Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Date: August 30, 2006 Contractor: The Gas Connection Client: Michael White | Applicant: The Gas Connection | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: July 22, 2008 | Current use: Single family d | |||||
SCORE 96 1709 Pine St 5 Boulder Co Installation of new gas line for gas insert, installed per covenants. Btu demand to be determined. Gas line approved per hoa and historic boulder inc., reference 1978 covenant on building. Date: July 14, 2006 Contractor: The Gas Connection Client: Marilyn Fowler | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 29, 2008 | Current use: Multifamily dwe | |||||
SCORE 96 1709 Pine St 4 Boulder Co Installation of new gas line for range, installed per covenants. Btu demand to be determined. Gas line approved per hoa and historic boulder inc., reference 1978 covenant on building. Date: July 14, 2006 Contractor: The Gas Connection Client: Elizabeth Stuber | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: August 24, 2006 Contractor: The Gas Connection Client: Karen Goodwin,James Goodwin | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 29, 2008 | Current use: Single family d | |||||
SCORE 96 Date: August 24, 2006 Contractor: The Gas Connection Client: Mark Bowen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Manufactured/mo | |||||
SCORE 96 Date: April 17, 2003 Contractor: The Gas Connection Client: Denise Maslanka | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 14, 2003 | Current use: Single family d | |||||
SCORE 96 Date: April 18, 2003 Contractor: The Gas Connection Client: Donald Morgan,Irene Morgan | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 2, 2003 | Current use: Single family d | |||||
SCORE 96 Date: August 7, 2006 Contractor: The Gas Connection Client: Roger Kipfer, Kipfer | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 3, 2001 Contractor: The Gas Connection Client: Partnershi Nuttall | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 8, 2001 | Current use: Single family d | |||||
SCORE 96 Date: October 3, 2001 Contractor: The Gas Connection Client: Partnershi Nuttall | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 8, 2001 | Current use: Single family d | |||||
SCORE 96 Date: January 11, 2006 Contractor: The Gas Connection Client: David Martindale | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 30, 2008 | Current use: Single family a | |||||
SCORE 96 Date: December 27, 2005 Contractor: The Gas Connection Client: Polly Atkinson,Raymond Atkinson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 29, 2006 | Current use: Single family d | |||||
SCORE 96 Date: February 17, 2006 Contractor: The Gas Connection Client: George Sharman,Marti Sharman | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 16, 2005 Contractor: The Gas Connection Client: Adam Wright,Gabrielle Wright | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 2, 2005 | Current use: Single family d | |||||
SCORE 96 Date: August 25, 2005 Contractor: The Gas Connection Client: Nan Bryant | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 26, 2005 | Current use: Single family d | |||||
SCORE 96 Date: August 19, 2005 Contractor: The Gas Connection Client: Chin Moeng,Fanthune Moeng | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 6, 2005 | Current use: Single family d | |||||
SCORE 96 Date: August 29, 2005 Contractor: The Gas Connection Client: John Hamilton | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 13, 2005 | Current use: Single family d | |||||
SCORE 96 Date: June 30, 2005 Contractor: The Gas Connection Client: Sara Sheldon | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: August 11, 2005 | Current use: Single family d | |||||
SCORE 96 Date: March 30, 2005 Contractor: The Gas Connection Client: Jennifer Nelson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 8, 2005 Contractor: The Gas Connection Client: Walter Fricke | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 5, 2005 | Current use: Single family d | |||||
SCORE 96 Date: March 8, 2005 Contractor: The Gas Connection Client: Karl Eggert | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 16, 2005 Contractor: The Gas Connection Client: Philip Hernandez | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 23, 2005 Contractor: The Gas Connection Client: Judy Hartley,James Hartley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 20, 2005 Contractor: The Gas Connection Client: Jeannette Kornreich,Scott Kornreich | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 42 Hanover Av Boulder Co Install free standing stove. Stove must be epa phase ii certified wood stove. Date: November 13, 2001 Contractor: The Gas Connection Client: John Drozdek,Cheryl Drozdek | Applicant: The Gas Connection | Permit type: Woodstove | Permit status: Cmp | Completion date: December 12, 2001 | Current use: Single family d | |||||
SCORE 96 Date: November 13, 2001 Contractor: The Gas Connection Client: James Topping,Carolyn Topping | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 14, 2001 | Current use: Single family d | |||||
SCORE 96 2685 Winding Trail Dr Boulder Co Install new 35,0 btu gas fireplace insert in single-family residence. Date: April 14, 2003 Contractor: The Gas Connection Client: Ronald Broome | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 14, 2003 | Current use: Single family d | |||||
SCORE 96 5 Pine St Boulder Co Gas line installation of snow melt system in driveway of single-family residence. System to be installed in-property only, separate r. O. W. Permit required for any work done in city r. O. W. Date: October 12, 2005 Contractor: The Gas Connection Client: Partnershi Pjr | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 10, 2005 | Current use: Single family d | |||||
SCORE 96 Date: April 25, 2005 Contractor: The Gas Connection Client: Court Walnut | Applicant: The Gas Connection | Permit type: Electrical | Permit status: Cmp | Completion date: July 12, 2005 | Current use: Commercial/reta | |||||
SCORE 96 Date: September 21, 2005 Contractor: The Gas Connection Client: Homestead Digregorio | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 26, 2005 | Current use: Single family d | |||||
SCORE 96 Date: September 16, 2005 Contractor: The Gas Connection Client: Ellen Gager,Ronald Gager | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 11, 2006 | Current use: Single family d | |||||
SCORE 96 Date: September 14, 2005 Contractor: The Gas Connection Client: Stephen Tappert,Jill Tappert | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 25, 2005 Contractor: The Gas Connection Client: Lofts 1360.0 | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: August 22, 2001 Contractor: The Gas Connection Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 4, 2001 | Current use: Commercial/reta | |||||
SCORE 96 Date: September 12, 2001 Contractor: The Gas Connection Client: Pearl 954.0 | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 8, 2001 | Current use: Commercial/reta | |||||
SCORE 96 Date: August 22, 2001 Contractor: The Gas Connection Client: Frederick Carruth,Mary Carruth | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 21, 2001 Contractor: The Gas Connection Client: Stephanie Wanek,Charles Wanek | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 20, 2001 Contractor: The Gas Connection Client: Gary Reid,Judith Reid | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 19, 2001 | Current use: Single family d | |||||
SCORE 96 Date: August 17, 2005 Contractor: The Gas Connection Client: Heulwen Franklin | Applicant: The Gas Connection | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: September 6, 2005 | Current use: Single family d | |||||
SCORE 96 Date: August 3, 2005 Contractor: The Gas Connection Client: William Thomas,Leila Thomas | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 24, 2005 Contractor: The Gas Connection Client: Roger Ayan,Margaret Ayan | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 30, 2005 Contractor: The Gas Connection Client: Julie Haggerty,Michael Kraus | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: August 9, 2005 | Current use: Single family d | |||||
SCORE 96 7 Quince Cr Boulder Co Install gas line for range, grill and gas fireplace in single-family residence. Date: March 10, 2006 Contractor: The Gas Connection Client: M Gardner,Kay Gardner | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 5, 2011 | Current use: Single family d | |||||
SCORE 96 Date: June 21, 2005 Contractor: The Gas Connection Client: Mahmood Meamar,Fereshteh Meamar | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 3, 2006 | Current use: Single family d | |||||
SCORE 96 Date: October 5, 2005 Contractor: The Gas Connection Client: Marcisz,Nick Marcisz | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 55 Racquet Ln Boulder Co Installation of natural gas fired back-up generator for single family residence. Date: May 25, 2005 Contractor: The Gas Connection Client: Leslee Boss,R Boss | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 3166 Eastwood Ct Boulder Co Install gas meter and service to townhome unit, gas piping, and gas fireplace in basement. Date: May 5, 2005 Contractor: The Gas Connection Client: Phoebe Dooley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Townhomes, exis | |||||
SCORE 96 Date: April 22, 2005 Contractor: The Gas Connection Client: Court Walnut | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 3, 2005 | Current use: Restaurant, exi | |||||
SCORE 96 Date: May 18, 2005 Contractor: The Gas Connection Client: Dale Lagow,Ellen Lagow | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 26, 2005 | Current use: Single family d | |||||
SCORE 96 Date: May 20, 2005 Contractor: The Gas Connection Client: Philip Hernandez | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 23, 2004 Contractor: The Gas Connection Client: John Kempton | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 23, 2004 Contractor: The Gas Connection Client: Norman Kutner | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 1, 2005 | Current use: Single family d | |||||
SCORE 96 Date: October 27, 2004 Contractor: The Gas Connection Client: Teri Gortmaker,Wiebe Gortmaker | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 8, 2004 Contractor: The Gas Connection Client: Robert Backerman,Carolyn Backerman | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 23, 2004 | Current use: Single family d | |||||
SCORE 96 Date: October 8, 2004 Contractor: The Gas Connection Client: Kim Miller,Maria Miller | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: October 8, 2004 Contractor: The Gas Connection Client: Carl Skulski,Julianna Giudici | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 8, 2004 Contractor: The Gas Connection Client: Nicky Marone,Peter Meyer | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 16, 2004 Contractor: The Gas Connection Client: Karen Winkelman,Peter Winkelman | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: September 1, 2004 Contractor: The Gas Connection Client: John Juroshek,Carol Juroshek | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 1, 2004 | Current use: Single family d | |||||
SCORE 96 Date: August 26, 2004 Contractor: The Gas Connection Client: Associates Rsp | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Multifamily dwe | |||||
SCORE 96 Date: August 18, 2004 Contractor: The Gas Connection Client: Kenneth Pinson,Margaret Pinson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 23, 2004 | Current use: Single family d | |||||
SCORE 96 Date: July 28, 2004 Contractor: The Gas Connection Client: Janice Kern | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: May 3, 2004 Contractor: The Gas Connection Client: Mark Hutchins,Elfriede Hutchins | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 7, 2005 | Current use: Single family d | |||||
