Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Date: January 14, 2014 Contractor: Sunergy Systems Inc Client: Ledzian Wayne Francis+rebec | Applicant: Sunergy Systems Inc | Permit type: Alterations | Permit status: Finaled | Permit id: Alt14-0005 | Parcel: 7338220600 | |||||
SCORE 99 4333 Phinney Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, add circuit for monitoring. Add subpanel feeders. Date: September 30, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: September 30, 2017 | Current use: Single family / duplex | Permit id: 6559449 | |||||
SCORE 99 7732 33rd Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 5000watt grid interactive inverter. Upgrade meter and mast from 125a to 200a. Date: September 21, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 29, 2016 | Expiration date: September 21, 2017 | Current use: Single family / duplex | Permit id: 6557818 | |||||
SCORE 99 Date: September 9, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2016 | Expiration date: September 9, 2017 | Current use: Single family / duplex | Permit id: 6555625 | |||||
SCORE 99 Date: September 9, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2016 | Expiration date: September 9, 2017 | Current use: Single family / duplex | Permit id: 6555623 | |||||
SCORE 99 6 Nw 50th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, add circuit for monitoring Date: August 22, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2016 | Expiration date: August 22, 2017 | Current use: Single family / duplex | Permit id: 6552775 | |||||
SCORE 99 652 Nw 50th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, add circuit for monitoring. Date: August 22, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2016 | Expiration date: August 22, 2017 | Current use: Single family / duplex | Permit id: 6552774 | |||||
SCORE 99 119 Nw 50th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, add circuit for monitoring, add subpanel Date: August 19, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 25, 2016 | Expiration date: August 19, 2017 | Current use: Single family / duplex | Permit id: 6552315 | |||||
SCORE 99 4529b Rainier Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 3. 6kw ac module system. Grid direct, no batteries. Add circuit for monitoring. Date: August 17, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 14, 2016 | Expiration date: August 17, 2017 | Current use: Single family / duplex | Permit id: 6552005 | |||||
SCORE 99 3443 12th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] add 2 solar modules to existing array. No change of inverter ac output which will still be 4000watts ac. Date: August 17, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 18, 2016 | Expiration date: August 17, 2017 | Current use: Single family / duplex | Permit id: 6551873 | |||||
SCORE 99 Date: August 4, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 8, 2016 | Expiration date: August 4, 2017 | Current use: Single family / duplex | Permit id: 6549819 | |||||
SCORE 99 6117 34th Ave Nw Seattle Wa Install new overhead 200a service to replace existing underground 200a service. Date: July 28, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 11, 2016 | Expiration date: July 28, 2017 | Current use: Single family / duplex | Permit id: 6548659 | |||||
SCORE 99 3825 Carr Pl N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, ac modules. Add circuit for monitoring Date: June 23, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 29, 2016 | Expiration date: June 23, 2017 | Current use: Single family / duplex | Permit id: 6542270 | |||||
SCORE 99 8317 27th Ave Nw Seattle Wa Inspect existing unpermitted main panel that was discovered upon inspection of the photovoltaic system inspection Date: June 22, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 27, 2016 | Expiration date: June 22, 2017 | Current use: Single family / duplex | Permit id: 6542036 | |||||
SCORE 99 8517 28th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, ac modules. Add circuit for monitoring Date: June 20, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 27, 2016 | Expiration date: June 20, 2017 | Current use: Single family / duplex | Permit id: 6541702 | |||||
SCORE 99 8317 27th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 5200watt ac output from grid interactive inverter, backfeed breaker in main 200a panel. Add circuit for monitoring. Date: June 16, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 28, 2016 | Expiration date: June 16, 2017 | Current use: Single family / duplex | Permit id: 6541035 | |||||
SCORE 99 6117 34th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. 7600watt ac output of interactive inverter, 40a backfeed breaker. Add circuit for monitoring Date: June 14, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 30, 2016 | Expiration date: June 14, 2017 | Current use: Single family / duplex | Permit id: 6540649 | |||||
SCORE 99 1524 Nw Blue Ridge Dr Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 6000watt output of grid interactive inverter, 40a backfeed breaker into main 200a panel. Add circuit for monitoring. Date: June 14, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 26, 2016 | Expiration date: June 14, 2017 | Current use: Single family / duplex | Permit id: 6540645 | |||||
SCORE 99 4101 Evanston Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic, add circuit for monitoring. Date: May 25, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 8, 2016 | Expiration date: May 25, 2017 | Current use: Single family / duplex | Permit id: 6537010 | |||||
SCORE 99 6253 1st Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, acpv modules Date: May 25, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 3, 2016 | Expiration date: May 25, 2017 | Current use: Single family / duplex | Permit id: 6536999 | |||||
SCORE 99 5656 36th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic system. 3800watt ac output of interactive inverter, 20a backfeed breaker in main 200a panel. Add circuit for monitoring Date: May 2, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 18, 2016 | Expiration date: May 2, 2017 | Current use: Single family / duplex | Permit id: 6532586 | |||||
SCORE 99 2806 Nw 68th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 5000watt ac output of grid interactive inverter, add circuit for monitoring. Date: April 19, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 22, 2016 | Expiration date: April 19, 2017 | Current use: Single family / duplex | Permit id: 6530030 | |||||
SCORE 99 4542 4th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. Add circuit for monitoring. Add outdoor subpanel at solar equipment. Date: April 12, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 15, 2016 | Expiration date: April 12, 2017 | Current use: Single family / duplex | Permit id: 6528817 | |||||
SCORE 99 11345 38th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, on detached garage structure. Date: March 29, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 5, 2016 | Expiration date: March 29, 2017 | Current use: Single family / duplex | Permit id: 6526532 | |||||
SCORE 99 507 34th Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] addition of 8 modules and microinverters - 2000watts ac output. Sum of both systems = 6000watts ac output Date: March 23, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 28, 2016 | Expiration date: March 23, 2017 | Current use: Single family / duplex | Permit id: 6525509 | |||||
SCORE 99 106 Lakeside Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 40a backfeed breaker in main 200a panel. Add circuit for ev charger in garage. Date: March 11, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 18, 2016 | Expiration date: March 11, 2017 | Current use: Single family / duplex | Permit id: 6523518 | |||||
SCORE 99 Date: March 9, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 10, 2016 | Expiration date: March 9, 2017 | Current use: Single family / duplex | Permit id: 6522493 | |||||
SCORE 99 3249 Perkins Ln W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. Add circuit for monitoring Date: March 7, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 15, 2016 | Expiration date: March 7, 2017 | Current use: Single family / duplex | Permit id: 6522656 | |||||
SCORE 99 7318 23rd Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. 5200watt ac output of interactive inverter, 30a backfeed breaker. Add circuit for monitoring. Date: January 26, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: February 10, 2016 | Expiration date: January 25, 2017 | Current use: Single family / duplex | Permit id: 6515620 | |||||
SCORE 99 1746 Ne 88th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. 3800watt ac output of interactive inverter. 20a backfeed breaker into 200a main panel. Add circuit for monitoring. Date: January 25, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: February 5, 2016 | Expiration date: January 24, 2017 | Current use: Single family / duplex | Permit id: 6515561 | |||||
SCORE 99 9634 28th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop mounted photovoltaic. 66 watt ac output of interactive inverter. 40a backfeed breaker into main 200a panel. Add circuit for monitoring. Add circuit for future portable generator Date: January 25, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: February 4, 2016 | Expiration date: January 24, 2017 | Current use: Single family / duplex | Permit id: 6515535 | |||||
SCORE 99 Date: January 7, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 12, 2016 | Expiration date: January 6, 2017 | Current use: Single family / duplex | Permit id: 6512703 | |||||
SCORE 99 5305 Greenwood Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic on detached garage, 20a backfeed breaker in main 125a panel. Add circuit for monitoring. Date: December 10, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 31, 2015 | Expiration date: December 9, 2016 | Current use: Single family / duplex | Permit id: 6509107 | |||||
SCORE 99 152 Newton St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 3. 8kw output interactive inverter ac module system. 20a backfeed breaker in main 200a panel. Date: November 25, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 28, 2015 | Expiration date: November 24, 2016 | Current use: Single family / duplex | Permit id: 6506793 | |||||
SCORE 99 3234 Nw 60th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install roof mounted photovoltaic, 40a backfeed breaker in main 200a panel. Add sub panel. Add circuit for monitoring. Date: November 9, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 16, 2015 | Expiration date: November 8, 2016 | Current use: Single family / duplex | Permit id: 6504178 | |||||
