel to existing admn officesemiconductor manufacturing facility installation of mechanical process electrical equipment to support additional tools Date: April 15, 2008 Contractor: Randall Kratz Permit type: Plumbing permit | Permit status: Final | Completion date: April 17, 2008 | Expiration date: April 17, 2008 | Permit id: 2008-014631 Pp | |||||
SCORE 100 Install elec for job site trailer wattinger co only Date: August 16, 2011 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: August 23, 2011 | Expiration date: August 23, 2011 | Permit id: 2011-073098 Ep | |||||
SCORE 100 Underground drainage for storm water drainage 2 of 6 pvc pipe plant 6 Date: November 1, 2010 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: February 24, 2011 | Expiration date: February 24, 2011 | Permit id: 2010-094244 Pp | |||||
SCORE 88 Install new conduit 225 amp electrical feeder conductors new 225 amp ocpd and 225 amp sub panel from existing distribution panel Date: September 14, 2016 Contractor: Michael A Bouchard Permit type: Electrical permit | Permit status: Active | Expiration date: March 15, 2017 | Permit id: 2016-112427 Ep | |||||
SCORE 92 Connect elec for pump unit sohpoc02 Date: May 13, 2013 Contractor: John Verhelst Permit type: Electrical permit | Permit status: Final | Completion date: May 23, 2013 | Expiration date: May 23, 2013 | Permit id: 2013-049258 Ep | |||||
SCORE 100 Install 14 electrical sub panels only Date: July 19, 2016 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Active | Expiration date: March 19, 2017 | Permit id: 2016-084852 Ep | |||||
SCORE 100 Install 1125 kva transformer Date: May 17, 2016 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: May 31, 2016 | Expiration date: May 31, 2016 | Permit id: 2016-057163 Ep | |||||
SCORE 100 Electrical permit for sas fab2 office expansion grounding in building slab only permit is for grounding grid ony building ground to be performed at later date on future permit Date: July 19, 2016 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: August 10, 2016 | Expiration date: August 10, 2016 | Permit id: 2016-084858 Ep | |||||
Extend temporary elec power win fabofc bldg Date: September 19, 1996 Value: $120,000 Permit type: Mechanical permit | Permit status: Final | Completion date: April 13, 1999 | Expiration date: August 29, 2007 | Permit id: 1996-014942 Mp | |||||
SCORE 100 Mod 1 electrical equipment hookup fab a2 non clean east utility deck penthouse Date: April 12, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: August 7, 2007 | Expiration date: August 7, 2007 | Permit id: 2007-106118 Ep | |||||
SCORE 100 Mod 1 a2 cooling tower Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Void | Expiration date: September 25, 2007 | Permit id: 2007-109046 Bp | |||||
SCORE 100 Mod 1 a2 elect equipment hookup se elect room lighting feeder wiring to motors eqpmnt connections and bus duct install grounding Date: April 6, 2007 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: August 7, 2007 | Expiration date: August 7, 2007 | Permit id: 2007-112082 Ep | |||||
SCORE 100 Install electrical equipment in slurry utility bldg only Date: October 25, 2013 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: October 28, 2013 | Expiration date: October 28, 2013 | Permit id: 2013-112065 Ep | |||||
SCORE 100 Cub 1cub 2 substation ups redundant feed for iwt fab 2 only Date: December 6, 2013 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 23, 2014 | Expiration date: April 23, 2014 | Permit id: 2013-1265 Ep | |||||
SCORE 100 Relocate 4 electrical panels in fab 2 only Date: February 26, 2014 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 23, 2014 | Expiration date: April 23, 2014 | Permit id: 2014-018692 Ep | |||||
Fire alarm testing for speed gatesfirestrobe relocation on process leveladd smoke detector to fsfio room Date: September 27, 2007 Permit type: Plumbing permit | Permit status: Final | Completion date: December 28, 2007 | Expiration date: December 28, 2007 | Permit id: 2007-1544 Pp | |||||
SCORE 100 Remodel to existing aww canopy extention to install mechanical and electrical equipment Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: November 6, 2014 | Expiration date: November 6, 2014 | Permit id: 2014-052487 Bp | |||||
SCORE 100 Remodel to existing aww canopy extention to install mechanical and electrical equipment Date: June 20, 2014 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: October 17, 2014 | Expiration date: October 17, 2014 | Permit id: 2014-052487 Ep | |||||
SCORE 99 Relocation of 13 subpanels and add 12 new subpanels Date: May 22, 2014 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: August 13, 2014 | Expiration date: August 13, 2014 | Permit id: 2014-053254 Ep | |||||