SCORE 96 Date: April 1, 2004 Contractor: The Gas Connection Client: Lllp Sunflower | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: April 1, 2004 Contractor: The Gas Connection Client: Enterprise Nga | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: April 6, 2004 Contractor: The Gas Connection Client: William Nagel,Joan Nagel | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 11, 2004 Contractor: The Gas Connection Client: D Neely,Tracy Winfree | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 26, 2004 | Current use: Single family d | |||||
SCORE 96 Date: February 10, 2004 Contractor: The Gas Connection Client: Robert Bonomo,Joyce Family Trust | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 21, 2004 Contractor: The Gas Connection Client: John Stovall,Roxanne Stovall | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family a | |||||
SCORE 96 Date: January 27, 2004 Contractor: The Gas Connection Client: Betty Anderson,Arthur Anderson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 2, 2004 | Current use: Single family d | |||||
SCORE 96 Date: February 3, 2004 Contractor: The Gas Connection Client: Alan Wachs | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: February 9, 2004 Contractor: The Gas Connection Client: Carol Trujillo,Charles Trujillo | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 23, 2008 | Current use: Single family d | |||||
SCORE 96 Date: February 16, 2004 Contractor: The Gas Connection Client: Marlene Smith | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 26, 2004 | Current use: Single family d | |||||
SCORE 96 Date: January 9, 2004 Contractor: The Gas Connection Client: Isabel Moss | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 23, 2004 | Current use: Single family d | |||||
SCORE 96 Date: January 13, 2004 Contractor: The Gas Connection Client: David Read,Susan Read | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 7, 2004 | Current use: Single family d | |||||
SCORE 96 Date: January 13, 2004 Contractor: The Gas Connection Client: Industries Talus | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 26, 2004 | Current use: Single family d | |||||
SCORE 96 Date: January 8, 2004 Contractor: The Gas Connection Client: James Bull,Erin Mull | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 5, 2004 Contractor: The Gas Connection Client: Janyce Ernest | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 5, 2004 Contractor: The Gas Connection Client: Laura Farrelly | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 30, 2004 Contractor: The Gas Connection Client: Alice Turner | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 6, 2005 | Current use: Multifamily dwe | |||||
SCORE 96 Date: April 22, 2004 Contractor: The Gas Connection Client: Midge Korczak | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 23, 2008 | Current use: Single family d | |||||
SCORE 96 Date: October 20, 2004 Contractor: The Gas Connection Client: Creek Grove | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: October 11, 2004 Contractor: The Gas Connection Client: Joanne Oshell | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 9, 2004 Contractor: The Gas Connection Client: Robert Denis, Rainbow Homes | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 8, 2004 | Current use: Manufactured/mo | |||||
SCORE 96 Date: February 9, 2004 Contractor: The Gas Connection Client: Frank Seger,Claire Seger | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 9, 2004 Contractor: The Gas Connection Client: Phyllis Mayben | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 25, 2004 | Current use: Single family d | |||||
SCORE 96 Date: January 5, 2000 Contractor: The Gas Connection Client: Marc Levinson,John Holland | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 16 Dogwood Ln Boulder Co Extend and pressurize last 5 of gas line to existing gas logs, as requested by matt english. Date: August 11, 2004 Contractor: The Gas Connection Client: John Franchini,D Franchini | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 1965 Riverside Av Boulder Co Installation of a 50k btu swimming pool heater per section 504. 3, 20 iecc. Date: July 20, 2004 Contractor: The Gas Connection Client: Mary Lee,Jerome Schusterman | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 5, 2004 Contractor: The Gas Connection Client: Barbara Rubinson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 22, 2004 Contractor: The Gas Connection Client: Of Archdiocese | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 8, 2004 | Current use: Religious assem | |||||
SCORE 96 Date: June 16, 2004 Contractor: The Gas Connection Client: Judith Davis | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Townhomes, exis | |||||
SCORE 96 Date: June 16, 2004 Contractor: The Gas Connection Client: Lindley Brenza | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 14, 2004 Contractor: The Gas Connection Client: Jennifer Abram | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Service industr | |||||
SCORE 96 Date: April 30, 2001 Contractor: The Gas Connection Client: Lisa Bennett,Jeffrey Bennett | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 25, 2001 | Current use: Single family d | |||||
SCORE 96 Date: December 3, 2003 Contractor: The Gas Connection Client: Chris Thornson, Thornson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 3, 2003 Contractor: The Gas Connection Client: E Steven | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 3, 2003 Contractor: The Gas Connection Client: R Rudy | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 26, 2004 | Current use: Single family d | |||||
SCORE 96 Date: December 10, 2003 Contractor: The Gas Connection Client: Jack Sinclair,Karin Sinclair | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 17, 2003 Contractor: The Gas Connection Client: Richard Rook, Rook | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 12, 2004 | Current use: Single family d | |||||
SCORE 96 Date: November 13, 2003 Contractor: The Gas Connection Client: James Mcmillan | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 27, 2003 Contractor: The Gas Connection Client: Karen Quates | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family a | |||||
SCORE 96 Date: October 29, 2003 Contractor: The Gas Connection Client: Karl Thompson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 12, 2004 | Current use: Single family d | |||||
SCORE 96 Date: November 6, 2003 Contractor: The Gas Connection Client: Amy Maranowicz | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 3, 2003 Contractor: The Gas Connection Client: Brenda Stone | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family a | |||||
SCORE 96 1859 23rd St Boulder Co Repair and replace gass log inserts in four apartments. Emergency work. Xcel has turned gas off. Date: December 22, 2003 Contractor: The Gas Connection Client: James Bock | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 8, 2004 | Current use: Multifamily dwe | |||||
SCORE 96 Date: November 26, 2003 Contractor: The Gas Connection Client: Georg Haughland, Haughland | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 16, 2000 Contractor: The Gas Connection Client: Howard Woodard,Mildred Woodard | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 3, 2001 Contractor: The Gas Connection Client: Beatrice Hoverstock,Rolland Hoverstock | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 3, 2008 | Current use: Single family d | |||||
SCORE 96 Date: October 6, 2003 Contractor: The Gas Connection Client: Rodger Lucero | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 21, 2003 | Current use: Single family d | |||||
SCORE 96 Date: October 6, 2003 Contractor: The Gas Connection Client: Keryn Comerford | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 30, 2003 Contractor: The Gas Connection Client: Rodger Lucero | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 21, 2003 | Current use: Multifamily dwe | |||||
SCORE 96 Date: September 24, 2003 Contractor: The Gas Connection Client: Robert Elmore,Lois Elmore | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: July 17, 2000 Contractor: The Gas Connection Client: Cheryl Klinger | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 9, 2000 | Current use: Single family d | |||||
SCORE 96 Date: September 17, 2003 Contractor: The Gas Connection Client: Christine Halvorson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 2, 2003 | Current use: Single family d | |||||
SCORE 96 Date: September 15, 2003 Contractor: The Gas Connection Client: Genevieve Devaud | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 16, 2004 | Current use: Single family d | |||||
SCORE 96 Date: September 8, 2003 Contractor: The Gas Connection Client: Associates Rsp | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 5, 2003 | Current use: Multifamily dwe | |||||
SCORE 96 Date: August 29, 2003 Contractor: The Gas Connection Client: Stefanie Selden | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 3, 2003 | Current use: Single family d | |||||
SCORE 96 Date: August 27, 2003 Contractor: The Gas Connection Client: Angie Offstein,Randall Offstein | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 27, 2003 Contractor: The Gas Connection Client: Cintha Ring | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 11, 2003 | Current use: Multifamily dwe | |||||
SCORE 96 Date: August 20, 2003 Contractor: The Gas Connection Client: Robert Leland | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: April 17, 2002 Contractor: The Gas Connection Client: Robert Wood | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 4, 2003 | Current use: Single family d | |||||
SCORE 96 Date: August 11, 2003 Contractor: The Gas Connection Client: Janet Allsup | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 17, 2003 | Current use: Single family a | |||||
SCORE 96 Date: August 11, 2003 Contractor: The Gas Connection Client: Carl Drews | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 11, 2003 | Current use: Single family d | |||||
SCORE 96 Date: June 19, 2003 Contractor: The Gas Connection Client: Mark Schiander,Aimee Schiander | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 27, 2008 | Current use: Single family d | |||||
SCORE 96 Date: June 19, 2003 Contractor: The Gas Connection Client: Scott Hunsaker,Amy Howard | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 12, 2003 Contractor: The Gas Connection Client: Deborah Blendermann | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 27, 2003 | Current use: Single family d | |||||
SCORE 96 Date: May 29, 2003 Contractor: The Gas Connection Client: Mary Bode | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 17, 2001 Contractor: The Gas Connection Client: Hazel Thornley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 21, 2001 | Current use: Single family d | |||||
SCORE 96 Date: October 17, 2001 Contractor: The Gas Connection Client: Joseph Printz,Jane Printz | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 24, 2001 | Current use: Single family d | |||||
SCORE 96 Date: October 17, 2001 Contractor: The Gas Connection Client: William Herbstreit, Herbstreit | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Wdn | Current use: Single family d | |||||
SCORE 96 Date: March 18, 2003 Contractor: The Gas Connection Client: Martha Moyers | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 17, 2003 | Current use: Single family d | |||||
SCORE 96 Date: March 10, 2003 Contractor: The Gas Connection Client: Jana Swanson,Ivan Swanson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 3, 2003 | Current use: Single family d | |||||