SCORE 99 2141 47th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 40a backfeed breaker in main 200a panel. Add circuit for monitoring. Date: November 4, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 13, 2015 | Expiration date: November 3, 2016 | Current use: Single family / duplex | Permit id: 6503546 | |||||
SCORE 99 6032 5th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install rooftop photovoltaic, interactive inverter, 6600ac watts output. Add circuit from monitoring. Change 100a panel to 125a panel with 100a main breaker. Date: October 30, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 9, 2015 | Expiration date: October 29, 2016 | Current use: Single family / duplex | Permit id: 6502852 | |||||
SCORE 99 45 48th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 40a backfeed into new 125a sub fed with 50a circuit from main 200a panel. Add circuit for monitoring. Date: October 22, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 3, 2015 | Expiration date: October 21, 2016 | Current use: Single family / duplex | Permit id: 6501289 | |||||
SCORE 99 4415 2nd Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 40a backfeed breaker into main 200a panel. Add circuit for monitoring. Date: October 20, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 23, 2015 | Expiration date: October 19, 2016 | Current use: Single family / duplex | Permit id: 6500751 | |||||
SCORE 99 12 S Henderson St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 3800watt ac output from interactive inverter, add circuit for monitoring Date: October 5, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 14, 2015 | Expiration date: October 4, 2016 | Current use: Single family / duplex | Permit id: 6498255 | |||||
SCORE 99 58 57th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install additional modules to existing pv system. Pv system is on garage, adding modules to the house roof. Date: September 28, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 22, 2016 | Expiration date: September 27, 2016 | Current use: Single family / duplex | Permit id: 6496937 | |||||
SCORE 99 Date: September 24, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 8, 2015 | Expiration date: September 23, 2016 | Current use: Single family / duplex | Permit id: 6496722 | |||||
SCORE 99 11525 20th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic, 5200watt ac output from interactive inverter, 30a backfeed breaker in main 200a panel. Add monitoring circuit. Date: September 15, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 18, 2015 | Expiration date: September 14, 2016 | Current use: Single family / duplex | Permit id: 6494846 | |||||
SCORE 99 3626 50th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic, 30a backfeed breaker in main 200a panel. Add circuit for monitoring. Date: August 20, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 1, 2015 | Expiration date: August 19, 2016 | Current use: Single family / duplex | Permit id: 6490863 | |||||
SCORE 99 4736 49th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 40a backfeed breaker in 200a main panel. Add circuit for monitoring. Date: August 20, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 26, 2015 | Expiration date: August 19, 2016 | Current use: Single family / duplex | Permit id: 6490834 | |||||
SCORE 99 2703 Ne 92nd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic, 5500watt ac output of interactive micro-inverters. 30a backfeed breaker in 200a main panel. Date: August 19, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 21, 2015 | Expiration date: August 18, 2016 | Current use: Single family / duplex | Permit id: 6490548 | |||||
SCORE 99 3875 43rd Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic system Date: August 14, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 20, 2015 | Expiration date: August 13, 2016 | Current use: Single family / duplex | Permit id: 6489986 | |||||
SCORE 99 7543 17th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic + service meter and panel upgrade to 200amps. Date: July 31, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 7, 2015 | Expiration date: July 30, 2016 | Current use: Single family / duplex | Permit id: 6487437 | |||||
SCORE 99 1235 10th Ave W Seattle Wa Update service. 200a to stay 200a. Currently a ct metered service. Supplying a new meter and mast with feed through 200a meter. Date: July 30, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 5, 2015 | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487152 | |||||
SCORE 99 1235 10th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic, 5200watt ac output interactive inverter, 30a backfeed breaker in 200a main panel Date: July 30, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 5, 2015 | Expiration date: July 29, 2016 | Current use: Single family / duplex | Permit id: 6487149 | |||||
SCORE 99 16 Comstock St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic- 7600watt ac output, add monitoring circuit Date: July 23, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 4, 2015 | Expiration date: July 22, 2016 | Current use: Single family / duplex | Permit id: 6485915 | |||||
SCORE 99 2847 Nw 65th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic- 66 watt ac output of interactive inverter - 40a backfeed breaker in 200a panel. Add circuit for monitoring. Date: July 20, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 24, 2015 | Expiration date: July 19, 2016 | Current use: Single family / duplex | Permit id: 6485276 | |||||
SCORE 99 6529 44th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic using grid interactive inverter with 2900watt ac output. 15a backfeed breaker in 200a panel. Add circuit for monitoring. Date: July 7, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 10, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6482868 | |||||
SCORE 99 12253 1st Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic on detached garage. Move service meter and main service panel. Add circuit for monitoring. Date: July 7, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 15, 2015 | Expiration date: July 6, 2016 | Current use: Single family / duplex | Permit id: 6482854 | |||||
SCORE 99 2437 Nw Blue Ridge Dr Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic, 7600watt ac output interactive inverter, 40a backfeed breaker in 200a main panel. Install subpanel and added circuit for monitoring of pv system. Date: July 1, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 9, 2015 | Expiration date: June 30, 2016 | Current use: Single family / duplex | Permit id: 6482322 | |||||
SCORE 99 6027 37th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted, 5. 2kw ac output interactive ac module photovoltaic system. Date: June 29, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 2, 2015 | Expiration date: June 28, 2016 | Current use: Single family / duplex | Permit id: 6481682 | |||||
SCORE 99 6214 Latona Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 5200watt ac output interactive inverter, 30a backfeed breaker in 200a panel. Add circuit for monitoring Date: June 23, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 26, 2015 | Expiration date: June 22, 2016 | Current use: Single family / duplex | Permit id: 6480730 | |||||
SCORE 99 4852 Ne 41st St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic, 3800watt ac output interactive inverter. Added circuit for monitoring Date: June 16, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 26, 2015 | Expiration date: June 15, 2016 | Current use: Single family / duplex | Permit id: 6479671 | |||||
SCORE 99 4041 51st Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install roof mounted photovoltaic, 3800watt ac output interactive inverter. Added circuit for monitoring Date: June 16, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 19, 2015 | Expiration date: June 15, 2016 | Current use: Single family / duplex | Permit id: 6479580 | |||||
SCORE 99 42 Sw Holly St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic, interactive inverter and backfeed breaker. Circuit for monitoring. Date: June 10, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 24, 2015 | Expiration date: June 9, 2016 | Current use: Single family / duplex | Permit id: 6478578 | |||||
SCORE 99 222 Nw 45th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic. Grid interactive inverter with 7600watt ac output, 40a backfeed breaker in 200a panel. Add circuit for monitoring. Date: June 8, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 11, 2015 | Expiration date: June 7, 2016 | Current use: Single family / duplex | Permit id: 6478066 | |||||
SCORE 99 912a Nw 52nd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install roof top pv system, 2900watt ac output interactive inverter. Date: June 3, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 9, 2015 | Expiration date: June 2, 2016 | Current use: Single family / duplex | Permit id: 6477421 | |||||
SCORE 99 3219 34th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic, interactive inverter with 5. 2kw ac output, 30a backfeed breaker in 200a panel. Add circuit for monitoring. Date: May 22, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 1, 2015 | Expiration date: May 21, 2016 | Current use: Single family / duplex | Permit id: 6475575 | |||||
SCORE 99 6727 20th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic, 7600watt ac output grid interactive inverter, 40a backfeed in main 200a panel. Circuit added for monitoring Date: May 13, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 21, 2015 | Expiration date: May 12, 2016 | Current use: Single family / duplex | Permit id: 6473989 | |||||
SCORE 99 7701 15th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] add on to existing roof top photovoltaic system. Date: May 6, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 19, 2015 | Expiration date: May 5, 2016 | Current use: Single family / duplex | Permit id: 6472706 | |||||
SCORE 99 Date: April 30, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 1, 2015 | Expiration date: April 29, 2016 | Current use: Single family / duplex | Permit id: 6471613 | |||||
SCORE 99 6519 22nd Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic, 5000watt ac output interactive inverter, backfeed breaker in main panel. Added circuits for monitoring and future ev charger Date: April 24, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 28, 2015 | Expiration date: April 23, 2016 | Current use: Single family / duplex | Permit id: 6470742 | |||||
SCORE 99 2638 E Ward St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 5200watt ac interactive inverter output. Add circuit for monitoring. Date: April 23, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 15, 2015 | Expiration date: April 22, 2016 | Current use: Single family / duplex | Permit id: 6470446 | |||||