SCORE 100 Interior remodel to existing admn officesemiconductor manufacturing facility cub2 mechanical infrastructure upgrades to support additional tools electric permit separate Date: March 27, 2008 Contractor: V R Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: April 1, 2008 | Expiration date: April 1, 2008 | Permit id: 2008-0146 Mp | |||||
SCORE 100 Extend existing canopy for officesemiconductor manufacturing Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: September 26, 2014 | Expiration date: September 26, 2014 | Permit id: 2014-009305 Bp | |||||
SCORE 100 Extend existing canopy for officesemiconductor manufacturing Date: March 13, 2014 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 12, 2014 | Expiration date: September 12, 2014 | Permit id: 2014-009305 Ep | |||||
SCORE 96 Extend existing canopy for officesemiconductor manufacturing Date: April 30, 2014 Contractor: Travis Everett Permit type: Mechanical permit | Permit status: Final | Completion date: September 16, 2014 | Expiration date: September 16, 2014 | Permit id: 2014-009305 Mp | |||||
SCORE 100 Relocation of domestic water line and fire line only ok per cory harmon Date: February 5, 2014 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Final | Completion date: August 4, 2014 | Expiration date: August 4, 2014 | Permit id: 2014-009305 Pp | |||||
SCORE 100 New prefab metal building welding bldg for admnbusmanufacturing Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: January 14, 2015 | Expiration date: January 14, 2015 | Permit id: 2014-077334 Bp | |||||
SCORE 100 New prefab metal building welding bldg for admnbusmanufacturing Date: August 19, 2014 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: December 16, 2014 | Expiration date: December 16, 2014 | Permit id: 2014-077334 Ep | |||||
SCORE 99 New prefab metal building welding bldg for admnbusmanufacturing Date: August 11, 2014 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: December 23, 2014 | Expiration date: December 23, 2014 | Permit id: 2014-077334 Mp | |||||
SCORE 100 Installation of onsite underground water piping and wastewater piping to a temporary construction trailer Date: August 18, 2014 Contractor: Sidney Ging Permit type: Plumbing permit | Permit status: Final | Completion date: October 29, 2014 | Expiration date: October 29, 2014 | Permit id: 2014-087542 Pp | |||||
SCORE 99 Add 6 new enclosed breakers relocate one bus plug and relocate two panels Date: September 18, 2014 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: March 4, 2015 | Expiration date: March 4, 2015 | Permit id: 2014-100626 Ep | |||||
SCORE 100 Replace existing chiller with new chillers for existing officesemiconductor manufacturing Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: September 3, 2015 | Expiration date: September 3, 2015 | Permit id: 2014-112363 Bp | |||||
SCORE 100 Replace existing chiller with new chillers for existing officesemiconductor manufacturing Date: December 3, 2014 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: September 2, 2015 | Expiration date: September 2, 2015 | Permit id: 2014-112363 Ep | |||||
SCORE 99 Replace existing chiller with new chillers for existing officesemiconductor manufacturing Date: November 18, 2014 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: August 28, 2015 | Expiration date: August 28, 2015 | Permit id: 2014-112363 Mp | |||||
SCORE 100 Install 1 new boiler for existing officesemiconductor manufacturing Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: January 14, 2015 | Expiration date: January 14, 2015 | Permit id: 2014-113712 Bp | |||||
SCORE 100 Install 1 new boiler for existing officesemiconductor manufacturing Date: December 3, 2014 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 29, 2014 | Expiration date: December 29, 2014 | Permit id: 2014-113712 Ep | |||||
SCORE 99 Install 1 new boiler for existing officesemiconductor manufacturing Date: November 18, 2014 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: January 9, 2015 | Expiration date: January 9, 2015 | Permit id: 2014-113712 Mp | |||||
SCORE 99 Relocate three 8 amp panels wire in one 8 amp existing panel and add one 6 amp ecb Date: April 3, 2015 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: April 16, 2015 | Expiration date: April 16, 2015 | Permit id: 2015-037724 Ep | |||||
SCORE 95 Installation of two safety showers and drains to new commercial only Date: June 16, 2015 Contractor: Michael Daniel Sweat Permit type: Plumbing permit | Permit status: Final | Completion date: October 8, 2015 | Expiration date: October 8, 2015 | Permit id: 2015-072324 Pp | |||||
SCORE 100 Finishout for cleanroom over bridge for existing officeseminconductor manufacturing facility Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 11, 2010 | Expiration date: June 11, 2010 | Permit id: 2009-133674 Bp | |||||
SCORE 99 Install plumbing for job trailer tei tech 3 Date: December 14, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: February 9, 2010 | Expiration date: February 9, 2010 | Permit id: 2009-136491 Pp | |||||