SCORE 96 Date: February 27, 2003 Contractor: The Gas Connection Client: Richard Irvin,Ruth Irvin | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 4, 2003 | Current use: Single family d | |||||
SCORE 96 Date: February 14, 2003 Contractor: The Gas Connection Client: Donald Bishop,Judith Bishop | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 10, 2003 | Current use: Single family d | |||||
SCORE 96 Date: February 3, 2003 Contractor: The Gas Connection Client: Family Liddell | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 12, 2003 Contractor: The Gas Connection Client: Francis Shafer | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 27, 2005 | Current use: Single family d | |||||
SCORE 96 Date: January 29, 2003 Contractor: The Gas Connection Client: Darien Davis | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 2, 2003 | Current use: Single family d | |||||
SCORE 96 Date: January 29, 2003 Contractor: The Gas Connection Client: Grady Wilson,Linda Wilson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: January 3, 2001 Contractor: The Gas Connection Client: Joseph Wells,Virginia Trustees | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 3, 2001 Contractor: The Gas Connection Client: David Jaeger,Karen Jaeger | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 24, 2003 Contractor: The Gas Connection Client: Wendy Maccloud | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 21, 2003 Contractor: The Gas Connection Client: Toni Smolen, Smolen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 2, 2004 | Current use: Single family d | |||||
SCORE 96 Date: January 17, 2003 Contractor: The Gas Connection Client: Robert Howe, Howe | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 23, 2003 | Current use: Single family d | |||||
SCORE 96 Date: January 13, 2003 Contractor: The Gas Connection Client: Lolita Higbie | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 16, 2003 | Current use: Single family d | |||||
SCORE 96 Date: January 2, 2003 Contractor: The Gas Connection Client: Jeremy Martin | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 24, 2002 Contractor: The Gas Connection Client: Joanne Rinehart | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 9, 2002 Contractor: The Gas Connection Client: Janet Jacobs,Maude Brockelsy | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 12, 2004 | Current use: Single family d | |||||
SCORE 96 Date: December 9, 2002 Contractor: The Gas Connection Client: Christine Hansen,Eric Reish | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 22, 2003 | Current use: Single family d | |||||
SCORE 96 Date: December 3, 2002 Contractor: The Gas Connection Client: Harold Reitsema,Mary Reitsema | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 3, 2002 Contractor: The Gas Connection Client: Richard Young,Nancy Young | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 27, 2002 Contractor: The Gas Connection Client: Harold Reitsema,Mary Reitsema | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 21, 2003 | Current use: Single family d | |||||
SCORE 96 Date: November 27, 2002 Contractor: The Gas Connection Client: Richard Young,Nancy Young | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 25, 2002 Contractor: The Gas Connection Client: James Densmore,Jonna Densmore | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 25, 2002 Contractor: The Gas Connection Client: Liora Pitcher,Justin Joffe | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Multifamily dwe | |||||
SCORE 96 Date: December 17, 2002 Contractor: The Gas Connection Client: Helen Stanley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 14, 2002 Contractor: The Gas Connection Client: Guenther Rahm | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 13, 2007 | Current use: Single family d | |||||
SCORE 96 Date: November 13, 2002 Contractor: The Gas Connection Client: Karen Lewis | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 13, 2003 | Current use: Multifamily dwe | |||||
SCORE 96 Date: November 5, 2002 Contractor: The Gas Connection Client: Terry Lindenberg | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 18, 2004 | Current use: Single family d | |||||
SCORE 96 Date: October 30, 2002 Contractor: The Gas Connection Client: Brian Osborne,Tamara Osborne | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Wdn | Current use: Single family d | |||||
SCORE 96 851 Crescent Dr Boulder Co Mechanical permit for a gas insert installation (35k btu) at an existing single-family residence. Date: October 22, 2002 Contractor: The Gas Connection Client: Charles Pinkerton | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 21, 2002 | Current use: Single family d | |||||
SCORE 96 Date: October 21, 2002 Contractor: The Gas Connection Client: Gwen Ritter | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 8, 2003 | Current use: Single family d | |||||
SCORE 96 Date: October 14, 2002 Contractor: The Gas Connection Client: Massimo Buvoli, Buvoli | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 28, 2002 | Current use: Single family d | |||||
SCORE 96 Date: November 15, 2002 Contractor: The Gas Connection Client: Mark Lewis,Susan Lewis | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 23, 2002 | Current use: Single family a | |||||
SCORE 96 Date: October 4, 2002 Contractor: The Gas Connection Client: Harvey Lindenberg, Lindenberg | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 28, 2002 | Current use: Single family d | |||||
SCORE 96 Date: October 4, 2002 Contractor: The Gas Connection Client: Donald Hill,Arlene Hill | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 25, 2002 | Current use: Single family d | |||||
SCORE 96 Date: October 2, 2002 Contractor: The Gas Connection Client: Keith Flodstrom, Flodstrom | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 4, 2002 Contractor: The Gas Connection Client: Carole Kaye | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 10, 2003 | Current use: Single family d | |||||
SCORE 96 Date: September 17, 2002 Contractor: The Gas Connection Client: John Biddle,Beth Biddle | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 17, 2002 Contractor: The Gas Connection Client: Joseph Moore | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 9, 2002 Contractor: The Gas Connection Client: Barry Weiss | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: September 10, 2002 Contractor: The Gas Connection Client: Catherine Edwards | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 29, 2002 Contractor: The Gas Connection Client: W Parker,Judith Parker | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 28, 2002 Contractor: The Gas Connection Client: R Sonnenfeld,Antoinette Sonnenfeld | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 23, 2004 | Current use: Single family d | |||||
SCORE 96 Date: December 12, 2003 Contractor: The Gas Connection Client: David Simon,Andrea Jason | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 4, 2004 | Current use: Single family d | |||||
SCORE 96 Date: December 12, 2003 Contractor: The Gas Connection Client: John Putnam,Kristin Putnam | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 5, 2002 Contractor: The Gas Connection Client: Jacqueline Murphy | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 7, 2002 | Current use: Single family d | |||||
SCORE 96 Date: August 5, 2002 Contractor: The Gas Connection Client: Pamela Wanner | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 16, 2002 | Current use: Single family d | |||||
SCORE 96 Date: July 19, 2002 Contractor: The Gas Connection Client: Jeffrey Skovron,Deborah Skovron | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 17, 2002 Contractor: The Gas Connection Client: Rhodora Brown | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: July 12, 2002 Contractor: The Gas Connection Client: Carol Fier,Robert Fier | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 27, 2002 | Current use: Single family d | |||||
SCORE 96 Date: July 10, 2002 Contractor: The Gas Connection Client: Daniel Goldberger | Applicant: The Gas Connection | Permit type: Mechanical, flood ov | Permit status: Cmp | Completion date: November 13, 2002 | Current use: Single family d | |||||
SCORE 96 Date: July 10, 2002 Contractor: The Gas Connection Client: M Julian,John Julian | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 4, 2003 | Current use: Single family d | |||||
SCORE 96 Date: June 24, 2002 Contractor: The Gas Connection Client: Judith Boedecker | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: October 16, 2003 Contractor: The Gas Connection Client: Silas Koo, Koo | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 14, 2003 Contractor: The Gas Connection Client: Cintha Ring | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: May 24, 2002 Contractor: The Gas Connection Client: Wayne Gazur, Gazur | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 3, 2002 | Current use: Single family d | |||||
SCORE 96 Date: May 17, 2002 Contractor: The Gas Connection Client: Mark Maricle | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 28, 2002 | Current use: Single family d | |||||
SCORE 96 Date: May 3, 2002 Contractor: The Gas Connection Client: Ren Read | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 21, 2002 | Current use: Single family d | |||||
SCORE 96 Date: May 1, 2002 Contractor: The Gas Connection Client: Frank Georgianna,Ernestine Haight | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: March 26, 2001 Contractor: The Gas Connection Client: John Carlucci,Lori Carlucci | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Existing | |||||
SCORE 96 Date: March 27, 2002 Contractor: The Gas Connection Client: Jack Ford,Mary Ford | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 8, 2002 Contractor: The Gas Connection Client: Ellen Olaughlin | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: February 25, 2002 Contractor: The Gas Connection Client: George Thompson,Carolyn Thompson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 1, 2002 | Current use: Multifamily dwe | |||||
SCORE 96 Date: February 12, 2002 Contractor: The Gas Connection Client: Barbara Dolder | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 20, 2002 | Current use: Single family d | |||||
SCORE 96 Date: February 7, 2002 Contractor: The Gas Connection Client: Lenore Stewart,Al Weinberg | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 22, 2002 | Current use: Multifamily dwe | |||||
SCORE 96 Date: May 17, 2002 Contractor: The Gas Connection Client: Hanna Marsden,Lewis Gibb Jr | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 29, 2002 Contractor: The Gas Connection Client: Morrough Obrien,Susan Obrien | Applicant: The Gas Connection | Permit type: Mechanical, flood no | Permit status: Cmp | Completion date: March 11, 2002 | Current use: Single family d | |||||
SCORE 96 Date: January 29, 2002 Contractor: The Gas Connection Client: Thomas Roach,Shahnaz Roach | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 22, 2002 Contractor: The Gas Connection Client: Jane Pampel,Fred Pampel | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: January 22, 2002 Contractor: The Gas Connection Client: John Mangum,Gina Goick | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 4, 2002 | Current use: Single family d | |||||
SCORE 96 Date: January 11, 2002 Contractor: The Gas Connection Client: Peter Gowen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 6, 2002 | Current use: Single family d | |||||
SCORE 96 Date: January 9, 2002 Contractor: The Gas Connection Client: Marilyn Drayer | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 28, 2002 | Current use: Single family d | |||||
