SCORE 82 278 University Av, Palo Alto, Ca 94301 13000-00722: structural changes required in the field. Change top of post detail. Add two closets, changing ceiling grid, and lighting layout Date: July 3, 2013 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00420 | |||||
SCORE 82 2875 El Camino Real, Palo Alto, Ca 94306 12000-01541: revisions to change exterior door locations and how they open Date: June 21, 2013 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00396 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 13-638: revise bracing for architectural feature and millwork on first floor. Date: May 15, 2013 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00325 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 13000-00638: revision to reflected ceiling plan for structural elements, add chandelier, car hoods and overhead storage racks (keen garage) Date: April 26, 2013 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00275 | |||||
SCORE 82 Date: March 28, 2013 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00190 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 10-3481: changes to plumbing - revised gas calc, addition of gas piping, addition of gas stub, revised gas isometric piping Date: November 14, 2012 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00629 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 Keen garage: u&o and ti for a retail firm to occupy 3,0 sq ft on the ground floor. Date: March 7, 2013 Contractor: Southbay Construction Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00638 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 Invitae: suite 200, ti and u&o for a 4442 sf office on the second floor. No exterior work. Date: March 14, 2013 Contractor: Southbay Construction Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00722 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 10000-03481: revision 12, change tree well grates to decomposed granite at two locations on bryant per peter jensen Date: February 28, 2013 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00126 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 10000-00000-03481: sidewalk grade revisions to accomodate new survey elevations (university ave) Date: February 22, 2013 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00107 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 12000-00213: architectural revisions for door location and hallway construction detail. Revise mechanical and electrical for arch revisions. Date: February 12, 2013 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00086 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 12000-01548: finish revisions, new spec on lighting fixtures, replacing mechanical grills Date: February 12, 2013 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00087 | |||||
SCORE 82 Date: December 18, 2012 Contractor: Southbay Construction Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-03081 | |||||
SCORE 82 Date: October 5, 2012 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00552 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 12-1548: replacing (e) plumbing fixtures and upgrading (e) restroom core Date: November 5, 2012 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00598 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 12-00213: revision to suite separation to correspond with (n) hallway configuration Date: November 5, 2012 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00599 | |||||
SCORE 82 Date: October 24, 2012 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00577 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 10-3481: delta 9 revision includes new catch basin to address ponding issue. Date: October 9, 2012 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00554 | |||||
SCORE 82 2875 El Camino Real, Palo Alto, Ca 94306 New commercial warm shell with site improvement and detached trash enclosure. (tenant improvement under separate permit) Date: June 29, 2012 Contractor: Southbay Construction Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01541 | |||||
SCORE 82 1808 Embarcadero Rd, Palo Alto, Ca 94303 Accellion, inc u&o and office tenant improvement includes new phone room and mothers room. Tenant to occupy suite "a" Date: September 5, 2012 Contractor: Southbay Construction Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02205 | |||||
SCORE 82 Date: August 24, 2012 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00478 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 10-03481: deferred submittal for glass storefront on the first floor. No change to exterior appearance, deferred submittal is for the structural calculations of the already approved exterior Date: August 10, 2012 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00444 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 10-03481: deferred submittal for mechanical equipment base isolators Date: July 31, 2012 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00417 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 Spec space remodel of (e) building core restrooms on first floor - mens and womens restrooms Date: July 2, 2012 Contractor: Southbay Construction Permit type: Project - building permit | Permit status: Approved | Permit id: 12000-01548 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 Spec space upgrade to 1st floor area. Includes relocating hallway with direct exiting path to exterior, associated electrical and mechanical. Date: January 26, 2012 Contractor: Southbay Construction Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00213 | |||||
SCORE 82 251 University Av, Palo Alto, Ca 94301 Fidelity investments: ti for existing tenant. Scope of work is to build two interior offices and relocate the coffee bar to the adjoining wall. No increase to water or gas loads. No exterior work Date: May 16, 2012 Contractor: Southbay Construction Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01134 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 10-3481: deferred submittal of landscape plans for new street trees. Date: May 31, 2012 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00295 | |||||
SCORE 82 9 Hansen Wy, Palo Alto, Ca 94304 11-3249: revision to add 3 (n) roof top hvac units, 1 (n) exhaust fan and modify previously approved conference room 212. Date: January 19, 2012 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00029 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 Suite 350, gsr ventures: ti and u&o for a 4201 sf tenant space on the the third floor. Scope of work includes (n) interior walls. No exterior work. U&o sent 7/16/14 Date: April 5, 2013 Contractor: Southbay Construction Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00931 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 13000-00662: ammr to use a water dispenser with cups in lieu of the high/low drinking fountain requirement. 05/30/2013 ar. Per bud and bob ammr not needed, cup dispenser is equivalent facilitation Date: April 19, 2013 Contractor: Southbay Construction Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00250 | |||||
SCORE 82 18 Embarcadero Rd, Palo Alto, Ca 94303 Accellion: u&o and office tenant improvement (45 sf) includes new phone room and mothers room. Single tenant building, area of building and tenant space is 9241 sf. U&o sent 5/1/14 Date: September 5, 2012 Contractor: Southbay Construction Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02204 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 Suite 125: u&o and office tenant improvement ~53 sf for "meritech capital partners" u&o sent 4/29/14 Date: March 11, 2013 Contractor: Southbay Construction Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00662 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Suite 350, gsr ventures: ti and u&o for a 4201 sf tenant space on the the third floor. Scope of work includes (n) interior walls. No exterior work. U&o sent 7 16 14 Date: April 5, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13000-00931 | |||||