SCORE 99 Install feeder conduc tors enclosures rectifiers and disconnects for vfd install ground bar and grounding conductors add 1 volt power to control panel run dlo cable from rectifier to electrowinner to existing commercial only this permit is for the desdcription of work listed only no other work to be done Date: December 9, 2015 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: February 24, 2016 | Expiration date: February 24, 2016 | Permit id: 2015-147336 Ep | |||||
SCORE 100 Upgrade electric panel only for commercial Date: July 15, 2015 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: July 27, 2015 | Expiration date: July 27, 2015 | Permit id: 2015-0857 Ep | |||||
SCORE 100 Reroute existing underground 3 and 12 domestic water and 12 fire line piping around a proposed offload containment area Date: August 18, 2015 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Final | Completion date: January 14, 2016 | Expiration date: January 14, 2016 | Permit id: 2015-099856 Pp | |||||
SCORE 100 Install elec srv to job trailer restroom Date: June 7, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: June 9, 2010 | Expiration date: June 9, 2010 | Permit id: 2010-0490 Ep | |||||
SCORE 100 Install electric to comm job trailer only chasco Date: July 14, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: July 19, 2010 | Expiration date: July 19, 2010 | Permit id: 2010-059748 Ep | |||||
SCORE 100 Installation of onsite underground domestic waterwaste water piping and fireline piping Date: June 14, 2016 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Active | Expiration date: March 8, 2017 | Permit id: 2016-069404 Pp | |||||
SCORE 100 Underground drainage for storm water drainage 2 of 6 pvc pipe plant 5 Date: November 1, 2010 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: February 24, 2011 | Expiration date: February 24, 2011 | Permit id: 2010-094242 Pp | |||||
SCORE 99 Add seven 8 amp panels install cable tray in crawl space and install 8 amp of cable tray to panels Date: July 12, 2016 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: August 19, 2016 | Expiration date: August 19, 2016 | Permit id: 2016-081907 Ep | |||||
SCORE 98 Installation of bulk gas generation equipment compressor tanks vaporizers cold box electrical switchgear etc see shell pmt 2010078013 bp Date: January 20, 2011 Contractor: Richard Harkins Permit type: Mechanical permit | Permit status: Final | Completion date: January 21, 2011 | Expiration date: January 21, 2011 | Permit id: 2010-102681 Mp | |||||
SCORE 99 Install 800amp panel install 34c 3 1 ot ground cable Date: August 3, 2016 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: August 19, 2016 | Expiration date: August 19, 2016 | Permit id: 2016-092989 Ep | |||||
SCORE 100 Install a temporary egress path required for the utility excavation Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 16, 2016 | Expiration date: June 16, 2016 | Permit id: 2016-027891 Bp | |||||
SCORE 100 Onstall dysc ups at 121 samsung blvd this is a capacitor ups does not use batteries modification of the fire alarm system requires the approval of the austin fire department which includes the review of the fire alarm shop drawing required voltage drop and battery load calculations and an inspection of the system per scott stookeyi Date: April 15, 2016 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: June 27, 2016 | Expiration date: June 27, 2016 | Permit id: 2016-027891 Ep | |||||
SCORE 100 Install electrical panels and empty conduit only for future ev charging stations no electrical conductors or overcurrent devices permit for panels only and new pole lights at parking lot Date: March 29, 2016 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: August 16, 2016 | Expiration date: August 16, 2016 | Permit id: 2016-034767 Ep | |||||
SCORE 100 Install a temporary egress path required for the utility excavation Date: April 19, 2016 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: May 31, 2016 | Expiration date: May 31, 2016 | Permit id: 2016-043313 Ep | |||||
SCORE 100 Finishout to install bulk gas generation equipment compressor tanks vaporizers cold box electrical switchgear for existing officesemiconductor manufacturing Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: February 1, 2012 | Expiration date: February 1, 2012 | Permit id: 2011-034919 Bp | |||||
SCORE 94 Install elec for job site trailer teitech co only Date: September 22, 2011 Contractor: Larry Hall Permit type: Electrical permit | Permit status: Final | Completion date: October 10, 2011 | Expiration date: October 10, 2011 | Permit id: 2011-085725 Ep | |||||
SCORE 94 Install elec for construction trailer hn global llc only Date: September 23, 2011 Contractor: Larry Hall Permit type: Electrical permit | Permit status: Final | Completion date: October 10, 2011 | Expiration date: October 10, 2011 | Permit id: 2011-086218 Ep | |||||