SCORE 99 2901 10th Pl W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic, grid interactive inverter 5200watts ac output, backfeed breaker into main 200a panel. Added circuit for monitoring. Date: April 17, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 22, 2015 | Expiration date: April 16, 2016 | Current use: Single family / duplex | Permit id: 6469652 | |||||
SCORE 99 7739 29th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top mounted photovoltaic, 7600watt ac output interactive inverter, 40a backfeed breaker in main 200a panel. Added circuit for monitoring Date: April 13, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 16, 2015 | Expiration date: April 12, 2016 | Current use: Single family / duplex | Permit id: 6468629 | |||||
SCORE 99 67 2nd Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic, interactive inverter @ 5200watts ac max output. Added circuit for monitoring Date: April 3, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 10, 2015 | Expiration date: April 2, 2016 | Current use: Single family / duplex | Permit id: 6467376 | |||||
SCORE 99 5304 Sw Dakota St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic, 7600watt interactive inverter ac output, 40a backfeed breaker in main 200a panel. Date: March 23, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 26, 2015 | Expiration date: March 22, 2016 | Current use: Single family / duplex | Permit id: 6465343 | |||||
SCORE 99 6532 4th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 5200watt ac output interactive inverter tied into backfeed breaker in main panel. Added circuit for monitoring. Date: March 23, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 27, 2015 | Expiration date: March 22, 2016 | Current use: Single family / duplex | Permit id: 6465223 | |||||
SCORE 99 10526 12th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic, 5. 2kw ac interactive inverter output. Add circuit for monitoring unit. Date: March 12, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 17, 2015 | Expiration date: March 11, 2016 | Current use: Single family / duplex | Permit id: 6463638 | |||||
SCORE 99 64 24th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install roof mounted photovoltaic system, 6700watt interactive inverter output, add circuit for monitoring device. Date: March 10, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 4, 2015 | Expiration date: March 9, 2016 | Current use: Multifamily | Permit id: 6463307 | |||||
SCORE 99 3623 Corliss Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, utilizing interactive inverter with 40a backfeed breaker in 200a main panel. Add circuit for monitoring Date: March 6, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 11, 2015 | Expiration date: March 5, 2016 | Current use: Single family / duplex | Permit id: 6462879 | |||||
SCORE 99 3212 S Norman St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic with interactive inverter-3800watts ac output. Backfeed breaker in main panel. Add circuit for monitoring. Date: February 25, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 6, 2015 | Expiration date: February 25, 2016 | Current use: Single family / duplex | Permit id: 6461225 | |||||
SCORE 99 10412 63rd Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 6. 6kw. Upgrade service from 125a to 200a, install new outdoor panel and meter. Monitoring circuit. Date: January 30, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: February 12, 2015 | Expiration date: January 30, 2016 | Current use: Single family / duplex | Permit id: 6457176 | |||||
SCORE 99 12026 Fremont Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 5kw rooftop photovoltaic. Install subpanel. Install monitoring circuit Date: January 29, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: February 9, 2015 | Expiration date: January 29, 2016 | Current use: Single family / duplex | Permit id: 6457061 | |||||
SCORE 99 6802 52nd Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 5kw photovoltaic, ac module interactive system. Date: January 23, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 26, 2015 | Expiration date: January 23, 2016 | Current use: Single family / duplex | Permit id: 6455947 | |||||
SCORE 99 Date: January 14, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 15, 2015 | Expiration date: January 14, 2016 | Current use: Single family / duplex | Permit id: 6454554 | |||||
SCORE 99 629 Nw 53rd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 8. 25kw dc (7. 6kwac) roof top photovoltaic system. Interactive inverter, no batteries. Interconnect via backfeed breaker. Circuit for monitoring. Date: January 13, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 23, 2015 | Expiration date: January 13, 2016 | Current use: Single family / duplex | Permit id: 6454448 | |||||
SCORE 99 6235 Ne Princeton Way Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 8. 5kw photovoltaic, roof mounted, interactive inverter, no batteries, backfeed breaker. Monitoring circuit plans have been uploaded Date: January 8, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 15, 2015 | Expiration date: January 8, 2016 | Current use: Single family / duplex | Permit id: 6453725 | |||||
SCORE 99 14326 37th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 9. 72kw dc (7. 6kw ac output) on rooftop, interactive inverter, no batteries. 200a panel, 40a backfeed breaker. Date: December 22, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 30, 2014 | Expiration date: December 22, 2015 | Current use: Single family / duplex | Permit id: 6452026 | |||||
SCORE 99 33 S Morgan St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 5kw photovoltaic roof top mounted, interactive inverter no batteries, monitoring circuit. Date: December 19, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 31, 2014 | Expiration date: December 19, 2015 | Current use: Single family / duplex | Permit id: 6451664 | |||||
SCORE 99 5445 32nd Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install roof top 9. 72kw-dc (7600w ac inverter output), 40a backfeed breaker in 200a panel. Monitoring circuit. Install subpanel. Date: December 16, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 23, 2014 | Expiration date: December 16, 2015 | Current use: Single family / duplex | Permit id: 6451138 | |||||
SCORE 99 8022 12th Ave Nw Seattle Wa A one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic. Grid interactive inverter, no batteries, interconnect via 40a backfeed breaker in main panel. Also installing new service meter&mast and main load center, from 125a to 200a change. Date: December 10, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 20, 2014 | Expiration date: December 10, 2015 | Current use: Single family / duplex | Permit id: 6450146 | |||||
SCORE 99 Date: December 5, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 26, 2015 | Expiration date: December 5, 2015 | Current use: Single family / duplex | Permit id: 6449270 | |||||
SCORE 99 617 Nw 44th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 4. 9kw roof top photovoltaic, interactive, no batteries. Interconnect with backfeed breaker in main panel. Date: November 17, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 21, 2014 | Expiration date: November 17, 2015 | Current use: Single family / duplex | Permit id: 6446593 | |||||
SCORE 99 1322 N 78th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 5kw photovoltaic on roof. Interactive system, no batteries, interconnect via backfeed breaker. Install monitoring circuit. Date: November 4, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: February 6, 2015 | Expiration date: November 4, 2015 | Current use: Single family / duplex | Permit id: 6444531 | |||||
SCORE 99 4203 Woodlawn Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 8. 4kw photovoltaic system on roof of residence, interactive system, no batteries. Monitoring system. Date: October 30, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 4, 2014 | Expiration date: October 30, 2015 | Current use: Single family / duplex | Permit id: 6443970 | |||||
SCORE 99 8157 18th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 2. 7kw roof mounted photovoltaic system, interactive, no batteries. Interconnect via backfeed breaker. Date: October 29, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 4, 2014 | Expiration date: October 29, 2015 | Current use: Single family / duplex | Permit id: 6443822 | |||||
SCORE 99 5023 2nd Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 3. 5kw dc roof mounted photovoltaic, interactive inverter interconnected to main panel. No batteries Date: October 24, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 29, 2014 | Expiration date: October 24, 2015 | Current use: Single family / duplex | Permit id: 6443132 | |||||
SCORE 99 11051 Arroyo Beach Pl Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 8. 2kw dc roof mounted photovoltaic, no batteries Date: October 23, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 22, 2015 | Expiration date: October 23, 2015 | Current use: Single family / duplex | Permit id: 6442952 | |||||
SCORE 99 5218 Greenwood Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted 6. 5kw photovoltaic system, backfeed breaker in main panel. No batteries. Date: October 23, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 28, 2014 | Expiration date: October 23, 2015 | Current use: Single family / duplex | Permit id: 6442943 | |||||
SCORE 99 3906 Bagley Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 5kw photovoltaic, roof mounted, interactive inverter, no batteries. Interconnect via backfeed breaker in main panel. Monitoring circuit. Date: October 21, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 28, 2014 | Expiration date: October 21, 2015 | Current use: Single family / duplex | Permit id: 6442474 | |||||
SCORE 99 10021 61st Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 7. 8kw photovoltaic, roof top, interactive, no batteries Date: October 21, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 19, 2014 | Expiration date: October 21, 2015 | Current use: Single family / duplex | Permit id: 6442255 | |||||
SCORE 99 3601 Corliss Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 7. 3kw roof mounted photovoltaic, no batteries or storage, interconnect via backfeed breaker. Change electric panel and service conductors, 60a to 100a mains. Date: October 17, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 29, 2014 | Expiration date: October 17, 2015 | Current use: Single family / duplex | Permit id: 6442019 | |||||
SCORE 99 716 N 84th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 3. 5kw roof mounted photovoltaic, interactive, no energy storage. Date: October 14, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 20, 2014 | Expiration date: October 14, 2015 | Current use: Single family / duplex | Permit id: 6441228 | |||||