SCORE 96 Date: December 18, 2001 Contractor: The Gas Connection Client: Paul Whiteside | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 18, 2001 Contractor: The Gas Connection Client: Lawrence Kaptein,Ellen Brock | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 18, 2001 Contractor: The Gas Connection Client: Craig Martin, Martin | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 11, 2001 Contractor: The Gas Connection Client: James Roberts,Clara Roberts | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 11, 2001 Contractor: The Gas Connection Client: Robert Martig,Jose Angel | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Wdn | Current use: Single family d | |||||
SCORE 96 Date: December 7, 2001 Contractor: The Gas Connection Client: Scott Richardson,Royann Richardson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 22, 2004 | Current use: Single family d | |||||
SCORE 96 Date: December 5, 2001 Contractor: The Gas Connection Client: Philomena Dooley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 28, 2002 | Current use: Single family d | |||||
SCORE 96 Date: December 5, 2001 Contractor: The Gas Connection Client: Lisa Byron | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 25, 2002 | Current use: Multifamily dwe | |||||
SCORE 96 Date: December 5, 2001 Contractor: The Gas Connection Client: Sean Sullivan,Malin Sullivan | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 5, 2001 Contractor: The Gas Connection Client: Lee Radtke | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 18, 2002 | Current use: Single family d | |||||
SCORE 96 2211 Nicholl St Boulder Co Install a new e. P. A. Wood burning stove. Must be e. P. A. Pase ii or better. Date: November 20, 2001 Contractor: The Gas Connection Client: Alain Jouchoux,Rionda Jouchoux | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 30, 2001 | Current use: Single family d | |||||
SCORE 96 Date: November 7, 2001 Contractor: The Gas Connection Client: Realty Sfp | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 31, 2001 Contractor: The Gas Connection Client: Kaye Howe,Cynthia Schmidt | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 31, 2001 Contractor: The Gas Connection Client: Franklin Pierce,Leslie Garza | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 23, 2001 | Current use: Multifamily dwe | |||||
SCORE 96 Date: October 31, 2001 Contractor: The Gas Connection Client: Chuen Chow,Juliana S | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 23, 2001 | Current use: Single family d | |||||
SCORE 96 Date: December 5, 2001 Contractor: The Gas Connection Client: Donald Denham | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 26, 2001 Contractor: The Gas Connection Client: Claire Lindgren | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 30, 2001 | Current use: Single family a | |||||
SCORE 96 Date: March 4, 2002 Contractor: The Gas Connection Client: Fourth 2121.0 | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 10, 2002 | Current use: Multifamily dwe | |||||
SCORE 96 Date: October 19, 2001 Contractor: The Gas Connection Client: Emil Ericksen,Wanda Ericksen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 25, 2001 | Current use: Single family d | |||||
SCORE 96 Date: October 19, 2001 Contractor: The Gas Connection Client: Richelle Reilly,Michael Mcnamara | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 11, 2002 Contractor: The Gas Connection Client: Barbara Anuta | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 23, 2003 | Current use: Single family d | |||||
SCORE 96 Date: October 11, 2001 Contractor: The Gas Connection Client: Patrick Ellinwood,Martha Ellinwood | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 5, 2001 | Current use: Single family d | |||||
SCORE 96 Date: October 11, 2001 Contractor: The Gas Connection Client: David Hofmockel,Sara Hofmockel | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 11, 2001 Contractor: The Gas Connection Client: Peter Gowen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 31, 2001 | Current use: Single family d | |||||
SCORE 96 Date: October 8, 2001 Contractor: The Gas Connection Client: Donna Henslee | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 8, 2001 Contractor: The Gas Connection Client: Andrew Levinson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 29, 2001 | Current use: Single family d | |||||
SCORE 96 Date: September 26, 2001 Contractor: The Gas Connection Client: Gerald Schlatter,Nancy Schlatter | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 24, 2001 | Current use: Single family d | |||||
SCORE 96 Date: September 26, 2001 Contractor: The Gas Connection Client: John Accardi,Nancy Ttees | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 21, 2001 Contractor: The Gas Connection Client: Dean Dehart,Evelyn Dehart | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Inf | Current use: Single family d | |||||
SCORE 96 Date: September 21, 2001 Contractor: The Gas Connection Client: John Rainey,Donna Rainey | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 2, 2001 | Current use: Single family d | |||||
SCORE 96 Date: September 18, 2001 Contractor: The Gas Connection Client: C Griswold | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 18, 2001 Contractor: The Gas Connection Client: James Coughlin, Coughlin | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 13, 2001 Contractor: The Gas Connection Client: Diana Linnen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 17, 2001 | Current use: Single family d | |||||
SCORE 96 Date: September 12, 2001 Contractor: The Gas Connection Client: Sharon Dalebout,Ralph Dalebout | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 26, 2001 | Current use: Single family d | |||||
SCORE 96 Date: September 6, 2001 Contractor: The Gas Connection Client: David Levy,Susan Levy | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 27, 2001 Contractor: The Gas Connection Client: Briar North | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 27, 2001 Contractor: The Gas Connection Client: Priscilla Campbell | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 27, 2001 Contractor: The Gas Connection Client: Lin Murphy | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 5, 2001 | Current use: Single family d | |||||
SCORE 96 Date: August 27, 2001 Contractor: The Gas Connection Client: Donald Scrimgeour | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 31, 2002 | Current use: Multifamily dwe | |||||
SCORE 96 Date: August 27, 2001 Contractor: The Gas Connection Client: Jonathan Kopp,Julie Kopp | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 13, 2001 | Current use: Single family d | |||||
SCORE 96 Date: August 27, 2001 Contractor: The Gas Connection Client: Mary Kelley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 20, 2001 | Current use: Single family d | |||||
SCORE 96 Date: January 6, 2006 Contractor: The Gas Connection Client: Raymond Crowder | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 3, 2006 | Current use: Single family d | |||||
SCORE 96 Date: August 10, 2001 Contractor: The Gas Connection Client: Graham Hartridge | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 10, 2001 Contractor: The Gas Connection Client: Michelle Theall,Amy Thompson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: June 1, 2001 Contractor: The Gas Connection Client: Kenneth Hogan,Lynn Hogan | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 4, 2001 | Current use: Single family d | |||||
SCORE 96 Date: March 4, 2002 Contractor: The Gas Connection Client: Peter Terpenning,Laura Terpenning | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 22, 2002 | Current use: Single family d | |||||
SCORE 96 Date: March 4, 2002 Contractor: The Gas Connection Client: Scott Kellicker,Patricia Kellicker | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 26, 2001 Contractor: The Gas Connection Client: Jennifer Rocke | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 26, 2001 Contractor: The Gas Connection Client: E Robbs | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 26, 2001 Contractor: The Gas Connection Client: Steven Frank,Julia Hobart | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: July 24, 2001 Contractor: The Gas Connection Client: Wayne Schroeder,Angelika Schroeder | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Wdn | Current use: Single family a | |||||
SCORE 96 Date: July 17, 2001 Contractor: The Gas Connection Client: John Scogland,Connie Scogland | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 26, 2001 Contractor: The Gas Connection Client: Land Bs,Cattle Llc | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Office - profes | |||||
SCORE 96 Date: June 26, 2001 Contractor: The Gas Connection Client: Land Bs,Cattle Llc | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Office - profes | |||||
SCORE 96 Date: June 26, 2001 Contractor: The Gas Connection Client: Land Bs,Cattle Llc | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Office - profes | |||||
SCORE 96 Date: June 26, 2001 Contractor: The Gas Connection Client: Sally Warren,Edward Morey | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 13, 2001 | Current use: Single family d | |||||
SCORE 96 Date: June 26, 2001 Contractor: The Gas Connection Client: Land Bs,Cattle Llc | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Office - profes | |||||
SCORE 96 Date: June 25, 2001 Contractor: The Gas Connection Client: Pelt Van | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 13, 2002 | Current use: Single family d | |||||
SCORE 96 Date: June 19, 2001 Contractor: The Gas Connection Client: William Marx,Sarah A Marx | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: June 12, 2001 Contractor: The Gas Connection Client: Deborah Bowman | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 19, 2001 | Current use: Single family d | |||||
SCORE 96 Date: July 5, 2001 Contractor: The Gas Connection Client: Lloyd Stoops,Mary Stoops | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 13, 2001 | Current use: Single family d | |||||
SCORE 96 Date: April 13, 2000 Contractor: The Gas Connection Client: Gregg Deboever | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: August 31, 2000 | Current use: Single family d | |||||
SCORE 96 Date: April 13, 2000 Contractor: The Gas Connection Client: William Watson,Dorothy Trustees Of | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 7, 2001 Contractor: The Gas Connection Client: Robert Marcus,Lois Marcus | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 21, 2001 | Current use: Single family d | |||||
SCORE 96 Date: May 3, 2001 Contractor: The Gas Connection Client: Wm Moser,Barbara Moser | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 15, 2001 | Current use: Single family d | |||||
SCORE 96 Date: April 20, 2001 Contractor: The Gas Connection Client: Jacques Delorimier, Delorimier | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 21, 2000 Contractor: The Gas Connection Client: Stanley Christensen,Lynn Christensen | Applicant: The Gas Connection | Permit status: Cmp | Completion date: July 20, 2000 | Current use: Single family d | |||||
SCORE 96 Date: April 6, 2001 Contractor: The Gas Connection Client: Kathryn Knox | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: April 6, 2001 Contractor: The Gas Connection Client: Trust Fraser | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 21, 2001 Contractor: The Gas Connection Client: Alison Litchfield | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 20, 2001 Contractor: The Gas Connection Client: Martin Miles | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 13, 2001 Contractor: The Gas Connection Client: Paul Katz,Cassandra Katz | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 22, 2001 Contractor: The Gas Connection Client: Betsy Imig | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 5, 2001 | Current use: Single family d | |||||