SCORE 100 New concrete canopy for iwt tanks treatment chemical storage Date: September 24, 2012 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 17, 2013 | Expiration date: April 17, 2013 | Permit id: 2012-038265 Ep | |||||
SCORE 89 Relocate 1 exsting parking lot pole and add additional two head parking lot poles and related circuit only Date: April 23, 2012 Contractor: Charles F Benge Permit type: Electrical permit | Permit status: Final | Completion date: July 10, 2012 | Expiration date: July 10, 2012 | Permit id: 2012-039018 Ep | |||||
SCORE 98 Branch power for pumps and blowers only industrial water treament plant 1 Date: October 23, 2012 Contractor: Kevin Smith Permit type: Electrical permit | Permit status: Final | Completion date: October 24, 2012 | Expiration date: October 24, 2012 | Permit id: 2012-1073 Ep | |||||
SCORE 100 Tenant finishout for cu iwt Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 14, 2013 | Expiration date: June 14, 2013 | Permit id: 2012-116266 Bp | |||||
SCORE 98 Tenant finishout for cu iwt Date: December 3, 2012 Contractor: Kevin Smith Permit type: Electrical permit | Permit status: Final | Completion date: May 21, 2013 | Expiration date: May 21, 2013 | Permit id: 2012-116266 Ep | |||||
SCORE 90 New cub boiler back up propane tank vaporizers and pumps buildingfor propane tanks air mix surge tank pumps and related piping only Date: November 30, 2012 Contractor: Javier Ramirez Permit type: Mechanical permit | Permit status: Final | Completion date: January 23, 2013 | Expiration date: January 23, 2013 | Permit id: 2012-117269 Mp | |||||
SCORE 99 New construction utility building for slurry storage and electrical room Date: March 8, 2013 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: October 24, 2013 | Expiration date: October 24, 2013 | Permit id: 2013-006517 Mp | |||||
SCORE 100 Add 2nd floor to existing facilities operation building Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: September 13, 2013 | Expiration date: September 13, 2013 | Permit id: 2013-028637 Bp | |||||
SCORE 92 Add 2nd floor to existing facilities operation building Date: April 19, 2013 Contractor: John Verhelst Permit type: Electrical permit | Permit status: Final | Completion date: August 28, 2013 | Expiration date: August 28, 2013 | Permit id: 2013-028637 Ep | |||||
SCORE 100 Add 2nd floor to existing facilities operation building Date: April 25, 2013 Contractor: Thomas Emmett Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: August 30, 2013 | Expiration date: August 30, 2013 | Permit id: 2013-028637 Mp | |||||
SCORE 99 Add 2nd floor to existing facilities operation building Date: April 25, 2013 Contractor: Alfred Botello Permit type: Plumbing permit | Permit status: Final | Completion date: August 23, 2013 | Expiration date: August 23, 2013 | Permit id: 2013-028637 Pp | |||||
SCORE 100 Finishout compressor building for manufacturing facility Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: December 20, 2013 | Expiration date: December 20, 2013 | Permit id: 2013-0351 Bp | |||||
SCORE 99 Finishout compressor building for manufacturing facility Date: May 13, 2013 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: November 22, 2013 | Expiration date: November 22, 2013 | Permit id: 2013-0351 Ep | |||||
SCORE 99 Finishout compressor building for manufacturing facility Date: April 24, 2013 Contractor: Julian Lopez Permit type: Mechanical permit | Permit status: Final | Completion date: December 6, 2013 | Expiration date: December 6, 2013 | Permit id: 2013-0351 Mp | |||||
SCORE 100 Relocation of a fire line Date: June 4, 2013 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Final | Completion date: June 18, 2013 | Expiration date: June 18, 2013 | Permit id: 2013-057718 Pp | |||||
SCORE 100 Replacement of storm and wastewater piping from pvc to ductile iron underneath a proposed co2 pad only Date: December 18, 2013 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Final | Completion date: January 2, 2014 | Expiration date: January 2, 2014 | Permit id: 2013-130434 Pp | |||||
Add 5 floor plugs in const trailerpmt9606014 Date: June 26, 1996 Value: $500 Permit type: Mechanical permit | Permit status: Final | Completion date: December 13, 1996 | Expiration date: August 29, 2007 | Permit id: 1996-016907 Mp | |||||
3temporary job trailers Date: March 20, 1996 Value: $3,000 Permit type: Mechanical permit | Permit status: Final | Completion date: March 5, 1997 | Expiration date: August 29, 2007 | Permit id: 1996-015997 Mp | |||||
Temporary construction trailer Date: April 16, 1996 Permit type: Mechanical permit | Permit status: Final | Completion date: March 5, 1997 | Expiration date: August 29, 2007 | Permit id: 1996-003881 Mp | |||||
New central utility building Date: May 28, 1996 Value: $33,400,000 Permit type: Mechanical permit | Permit status: Final | Completion date: October 21, 1997 | Expiration date: October 21, 1997 | Permit id: 1996-004101 Mp | |||||
