Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 A one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] roof mounted photovoltaic. Grid interactive inverter, no batteries, interconnect via 40a backfeed breaker in main panel. Also installing new service meter&mast and main load center, from 125a to 200a change. Date: December 10, 2014 Contractor: Sunergy Systems Inc Permit type: Electrical | Permit status: Permit closed | Completion date: December 20, 2014 | Expiration date: December 10, 2015 | Current use: Single family / duplex | Permit id: 6450146 | |||||
SCORE 99 Repair existing sewer line Date: January 28, 2010 Contractor: Martin Excavating Llc Applicant: Martin Excavating Llc | Permit type: Side sewer | Permit status: Permit closed | Completion date: February 2, 2010 | Expiration date: July 28, 2011 | Current use: Single family / duplex | Permit id: 6239245 | |||||
SCORE 95 Repair existing side sewer Date: July 15, 2008 Contractor: Rescue Rooter Llc Applicant: Rescue Rooter Llc | Permit type: Side sewer | Permit status: Permit finaled | Completion date: July 17, 2008 | Expiration date: January 15, 2010 | Current use: Single family / duplex | Permit id: 6187719 |