SCORE 96 Date: February 21, 2001 Contractor: The Gas Connection Client: James Scott Iii | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 9, 2001 | Current use: Multifamily dwe | |||||
SCORE 96 Date: January 18, 2001 Contractor: The Gas Connection Client: Gordon Maclean | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 6, 2001 | Current use: Single family d | |||||
SCORE 96 Date: January 18, 2001 Contractor: The Gas Connection Client: Deborah Hayes | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 30, 2001 | Current use: Single family d | |||||
SCORE 96 Date: January 18, 2001 Contractor: The Gas Connection Client: Randolph Ware,Maria Ware | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 17, 2001 Contractor: The Gas Connection Client: Dennis Donald,Polly Donald | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 2058 Alpine Dr Boulder Co Install new gas fireplace insert. Must be epa phase ii or state phase iii certified. Date: December 26, 2000 Contractor: The Gas Connection Client: Carol Miller | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family a | |||||
SCORE 96 16 Ithaca Dr Boulder Co Install new gas fireplace insert. Must be epa phase ii or state phase iii certified. Date: December 26, 2000 Contractor: The Gas Connection Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 22, 2001 | Current use: Single family d | |||||
SCORE 96 Date: December 15, 2000 Contractor: The Gas Connection Client: J Geer, Mary Jenson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 8, 2000 Contractor: The Gas Connection Client: Janet Degrazia,Hans Funke | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 25, 2001 | Current use: Single family d | |||||
SCORE 96 Date: December 7, 2000 Contractor: The Gas Connection Client: Michael Belochi,Mary Tstees | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 19, 2001 | Current use: Single family d | |||||
SCORE 96 1421 Sunset Bl Boulder Co Gas insert for fireplace must be epa phase ii or state phase iii certification. Date: December 1, 2000 Contractor: The Gas Connection Client: Joann Robinson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family a | |||||
SCORE 96 Date: December 1, 2000 Contractor: The Gas Connection Client: Harvey Hine | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 12, 2000 | Current use: Single family a | |||||
SCORE 96 5547 Stonewall Pl Boulder Co Install gas log fireplace. Must be epa phase ii or state phase iii certification. Date: December 1, 2000 Contractor: The Gas Connection Client: Sally Schneider | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 27, 2000 | Current use: Single family d | |||||
SCORE 96 Date: November 29, 2000 Contractor: The Gas Connection Client: Douglas Sweeney,Jocelyn Sweeney | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 28, 2000 Contractor: The Gas Connection Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 9, 2001 | Current use: Single family d | |||||
SCORE 96 Date: November 21, 2000 Contractor: The Gas Connection Client: Joanne Little | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 27, 2000 | Current use: Single family d | |||||
SCORE 96 Date: November 21, 2000 Contractor: The Gas Connection Client: Mary Gruda | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 27, 2000 | Current use: Single family d | |||||
SCORE 96 Date: November 21, 2000 Contractor: The Gas Connection Client: Paul Schlegel,Clara Schlegel | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 17, 2000 Contractor: The Gas Connection Client: John Adams | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 25, 2001 | Current use: Single family d | |||||
SCORE 96 Date: November 13, 2000 Contractor: The Gas Connection Client: Vanessa Coleman | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 29, 2000 Contractor: The Gas Connection Client: Francois Vandenberghe, Vandenberghe | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 8, 2000 Contractor: The Gas Connection Client: Lois Lafond,Richard Lafond | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 28, 2000 Contractor: The Gas Connection Client: Carole Kaye | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 10, 2003 | Current use: Single family d | |||||
SCORE 96 Date: November 28, 2000 Contractor: The Gas Connection Client: William Sheerin,Susan Sheerin | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 6, 2000 Contractor: The Gas Connection Client: Manson Root | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 12, 2000 | Current use: Single family d | |||||
SCORE 96 Date: October 31, 2000 Contractor: The Gas Connection Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 16, 2001 | Current use: Single family d | |||||
SCORE 96 535 S 43rd St Boulder Co Install freestanding fireplace in single family residence. Must be epa phase ii or state phase iii certified. Date: December 6, 2000 Contractor: The Gas Connection Client: Wm Kucera,Myrna Kucera | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 1405 Ithaca Dr Boulder Co Install gas insert in fireplace. Must be epa phase ii or state phase iii certified. Date: December 6, 2000 Contractor: The Gas Connection Client: Janet Polkinghorne,William Polkinghorne | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 27, 2000 | Current use: Single family d | |||||
SCORE 96 Date: October 24, 2000 Contractor: The Gas Connection Client: Creek Brandon | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 11, 2001 | Current use: Single family d | |||||
SCORE 96 Date: October 24, 2000 Contractor: The Gas Connection Client: David Murphy,Janet Mckean | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 17, 2000 Contractor: The Gas Connection Client: Rhonda Lichtenstein,Charles Lichtenstein | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 17, 2000 Contractor: The Gas Connection Client: Lewis Richey,Diane Richey | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 16, 2000 Contractor: The Gas Connection Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 9, 2001 | Current use: Single family d | |||||
SCORE 96 Date: October 5, 2000 Contractor: The Gas Connection Applicant: The Gas Connection | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: January 24, 2001 | Current use: Single family d | |||||
SCORE 96 Date: October 5, 2000 Contractor: The Gas Connection Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 12, 2000 | Current use: Single family d | |||||
SCORE 96 Date: September 26, 2000 Contractor: The Gas Connection Client: Linda Wolvington | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 13, 2000 | Current use: Single family d | |||||
SCORE 96 Date: June 23, 2005 Contractor: The Gas Connection Client: Patrick Lai | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 26, 2005 | Current use: Single family d | |||||
SCORE 96 Date: March 22, 2000 Contractor: The Gas Connection Client: On Inn | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 14, 2000 Contractor: The Gas Connection Client: Living Strattman | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: August 8, 2000 Contractor: The Gas Connection Client: William Eck,Lillian Eck | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 9, 2000 | Current use: Single family d | |||||
SCORE 96 Date: July 12, 2000 Contractor: The Gas Connection Client: Sayer | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 30, 2000 Contractor: The Gas Connection Client: Sue Harrison | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 21, 2000 | Current use: Single family d | |||||
SCORE 96 Date: May 1, 2000 Contractor: The Gas Connection Client: David Erikson,Julie Erikson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 11, 2000 | Current use: Single family d | |||||
SCORE 96 Date: May 9, 2000 Contractor: The Gas Connection Client: Robert Hardesty,Barbara Hardesty | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 2, 2000 Contractor: The Gas Connection Client: Erin Robbins | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 26, 2000 | Current use: Single family d | |||||
SCORE 96 Date: April 24, 2000 Contractor: The Gas Connection Client: Jule Patrick | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 12, 2000 Contractor: The Gas Connection Client: Paul King,Clarissa King | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 27, 2000 | Current use: Single family d | |||||
SCORE 96 Date: February 22, 2000 Contractor: The Gas Connection Client: Carolyn Hall,Braddon Hall | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: February 22, 2000 Contractor: The Gas Connection Client: George Green,Pearl Green | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 31, 2000 | Current use: Single family d | |||||
SCORE 96 Date: January 22, 2002 Contractor: The Gas Connection Client: Jean-Claud Bosch,Nancy Bosch | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 6, 2002 | Current use: Single family d | |||||
SCORE 96 Date: February 4, 2000 Contractor: The Gas Connection Client: Robert Krassa,Joel Hamm | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 30, 2000 | Current use: Single family d | |||||
SCORE 96 Date: February 4, 2000 Contractor: The Gas Connection Client: Of City | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 4, 2000 Contractor: The Gas Connection Client: Of City | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Government uses | |||||
SCORE 96 Date: January 27, 2000 Contractor: The Gas Connection Client: Bryan White,Elizabeth Raba | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: January 11, 2000 Contractor: The Gas Connection Client: Andrea Lewis,Deborah Hopkins | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 12, 2000 | Current use: Single family d | |||||
SCORE 96 Date: January 7, 2000 Contractor: The Gas Connection Client: Marilyn Rudolph | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 10, 2000 | Current use: Single family d | |||||
SCORE 96 Client: Alexander Brown, Kathy Vogeley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Rev | Current use: Single family d | |||||
SCORE 96 Date: September 27, 2006 Contractor: The Gas Connection Client: Meridian Boulder | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 6, 2007 | Current use: Hospital/instit | |||||
SCORE 96 Date: October 3, 2006 Contractor: The Gas Connection Client: Eckart Schutrumpf,Mary Schutrumpf | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 31, 2007 | Current use: Single family d | |||||
SCORE 96 Date: October 3, 2006 Contractor: The Gas Connection Client: Carolyn Greene | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 24, 2006 Contractor: The Gas Connection Client: Anna Payne,T Payne Iii | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 5, 2009 | Current use: Single family d | |||||
SCORE 96 Date: October 24, 2006 Contractor: The Gas Connection Client: Measuring Particle | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 96 25 University Heights Av Boulder Co Installation of gas line for new gas cooktop oven. Btu rating and gas demand of device unknown at time of permit application. Date: November 2, 2006 Contractor: The Gas Connection Client: Didi Limasalle,Yan Limasalle | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 3, 2007 | Current use: Single family d | |||||
SCORE 96 Date: November 21, 2006 Contractor: The Gas Connection Client: Pearl 1102.0 | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Restaurant, exi | |||||
SCORE 96 Date: January 12, 2006 Contractor: The Gas Connection Client: Joan Benham | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 10, 2006 | Current use: Single family d | |||||
