Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Interior non-structural demo permit (5,6 sf) Date: March 6, 2015 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 15000-00559 | |||||
SCORE 69 Commercial panel replacement: remove and replace 4 amp 120 208 volt meter main with (n) cpa utility required because new metering equipment will not work in old switchgear in same location: basement Date: July 24, 2013 Contractor: Keene Electric Inc Permit status: Permit issued | Permit id: 13000-01948 | |||||
SCORE 92 Commercial re-roof repair: replacing (e) underlayment ( squares) , no changes to existing tile: will remove and replace (e) tiles after new underlayment is replaced, no new sheathing Permit status: Permit issued | Permit id: 13000-03123 | |||||
SCORE 82 Fidelity investments: ti for existing tenant. Scope of work is to build two interior offices and relocate the coffee bar to the adjoining wall. No increase to water or gas loads. No exterior work Date: May 16, 2012 Contractor: Southbay Construction Permit status: Permit issued | Permit id: 12000-01134 | |||||
SCORE 93 Fidelity investments: ti and u&o for expansion of tenant onto the second floor (6,2 sf). U&o sent 3 1 16 Date: April 9, 2015 Contractor: S B C C Inc Permit status: Finaled | Permit id: 15000-00887 |