SCORE 82 18 Embarcadero Rd, Palo Alto, Ca 94303 San Diego Ca Accellion: u&o and office tenant improvement (45 sf) includes new phone room and mothers room. Single tenant building, area of building and tenant space is 9241 sf. U&o sent 5 1 14 Date: September 5, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12000-02204 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Suite 125: u&o and office tenant improvement ~53 sf for "meritech capital partners" u&o sent 4 29 14 Date: March 11, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13000-00662 | |||||
SCORE 82 2875 El Camino Real, Palo Alto, Ca 94306 San Diego Ca New commercial warm shell with site improvement and detached trash enclosure. (tenant improvement under separate permit) Date: June 29, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12000-01541 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca Invitae: suite 200, ti and u&o for a 4442 sf office on the second floor. No exterior work. Date: March 14, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13000-00722 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 13-638: revise bracing for architectural feature and millwork on first floor. Date: May 15, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13rev-00325 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 13000-00722: structural changes required in the field. Change top of post detail. Add two closets, changing ceiling grid, and lighting layout Date: July 3, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13rev-00420 | |||||
SCORE 82 2875 El Camino Real, Palo Alto, Ca 94306 San Diego Ca 12000-01541: revisions to change exterior door locations and how they open Date: June 21, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13rev-00396 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca 13000-00662: ammr to use a water dispenser with cups in lieu of the high low drinking fountain requirement. 05 30 2013 ar. Per bud and bob ammr not needed, cup dispenser is equivalent facilitation Date: April 19, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13rev-00250 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca Keen garage: u&o and ti for a retail firm to occupy 3,0 sq ft on the ground floor. Date: March 7, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13000-00638 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 13000-00638: revision to reflected ceiling plan for structural elements, add chandelier, car hoods and overhead storage racks (keen garage) Date: April 26, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13rev-00275 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 10-3481: facade stone structural attachment detail. Date: March 28, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13rev-00190 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 10000-00000-03481: sidewalk grade revisions to accomodate new survey elevations (university ave) Date: February 22, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13rev-00107 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 10000-03481: revision 12, change tree well grates to decomposed granite at two locations on bryant per peter jensen Date: February 28, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13rev-00126 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca 12000-01548: finish revisions, new spec on lighting fixtures, replacing mechanical grills Date: February 12, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13rev-00087 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca 12000-00213: architectural revisions for door location and hallway construction detail. Revise mechanical and electrical for arch revisions. Date: February 12, 2013 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 13rev-00086 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Interior non-structural demo for the first floor (53 sf) Date: December 18, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12000-03081 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 10-3481: changes to plumbing - revised gas calc, addition of gas piping, addition of gas stub, revised gas isometric piping Date: November 14, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12rev-00629 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca 12-00213: revision to suite separation to correspond with (n) hallway configuration Date: November 5, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12rev-00599 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca 12-1548: replacing (e) plumbing fixtures and upgrading (e) restroom core Date: November 5, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12rev-00598 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 10-03481: addition of brick pavers to public sidewalk Date: October 24, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12rev-00577 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 10-3481: delta 9 revision includes new catch basin to address ponding issue. Date: October 9, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12rev-00554 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 10-03481: deferred submittal for the awning framing Date: October 5, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12rev-00552 | |||||
SCORE 82 1808 Embarcadero Rd, Palo Alto, Ca 94303 San Diego Ca Accellion, inc u&o and office tenant improvement includes new phone room and mothers room. Tenant to occupy suite "a" Date: September 5, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12000-02205 | |||||
SCORE 82 Date: August 24, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12rev-00478 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 10-03481: deferred submittal for glass storefront on the first floor. No change to exterior appearance, deferred submittal is for the structural calculations of the already approved exterior Date: August 10, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12rev-00444 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 10-03481: deferred submittal for mechanical equipment base isolators Date: July 31, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12rev-00417 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Spec space remodel of (e) building core restrooms on first floor - mens and womens restrooms Date: July 2, 2012 Contractor: Southbay Construction Permit status: Approved | Permit id: 12000-01548 | |||||
SCORE 82 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Spec space upgrade to 1st floor area. Includes relocating hallway with direct exiting path to exterior, associated electrical and mechanical. Date: January 26, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12000-00213 | |||||
SCORE 82 251 University Av, Palo Alto, Ca 94301 San Diego Ca Fidelity investments: ti for existing tenant. Scope of work is to build two interior offices and relocate the coffee bar to the adjoining wall. No increase to water or gas loads. No exterior work Date: May 16, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12000-01134 | |||||
SCORE 82 278 University Av, Palo Alto, Ca 94301 San Diego Ca 10-3481: deferred submittal of landscape plans for new street trees. Date: May 31, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12rev-00295 | |||||
SCORE 82 9 Hansen Wy, Palo Alto, Ca 94304 San Diego Ca 11-3249: revision to add 3 (n) roof top hvac units, 1 (n) exhaust fan and modify previously approved conference room 212. Date: January 19, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12rev-00029 |