Temporary const trailers wcafeteria decks Date: April 25, 1996 Value: $250,000 Permit type: Mechanical permit | Permit status: Final | Completion date: February 5, 1997 | Expiration date: August 29, 2007 | Permit id: 1996-004463 Mp | |||||
3 ht loops Date: April 30, 1996 Value: $300 Permit type: Mechanical permit | Permit status: Final | Completion date: June 6, 1996 | Expiration date: August 29, 2007 | Permit id: 1996-007344 Mp | |||||
Electric for inside temporary trailer Date: May 15, 1996 Value: $2,150 Permit type: Mechanical permit | Permit status: Final | Completion date: June 7, 1996 | Expiration date: August 29, 2007 | Permit id: 1996-0081 Mp | |||||
Electric for lift station Date: May 17, 1996 Value: $5,000 Permit type: Mechanical permit | Permit status: Final | Completion date: April 13, 1999 | Expiration date: August 29, 2007 | Permit id: 1996-010747 Mp | |||||
Ht loop for concrete batch plant Date: May 20, 1996 Value: $10,500 Permit type: Mechanical permit | Permit status: Final | Completion date: May 29, 1996 | Expiration date: August 29, 2007 | Permit id: 1996-0108 Mp | |||||
Electric to tower crane Date: June 4, 1996 Value: $18,000 Permit type: Mechanical permit | Permit status: Final | Completion date: June 6, 1996 | Expiration date: August 29, 2007 | Permit id: 1996-011539 Mp | |||||
Remodel construction trailer satellite kitchen Date: June 13, 1996 Value: $30,000 Permit type: Mechanical permit | Permit status: Final | Completion date: February 4, 1997 | Expiration date: February 4, 1997 | Permit id: 1996-014388 Mp | |||||
Contr trailer area a 19 trailers temp util Date: June 25, 1996 Permit type: Mechanical permit | Permit status: Void | Completion date: December 22, 1996 | Expiration date: January 6, 1997 | Permit id: 1996-016808 Mp | |||||
Install sight lighting Date: July 15, 1996 Value: $40,000 Permit type: Mechanical permit | Permit status: Final | Completion date: July 19, 1996 | Expiration date: August 29, 2007 | Permit id: 1996-001648 Mp | |||||
Electric duct bank to samsung substation Date: August 26, 1996 Value: $500,000 Permit type: Mechanical permit | Permit status: Final | Completion date: April 13, 1999 | Expiration date: August 29, 2007 | Permit id: 1996-0117 Mp | |||||
Temporary first aid trailer Date: September 20, 1996 Permit type: Mechanical permit | Permit status: Final | Completion date: September 30, 1996 | Expiration date: August 29, 2007 | Permit id: 1996-014886 Mp | |||||
Temporary job trailer6 months Date: September 27, 1996 Permit type: Mechanical permit | Permit status: Final | Completion date: August 20, 1997 | Expiration date: August 29, 2007 | Permit id: 1996-015375 Mp | |||||
Install underground conduitparking lot lights Date: September 30, 1996 Value: $1,000 Permit type: Mechanical permit | Permit status: Final | Completion date: April 13, 1999 | Expiration date: August 29, 2007 | Permit id: 1996-0173 Mp | |||||
Temporary construction trailer 6 months Date: October 10, 1996 Permit type: Mechanical permit | Permit status: Final | Completion date: August 20, 1997 | Expiration date: August 29, 2007 | Permit id: 1996-017794 Mp | |||||
New industrial wastewater treatment plant Date: November 1, 1996 Value: $2,980,000 Permit type: Mechanical permit | Permit status: Final | Completion date: June 25, 1997 | Expiration date: June 25, 1997 | Permit id: 1996-0029 Mp | |||||
Ground grid for water treatment plant only Date: November 7, 1996 Value: $6,000 Permit type: Mechanical permit | Permit status: Final | Completion date: October 27, 1997 | Expiration date: August 29, 2007 | Permit id: 1996-005642 Mp | |||||
2 temporary construction trailers Date: November 27, 1996 Permit type: Mechanical permit | Permit status: Final | Completion date: August 20, 1997 | Expiration date: August 29, 2007 | Permit id: 1996-009064 Mp | |||||
Install general lightingreceptacles only Date: January 15, 1997 Value: $23,000 Permit type: Mechanical permit | Permit status: Void | Completion date: July 14, 1997 | Expiration date: October 21, 1997 | Permit id: 1997-011236 Mp | |||||
Temporary office building Date: January 17, 1997 Permit type: Mechanical permit | Permit status: Final | Completion date: March 4, 1997 | Expiration date: August 29, 2007 | Permit id: 1997-011401 Mp | |||||
2 temporary construction trailers Date: February 19, 1997 Permit type: Mechanical permit | Permit status: Final | Completion date: August 20, 1997 | Expiration date: August 29, 2007 | Permit id: 1997-000198 Mp | |||||
Electric for grounding in bulk gas area Date: February 28, 1997 Value: $25,000 Permit type: Mechanical permit | Permit status: Final | Completion date: February 26, 1999 | Expiration date: August 29, 2007 | Permit id: 1997-000546 Mp | |||||