SCORE 99 Date: October 13, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 16, 2014 | Expiration date: October 13, 2015 | Current use: Single family / duplex | Permit id: 6441072 | |||||
SCORE 99 4741 22nd Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 7. 6kw photovoltaic, interactive system on roof. Change electrical panel, staying @ 200a. Date: October 8, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 16, 2014 | Expiration date: October 8, 2015 | Current use: Single family / duplex | Permit id: 6440517 | |||||
SCORE 99 6226 34th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 5kw roof mounted photovoltaic, interconnect via backfeed breaker in main panel Date: October 1, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 3, 2014 | Expiration date: October 1, 2015 | Current use: Single family / duplex | Permit id: 6439359 | |||||
SCORE 99 62 6th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 8. 6kw photovoltaic, interactive, no batteries, interconnect via 40a breaker in main panel Date: September 3, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 11, 2014 | Expiration date: September 3, 2015 | Current use: Single family / duplex | Permit id: 6434735 | |||||
SCORE 99 7341 Dibble Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 5kw rooftop mounted photovoltaic system with monitoring circuit. Backfeed breaker in main 200a panel. Date: August 26, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 29, 2014 | Expiration date: August 26, 2015 | Current use: Single family / duplex | Permit id: 6433805 | |||||
SCORE 99 313 18th Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 7. 7kw roof top photovoltaic Date: June 30, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 21, 2014 | Expiration date: June 30, 2015 | Current use: Single family / duplex | Permit id: 6425179 | |||||
SCORE 99 13721 17th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 5kw roof top photovoltaic system Date: June 30, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 23, 2014 | Expiration date: June 30, 2015 | Current use: Single family / duplex | Permit id: 6425129 | |||||
SCORE 99 5412 S Othello St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 3. 6kw photovoltaic via backfeed breaker Date: June 30, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 30, 2014 | Expiration date: June 30, 2015 | Current use: Single family / duplex | Permit id: 6425096 | |||||
SCORE 99 140 41st Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 7. 6kw photovoltaic on roof top, interconnect via backfeed breaker Date: June 30, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 16, 2014 | Expiration date: June 30, 2015 | Current use: Single family / duplex | Permit id: 6425049 | |||||
SCORE 99 10533 14th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 6. 5kw photovoltaic Date: June 30, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 1, 2014 | Expiration date: June 30, 2015 | Current use: Single family / duplex | Permit id: 6425048 | |||||
SCORE 99 7537 28th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 6kw photovoltaic, roof mounted. Interconnect via 30a backfeed breaker in main panel. Date: June 19, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 15, 2014 | Expiration date: June 19, 2015 | Current use: Single family / duplex | Permit id: 6423615 | |||||
SCORE 99 21 2nd Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 3. 3kw roof top mounted photovoltaic. Interconnect via 15a backfeed breaker. Also install monitoring. Date: June 18, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 23, 2014 | Expiration date: June 18, 2015 | Current use: Single family / duplex | Permit id: 6423349 | |||||
SCORE 99 2716 4th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 3. 2kw rooftop pv solar electric, interconnect via 15a backfed breaker. Date: June 9, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 11, 2014 | Expiration date: June 9, 2015 | Current use: Single family / duplex | Permit id: 6421771 | |||||
SCORE 99 1718 Nw 56th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 4. 5kw pv system on rooftop. Interconnect via 30a backfeed breaker. Date: May 19, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 23, 2014 | Expiration date: May 19, 2015 | Current use: Commercial | Permit id: 6418623 | |||||
SCORE 99 6231 4th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 9. 2kw photovoltaic, roof mounted, no batteries, interconnect via backfeed breaker Date: May 8, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 21, 2014 | Expiration date: May 8, 2015 | Current use: Single family / duplex | Permit id: 6417002 | |||||
SCORE 99 2222 Ne 82nd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 7. 7kw roof top photovoltaic, interconnect via 40a backfeed breaker Date: May 8, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 5, 2014 | Expiration date: May 8, 2015 | Current use: Single family / duplex | Permit id: 6416999 | |||||
SCORE 99 6516 18th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 7kw roof mounted photovoltaic, backfeed breaker interconnect in main panel (40a) Date: May 6, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 9, 2014 | Expiration date: May 6, 2015 | Current use: Single family / duplex | Permit id: 6416443 | |||||
SCORE 99 5151 Sw Hudson St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 2. 4kw photovoltaic installed on rooftop of residence, interconnected via backfeed breaker in main panel. Date: April 14, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 18, 2014 | Expiration date: April 14, 2015 | Current use: Single family / duplex | Permit id: 6413251 | |||||
SCORE 99 3021 23rd Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 3. 2kw rooftop photovoltaic, interconnect with backfeed breaker in main panel. Add monitoring circuit. Date: April 10, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 22, 2014 | Expiration date: April 10, 2015 | Current use: Single family / duplex | Permit id: 6412655 | |||||
SCORE 99 1705 Ne 135th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 6. 8kw photovoltaic, roof mounted, backfeed breaker to interconnect. Monitoring circuit added. Date: April 7, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 11, 2014 | Expiration date: April 7, 2015 | Current use: Single family / duplex | Permit id: 6412002 | |||||
SCORE 99 35 Burke Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 3. Kw pv system mounted on roof, backfeed breaker in main electrical panel. Grid tied only, no batteries or energy storage associated. Date: March 31, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 4, 2014 | Expiration date: March 31, 2015 | Current use: Single family / duplex | Permit id: 6411120 | |||||
SCORE 99 4915 Purdue Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 4. 9kw photovoltaic, roof mounted, backfeed breaker in electric panel Date: March 28, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 2, 2014 | Expiration date: March 28, 2015 | Current use: Single family / duplex | Permit id: 6410944 | |||||
SCORE 99 47 49th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] solar installation Date: February 3, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: February 14, 2014 | Expiration date: February 3, 2015 | Current use: Single family / duplex | Permit id: 6402521 | |||||
SCORE 99 60 Lake Shore Dr S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] solar install - Date: January 21, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 4, 2015 | Expiration date: January 21, 2015 | Current use: Single family / duplex | Permit id: 6400671 | |||||
SCORE 99 109 12th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 6. 9kw grid tied solar installation on roof of apt building - (21 modules-one 7kw inverter) Date: December 20, 2013 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 2, 2014 | Expiration date: December 20, 2014 | Current use: Multifamily | Permit id: 6397281 | |||||
SCORE 99 Date: December 4, 2013 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 6, 2013 | Expiration date: December 4, 2014 | Current use: Single family / duplex | Permit id: 6394752 | |||||
SCORE 99 803 Nw 64th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] pv install; add outdoor outlet Date: November 27, 2013 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 6, 2013 | Expiration date: November 27, 2014 | Current use: Single family / duplex | Permit id: 6394073 | |||||
SCORE 99 3302 S Charles St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] pv install - microinverters Date: November 26, 2013 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 10, 2013 | Expiration date: November 26, 2014 | Current use: Single family / duplex | Permit id: 6393885 | |||||
SCORE 99 2304 N 50th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] pv install and new 200a service install Date: November 19, 2013 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 13, 2013 | Expiration date: November 19, 2014 | Current use: Single family / duplex | Permit id: 6392801 | |||||
SCORE 99 32 S Charles St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] pv install - 18 255w panels Date: November 12, 2013 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 6, 2013 | Expiration date: November 12, 2014 | Current use: Single family / duplex | Permit id: 6391824 | |||||
SCORE 99 3944 Sw 97th St Seattle Wa Install wiring and disconnect for heat pump (installed by greenwood heating) Date: November 6, 2013 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 8, 2013 | Expiration date: November 6, 2014 | Current use: Single family / duplex | Permit id: 6391015 | |||||
SCORE 99 3944 Sw 97th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] pv install Date: November 5, 2013 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 8, 2013 | Expiration date: November 5, 2014 | Current use: Single family / duplex | Permit id: 6390779 | |||||
SCORE 99 8064 26th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] pv install Date: October 29, 2013 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 18, 2013 | Expiration date: October 29, 2014 | Current use: Single family / duplex | Permit id: 6389760 | |||||
SCORE 99 4512 S Fletcher St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] pv install - 5kw Date: October 24, 2013 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 6, 2013 | Expiration date: October 24, 2014 | Current use: Single family / duplex | Permit id: 6389062 | |||||
SCORE 99 4907 Densmore Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] pv install using 19 acpv modules Date: October 17, 2013 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 29, 2013 | Expiration date: October 17, 2014 | Current use: Single family / duplex | Permit id: 6387994 | |||||
