Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 19 Anacostia Drive Se Washington Dc Anacostia riverwalk trail: a total of ten spt borings advanced to depths ranging from approximately to 1 feet below the existing ground surface will be performed at the locations indicated on the attached boring location plan, sk-1. Five of the borings, designated as b-5 through b- will be performed in the proposed trail alignment to depths of approximately feet. Two of the borings, designated as b-1 and b-5 will be performed at the proposed abutment locations to depths of approximately 1 feet. Three of the borings, designated as b-2 through b-4 will be performed at the proposed pier locations from a barge in the anacostia river to depths of approximately 75 feet below the existing mudline. Date: June 26, 2017 Contractor: Tom Hay Client: Robert Mocko | Permit type: Excavation; boring test pit (each addl) | Permit status: Revise and resubmit | Expiration date: November 3, 2017 | Permit id: 0 | |||||
SCORE 59 Contractor: Tom Hay Permit status: 10 | Expiration date: November 3, 2017 | Permit id: 0 |