Temporary construction trailer Date: March 6, 1997 Permit type: Mechanical permit | Permit status: Final | Completion date: April 15, 1997 | Expiration date: August 29, 2007 | Permit id: 1997-002762 Mp | |||||
SCORE 94 Adding saftey shower to site only Date: June 23, 2014 Contractor: David Moats Permit type: Plumbing permit | Permit status: Final | Completion date: October 16, 2014 | Expiration date: October 16, 2014 | Permit id: 2014-065572 Pp | |||||
Temporary construction trailer6 month max Date: June 4, 1997 Permit type: Mechanical permit | Permit status: Final | Completion date: October 27, 1997 | Expiration date: August 29, 2007 | Permit id: 1997-015806 Mp | |||||
Connect moniter equip for gaschemical in fab Date: June 5, 1997 Value: $750,000 Permit type: Mechanical permit | Permit status: Final | Completion date: April 13, 1999 | Expiration date: August 29, 2007 | Permit id: 1997-015931 Mp | |||||
Electric for sewer flow monitors Date: August 21, 1997 Value: $5,000 Permit type: Mechanical permit | Permit status: Final | Completion date: April 13, 1999 | Expiration date: August 29, 2007 | Permit id: 1997-012979 Mp | |||||
Electric for water fountain Date: August 21, 1997 Value: $5,000 Permit type: Mechanical permit | Permit status: Final | Completion date: April 13, 1999 | Expiration date: August 29, 2007 | Permit id: 1997-012981 Mp | |||||
Temporary buildingfit up operations Date: September 11, 1997 Value: $20,000 Permit type: Mechanical permit | Permit status: Final | Completion date: October 14, 1997 | Expiration date: August 29, 2007 | Permit id: 1997-016279 Mp | |||||
Renovations 1st2dn3rd fl for service request Date: November 18, 1997 Value: $57,000 Permit type: Mechanical permit | Permit status: Void | Completion date: May 17, 1998 | Expiration date: July 7, 1998 | Permit id: 1997-007804 Mp | |||||
SCORE 99 Relocate two 8 amp panels Date: September 18, 2014 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: September 25, 2014 | Expiration date: September 25, 2014 | Permit id: 2014-100609 Ep | |||||
SCORE 99 Install 6 150a ats switch 1 800a panel 7 motor control mcc buckets 4 120v power circuits only Date: October 1, 2014 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: November 13, 2014 | Expiration date: November 13, 2014 | Permit id: 2014-105639 Ep | |||||
Install equipment only phase ii Date: October 7, 1998 Value: $7,000,000 Permit type: Mechanical permit | Permit status: Void | Completion date: April 5, 1999 | Expiration date: August 18, 1999 | Permit id: 1998-0082 Mp | |||||
SCORE 100 New construction canopy structure for storage of chemicals Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: October 22, 2015 | Expiration date: October 22, 2015 | Permit id: 2015-010761 Bp | |||||
SCORE 100 New construction canopy structure for storage of chemicals Date: March 3, 2015 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: October 5, 2015 | Expiration date: October 5, 2015 | Permit id: 2015-010761 Ep | |||||
SCORE 100 Relocation of onsite underground domestic water piping and fireline piping only Date: February 3, 2015 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Final | Completion date: July 21, 2015 | Expiration date: July 21, 2015 | Permit id: 2015-012501 Pp | |||||
SCORE 100 Install of 8 fire line pipinig from private main to a fire riser room only Date: March 12, 2015 Contractor: Travis S Cox Permit type: Plumbing permit | Permit status: Final | Completion date: May 20, 2015 | Expiration date: May 20, 2015 | Permit id: 2015-028409 Pp | |||||
SCORE 99 Install three 6 amp enclosed circuit breakers and one 8 amp enclosed circuit breaker to existing commercial only Date: April 7, 2015 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: April 16, 2015 | Expiration date: April 16, 2015 | Permit id: 2015-038887 Ep | |||||
SCORE 99 Addition for manufacturing office Permit type: Mechanical permit | Permit status: Final | Completion date: December 22, 2000 | Expiration date: December 22, 2000 | Permit id: 2000-019568 Mp | |||||
SCORE 99 Permit to add three 1 amp ats switches add six 1 amp feeders three normal three emergency terminate to existing vfds reuse existing circuit breakers in switchboards at 121 samsung blvd Date: May 28, 2015 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: June 26, 2015 | Expiration date: June 26, 2015 | Permit id: 2015-063481 Ep | |||||
SCORE 99 Finish out for 2 training rooms Permit type: Mechanical permit | Permit status: Final | Completion date: February 5, 2001 | Expiration date: February 5, 2001 | Permit id: 2001-009819 Mp | |||||
SCORE 62 A2 construct x control bldg in iwt complex ref permit 06024807 Date: December 20, 2006 Contractor: Total Facility Solutions Permit type: Mechanical permit | Permit status: Final | Completion date: May 8, 2007 | Expiration date: December 23, 2007 | Permit id: 2006-029109 Mp | |||||