SCORE 99 106 30th Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 2. 5kw roof-top pv, grid-tied, no batteries. Date: October 1, 2010 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 12, 2010 | Expiration date: October 1, 2011 | Current use: Single family / duplex | Permit id: 6262710 | |||||
SCORE 99 1 Nw 79th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] roof top, flushmounted, photovoltaic, grid-tie, no batteries. Inverter in garage, system disconnect and production meter on the house next to utility meter. Date: September 29, 2010 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 4, 2010 | Expiration date: September 29, 2011 | Current use: Single family / duplex | Permit id: 6262401 | |||||
SCORE 99 13535 Northshire Rd Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 16. 2 kw roof top photovoltaic system. Grid-tie only, no battery back-up. Date: September 27, 2010 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 25, 2010 | Expiration date: September 27, 2011 | Current use: Single family / duplex | Permit id: 6262112 | |||||
SCORE 99 Date: June 11, 2010 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2010 | Expiration date: June 11, 2011 | Current use: Single family / duplex | Permit id: 6251617 | |||||
SCORE 99 Date: June 2, 2010 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 19, 2010 | Expiration date: June 2, 2011 | Current use: Single family / duplex | Permit id: 6250534 | |||||
SCORE 99 Date: May 24, 2010 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 9, 2010 | Expiration date: May 24, 2011 | Current use: Single family / duplex | Permit id: 6249855 | |||||
SCORE 99 3729 Wallingford Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 18 module 5. 7 kw photovoltaic system; grid tied system using a line side tap (customer has a 125 a panel, amperage of system exceeds 120% rule). 6000watt inverter and fused ac disconnect will be installed. Date: November 18, 2010 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 6, 2011 | Expiration date: November 18, 2011 | Current use: Single family / duplex | Permit id: 6267202 | |||||
SCORE 99 6823 27th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 3. 3kw grid-direct, roof-top, flush mounted pv solar electric array. No batteries or energy storage. All ul listed equipment. Date: December 20, 2010 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 22, 2010 | Expiration date: December 20, 2011 | Current use: Single family / duplex | Permit id: 6269835 | |||||
SCORE 99 4407 1st Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] roof mounted pv array, grid-direct (no batteries). 4. 6kw, 240vac Date: January 10, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 14, 2011 | Expiration date: January 10, 2012 | Current use: Single family / duplex | Permit id: 6271594 | |||||
SCORE 99 10336 Valmay Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] photovoltaic, 6. 8kw, backfeed breaker iterconnect 5/27/15 hkh; renewel Date: June 30, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 1, 2016 | Expiration date: June 30, 2016 | Current use: Single family / duplex | Permit id: 6425089 | |||||
SCORE 99 6026 5th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 9. 9kw roof mounted photovoltaic, grid interactive, no batteries. Tr 10/23/14 line side tap approved Date: October 17, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 24, 2014 | Expiration date: October 17, 2015 | Current use: Single family / duplex | Permit id: 6442042 | |||||
SCORE 99 1417 Nw 54th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic system, 7600watt interactive inverter, 40a backfeed breaker in "house" panel. Date: December 30, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 16, 2016 | Expiration date: December 29, 2016 | Current use: Commercial | Permit id: 6511614 | |||||
SCORE 99 2907 W Eaton St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] residential rooftop photovoltaic. Add circuit for monitoring. 12 14 16 jk approved plans. Date: September 29, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit issued | Completion date: December 19, 2016 | Expiration date: September 29, 2017 | Current use: Single family / duplex | Permit id: 6559299 | |||||
SCORE 99 2304 N 50th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] adding 3 solar panels to existing array. Date: October 7, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 11, 2016 | Expiration date: October 7, 2017 | Current use: Single family / duplex | Permit id: 6560651 | |||||
SCORE 99 3823 49th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, micro inverter system, plus running circuit to hot tub. 10 18 16 jk approved pv plans. Date: October 10, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 20, 2016 | Expiration date: October 10, 2017 | Current use: Single family / duplex | Permit id: 6560975 | |||||
SCORE 99 528 29th Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, micro inverter system. Add circuit for monitoring, add circuit for future ev. Date: October 17, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 4, 2016 | Expiration date: October 17, 2017 | Current use: Single family / duplex | Permit id: 6562284 | |||||
SCORE 99 Date: November 4, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 10, 2016 | Expiration date: November 4, 2017 | Current use: Single family / duplex | Permit id: 6565446 | |||||
SCORE 99 312 Nw 87th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. 01 05 17 jk approved plans. Date: January 5, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 12, 2017 | Expiration date: January 5, 2018 | Current use: Single family / duplex | Permit id: 6574657 | |||||
SCORE 99 4817 Meridian Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic Date: January 5, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: January 5, 2018 | Current use: Single family / duplex | Permit id: 6574806 | |||||
SCORE 99 7717 44th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic- ac module system, no batteries Date: January 6, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 12, 2017 | Expiration date: January 6, 2018 | Current use: Single family / duplex | Permit id: 6574997 | |||||
SCORE 99 12556 17th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, re-wire 1st floor, replace existing 200a panel with 225a panel and 200a main breaker, new dishwasher circuit, new circuit for nw floodlight. 01 13 17 jk approved plans. Date: January 12, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: January 12, 2018 | Current use: Single family / duplex | Permit id: 6575769 | |||||
SCORE 99 10 Elliott Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, micro-inverter system. Change 70a hot water service panel to make room for solar backfeed breaker. Install 120v outlet Date: December 16, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 2, 2017 | Expiration date: December 16, 2017 | Current use: Multifamily | Permit id: 6571983 | |||||
SCORE 99 5806 Woodlawn Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, add subpanel Date: January 16, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: January 16, 2018 | Current use: Single family / duplex | Permit id: 6576235 | |||||
SCORE 99 Date: January 14, 2014 Contractor: Sunergy Systems Inc Client: Ledzian Wayne Francis+rebec | Applicant: Sunergy Systems Inc | Permit type: Alterations | Permit status: Finaled | Completion date: February 5, 2014 | Permit id: Alt14-0005 | Parcel: 7338220600 | |||||
SCORE 99 719 2nd Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 11 kw grid-direct pv system, flush mounted rooftop installation south roof. Date: April 27, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 22, 2011 | Expiration date: April 26, 2012 | Current use: Commercial | Permit id: 6281520 | |||||
SCORE 99 222 Fairview Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic Date: July 25, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 4, 2017 | Expiration date: July 25, 2018 | Current use: Commercial | Permit id: 6609774 | |||||
SCORE 99 4808 Burke Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. Add circuit for monitoring. Change main panel. 6/28/16 jk approved plans. Date: June 15, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 8, 2016 | Expiration date: June 15, 2017 | Current use: Single family / duplex | Permit id: 6540876 | |||||
SCORE 99 741 Harvard Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, micro inverters, plus circuit for monitoring. Date: October 10, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 6, 2017 | Expiration date: October 10, 2018 | Current use: Multifamily | Permit id: 6623423 | |||||
SCORE 99 23 Ne 117th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovolatic. 7680watt ac output of interactive inverter, 40a backfeed in main 200a panel. Add circuit for monitoring Date: March 3, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 10, 2016 | Expiration date: March 3, 2017 | Current use: Single family / duplex | Permit id: 6522059 | |||||
SCORE 99 116 37th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. Date: October 24, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 16, 2017 | Expiration date: October 24, 2018 | Current use: Single family / duplex | Permit id: 6626194 | |||||
SCORE 99 7357 16th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic-acpv Date: December 5, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 11, 2017 | Expiration date: December 5, 2018 | Current use: Single family / duplex | Permit id: 6633476 | |||||
SCORE 99 Date: June 13, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 26, 2017 | Expiration date: June 13, 2018 | Current use: Single family / duplex | Permit id: 6602405 | |||||
SCORE 99 2708 Ne 135th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic Date: November 9, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 17, 2017 | Expiration date: November 9, 2018 | Current use: Single family / duplex | Permit id: 6629480 | |||||
SCORE 99 152 Newton St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic - adding 17 acpv modules to existing 15 module system = 32 total modules. 9/20/16 jk approved plans. Date: September 16, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 23, 2016 | Expiration date: September 16, 2017 | Current use: Single family / duplex | Permit id: 6557078 | |||||
SCORE 99 7323 Vashon Pl Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, add exterior subpanel Date: September 22, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 4, 2017 | Expiration date: September 22, 2018 | Current use: Single family / duplex | Permit id: 6620529 | |||||
SCORE 99 8056 Dibble Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic on house and detached garage, combined into one system. Move service meter, and upgrade to 200a meter main, upgrade existing 100a main panel in basement to 125a sub panel fed from meter main. Date: October 5, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 18, 2017 | Expiration date: October 5, 2018 | Current use: Single family / duplex | Permit id: 6622662 | |||||