SCORE 96 Date: January 13, 2006 Contractor: The Gas Connection Client: Handorf Von, Von | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 18, 2006 | Current use: Single family d | |||||
SCORE 96 Date: January 26, 2006 Contractor: The Gas Connection Client: Joy Molony, Molony | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 1, 2006 | Current use: Single family d | |||||
SCORE 96 Date: February 8, 2006 Contractor: The Gas Connection Client: Brian Jackson, Jackson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 8, 2009 | Current use: Single family d | |||||
SCORE 96 Date: February 9, 2006 Contractor: The Gas Connection Client: Diane Deschanel | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 2, 2006 | Current use: Single family d | |||||
SCORE 96 Date: February 21, 2006 Contractor: The Gas Connection Client: Daniel Webster,Margaret Webster | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 6, 2006 | Current use: Single family d | |||||
SCORE 96 Date: March 1, 2006 Contractor: The Gas Connection Client: Todd Marshall,Stephanie Mayer | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 9, 2006 Contractor: The Gas Connection Client: Gary Albrecht,Michele Albrecht | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 18, 2009 | Current use: Single family d | |||||
SCORE 96 Date: June 2, 2006 Contractor: The Gas Connection Client: Carolyn Evans | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family a | |||||
SCORE 96 Date: June 15, 2006 Contractor: The Gas Connection Client: Marilyn Sturm | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 1, 2006 | Current use: Single family d | |||||
SCORE 96 Date: July 14, 2006 Contractor: The Gas Connection Client: William Sweezy, Sweezy | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 7, 2007 | Current use: Single family d | |||||
SCORE 96 Date: August 3, 2006 Contractor: The Gas Connection Client: Andrew Spetzler | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: August 11, 2006 Contractor: The Gas Connection Client: Mary Greenwald | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: August 18, 2006 Contractor: The Gas Connection Client: Jacob Puzio,Barbara Puzio | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 1, 2006 | Current use: Single family d | |||||
SCORE 96 Date: August 28, 2006 Contractor: The Gas Connection Client: Family Novosad | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: August 28, 2006 Contractor: The Gas Connection Client: James Patrick | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 1, 2006 | Current use: Single family d | |||||
SCORE 96 Date: September 8, 2006 Contractor: The Gas Connection Client: C Cares,Eleanor Cares | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: September 8, 2006 Contractor: The Gas Connection Client: C Cares,Eleanor Cares | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: September 15, 2006 Contractor: The Gas Connection Client: Bert Matissen,Marita Matissen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 30, 2008 | Current use: Single family d | |||||
SCORE 96 Date: September 15, 2006 Contractor: The Gas Connection Client: Mary Delong,John Leahey | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: November 9, 2006 Contractor: The Gas Connection Client: Julia Devine | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 21, 2006 Contractor: The Gas Connection Client: Megan Virgili, Virgili | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 96 Date: January 3, 2007 Contractor: The Gas Connection Client: Rusty Mccoy | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 27, 2007 Contractor: The Gas Connection Client: Martin Nuss, Nuss | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 33 25th St Boulder Co Mechanical permit for gas line only for anticipated gas firepit in backyard. Firepit requires permit, firepit required to be built of listed & approved components. Date: April 11, 2007 Contractor: The Gas Connection Client: Ryan Hartford | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 31, 2008 | Current use: Single family d | |||||
SCORE 96 421 Highland Av Boulder Co Installation of underground gas piping, listed firepit and grill off of back patio area. Date: May 22, 2007 Contractor: The Gas Connection Client: Alexander Bogusky | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 3003 Valmont Rd 58 Boulder Co Pressure check on existing gas line and replace flex connector for mobile home. Date: June 8, 2007 Contractor: The Gas Connection Client: Almir Rucic | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Manufactured/mo | |||||
SCORE 96 1311 Oakleaf Cr Boulder Co Installation of gas line for grill & listed firepit. 90,0 btu load. No gas schematic submitted at application. Date: June 18, 2007 Contractor: The Gas Connection Client: Cynthia Moomaw,Robert Moomaw | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 12, 2007 Contractor: The Gas Connection Client: Joyce Campbell,Tom Campbell | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 2503 23rd St Boulder Co Installation of outdoor gas fire pit in rear yard of single-family residence. Date: July 12, 2007 Contractor: The Gas Connection Client: Kori Bowers,Daniel Bowers | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 16, 2007 Contractor: The Gas Connection Client: Caryn Sheftel | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 30, 2008 | Current use: Multifamily dwe | |||||
SCORE 96 Date: August 6, 2007 Contractor: The Gas Connection Client: Margaret Donharl,Glenn Donharl | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: August 17, 2007 Contractor: The Gas Connection Client: Mark Meyer,Anita Ttees Mark D Me | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 23, 2008 | Current use: Single family d | |||||
SCORE 96 Date: August 28, 2007 Contractor: The Gas Connection Client: Olli Nikander,Donna Nikander | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 6, 2007 Contractor: The Gas Connection Client: Jeannette Rogers | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 2, 2011 | Current use: Multifamily dwe | |||||
SCORE 96 Date: September 6, 2007 Contractor: The Gas Connection Client: Lois Vanderhoof | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Manufactured/mo | |||||
SCORE 96 Date: September 6, 2007 Contractor: The Gas Connection Client: Erin Leckey,Christian Leckey | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Existing | |||||
SCORE 96 Date: September 17, 2007 Contractor: The Gas Connection Client: Jeffrey Steinhour,Amy Steinhour | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: September 17, 2007 Contractor: The Gas Connection Client: Michael Lipney,Kathryn Bennin | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 21, 2008 | Current use: Single family d | |||||
SCORE 96 Date: October 23, 2007 Contractor: The Gas Connection Client: Linda Quigley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 29, 2008 | Current use: Single family d | |||||
SCORE 96 3644 Hazelwood Ct Boulder Co Installation of a gas line, freestranding gas stove and associated venting. Date: October 23, 2007 Contractor: The Gas Connection Client: Dennis Long,Karen Long | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 639 Quince Cr Boulder Co Installation of gas line for a fireplace insert & installation of insert and associated venting. Date: October 31, 2007 Contractor: The Gas Connection Client: Jorgen Jensen,Hazel Jensen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 7, 2008 | Current use: Single family d | |||||
SCORE 96 Date: October 31, 2007 Contractor: The Gas Connection Client: John Griffith | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 31, 2007 Contractor: The Gas Connection Client: John Griffith | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 30, 2008 | Current use: Multifamily dwe | |||||
SCORE 96 Date: November 1, 2007 Contractor: The Gas Connection Client: Art Zirger,Mary Zirger | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 1, 2007 Contractor: The Gas Connection Client: Douglas Caskey,Cynthia Bowie | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 30, 2007 | Current use: Single family d | |||||
SCORE 96 Date: November 1, 2007 Contractor: The Gas Connection Client: David Crandall,Lark Corbeil | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 1, 2007 Contractor: The Gas Connection Client: Michele Kland | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 20, 2007 Contractor: The Gas Connection Client: Dorothy Knoedler,Roy Knoedler | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 1404 Kalmia Av Boulder Co Installation of fireplace insert & venting, gas cooktop, and associated gas piping for each device. Date: December 11, 2007 Contractor: The Gas Connection Client: Michael Friedman,Donna Casey | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 25, 2008 | Current use: Single family d | |||||
SCORE 96 Date: January 19, 2007 Contractor: The Gas Connection Client: Colin Schaffer,Zelda 50% | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 25, 2007 | Current use: Multifamily dwe | |||||
SCORE 96 Date: January 19, 2007 Contractor: The Gas Connection Client: George Lozier,Patricia K | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 25, 2007 | Current use: Single family d | |||||
SCORE 96 Date: February 9, 2007 Contractor: The Gas Connection Client: Kathleen Tierney,Peter Tierney | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 26, 2007 | Current use: Single family d | |||||
SCORE 96 Date: February 14, 2007 Contractor: The Gas Connection Client: Violet Nielsen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 14, 2010 | Current use: Single family a | |||||
SCORE 96 Date: March 12, 2007 Contractor: The Gas Connection Client: Jon Arvesen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 14, 2010 | Current use: Single family d | |||||
SCORE 96 Date: May 30, 2007 Contractor: The Gas Connection Client: Karla Bielanski | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 4, 2011 | Current use: Single family d | |||||
SCORE 96 Date: June 28, 2007 Contractor: The Gas Connection Client: Carrie Noonan | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 19, 2007 | Current use: Single family d | |||||
SCORE 96 Date: July 30, 2007 Contractor: The Gas Connection Client: Natalie Costa,Steven Oppenheimer | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 30, 2007 Contractor: The Gas Connection Client: Clinton Wall,Kirsten Wall | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 8, 2007 Contractor: The Gas Connection Client: Natalie Costa,Steven Oppenheimer | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 28, 2007 Contractor: The Gas Connection Client: Thomas Isaacson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: November 12, 2007 Contractor: The Gas Connection Client: Peter Allen,Lorraine Allen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: December 4, 2007 Contractor: The Gas Connection Client: Robert Belknap | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 4, 2008 Contractor: The Gas Connection Client: Daniel Shea,Patricia Shea | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: February 20, 2008 Contractor: The Gas Connection Client: James Clark,Jennifer Clark | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Iss | Current use: Single family a | |||||
SCORE 96 Date: February 25, 2008 Contractor: The Gas Connection Client: Brett Jackson,Janet Jackson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 9, 2008 | Current use: Multifamily dwe | |||||