SCORE 100 A2 fab building interior finish out mod1 Permit type: Mechanical permit | Permit status: Final | Completion date: September 17, 2007 | Expiration date: September 17, 2007 | Permit id: 2006-029387 Mp | |||||
SCORE 71 Modifications to existing stairwell Permit type: Mechanical permit | Permit status: Final | Completion date: August 6, 2004 | Expiration date: August 6, 2004 | Permit id: 2004-011684 Mp | |||||
SCORE 100 Add two truck scales to existing commercial only Date: August 11, 2015 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 2, 2016 | Expiration date: March 2, 2016 | Permit id: 2015-097026 Ep | |||||
SCORE 100 Addition to existing manufacturing facility samsung austin seminconductor Permit type: Mechanical permit | Permit status: Final | Completion date: April 1, 2005 | Expiration date: April 1, 2005 | Permit id: 2004-019386 Mp | |||||
SCORE 99 One story expansion of existing electrical substation Permit type: Mechanical permit | Permit status: Final | Completion date: March 11, 2005 | Expiration date: March 11, 2005 | Permit id: 2004-005822 Mp | |||||
SCORE 71 Acid exhaust for wet device lab Permit type: Mechanical permit | Permit status: Final | Completion date: April 7, 2005 | Expiration date: April 7, 2005 | Permit id: 2005-005573 Mp | |||||
SCORE 100 New industrial bldg amhs stocker bldg for officeseminconductor manufacturing Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 22, 2016 | Expiration date: June 22, 2016 | Permit id: 2015-112943 Bp | |||||
SCORE 99 New industrial bldg amhs stocker bldg for officeseminconductor manufacturing Date: September 24, 2015 Contractor: Billy C Hammett Permit type: Electrical permit | Permit status: Final | Completion date: March 23, 2016 | Expiration date: March 23, 2016 | Permit id: 2015-112943 Ep | |||||
SCORE 96 New industrial bldg amhs stocker bldg for officeseminconductor manufacturing Date: November 3, 2015 Contractor: Travis Everett Permit type: Mechanical permit | Permit status: Final | Completion date: April 13, 2016 | Expiration date: April 13, 2016 | Permit id: 2015-112943 Mp | |||||
SCORE 96 New industrial bldg amhs stocker bldg for officeseminconductor manufacturing Date: September 28, 2015 Contractor: Chris Cosgrove Permit type: Plumbing permit | Permit status: Final | Completion date: April 13, 2016 | Expiration date: April 13, 2016 | Permit id: 2015-112943 Pp | |||||
SCORE 100 Remodel to existing officemanufacturing install new amhs rail in the cleanroom Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: June 28, 2016 | Expiration date: June 28, 2016 | Permit id: 2015-121962 Bp | |||||
SCORE 100 Remodel to existing officemanufacturing install new amhs rail in the cleanroom Date: October 30, 2015 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: June 27, 2016 | Expiration date: June 27, 2016 | Permit id: 2015-121962 Ep | |||||
SCORE 100 Interior remodel to existing officemanufacturing to install new scrubbers on roof of existing utility bldgs Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: March 18, 2016 | Expiration date: March 18, 2016 | Permit id: 2015-126176 Bp | |||||
SCORE 100 Interior remodel to existing officemanufacturing to install new scrubbers on roof of existing utility bldgs Date: October 28, 2015 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 9, 2016 | Expiration date: March 9, 2016 | Permit id: 2015-126176 Ep | |||||
SCORE 96 Interior remodel to existing officemanufacturing to install new scrubbers on roof of existing utility bldgs Date: January 7, 2016 Contractor: Travis Everett Permit type: Mechanical permit | Permit status: Final | Completion date: March 14, 2016 | Expiration date: March 14, 2016 | Permit id: 2015-126176 Mp | |||||
SCORE 100 New shell officesemiconductor manufacturing bldg shell bridge structure Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: April 1, 2010 | Expiration date: April 1, 2010 | Permit id: 2009-1200 Bp | |||||
SCORE 100 Installing water waste water line to comm job trailer only Date: November 3, 2009 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: November 10, 2009 | Expiration date: November 10, 2009 | Permit id: 2009-122525 Pp | |||||
SCORE 100 Installing electrical service to comm job trailer Date: November 4, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 18, 2009 | Expiration date: December 18, 2009 | Permit id: 2009-122857 Ep | |||||
SCORE 100 Installing electrical to job trailer only Date: November 9, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: November 16, 2009 | Expiration date: November 16, 2009 | Permit id: 2009-125105 Ep | |||||
SCORE 99 Installing electrical service and plumbing to comm job trailer Date: November 12, 2009 Contractor: Elliot House Permit type: Electrical permit | Permit status: Final | Completion date: April 28, 2010 | Expiration date: April 28, 2010 | Permit id: 2009-126191 Ep | |||||
SCORE 99 Installing electrical service and plumbing to comm job trailer Date: November 16, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: December 8, 2009 | Expiration date: December 8, 2009 | Permit id: 2009-126196 Pp | |||||