SCORE 99 8334 20th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, adding circuit for monitoring. 7600watt ac output of interactive inverter, 40a backfeed breaker in main 200a panel. 4/29/16 jk approved plans. Date: April 22, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 4, 2016 | Expiration date: April 22, 2017 | Current use: Single family / duplex | Permit id: 6530886 | |||||
SCORE 99 4229 7th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic Date: August 4, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 22, 2017 | Expiration date: August 4, 2018 | Current use: Multifamily | Permit id: 6611804 | |||||
SCORE 99 9021 49th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. Add circuit for possible future ev in garage. 04 28 17 jk approved plans. Date: April 26, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 5, 2017 | Expiration date: April 26, 2018 | Current use: Single family / duplex | Permit id: 6593703 | |||||
SCORE 99 3509 Meridian Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic Date: December 5, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 13, 2017 | Expiration date: December 5, 2018 | Current use: Single family / duplex | Permit id: 6633497 | |||||
SCORE 99 324 Ne 45th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, production meter and disconnect in basement electrical room Date: August 3, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 25, 2017 | Expiration date: August 3, 2018 | Current use: Commercial | Permit id: 6611412 | |||||
SCORE 99 2814 Ne 77th St Seattle Wa 5 15 2017 - cancelled customer log #17-615[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 7600watt ac max output, 40a backfeed into 200a main panel. 7 15 16 jk approved plans. Date: June 24, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: June 24, 2017 | Current use: Single family / duplex | Permit id: 6542661 | |||||
SCORE 99 8305 28th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic and service/panel upgrade Date: March 7, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 23, 2016 | Expiration date: March 7, 2017 | Current use: Single family / duplex | Permit id: 6522494 | |||||
SCORE 99 719 30th Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. Add subpanel. Date: May 18, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 23, 2017 | Expiration date: May 18, 2018 | Current use: Single family / duplex | Permit id: 6597866 | |||||
SCORE 99 11031 38th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. 05 25 17 jk approved plans. Date: May 15, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 26, 2017 | Expiration date: May 15, 2018 | Current use: Single family / duplex | Permit id: 6597146 | |||||
SCORE 99 4528 44th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, micro-inverter system. Date: May 22, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 30, 2017 | Expiration date: May 22, 2018 | Current use: Multifamily | Permit id: 6598480 | |||||
SCORE 99 11517 North Park Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. 11 14 17 jk approved one-line. Date: November 3, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 15, 2017 | Expiration date: November 3, 2018 | Current use: Single family / duplex | Permit id: 6628305 | |||||
SCORE 99 40 Sw 107th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] residential rooftop photovoltaic. 7600watt ac output of interactive inverter- 40a backfeed breaker in main 200a panel add circuit for system monitoring Date: February 24, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: March 10, 2016 | Expiration date: February 23, 2017 | Current use: Single family / duplex | Permit id: 6520759 | |||||
SCORE 99 4409 3rd Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] upgrade service from 1 to 200a, new electric panel. Rooftop photovolatic, micro-inverters totaling 5000watts ac output. Date: February 29, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 6, 2016 | Expiration date: February 28, 2017 | Current use: Single family / duplex | Permit id: 6521234 | |||||
SCORE 99 3443 12th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, adding 3. 22kw grid-interconnected system. 9/9/16 jk approved plans. Date: July 27, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 18, 2016 | Expiration date: July 27, 2017 | Current use: Single family / duplex | Permit id: 6548331 | |||||
SCORE 99 5326 Keystone Pl N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. Ac modules, add circuit for monitoring Date: August 1, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 8, 2017 | Expiration date: August 1, 2018 | Current use: Single family / duplex | Permit id: 6611018 | |||||
SCORE 99 7049 9th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic Date: November 9, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 16, 2017 | Expiration date: November 9, 2018 | Current use: Single family / duplex | Permit id: 6629415 | |||||
SCORE 99 408 N 100th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] residential rooftop photovoltaic system. 9/12/16 jk approved plans. Date: September 7, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 22, 2016 | Expiration date: September 7, 2017 | Current use: Single family / duplex | Permit id: 6555289 | |||||
SCORE 99 409 Highland Dr Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, add circuit for monitoring. 7/15/16 jk approved the plans,8/8/2016,lake,installed was a 4. 3k system not a 7k. Date: June 24, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 9, 2016 | Expiration date: June 24, 2017 | Current use: Single family / duplex | Permit id: 6542530 | |||||
SCORE 99 3 Ne 89th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, add circuit for monitoring. 7/15/16 jk approved plans. Date: June 24, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 4, 2016 | Expiration date: June 24, 2017 | Current use: Single family / duplex | Permit id: 6542517 | |||||
SCORE 99 5552 15th Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaci using listed ac modules, 6400watt ac max output. Add circuit for monitoring. 6/29/16 jk approved plans. Change renewable energy system from 0-6. 9 to 7+ kw Date: June 21, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 3, 2016 | Expiration date: June 21, 2017 | Current use: Single family / duplex | Permit id: 6541875 | |||||
SCORE 99 221 Minor Ave N Seattle Wa 11 22 2017 - cancelled customer log #17-1444 (completed under 6609774)[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 2kw ac modulephotovoltaic system on roof. Date: December 27, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: December 27, 2017 | Current use: Commercial | Permit id: 6573475 | |||||
SCORE 99 6242 31st Ave Ne Seattle Wa 8-25-17 bz pv review waived per 2017 code new threshold 7. 7kva[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovotaic, acpv system. Date: August 7, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 12, 2017 | Expiration date: August 7, 2018 | Current use: Single family / duplex | Permit id: 6612050 | |||||
SCORE 99 5028 159th Ct Ne Redmond, Wa 98052 Otc - rooftop photovoltaic system 6kw ac-output rapid shutdown compliant. Date: October 18, 2017 Contractor: Sunergy Systems Inc Applicant: Jon Lange | Permit type: Fire installation | Permit id: Fire-2017-07215 | |||||
SCORE 99 6722 Earl Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, string inverter- optimizers. 08 25 17 jk waived plan review as the total continuous rated output power of the ac modules is 7. 68kw which falls below the 7. 7kw threshold for requiring plan review. Date: August 22, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 5, 2017 | Expiration date: August 22, 2018 | Current use: Single family / duplex | Permit id: 6614818 | |||||
SCORE 99 11009 Fremont Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 40a backfeed breaker in main 200a meter main. Add circuit for monitoring 12/14/15 hkh; remove (1) 0-6kw ren eng system and add (1) 7-26kw ren eng system Date: December 9, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 18, 2015 | Expiration date: December 8, 2016 | Current use: Single family / duplex | Permit id: 6508770 | |||||
SCORE 99 58 57th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic on detached garage, move service strike and new meter utilizing a meter/main feed-through panel. Trench to house to feed existing 200a panel. Date: March 31, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 5, 2015 | Expiration date: March 30, 2016 | Current use: Single family / duplex | Permit id: 6466646 | |||||
SCORE 99 12066 Palatine Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. 09 28 17 jk approved plans. Date: September 27, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 12, 2017 | Expiration date: September 27, 2018 | Current use: Single family / duplex | Permit id: 6621322 | |||||
SCORE 99 Date: October 12, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 13, 2017 | Expiration date: October 12, 2018 | Current use: Single family / duplex | Permit id: 6623918 | |||||
SCORE 99 4135 2nd Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof top photovoltaic, 5200watt ac output interactive inverter into 200a meter/panel. Change existing 200a meter to a new 200a meter/main. Add circuit for monitoring. Date: June 23, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 8, 2015 | Expiration date: June 22, 2016 | Current use: Single family / duplex | Permit id: 6480696 | |||||
SCORE 99 Date: May 26, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 30, 2017 | Expiration date: May 26, 2018 | Current use: Single family / duplex | Permit id: 6599430 | |||||
SCORE 99 92 Mary Ave Nw Seattle Wa 4-25-17 bz pv system approved [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. 32a max inverter output, 40a ocpd in main 200a panel. Add circuit for egauge system monitoring. Date: April 19, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 31, 2017 | Expiration date: April 19, 2018 | Current use: Single family / duplex | Permit id: 6592590 | |||||
SCORE 99 239 Nw 48th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 40a backfeed breaker in main 200a panel. Add circuit for monitoring. 12/14/15 hkh; remove (1) 0-6kw ren eng system and add (1) 7-26kw ren eng system Date: December 4, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 23, 2015 | Expiration date: December 3, 2016 | Current use: Single family / duplex | Permit id: 6508120 | |||||
SCORE 99 27 Boyer Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, add circuit for monitoring. 06 05 17 jk approved plans. Date: May 25, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 12, 2017 | Expiration date: May 25, 2018 | Current use: Single family / duplex | Permit id: 6599169 | |||||