SCORE 96 Date: February 25, 2008 Contractor: The Gas Connection Client: Marilyn Sturm | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: March 5, 2008 Contractor: The Gas Connection Client: Charles Marcy,Cynthia Marcy | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 10, 2011 | Current use: Single family d | |||||
SCORE 96 Date: March 11, 2008 Contractor: The Gas Connection Client: Martha Manning | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 13, 2011 | Current use: Single family d | |||||
SCORE 96 Date: March 13, 2008 Contractor: The Gas Connection Client: Family Higgins | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 20, 2011 | Current use: Single family d | |||||
SCORE 96 5 Euclid Av Boulder Co Extend existing exterior gas line feet to new bbq grille location and install gas log set in existing masonry fireplace. Date: April 3, 2008 Contractor: The Gas Connection Client: J Julian,S Trust | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 7, 2010 | Current use: Single family d | |||||
SCORE 96 1836 Mapleton Av Boulder Co Replacement of of existing gas-piping from meter to furnace water heater & renage. Date: April 24, 2008 Contractor: The Gas Connection Client: Nils Halverson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 8, 2008 Contractor: The Gas Connection Client: Alicen Kandt,Jeffery Stephans | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 10, 2011 | Current use: Single family d | |||||
SCORE 96 Date: May 8, 2008 Contractor: The Gas Connection Client: Laura Uhls,Jeffrey Uhls | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: May 20, 2008 Contractor: The Gas Connection Client: Lois Edgar | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 26, 2008 | Current use: Single family d | |||||
SCORE 96 2028 14th St Boulder Co Installation of a gas piping & a gas-fired decorative fireplace in lobby seating area. Vent termination to be made on roof surface. No exterior modifications allowed under the scope of this permit. Date: May 20, 2008 Contractor: The Gas Connection Client: Building Crystal | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Restaurant, exi | |||||
SCORE 96 5 12th St Boulder Co Install venting and two gas fireplaces. Gas line existing from previous fireplace. Date: May 28, 2008 Contractor: The Gas Connection Client: Real Boulder | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: August 3, 2009 | Current use: Single family d | |||||
SCORE 96 3003 Valmont Rd 41 Boulder Co Replace gas line from meter to outside of mobile home and extend existing pipe from under home to west exterior. Date: June 3, 2008 Contractor: The Gas Connection Client: Paul Segal | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 13, 2011 | Current use: Manufactured/mo | |||||
SCORE 96 1709 Pine St 3 Boulder Co Install gas line and venting for gas insert and range, all work inside of structure Date: June 12, 2008 Contractor: The Gas Connection Client: Barbara Lavender | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 8, 2011 | Current use: Single family a | |||||
SCORE 96 Date: July 10, 2008 Contractor: The Gas Connection Client: Onis De | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 12, 2009 | Current use: Single family d | |||||
SCORE 96 Date: July 10, 2008 Contractor: The Gas Connection Client: Kimberly Weins | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 85 Huron Ct Boulder Co Installation of gas line and venting for owners gas fireplace and installation of gas line stub for future dryer, range, and grill. Date: July 18, 2008 Contractor: The Gas Connection Client: Joel Thompson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: July 29, 2008 Contractor: The Gas Connection Client: William Wolpert,Judith Wolpert | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 8, 2010 | Current use: Single family d | |||||
SCORE 96 Date: August 14, 2008 Contractor: The Gas Connection Client: Jack Keeley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 443 Juniper Av Boulder Co Installation of gas line only, for future firepit and spa heater (to be installed through separate permit) Date: September 5, 2008 Contractor: The Gas Connection Client: Louis Psihoyos,Victoria Psihoyos | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 824 Walnut St C Boulder Co Installation of new gas line from meter to new gas fireplace and range. Install venting for gas fireplace. Date: September 11, 2008 Contractor: The Gas Connection Client: Gail Chadwell,Michael Chadwell | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 9, 2009 | Current use: Multifamily dwe | |||||
SCORE 96 9 Lincoln Pl Boulder Co Installation of gas fireplace in duplex unit. Unit and liner flue to be installed inside of old coal burning fireplace and chimney to code. Date: September 25, 2008 Contractor: The Gas Connection Client: Megan Casselman-Condon,Richard Casselman-Condon | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 11, 2009 | Current use: Multifamily dwe | |||||
SCORE 96 3007 10th St Boulder Co Installation of gas-piping, two gas-fired fireplaces and associated venting for each. Provide manufacturers installation manual & gas schematic to inspector at initial inspection. Date: September 29, 2008 Contractor: The Gas Connection Client: Kira Zana,Peter Zana | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: August 17, 2009 | Current use: Single family d | |||||
SCORE 96 94 Benthaven Pl Boulder Co Installation of gas piping, a gas-fired fireplace & associated venting. Provide a gas-piping schematic & manufacturers installation manual at initial inspection. Date: September 29, 2008 Contractor: The Gas Connection Client: Enterprise Nga | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 17, 2008 | Current use: Single family d | |||||
SCORE 96 Date: October 3, 2008 Contractor: The Gas Connection Client: Deborah Magaldi,Mark Magaldi | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 2, 2010 | Current use: Single family d | |||||
SCORE 96 Date: October 6, 2008 Contractor: The Gas Connection Client: Brian Lambden,Rachel Lambden | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: October 27, 2008 Contractor: The Gas Connection Client: Evan Shively | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 3, 2008 | Current use: Manufactured/mo | |||||
SCORE 96 Date: November 5, 2008 Contractor: The Gas Connection Client: L Staenhelin, Staenhelin | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 7, 2010 | Current use: Single family d | |||||
SCORE 96 Date: December 3, 2008 Contractor: The Gas Connection Client: Emma Birath | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: August 31, 2009 | Current use: Single family d | |||||
SCORE 96 Date: December 31, 2008 Contractor: The Gas Connection Client: Paul Crellin,Helen Devereux | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 18, 2010 | Current use: Single family d | |||||
SCORE 96 Date: January 10, 2008 Contractor: The Gas Connection Client: Victor Pollak,Natalie Pollak | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 4, 2008 | Current use: Single family d | |||||
SCORE 96 Date: January 21, 2008 Contractor: The Gas Connection Client: Enterprise Nga | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 6, 2008 | Current use: Single family d | |||||
SCORE 96 Date: March 12, 2008 Contractor: The Gas Connection Client: Daniel Schwartz | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 1729 28th St Boulder Co Installation of gas line for future gas firepit (to be installed through separate permit) for baker street pub. Date: January 22, 2009 Contractor: The Gas Connection Client: Plaza Tebomarshall | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 6, 2009 | Current use: Restaurant, exi | |||||
SCORE 96 Date: March 16, 2009 Contractor: The Gas Connection Client: Joel Ullom | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: March 24, 2009 | Current use: Single family d | |||||
SCORE 96 2042 Alpine Dr Boulder Co Installation of new gas piping only to supply a exterior fire-pit, pool & grille. Gas schematic must be supplied to inspector at rough inspection. (equipment to be intalled under separate permit by separate contractor.) Date: March 24, 2009 Contractor: The Gas Connection Client: James Butterworth | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 6, 2009 | Current use: Single family a | |||||
SCORE 96 3082 10th St Boulder Co Installation of a underground gas line to supply a proposed gas-fire pit (by separate contractor & separate permit). Date: April 3, 2009 Contractor: The Gas Connection Client: Stephen Sundstrom,Lauren Sundstrom | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 10, 2011 | Current use: Single family d | |||||
SCORE 96 Date: April 20, 2009 Contractor: The Gas Connection Client: Margaret Planchard | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 29, 2011 | Current use: Single family d | |||||
SCORE 96 Date: April 23, 2009 Contractor: The Gas Connection Client: James Cochrane | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 27, 2009 | Current use: Manufactured/mo | |||||
SCORE 96 5335 Tenino Av Boulder Co Installation of two gas log inserts into two existing masonry fireplaces -- includes installation of associated gas piping. Date: May 27, 2009 Contractor: The Gas Connection Client: Family Ashley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 23, 2009 | Current use: Single family d | |||||
SCORE 96 Date: June 1, 2009 Contractor: The Gas Connection Client: Arapahoe 5360.0 | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 6, 2009 | Current use: Commercial/reta | |||||
SCORE 96 Date: June 8, 2009 Contractor: The Gas Connection Client: Jerome Crawford,Janet Crawford | Applicant: The Gas Connection | Permit type: Mechanical, woodstov | Permit status: Cmp | Completion date: July 18, 2011 | Current use: Single family d | |||||
SCORE 96 Date: June 8, 2009 Contractor: The Gas Connection Client: Gary Banik, Banik | Applicant: The Gas Connection | Permit type: Mechanical, woodstov | Permit status: Cmp | Completion date: July 27, 2009 | Current use: Single family d | |||||
SCORE 96 Date: June 8, 2009 Contractor: The Gas Connection Client: John Wharton | Applicant: The Gas Connection | Permit type: Mechanical, woodstov | Permit status: Cmp | Completion date: June 23, 2009 | Current use: Single family d | |||||
SCORE 96 Date: June 9, 2009 Contractor: The Gas Connection Client: Gary Banik, Banik | Applicant: The Gas Connection | Permit type: Mechanical, woodstov | Permit status: Cmp | Completion date: October 7, 2009 | Current use: Single family d | |||||
SCORE 96 45 19th St 422 Boulder Co Mechanical permit - for installation of freestanding wood-burning fireplace in living room of mobile home. Date: July 27, 2009 Contractor: The Gas Connection Client: Bruce Smith | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 9, 2011 | Current use: Manufactured/mo | |||||
SCORE 96 2295 Glenwood Dr Boulder Co Installation of gas piping for a spa heater. (spa heater installation by separate permit by separate contractor.) gas schematic to be provided to inspector at initial inspection. Date: August 6, 2009 Contractor: The Gas Connection Client: David Paradis, Paradis | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 25, 2011 | Current use: Single family d | |||||
SCORE 96 Date: August 18, 2009 Contractor: The Gas Connection Client: Apartments Boulders | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 4, 2009 | Current use: Multifamily dwe | |||||
SCORE 96 81 Benthaven Pl Boulder Co Installation of direct venting and gas piping for gas fireplace insert in living room. Date: August 31, 2009 Contractor: The Gas Connection Client: Edward Gardner,Betty Gardner | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 7, 2009 | Current use: Single family d | |||||