SCORE 100 Installing electrical plumbing to job trailer only daw tech 1 Date: November 16, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: November 18, 2009 | Expiration date: November 18, 2009 | Permit id: 2009-1270 Ep | |||||
SCORE 100 Installing electrical to job trailer only tei Date: November 16, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: November 18, 2009 | Expiration date: November 18, 2009 | Permit id: 2009-127094 Ep | |||||
SCORE 100 Installing electrical to job trailer only ssr Date: November 18, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 18, 2009 | Expiration date: December 18, 2009 | Permit id: 2009-127922 Ep | |||||
SCORE 99 Installing plumbing to job trailer only daw tech 1 Date: November 20, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: December 8, 2009 | Expiration date: December 8, 2009 | Permit id: 2009-1287 Pp | |||||
SCORE 99 Installing plumbing to job trailer only daw tech 2 Date: November 20, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: December 8, 2009 | Expiration date: December 8, 2009 | Permit id: 2009-128763 Pp | |||||
SCORE 99 Installing plumbing to job trailer only tei 1 Date: November 20, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: December 8, 2009 | Expiration date: December 8, 2009 | Permit id: 2009-128764 Pp | |||||
SCORE 99 Installing plumbing to job trailer only tei 2 Date: November 20, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: December 8, 2009 | Expiration date: December 8, 2009 | Permit id: 2009-128765 Pp | |||||
SCORE 99 Installing plumbing to job trailer only wk 1 Date: November 20, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: December 8, 2009 | Expiration date: December 8, 2009 | Permit id: 2009-128768 Pp | |||||
SCORE 99 Installing plumbing to job trailer only wk 2 Date: November 20, 2009 Contractor: Benjamin G Felder Permit type: Plumbing permit | Permit status: Final | Completion date: December 8, 2009 | Expiration date: December 8, 2009 | Permit id: 2009-128769 Pp | |||||
SCORE 100 Install plumbing to temporary construction trailer for t project Date: November 20, 2009 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: February 9, 2010 | Expiration date: February 9, 2010 | Permit id: 2009-128919 Pp | |||||
SCORE 100 Installing electrical to job trailer only dynamic system Date: November 25, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 18, 2009 | Expiration date: December 18, 2009 | Permit id: 2009-131432 Ep | |||||
SCORE 100 Finishout for cleanroom over bridge for existing officeseminconductor manufacturing facility Date: January 13, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 25, 2010 | Expiration date: March 25, 2010 | Permit id: 2009-133674 Ep | |||||
SCORE 100 Finishout for cleanroom over bridge for existing officeseminconductor manufacturing facility Date: January 4, 2010 Contractor: V R Wattinger Permit type: Mechanical permit | Permit status: Final | Completion date: March 29, 2010 | Expiration date: March 29, 2010 | Permit id: 2009-133674 Mp | |||||
SCORE 100 Finishout for cleanroom over bridge for existing officeseminconductor manufacturing facility Date: January 4, 2010 Contractor: Vernon Wattinger Permit type: Plumbing permit | Permit status: Final | Completion date: March 29, 2010 | Expiration date: March 29, 2010 | Permit id: 2009-133674 Pp | |||||
SCORE 100 Installing electrical service to comm job trailer only teitech 2 Date: December 11, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 18, 2009 | Expiration date: December 18, 2009 | Permit id: 2009-136267 Ep | |||||
SCORE 100 Installing electrical service to comm job trailer only lasko Date: December 11, 2009 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: December 18, 2009 | Expiration date: December 18, 2009 | Permit id: 2009-136269 Ep | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing iwt upgrade package Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: April 6, 2010 | Expiration date: April 6, 2010 | Permit id: 2009-136613 Bp | |||||
SCORE 100 New pad canopy for additional tanks Applicant Phone: (512) 672-3355 | Permit type: Building permit | Permit status: Final | Completion date: April 1, 2010 | Expiration date: April 1, 2010 | Permit id: 2009-136614 Bp | |||||
SCORE 100 Interior remodel to existing officesemiconductor manufacturing iwt upgrade package Date: March 30, 2010 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: April 2, 2010 | Expiration date: April 2, 2010 | Permit id: 2009-136613 Ep | |||||
SCORE 94 Interior remodel to existing officesemiconductor manufacturing iwt upgrade package Date: April 1, 2010 Contractor: David Moats Permit type: Plumbing permit | Permit status: Final | Completion date: April 5, 2010 | Expiration date: April 5, 2010 | Permit id: 2009-136613 Pp |