SCORE 99 1731 Nw 57th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic Date: May 30, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 14, 2017 | Expiration date: May 30, 2018 | Current use: Multifamily | Permit id: 6599691 | |||||
SCORE 99 27 Boyer Ave E Seattle Wa Install 200a meter main, turn existing 200a panel into subpanel fed from new meter main. Date: June 5, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: June 5, 2018 | Current use: Single family / duplex | Permit id: 6600789 | |||||
SCORE 99 11835 159th Ave Ne Redmond, Wa 98052 Sopa #49937 - whilden residence - photovoltaic - 206-571-4726 - rooftop photovoltaic + subpanel with 80a feeders customer paid for:(1) feeder (1) service - added Applicant: Jon Lange | Permit type: Electrical - otc | Permit id: Elec-2017-07621 | |||||
SCORE 99 808 Nw 64th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] remove old solar panels and install new. Replace old solar meter and ac disconnect. Leave existing inverter as is. Date: April 21, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 26, 2017 | Expiration date: April 21, 2018 | Current use: Single family / duplex | Permit id: 6593023 | |||||
SCORE 99 3295 Conkling Pl W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 7600watt ac output of interactive invertrer- 40a backfeed into 200a main panel, upgrade main panel, add circuit for monitoring. 8/16/16 jk approved plans. Date: August 15, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 24, 2016 | Expiration date: August 15, 2017 | Current use: Single family / duplex | Permit id: 6551409 | |||||
SCORE 99 8116 14th Ave Sw Seattle Wa 7-27-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, 7. 19kw-dc, 7kw ac output. Date: July 25, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 4, 2017 | Expiration date: July 25, 2018 | Current use: Single family / duplex | Permit id: 6609613 | |||||
SCORE 99 507 34th Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install9 21 2012 jnl - about to expire letter mailed Date: September 1, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 16, 2013 | Expiration date: August 31, 2012 | Current use: Single family / duplex | Permit id: 6294373 | |||||
SCORE 99 11733 12th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic + panel change (service to remain at 200a) Date: November 21, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 30, 2017 | Expiration date: November 21, 2018 | Current use: Single family / duplex | Permit id: 6631570 | |||||
SCORE 99 12 18th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: December 7, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 6, 2012 | Expiration date: December 6, 2012 | Current use: Single family / duplex | Permit id: 6304344 | |||||
SCORE 99 9251 Wallingford Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: November 29, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: January 25, 2012 | Expiration date: November 28, 2012 | Current use: Single family / duplex | Permit id: 6303367 | |||||
SCORE 99 3417 23rd Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] grid-direct 4kw photovoltaic, roof mounted, no batteries. Electric panel change but staying at existing 125amps size. Date: November 16, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 12, 2011 | Expiration date: November 15, 2012 | Current use: Multifamily | Permit id: 6302325 | |||||
SCORE 99 826 Lakeside Ave S Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: November 10, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 29, 2012 | Expiration date: November 9, 2012 | Current use: Single family / duplex | Permit id: 6301742 | |||||
SCORE 99 Date: November 7, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 16, 2011 | Expiration date: November 6, 2012 | Current use: Single family / duplex | Permit id: 6301264 | |||||
SCORE 99 5802 Kenwood Pl N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: October 26, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 23, 2011 | Expiration date: October 25, 2012 | Current use: Single family / duplex | Permit id: 6300041 | |||||
SCORE 99 516 31st Ave Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: October 17, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 26, 2011 | Expiration date: October 16, 2012 | Current use: Single family / duplex | Permit id: 6298877 | |||||
SCORE 99 3 W Armour St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install and panel service upgrade Date: October 3, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 7, 2011 | Expiration date: October 2, 2012 | Current use: Single family / duplex | Permit id: 6297390 | |||||
SCORE 99 2501 Westview Dr W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: September 21, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 6, 2011 | Expiration date: September 20, 2012 | Current use: Single family / duplex | Permit id: 6296272 | |||||
SCORE 99 60 17th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] photovoltaic system, no batteries, flush mounted to roof, components on south wall at meter. Date: September 13, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 27, 2011 | Expiration date: September 12, 2012 | Current use: Single family / duplex | Permit id: 6295452 | |||||
SCORE 99 1615 11th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: September 8, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 15, 2011 | Expiration date: September 7, 2012 | Current use: Single family / duplex | Permit id: 6294878 | |||||
SCORE 99 82 19th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 2. 9 kw photovoltaic, roof mounted, no batteries. Date: August 30, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 6, 2011 | Expiration date: August 29, 2012 | Current use: Single family / duplex | Permit id: 6294065 | |||||
SCORE 99 2523 1st Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install 5k Date: August 23, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 12, 2011 | Expiration date: August 22, 2012 | Current use: Single family / duplex | Permit id: 6293477 | |||||
SCORE 99 3511 46th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: August 23, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 25, 2011 | Expiration date: August 22, 2012 | Current use: Single family / duplex | Permit id: 6293460 | |||||
SCORE 99 3002 11th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: August 19, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 23, 2011 | Expiration date: August 18, 2012 | Current use: Single family / duplex | Permit id: 6293103 | |||||
SCORE 99 2723 4th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 9200w pv install Date: August 17, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 22, 2011 | Expiration date: August 16, 2012 | Current use: Single family / duplex | Permit id: 6292956 | |||||
SCORE 99 806 W Dravus St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: August 8, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 10, 2011 | Expiration date: August 7, 2012 | Current use: Single family / duplex | Permit id: 6291712 | |||||
SCORE 99 806 W Dravus St Seattle Wa Cancel - work performed under 6291712[a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] roof mounted pv system, no batteries, grid-direct, backfeed breaker. Date: August 8, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: August 7, 2012 | Current use: Single family / duplex | Permit id: 6291768 | |||||
SCORE 99 Date: August 8, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 9, 2011 | Expiration date: August 7, 2012 | Current use: Single family / duplex | Permit id: 6291709 | |||||
SCORE 99 612 Nw 60th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] roof mounted pv system, no batteries, backfeed breaker. 8 30 2011 bew address changed from 105 11th av nw & upgraded to 7 - 26 kw. Date: August 8, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 6, 2011 | Expiration date: August 7, 2012 | Current use: Single family / duplex | Permit id: 6291769 | |||||
SCORE 99 4037 32nd Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, plus panel change- plan review has been waived because the total ac power output of the system is less than or equal to 7,7 watts. Date: November 14, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 27, 2017 | Expiration date: November 14, 2018 | Current use: Single family / duplex | Permit id: 6630320 | |||||
SCORE 99 2435 1st Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 3. 7 solar install Date: July 29, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 3, 2011 | Expiration date: July 28, 2012 | Current use: Single family / duplex | Permit id: 6290798 | |||||
SCORE 99 2152 5th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 3. 8 kw solar install Date: July 29, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 2, 2011 | Expiration date: July 28, 2012 | Current use: Single family / duplex | Permit id: 6290795 | |||||
SCORE 99 19 6th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: August 2, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 8, 2011 | Expiration date: August 1, 2012 | Current use: Single family / duplex | Permit id: 6291090 | |||||
SCORE 99 1011 W Armour St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: August 2, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 5, 2011 | Expiration date: August 1, 2012 | Current use: Single family / duplex | Permit id: 6291089 | |||||
SCORE 99 67 34th Ave Nw Seattle Wa 6-20-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, micro inverter system. Date: March 28, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 11, 2017 | Expiration date: March 28, 2018 | Current use: Single family / duplex | Permit id: 6588632 | |||||
SCORE 99 1021 1st Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 3. 7kw rooftop pv system. Grid-direct-no batteries Date: July 25, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 1, 2011 | Expiration date: July 24, 2012 | Current use: Single family / duplex | Permit id: 6290326 | |||||
SCORE 99 2507 8th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 7. 2kw rooftop pv solar array Date: July 25, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 28, 2011 | Expiration date: July 24, 2012 | Current use: Single family / duplex | Permit id: 6290192 | |||||
SCORE 99 2615 Queen Anne Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] grid-direct roof top mounted pv solar. 3. 2kw Date: July 22, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 26, 2011 | Expiration date: July 21, 2012 | Current use: Single family / duplex | Permit id: 6290145 | |||||
SCORE 99 1514 9th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] rooftop pv solar Date: July 18, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 20, 2011 | Expiration date: July 17, 2012 | Current use: Single family / duplex | Permit id: 6289446 | |||||