SCORE 96 Date: August 31, 2009 Contractor: The Gas Connection Client: Donna Mayo | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 15, 2011 | Current use: Multifamily dwe | |||||
SCORE 96 Date: September 9, 2009 Contractor: The Gas Connection Client: Craig Shiesley,Marie Shiesley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 18, 2011 | Current use: Single family d | |||||
SCORE 96 Date: October 20, 2009 Contractor: The Gas Connection Client: Megan Casselman-Condon,Richard Casselman-Condon | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 3, 2009 | Current use: Multifamily dwe | |||||
SCORE 96 Date: October 26, 2009 Contractor: The Gas Connection Client: Jay Dunlap | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 18, 2009 | Current use: Single family d | |||||
SCORE 96 Date: October 26, 2009 Contractor: The Gas Connection Client: Brent Halsey,Molly Halsey | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 38 Telluride Pl Boulder Co Mechanical permit - for installation of wood buring fireplace insert (fireplace products international limited model i1200s). Date: December 2, 2009 Contractor: The Gas Connection Client: Laurie Clark | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 14, 2009 | Current use: Townhomes, exis | |||||
SCORE 96 Date: February 9, 2010 Contractor: The Gas Connection Client: Karen Sinclair,Jack Sinclair | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 17, 2010 | Current use: Single family d | |||||
SCORE 96 Date: February 9, 2010 Contractor: The Gas Connection Client: Jeffrey Lurie,Paula Lurie | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 4, 2013 | Current use: Single family d | |||||
SCORE 96 1491 High St Boulder Co Mechanical permit - for installation of two (2) 400,0 btu pool heaters, one (1) 50,0 btu gas grill, and one (1) 200,0 btu firepit in backyard of sfd. Date: March 22, 2010 Contractor: The Gas Connection Client: Eric Weissmann | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 4, 2013 | Current use: Single family d | |||||
SCORE 96 Date: June 9, 2010 Contractor: The Gas Connection Client: Susan Iott,Roger Pulwarty | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 96 Date: June 16, 2010 Contractor: The Gas Connection Client: David 2004.0 | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: August 4, 2010 | Current use: Single family d | |||||
SCORE 96 2907 Shadow Creek Dr 103 Boulder Co Mechanical permit - for installation of gas line for insert and venting. Includes upsizing of gas line for future tankless water heater. Date: July 6, 2010 Contractor: The Gas Connection Client: Greg Sherwin | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 96 Date: July 8, 2010 Contractor: The Gas Connection Client: Mark Newland,Barbara Newland | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 25, 2011 | Current use: Single family d | |||||
SCORE 96 Date: July 8, 2010 Contractor: The Gas Connection Client: Janis Devoto | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 15, 2010 | Current use: Single family d | |||||
SCORE 96 Date: July 23, 2010 Contractor: The Gas Connection Client: Rebecca Roser | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 12, 2014 | Current use: Single family d | |||||
SCORE 96 2042 Alpine Dr Boulder Co Installation of gas line for future fire pit. Pemit is for gas piping only. Date: July 30, 2010 Contractor: The Gas Connection Client: James Butterworth | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 96 Date: August 17, 2010 Contractor: The Gas Connection Client: Bradley Goeldner,Lisle Goeldner | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: September 17, 2010 | Current use: Single family d | |||||
SCORE 96 4019 Wonderland Hill Av Boulder Co Mechanical permit - for installation of 1-inch gas line in rear yard of townhome for future connection to gas main. No connection to gas main will occur through this permit. Date: September 3, 2010 Contractor: The Gas Connection Client: Chappell Marmon | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 13, 2010 | Current use: Townhomes, exis | |||||
SCORE 96 Client: Timothy Beal | Applicant: The Gas Connection | Permit type: Woodstove | Permit status: Cmp | Completion date: September 12, 2014 | Current use: Single family d | |||||
SCORE 96 Date: October 5, 2010 Contractor: The Gas Connection Client: Andrew Shaffer,Irene Shaffer | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: February 7, 2011 | Current use: Single family d | |||||
SCORE 96 Date: October 26, 2010 Contractor: The Gas Connection Client: Sarah Haugen, Haugen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 12, 2014 | Current use: Single family d | |||||
SCORE 96 Date: October 28, 2010 Contractor: The Gas Connection Client: Thomas Cohen,Kirsten Cohen | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 8, 2010 | Current use: Single family d | |||||
SCORE 96 Client: Judith Denberg | Applicant: The Gas Connection | Permit type: Woodstove | Permit status: Cmp | Completion date: February 3, 2011 | Current use: Single family d | |||||
SCORE 96 946 Pearl St Boulder Co Installation of a gas fireplace, venting and gas piping. Venting required to terminate in accordance with ifgc and his2010-00223 (enclosed) Date: November 10, 2010 Contractor: The Gas Connection Client: Pearl 954.0 | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: December 21, 2010 | Current use: Restaurant, exi | |||||
SCORE 96 2319 Arapahoe Av Boulder Co Mechanical permit - for replacement of 55 feet of 1-1 4 inch gas line to serve existing pizza ovens at inchback country pizzainch. Date: November 19, 2010 Contractor: The Gas Connection Client: Rentals Means | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 20, 2014 | Current use: Restaurant, exi | |||||
SCORE 96 4019 Wonderland Hill Av Boulder Co Installation of veinting for future gas stove. Stove installation through separate permit, gas line installed through pmt2010-03782 Date: February 24, 2011 Contractor: The Gas Connection Client: Chappell Marmon | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: June 10, 2011 | Current use: Single family d | |||||
SCORE 96 30 Washington St Boulder Co Installation of a one inch gas line for future firepit and grill. Seperate permit required for installation of firepit. Date: March 4, 2011 Contractor: The Gas Connection Client: Pamela Mcillwain,Ronald Et Al | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 22, 2014 | Current use: Single family d | |||||
SCORE 96 Date: April 5, 2011 Contractor: The Gas Connection Client: Geoffrey Ellis,Katharine Ellis | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 1945 Vassar Cr Boulder Co Installation of 105foot of 1 1 4 inch poly line from meter to 400k btu pool heater. Date: June 28, 2011 Contractor: The Gas Connection Client: Josh Wurman,Ling Wurman | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 4, 2012 | Current use: Single family d | |||||
SCORE 96 Date: June 30, 2011 Contractor: The Gas Connection Client: Judith Goodman | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 9, 2014 | Current use: Single family d | |||||
SCORE 96 3982 Promontory Ct Boulder Co Installation of gas line for firepit to be installed through separate permit Date: July 20, 2011 Contractor: The Gas Connection Client: Pamela Stewart,William Stewart | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: August 5, 2011 | Current use: Single family d | |||||
SCORE 96 3358 Barbados Pl Boulder Co Installation of gas line for firepit and grill to be installation separate permit Date: July 20, 2011 Contractor: The Gas Connection Client: Roger Pielke,Julie Pielke | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 3231 4th St Boulder Co Installation of gas line only for future gas firepit (to be installed by separate permit). Date: August 1, 2011 Contractor: The Gas Connection Client: Daniel Drake,Britt Drake | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 23 Jasper Ct Boulder Co Mechanical permit - for installation of new gas line and venting for new gas stove (by separate permit) in sfd. Date: September 7, 2011 Contractor: The Gas Connection Client: Roxan Gould | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 96 Date: September 20, 2011 Contractor: The Gas Connection Client: Michael Hankal | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: July 10, 2012 | Current use: Single family d | |||||
SCORE 96 7 Quince Cr Boulder Co Gas piping and gas fireplace in single family residence. This permit is a replacement for expired permit pmt2006-00822. Date: September 28, 2011 Contractor: The Gas Connection Client: M Gardner,Kay Gardner | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: November 21, 2011 | Current use: Single family d | |||||
SCORE 96 1658 Bear Mountain Dr Boulder Co Installation of a gas line and a gas log set on a rear deck (lower level) to the rear of the house. Electrical by separate permit. Date: September 28, 2011 Contractor: The Gas Connection Client: Joanne Halbrecht | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: April 16, 2014 | Current use: Single family d | |||||
SCORE 96 904 Hawthorn Av Boulder Co Installation of gas line and venting for freestanding stove. To include heating unit. Date: October 6, 2011 Contractor: The Gas Connection Client: Mary Hixson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 31, 2012 | Current use: Single family d | |||||
SCORE 96 Date: October 14, 2011 Contractor: The Gas Connection Client: Michael Dubson,Gisele Dubson | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: October 18, 2011 | Current use: Single family d | |||||
SCORE 96 1498 Periwinkle Dr Boulder Co Installation of an underground gas line and a listed firepit in the rear yard. Electrical by separate permit. Date: October 19, 2011 Contractor: The Gas Connection Client: Julie Seaman,Daniel Still | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 14, 2014 | Current use: Single family d | |||||
SCORE 96 8 Hartford Dr Boulder Co Installation of a wood stove and and associated venting. Device is requried to be a phase iii certified device. Hase kaminofenbau bari 3. 57 11,805-31,653 63 non catalytic Client: Joseph Bruce | Applicant: The Gas Connection | Permit type: Woodstove | Permit status: Cmp | Completion date: November 10, 2011 | Current use: Single family d | |||||
SCORE 96 1801 13th St Boulder Co Installation of freestanding, vent free gas fireplace and associated gas piping. Date: October 28, 2011 Contractor: The Gas Connection Client: Lizard Vail | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Iss | Current use: Restaurant, exi | |||||
SCORE 96 1449 Johnson Ct Boulder Co Installation of a gas insert fireplace and associated venting. Gas piping existing Date: December 8, 2011 Contractor: The Gas Connection Client: Marc Sobel,Margaret Sobel | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 5, 2012 | Current use: Single family d | |||||
SCORE 96 1 Seminole Dr Boulder Co Installation of natural gas powered, back-up, 83 amp, kw electrical generator in northern side-yard of residence. Date: December 9, 2011 Contractor: The Gas Connection Client: Carol Miller | Applicant: The Gas Connection | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: February 5, 2013 | Current use: Single family d | |||||
SCORE 96 Date: December 28, 2011 Contractor: The Gas Connection Client: Darrell Daley | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: May 9, 2014 | Current use: Single family d | |||||
SCORE 96 2375 Hillsdale Wy Boulder Co Installation of two new gas fireplace inserts - one upstairs and one downstairs. Installation of gasline and venting. Client: Mark Leifeste,Michelle Leifeste | Applicant: The Gas Connection | Permit type: Mechanical | Permit status: Cmp | Completion date: January 19, 2012 | Current use: Single family d |