SCORE 99 2017 Warren Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 5. 5 kw pv install Date: July 5, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 8, 2011 | Expiration date: July 4, 2012 | Current use: Single family / duplex | Permit id: 6288155 | |||||
SCORE 99 173 Mcgraw Pl Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 3. 7kw solar pv, rooftop, no batteries. Backfeed breaker. Date: June 20, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 13, 2011 | Expiration date: June 19, 2012 | Current use: Single family / duplex | Permit id: 6286814 | |||||
SCORE 99 3443 12th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: June 21, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 23, 2011 | Expiration date: June 20, 2012 | Current use: Single family / duplex | Permit id: 6286828 | |||||
SCORE 99 1912 8th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: June 21, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 29, 2012 | Expiration date: June 20, 2012 | Current use: Single family / duplex | Permit id: 6286827 | |||||
SCORE 99 2123 3rd Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 2. 8kw pv install Date: June 24, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 29, 2011 | Expiration date: June 23, 2012 | Current use: Single family / duplex | Permit id: 6287275 | |||||
SCORE 99 9546 14th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv instal Date: June 14, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 17, 2011 | Expiration date: June 13, 2012 | Current use: Single family / duplex | Permit id: 6286121 | |||||
SCORE 99 1948 11th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 4. 1kw pv install Date: June 14, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 21, 2011 | Expiration date: June 13, 2012 | Current use: Single family / duplex | Permit id: 6286119 | |||||
SCORE 99 1863 23rd Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 6 kw grid direct photovoltaic, roof mounted, backfeed breaker interconnect Date: May 11, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 8, 2011 | Expiration date: May 10, 2012 | Current use: Single family / duplex | Permit id: 6282936 | |||||
SCORE 99 2657 Nw 86th St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 5. 5kw pv install Date: May 19, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 29, 2011 | Expiration date: May 18, 2012 | Current use: Single family / duplex | Permit id: 6283712 | |||||
SCORE 99 5 W Comstock St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: May 23, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 26, 2011 | Expiration date: May 22, 2012 | Current use: Single family / duplex | Permit id: 6284002 | |||||
SCORE 99 1508 9th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install 5kw Date: May 9, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 11, 2011 | Expiration date: May 8, 2012 | Current use: Single family / duplex | Permit id: 6282547 | |||||
SCORE 99 908 W Blaine St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install 3. 2 kw Date: May 9, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: May 13, 2011 | Expiration date: May 8, 2012 | Current use: Single family / duplex | Permit id: 6282551 | |||||
SCORE 99 10757 5th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 3. 7 kw photovoltaic, roof mounted, no batteries, grid-direct. Inverter, ac disconnect, production meter. Date: June 4, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 10, 2011 | Expiration date: June 3, 2012 | Current use: Single family / duplex | Permit id: 6285210 | |||||
SCORE 99 10563 30th Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install rooftop photovoltaic with 6600watt ac output interactive inverter, 40a backfeed into 200a panel. Swap existing 200a panel with new 200a panel. Add circuit for monitoring Date: October 13, 2015 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 16, 2015 | Expiration date: October 12, 2016 | Current use: Single family / duplex | Permit id: 6499549 | |||||
SCORE 99 1222 Mcgilvra Blvd E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic, ac modules, 225a bussbar with 200a main ocpd. 10 13 17 jk approved plans. Date: October 9, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 19, 2017 | Expiration date: October 9, 2018 | Current use: Single family / duplex | Permit id: 6623287 | |||||
SCORE 99 6242 31st Ave Ne Seattle Wa Upgrade service to from 125a to 200a, including meter and service panel. Upgrade subpanel in garage to 80a feeders, trench, 50a receptacle in garage. Date: September 1, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 12, 2017 | Expiration date: September 1, 2018 | Current use: Single family / duplex | Permit id: 6616806 | |||||
SCORE 99 11835 159th Ave Ne Redmond, Wa 98052 Solar - whilden residence - residential rooftop photovoltaic equipped with rapid shutdown which is initiated automatically with loss of utility power. Date: October 25, 2017 Contractor: Sunergy Systems Inc Applicant: Jon Lange | Permit type: Fire installation | Permit id: Fire-2017-07652 | |||||
SCORE 99 5028 159th Ct Ne Redmond, Wa 98052 Otc rooftop photovoltaic system 6kw ac-output rapid shutdown compliant. No battery or energy storage Applicant: Jon Lange | Permit type: Electrical - otc | Permit id: Elec-2017-07216 | |||||
SCORE 99 222 Fairview Ave N Seattle Wa 1 4 2017 - cancelled customer log #17-14 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 2kw ac module photovoltaic system on roof. Date: October 25, 2016 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit issued | Completion date: October 26, 2017 | Expiration date: October 25, 2017 | Current use: Commercial | Permit id: 6563525 | |||||
SCORE 99 Date: October 24, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 27, 2017 | Expiration date: October 24, 2018 | Current use: Single family / duplex | Permit id: 6626296 | |||||
SCORE 99 8051 Corliss Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic Date: October 24, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 30, 2017 | Expiration date: October 24, 2018 | Current use: Single family / duplex | Permit id: 6626228 | |||||
SCORE 99 2017 2nd Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 5. 3 kw rooftop photovoltaic, grid-tied, no batteries Date: April 15, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 21, 2011 | Expiration date: April 14, 2012 | Current use: Single family / duplex | Permit id: 6280342 | |||||
SCORE 99 1427 39th Ave E Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 10kw roof mounted photovoltaic system, utilizing micro-inverters. Date: March 27, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: October 3, 2011 | Expiration date: March 26, 2012 | Current use: Single family / duplex | Permit id: 6278338 | |||||
SCORE 99 2811 Queen Anne Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] photovoltaic roof mounted, grid-direct, no batteries, amp backfeed breaker Date: August 9, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 22, 2011 | Expiration date: August 8, 2012 | Current use: Single family / duplex | Permit id: 6291957 | |||||
SCORE 99 3937 Sw 109th St Seattle Wa 6-13-17 bz pv system one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop photovoltaic. Date: May 31, 2017 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: June 20, 2017 | Expiration date: May 31, 2018 | Current use: Single family / duplex | Permit id: 6600029 | |||||
SCORE 99 6041 Palatine Ave N Seattle Wa 1-installation of rooftop grid-tied only pv system (no batteries) on home and detached garage, point of interconnect with utility power will be on the line side of main panel, on the customer side of the meter base. 2-and the addition of a subpanel in the garage. Date: September 17, 2010 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: September 29, 2010 | Expiration date: September 17, 2011 | Current use: Single family / duplex | Permit id: 6261277 | |||||
SCORE 99 325 W Kinnear Pl Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] 3. 6 kw pv system Date: July 5, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: July 8, 2011 | Expiration date: July 4, 2012 | Current use: Single family / duplex | Permit id: 6288154 | |||||
SCORE 99 2148 7th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: August 10, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 19, 2011 | Expiration date: August 9, 2012 | Current use: Single family / duplex | Permit id: 6292084 | |||||
SCORE 99 1921 9th Ave W Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: August 10, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 18, 2011 | Expiration date: August 9, 2012 | Current use: Single family / duplex | Permit id: 6292080 | |||||
SCORE 99 6328 34th Ave Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install Date: August 10, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 24, 2011 | Expiration date: August 9, 2012 | Current use: Single family / duplex | Permit id: 6292083 | |||||
SCORE 99 120 6th Ave Nw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] pv install; panel swap-out Date: October 10, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 7, 2011 | Expiration date: October 9, 2012 | Current use: Single family / duplex | Permit id: 6298180 | |||||
SCORE 99 2223 4th Ave N Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. ] photovoltaic roof mounted, grid-direct, no batteries, amp backfeed breaker Date: August 9, 2011 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 16, 2011 | Expiration date: August 8, 2012 | Current use: Single family / duplex | Permit id: 6291958 | |||||
SCORE 99 5028 159th Ct Ne Redmond, Wa 98052 Otc rooftop photovoltaic system 6kw ac-output rapid shutdown compliant. No battery or energy storage Applicant: Jon Lange | Permit type: Electrical - otc | Permit id: Elec-2017-07216 | Parcel: 1425059154 | |||||
SCORE 99 11835 159th Ave Ne Redmond, Wa 98052 Sopa #49937 - whilden residence - photovoltaic - 206-571-4726 - rooftop photovoltaic + subpanel with 80a feeders customer paid for:(1) feeder (1) service - added Applicant: Jon Lange | Permit type: Electrical - otc | Permit id: Elec-2017-07621 | Parcel: 3825311130 | |||||
SCORE 99 11835 159th Ave Ne Redmond, Wa 98052 Solar - whilden residence - residential rooftop photovoltaic equipped with rapid shutdown which is initiated automatically with loss of utility power. Date: October 25, 2017 Contractor: Sunergy Systems Inc Applicant: Jon Lange | Permit type: Fire installation | Permit id: Fire-2017-07652 | Parcel: 3825311130 | |||||
SCORE 99 5028 159th Ct Ne Redmond, Wa 98052 Otc - rooftop photovoltaic system 6kw ac-output rapid shutdown compliant. Date: October 18, 2017 Contractor: Sunergy Systems Inc Applicant: Jon Lange | Permit type: Fire installation | Permit id: Fire-2017-07215 | Parcel: 1425059154 |